Loading...
HomeMy Public PortalAbout2015 Construction Phase Services for Ocean Lane Drive Well Connection.tifStantec May 12, 2015 Village of Key Biscayne 88 West McIntyre Street Key Biscayne, Florida 33149 Attention: Jose Lopez Stantec Consulting Services Inc. 901 Ponce de Leon Blvd., Suite 900 Coral Gables, Florida 33134 Reference: Construction Phase Services for Ocean Lane Drive Well Connection Dear Mr. Lopez, We are pleased to present this proposal for professional engineering services for your consideration. Scope of Project: The Village has contracted for the connection of the well discharge line to the newly lined well #3 west of the existing pump station of Ocean Lane Drive. Construction assistance and support will be required through the duration of the work. Our proposed scope of services is detailed below. Scope of Serviceg: We will coordinate and attend a pre -construction conference with all parties, review and approve contractor's submittals/shop drawings, answer requests for information, assess conflicts in the field and provide directives as required, and review and recommend contractor's application for payment. We will also provide the necessary site visits and inspections to confirm general conformance of the work. A report with photos will be generated for each visit. Lastly, we will compile a punch list and perform project close- out with the contractor including final payment requisition, warranty letters, and close-out documents. Terms and Conditions: All terms and conditions shall be per our Continuing Contract for Professional Services and all fees shall be billed monthly as the work progresses per the following lump sum: Construction Phase $3,500 We are ready to begin working on this assignment upon your authorization to proceed. If acceptable to you, we will accept a signed copy of this form as your written authorization to proceed. We look forward to working with the Village on this assignment. Design with community In mind May 12, 2015 Jose Lopez Page 2 of 2 Thank you, Stantec Consulting Services Inc. Pvelec,lee Sean Compel, P.E., LEED AP Associate Tel: 305-445-2900 sean.compel@stantec.com Village of Key Biscayne Approved by: huT Print Name ✓ V:\zt56\active\.56ta626\management\mnstruction admin\kb_welLeonnedion_CAdoot Design with community in mind