HomeMy Public PortalAbout2015_03_24_R039 Lower Sycolin SSCS Pro Rata Fees The Town of
Leesburg,
Virginia PRESENTED: March 24,2015
RESOLUTION NO. 2015-039 ADOPTED: March 24,2015
A RESOLUTION: AMENDING AND ESTABLISHING PRO-RATA FEES FOR THE
PHASE I AND PHASE II LOWER SYCOLIN SANITARY SEWER
CONVEYANCE SYSTEM
WHEREAS, Section 34-128 of the Town Code authorizes the Town to collect pro-rata fees
for Town constructed sewer facilities necessitated, at least in part, by future subdivisions or
development of land;and
WHEREAS, Resolution 2005-182 established a pro-rata fee for Area A(formally Section I)
and Area B (formally Section II) for Lower Sycolin Creek Sanitary Sewer Conveyance Systems;
and
WHEREAS, the Lower Sycolin Creek Sanitary Sewer Conveyance System has been
divided into two construction phases(Phase I and Phase II);and
WHEREAS, the Town constructed a pump station, force main and associated Phase I
gravity sewer main to provide sewer service to a portion of the Lower Sycolin Creek sewer shed
properties;and
WHEREAS,the actual cost to date of engineering and construction Phase I and engineering
Phase II of the conveyance system is$5,329,878.40; and
WHEREAS, the fixed construction cost of Phase II of the sewer conveyance system is
$4,000,000.00 per attached sewer construction agreement;and
WHEREAS, it has been determined that approximately 12% of the cost of the design and
construction related to Phase I of system is for the benefit of the existing customers and the
remaining 88% is for the benefit of property owners of undeveloped lands in the Lower Sycolin
Sewer shed;and
- 2 -
A RESOLUTION: CONSTRUCTION OF PHASE II LOWER SYCOLIN GRAVITY MAIN
AND AUTHORIZING THE TOWN MANAGER TO PROCURE THESE
SERVICES
WHEREAS, it has been determined that the costs for the design and construction related to
Phase II of system is for 100% of the benefit of property owners of undeveloped lands in the Lower
Sycolin Sewer shed; and
WHEREAS, the identification of the properties in the tables that follow is merely for
purposes of identifying properties which may benefit from this capital project and is in no way a
commitment, on the part of Town Council, to extend utilities to properties outside the Town
corporate boundaries; and
WHEREAS, the following allocation for Phase I have been determined based on properties
and uses subject to the Phase I pro-rata and has been adjusted accordingly to actual engineering and
construction costs of$5,329,878; and
Construction Project Total Area A % Area A Share Area B % Area B Share
Lower Sycolin Pump Station $2,134,000 26% $552,120 74% $1,581,880
Lower Sycolin Force Main $855,568 26% $221,357 74% $634,211
Airport Gravity Sanitary
Sewer(Phase I) $1,386,663 100% $1,386,663 0% $0
Engineering Design&
SDC's for Pump Station,
FM,Phases I&II $953,647 26% $246,733 74% $706,914
Total $5,329,878 $2,406,874 $2,923,005
- 3 -
A RESOLUTION: CONSTRUCTION OF PHASE II LOWER SYCOLIN GRAVITY MAIN
AND AUTHORIZING THE TOWN MANAGER TO PROCURE THESE
SERVICES
WHEREAS, the following allocations for Phase II have been determined, based on
properties and uses subject to the pro-rata Phase II and has been established based on the fixed
construction cost of$4,000,000 per the sewer construction agreement with Peterson Companies;
and
Area B
Construction Project Total Area A % Area A Share % Area B Share
Cochran Mill Gravity
Sanitary Sewer Phase II $4,000,000 0% $0 100% $4,000,000
Total $4,000,000 $0 $4,000,000
WHEREAS,the following table demonstrates costs assigned to each property based on
the most current available data for Phase I Pro-Rata; and
Area A Development % of Sector for Phase I Pro-Rata Phase I Pro-Rata
Phase I Share(2005) Share (2015 Cost
Index)
Existing Town Customers 44% $1,072,369 Not Recoverable
Loudoun County 12% $285,965 $375,691
Tuscarora Crossing 43% $1,024,709 $1,346,226
Cochran Mill Road
(Industrial Plant) 1% $23,830 $31,308
Total 100% $2,406,874 $1,753,224
Area B Development % of Sector for Phase I Pro-Rata Phase I Pro-Rata
Phase I Share(2005) Share(2015 Cost
Index)
Compass Creek(Northern
including Town Parcels) 35% $1,034,100 $1,363,480
Crosstrail (Southern) 50% $1,459,608 $1,924,522
Misc.Property(Unassigned 15%
Area) $429,297 $566,036
Total 100% $2,923,005 $3,854,038
-4 -
A RESOLUTION: CONSTRUCTION OF PHASE II LOWER SYCOLIN GRAVITY MAIN
AND AUTHORIZING THE TOWN MANAGER TO PROCURE THESE
SERVICES
WHEREAS,the following table demonstrates costs assigned to each property based on
the most current available data for Phase II Pro-Rata;
Area B Development % of Sector for Phase II Phase II Pro-Rata Share
(2014)
Compass Creek(Northern 35% $1,415,119
including Town Parcels)
Compass Creek(Southern) 50% $1,997,408
Misc.Property(Unassigned Area) 15% $587,473
Total 100% $4,000,000
THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as
follows:
SECTION I. The Lower Sycolin Creek Sanitary Sewer Conveyance System Phase I Pro-
rata fee is hereby reestablished and adjusted to reflect actual engineering and construction costs,
effective upon passage, at a rate of$11.92 per gallon per day of estimated usage for Phase I,Area
A properties (previously$8.76 per gallons per day) and $5.05 per gallon per day for Area B
properties (previously$9.24 per gallons per day).
SECTION II. The Lower Sycolin Creek Sanitary Sewer Conveyance System Phase II
Pro-Rata fee is hereby established to reflect the fixed construction cost, effective upon passage, at
a rate of$6.91 per gallon per day of estimated usage for Area B properties(previously$9.24 per
gallons per day). Therefore, Area B properties are subject to both Phase I (Pump station, force
main, design and engineering costs) and Phase II(gravity main) Pro-rata fees.
SECTION III. The fees as specified in Area A and Area B shall be paid prior to the
issuance of a Zoning Permit and concurrently with payment of all other required off-site and
availability fees for new connections or increased use of existing connections to the Lower
Sycolin Creek Sanitary Sewer Conveyance System.
- 5 -
A RESOLUTION: CONSTRUCTION OF PHASE II LOWER SYCOLIN GRAVITY MAIN
AND AUTHORIZING THE TOWN MANAGER TO PROCURE THESE
SERVICES
SECTION IV. The fee shall be adjusted by the percentage increase or decrease in
Engineering News Record Construction Cost Index value at the time of application. The
Construction Cost Index value from which the increase or decrease shall be measured is 7563 for
Phase I and 9962 for Phase II.
SECTION V. The fees established herein shall be calculated based on the gallons per day
usage per establishment as outlined on Drawing SD-2 (Average Daily Sewage Flows) in the
Town's Design and Construction Standards Manual.
SECTION VI. The fees established herein shall run with the property and the Town
Manager shall maintain for public inspection a record of properties subject to these fees.
PASSED this 24th day of March,2015.