HomeMy Public PortalAboutE Project Detail SheetsFISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11104
2012
Unincorporated
Bissell
Blackjack Creek
MALINE CREEK OMCI
MSD
$50,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL FLOODING FROM CREEK.
PROJECT PROBLEM
PROJECT SOLUTION
BUYOUT FLOOD PRONE PROPERTIES AND REMOVE STRUCTURES.
REMARKS
THIS PROJECT IS A COOPERATIVE EFFORT WITH ST. LOUIS COUNTY, WHICH IS SEEKING A FEMA GRANT FOR THIS BUYOUT EFFORT.
THIS APPROPRIATION WILL ASSIST ST. LOUIS COUNTY BY PROVIDING LOCAL MATCH FUNDING. ANTICIPATE BOARD INTRODUCTION
IN AUGUST, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $50,000
SCHEDULE
BON OAK #10074 - 10078 FLOOD MITIGATION
STORMWATER
576
2012 9494103ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
ORACLE PROJECT #
11104
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008045
2012
Breckenridge Hills
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
EDSI
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
BANK EROSION THREATENING FENCE AND PARKING LOT NEAR 9765 ST. CHARLES ROCK ROAD.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 500 LINEAL FEET OF BANK STABILIZATION USING MODULAR BLOCK WALLS AND BIOSTABILIZATION METHODS.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2010 BY COLDWATER CREEK WATERSHED STORM IMPROVEMENTS (DESIGN) 2008139. THIS
PROJECT SHOULD BE CONSTRUCTED WITH LYNN TOWN APARTMENTS CHANNEL IMPROVEMENTS.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
COLDWATER CREEK AT LYNN TOWN BANK STABILIZATION
STORMWATER
564
2012 8081104ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
08/01/2007 01/01/2010 02/01/2011 02/01/2012 06/01/2012
10/01/2007 02/01/2011 02/01/2012 06/01/2012 06/01/2013
EXPENSE TYPE = N
ORACLE PROJECT #
10284
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010290
2012
St. Louis County
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MO. BOTANICAL GARDEN
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
MSD HAS COMMITTED TO IMPLEMENTING PLANT BASED GREEN INFRASTRUCTURE PROJECTS IN PARTNERSHIP WITH THE MISSOURI
BOTANICAL GARDEN.
PROJECT PROBLEM
PROJECT SOLUTION
COST SHARE FOR 319 GRANT HELD BY MO. BOTANICAL GARDENS.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
DEER CREEK WATERSHED INITIATIVE
STORMWATER
566
2012 9335105ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
ORACLE PROJECT #
11065
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007182
2012
Unincorporated
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
EFK MOEN
$960,000
St. Louis Metropolitan Sewer District - Fiscal Year
EROSION THREATENING 12 HOMES ON DIAMOND HEAD RD. AND LOIS RD.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,300 LINEAL FEET OF NATURAL CHANNEL STABILIZATION, 100 LINEAL FEET OF 21-INCH SEWERS, 400 LINEAL FEET OF
MODULAR BLOCK WALL CONSTRUCTION, 60 CUBIC YARDS OF GRADE CONTROL AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $960,000
SCHEDULE
DIAMOND HEAD DR. STORM SEWER (GCUC-110)
STORMWATER
571
2012 4590106ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
02/02/2007 02/01/2010 01/01/2011 01/01/2012 05/01/2012
09/01/2007 01/01/2011 01/01/2012 05/01/2012 05/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10248
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11120
2012
Various
Various
Various
STORMWATER EMERGENCY
FUND
MSD
$250,000
St. Louis Metropolitan Sewer District - Fiscal Year
AGING AND DETERIORATED STORMWATER STRUCTURES CAN FAIL WITHOUT NOTICE, CREATING EMERGENCY SITUATIONS IN WHICH
THE DISTRICT MUST ACT IMMEDIATELY, TO EFFECT REPAIRS.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE STORMWATER EMERGENCY FUND, TO FACILITATE EMERGENCY RESPONSE AS
NEEDED.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN MAY, 2012.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $250,000
SCHEDULE
EMERGENCY REPAIR FUND APPROPRIATION
STORMWATER (FY2012)
STORMWATER
123
2012 9567107ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
11120
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006192
2012
Des Peres
Lemay/RDP
Two Mile Creek
DEER CREEK OMCI
STANTEC CONSULTING SERVICES,
INC.
$996,000
St. Louis Metropolitan Sewer District - Fiscal Year
STREAM BANK EROSION IN DEVELOPED AND UNMAINTAINED AREAS ALONG TWO MILE CREEK.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 2,100 SQUARE FEET OF CHANNEL STABILIZATION IN AREAS OF CREEK EROSION USING MODULAR BLOCK WALL.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2009 BY DEER CREEK WATERSHED STORM CHANNEL IMPROVEMENTS (DESIGN) 2008138.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $996,000
SCHEDULE
FAWNVALLEY STORM CHANNEL IMPROVEMENTS
STORMWATER
566
2012 8056108ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
01/01/2009 03/01/2010 11/01/2011 05/01/2012
03/01/2010 08/01/2011 03/01/2012 05/01/2013
EXPENSE TYPE = N
ORACLE PROJECT #
10192
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007111
2012
Breckenridge Hills
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
EDSI
$435,000
St. Louis Metropolitan Sewer District - Fiscal Year
MODERATE RISK EROSION AT ONE RESIDENTIAL PROPERTY AND NEAR LYNN TOWN DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 350 LINEAL FEET OF BANK STABILIZATION USING MODULAR BLOCK WALLS AND BIOSTABILIZATION AND 85 LINEAL FEET
OF 24 INCH STORM SEWER AND APPURTENANCES.
REMARKS
PROJECT DESIGN WAS FUNDED IN FY 2010 BY COLDWATER CREEK WATERSHED STORM IMPROVEMENTS (DESIGN) (2008139). THIS
PROJECT SHOULD BE CONSTRUCTED WITH COLDWATER CREEK AT LYNN TOWN BANK STABILIZATION (10284).
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $435,000
SCHEDULE
LYNN TOWN APARTMENTS CHANNEL IMPROVEMENTS
(CLD-19)
STORMWATER
564
2012 3986109ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
08/01/2006 01/01/2010 02/01/2011 02/01/2012 06/01/2012
11/01/2006 02/01/2011 02/01/2012 06/01/2012 08/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10220
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008160
2012
Olivette
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$50,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE ROAD DRAINAGE.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 245 FEET OF 12-INCH RCP STORM SEWER, TRENCH DRAIN, AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $50,000
SCHEDULE
MAGNET DRIVE STORM SEWER
STORMWATER
584
2012 3832110ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/01/2010 08/01/2011 01/01/2012 06/01/2012
08/01/2011 12/01/2011 05/01/2012 10/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10699
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005121
2012
Brentwood
Lemay/RDP
Deer Creek
DEER CREEK OMCI
EFK MOEN, LLC
$665,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING STORM SEWER SYSTEM FROM MANCHESTER ROAD UPSTREAM TO CECELIA AVENUE HAS DETERIORATED AND HAS
INADEQUATE CAPACITY, CAUSING LOCALIZED FLOODING OF YARDS AND STREETS AND REQUIRING MULTIPLE REPAIRS ON THE
SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,060 LINEAL FEET OF STORM SEWERS VARYING IN SIZE FROM 45" BY 29" ELLIPTICAL TO 12" IN DIAMETER. AMD 136
LINEAL FEET OF 8' SANITARY SEWERS AND APPURTENANCES.
REMARKS
THE DESIGN OF THIS PROJECT WAS FUNDED IN FISCAL YEAR 2006, FOR $175,000. CONSTRUCTION CANNOT START UNTIL THE
OUTFALL SEWER CONSTRUCTION IS COMPLETE.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $665,000
SCHEDULE
RUTH-HELEN-CECELIA STORM SEWER REPLACEMENT
STORMWATER
566
2012 7271111ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/01/2005 10/01/2008 02/01/2012 06/01/2012
12/01/2008 01/01/2009 06/01/2012 07/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10132
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005044
2012
Kirkwood
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$250,000
St. Louis Metropolitan Sewer District - Fiscal Year
STORM SEWER IS CRACKED AND FAILING, HAVING REDUCED CAPACITY CAUSING FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
REPLACE EXISTING 27-INCH SEWER WITH NEW 30-INCH TO 36-INCH RCP STORM SEWER & INLETS, & STABILIZE STREAMBANK AT
DISCHARGE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $250,000
SCHEDULE
SOUTH KIRKWOOD ROAD #906 STORM SEWER
REPLACEMENT
STORMWATER
571
2012 9460112ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
05/01/2009 06/01/2011 11/01/2011
06/01/2011 10/01/2011 03/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10758
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009155
2012
Maplewood
Lemay/RDP
Black Creek
BLACK CREEK OMCI
MSD
$1,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL FLOODING OF FOUR RESIDENCES.
PROJECT PROBLEM
PROJECT SOLUTION
BUYOUT OF FLOOD PRONE RESIDENCES AND REMOVAL OF STRUCTURES.
REMARKS
THE ACQUISITION WILL OCCUR DURING THE FISCAL YEAR WITH ANTICIPATED INTRODUCTION OF FUNDS IN AUGUST 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,000,000
SCHEDULE
WEAVER AVENUE #7761 - #7767 FLOOD MITIGATION
STORMWATER
594
2012 8486113ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
ORACLE PROJECT #
11102
TASK #
013.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007136
2012
Charlack
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$254,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND CAVE INS ON EXISTING NON-STANDARD STORM SYSTEM; SYSTEM IS UNABLE TO BE MAINTAINED.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,015 FEET OF 12-INCH TO 21-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $254,000
SCHEDULE
WINDOM #8721 SEWER REHABILITATION
STORMWATER
564
2012 7893114ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
07/01/2010 10/01/2011 03/01/2012 08/01/2012
10/01/2011 02/01/2012 07/01/2012 12/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10229
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008043
2013
Overland
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
EDSI
$780,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT, YARD, AND STREET FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 1,865 FEET OF 12-INCH TO 54-INCH DIAMETER STORM SEWER AND APPURTENANCES.
REMARKS
THE DESIGN WAS FUNDED AS PART OF THE COLDWATER CREEK WATERSHED STORM IMPROVEMENTS (2008139) IN FY 2010.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $780,000
SCHEDULE
ARGYLE #8800 STORM SEWER
STORMWATER
564
2013 3908119ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10283
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009133
2013
St. Ann
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$240,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND YARD EROSION.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 630 FEET OF 18-INCH RCP STORM SEWER, 20 FEET OF 8-INCH DIP, AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $240,000
SCHEDULE
ASHBY ROAD 3000 BLOCK STORM SEWER
STORMWATER
564
2013 3954120ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10371
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010206
2013
Clayton
Lemay/RDP
Black Creek
CLAYTON CENTRAL OMCI
MSD
$285,000
St. Louis Metropolitan Sewer District - Fiscal Year
FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 565 FEET OF 12-INCH RCP STORM SEWER, 25 FEET OF 6-INCH SANITARY SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $285,000
SCHEDULE
CLAYTON CENTRAL STORM IMPROVEMENTS
STORMWATER
563
2013 8792121ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
11103
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008166
2013
University City
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$170,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT, DETACHED GARAGE, AND YARD FLOODING ALONG FULLERTON AVENUE, TAMERTON DRIVE, AND APPLETON DRIVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 725 FEET OF 12-INCH TO 24-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $170,000
SCHEDULE
FULLERTON & TAMERTON STORM SEWER
STORMWATER
584
2013 4746122ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10334
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006141
2013
Kirkwood
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
GONZALEZ COMPANIES LLC
$1,460,000
St. Louis Metropolitan Sewer District - Fiscal Year
FLOODING OF RESIDENTIAL AND COMMERCIAL PROPERTIES AND STREET FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 42 FEET OF DOUBLE 9 X 3 BOX CULVERT, 128 FEET OF 96-INCH RCP STORM SEWER, 230 FEET OF ROCK LINED
TRAPEZOIDAL CHANNEL WITH BIOSTABILIZATION METHODS, 560 LINEAL FEET OF MODULAR BLOCK WALL, AND APPURTENANCES.
REMARKS
THIS PROJECT SHOULD BE CONSTRUCTED WITH TAYLOR-FILLMORE (PROJECT # 2005065).
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,460,000
SCHEDULE
GRAND & HARRISON STORM IMPROVEMENTS
STORMWATER
571
2013 4681123ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10172
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008143
2013
Florissant
Coldwater
Coldwater Creek
FOUNTAIN CREEK OMCI
MSD
$181,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND PONDING AT 280 AND 290 NORTH LAFAYETTE STREET.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 590 FEET OF 15-INCH TO 42-INCH RCP STORM SEWERS AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $181,000
SCHEDULE
HARRISON- ST MARIE STORM SEWER
STORMWATER
569
2013 7827124ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10331
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008068
2013
Overland
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$130,000
St. Louis Metropolitan Sewer District - Fiscal Year
BASEMENT AND YARD FLOODING AT RESIDENCES IN THE IMMEDIATE AREA OF PAGE AVENUE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 440 FEET OF 15-INCH TO 21-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $130,000
SCHEDULE
PAGE AVE. #9441-9445 STORM SEWER
STORMWATER
584
2013 4023125ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10295
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010051
2013
Kirkwood
Lemay/RDP
Gravois Creek
GRAVOIS CREEK OMCI
MSD
$75,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 125 FEET OF 18-INCH STORM SEWER, AND 250 FEET OF 15-INCH STORM SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $75,000
SCHEDULE
PARKWOODS - DICKSON STORM SEWER
STORMWATER
571
2013 8626126ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
11130
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009160
2013
Webster Groves
Lemay/RDP
Deer Creek
DEER CREEK OMCI
MSD
$42,000
St. Louis Metropolitan Sewer District - Fiscal Year
YARD FLOODING AND PONDING ALLOWS STORMWATER TO ENTER HOUSE LATERAL VENT AND SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 110 FEET OF 15-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $42,000
SCHEDULE
PLANT AVE. & E. SWON STORM SEWER
STORMWATER
566
2013 8499127ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10736
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
89162P
2013
Overland
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$125,000
St. Louis Metropolitan Sewer District - Fiscal Year
PONDING IN REAR YARDS OF 9447 AND 9449 ROMAINE AVE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 390 FEET OF 12-INCH TO 21-INCH STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $125,000
SCHEDULE
ROMAINE AVE. #9449 STORM SEWER
STORMWATER
584
2013 4500128ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10747
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008220
2013
University City
Lemay/RDP
University City Branch
UNIVERSITY CITY OMCI
MSD
$81,000
St. Louis Metropolitan Sewer District - Fiscal Year
INFREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 350 FEET OF 12-INCH TO 21-INCH RCP STORM SEWER AND APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $81,000
SCHEDULE
TULANE - SHANDEL STORM SEWER
STORMWATER
584
2013 4633129ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10344
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009085
2013
Berkeley
Coldwater
Coldwater Creek
COLDWATER CREEK OMCI
MSD
$90,000
St. Louis Metropolitan Sewer District - Fiscal Year
FLOODING AT 8555 WABASH AVENUE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 350 FEET OF 15-INCH TO 24-INCH DIAMETER REINFORCED CONCRETE PIPE STORM SEWER AND
APPURTENANCES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $90,000
SCHEDULE
WABASH AVE #8555 STORM SEWER
STORMWATER
564
2013 4195130ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10357
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005039
2013
Ladue
Lemay/RDP
Black Creek
DEER CREEK OMCI
MSD
$150,000
St. Louis Metropolitan Sewer District - Fiscal Year
REPLACE EXISTING DETERIORATED AND COLLAPSING STORM SEWER SYSTEM CAUSING CAVE-INS AND YARD AND HOUSE FLOODING.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 300 FEET OF 30-INCH RCP STORM SEWER AND 3 INLETS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $150,000
SCHEDULE
WILLOW HILL STORM SEWER (INFRA. REPAIR)
STORMWATER
566
2013 7117131ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT # TASK #
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008131
2012
St. Louis City
Bissell
Bissell
SANITARY REPLACEMENT
HDR
$1,150,000
St. Louis Metropolitan Sewer District - Fiscal Year
EPA AND MDNR HAVE MANDATED THAT DISINFECTION BE INSTALLED AT THE BISSELL WASTEWATER TREATMENT PLANT.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE ENGINEERING SUPPORT SERVICES DURING THE CONSTRUCTION OF PHYSICAL IMPROVEMENTS AT THE PLANT TO MEET
REGULATORY DISINFECTION REQUIREMENTS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,150,000
SCHEDULE
BISSELL WWTP DISINFECTION FACILITIES (ENGINEERING
CONSTRUCTION SERVICES) (SUPPLEMENTAL)
WASTEWATER
660
2012 822718ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
09/01/2010 01/30/2006 06/01/2012 10/01/2012
12/01/2011 06/01/2012 10/01/2012 01/01/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10325
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009162
2012
Various
Various
Various
SANITARY REPLACEMENT
ADS ENVIRONMENTAL SERVICES
$1,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OF INFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,500,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - NORTH (FY2012) (SUPPLEMENTAL
APPROPRIATION)
WASTEWATER
660
2012 800219ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10376
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009163
2012
Various
Various
Various
SANITARY REPLACEMENT
ACE PIPE CLEANING, INC.
$1,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OF INFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,500,000
SCHEDULE
CCTV INSPECTION AND PHYSICAL INSPECTION OF
SEWERS - SOUTH (FY2012) (SUPPLEMENTAL
APPROPRIATION)
WASTEWATER
660
2012 817220ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10377
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008179
2012
St. Louis County
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
BLACK AND VEATCH CORPORATION
$570,000
St. Louis Metropolitan Sewer District - Fiscal Year
DISINFECT PLANT EFFLUENT TO COMPLY WITH FUTURE MDNR PERMITTING REQUIREMENTS BY 2013.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE ENGINEERING SUPPORT SERVICES DURING THE CONSTRUCTION OF DISINFECTION FACILITIES AT THE COLDWATER
TREATMENT PLANT TO TREAT EFFLUENT DURING VARIOUS FLOW CONDITIONS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $570,000
SCHEDULE
COLDWATER TREATMENT PLANT DISINFECTION
FACILITIES (ENGINEERING CONSTRUCTION
SERVICES)(SUPPLEMENTAL)
WASTEWATER
660
2012 950421ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
07/01/2010 10/01/2001 04/01/2012
06/01/2011 04/01/2012 12/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10558
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007141
2012
Various
Various
Various
SANITARY REPLACEMENT
RJN GROUP, INC.
$4,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTO SANITARY SEWER SYSTEM CAUSES BUILDING BACKUPS AND
OVERCHARGING OF THE SYSTEM DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW AND INFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHED
THROUGH VARIOUS CONSTRUCTION OR REHABILITATION TECHNIQUES.
REMARKS
THIS BUDGET INCLUDES $500,000 FOR CRITICAL SEWER INFRASTRUCTURE IN THE CITY OF ST. LOUIS. IT ALSO INCLUDES TRAINING
COSTS TO INITIATE TRANSITION FIELD AND OFFICE I/I WORK TO OPERATIONS IN FUTURE YEARS. ANTICIPATE BOARD
INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $4,000,000
SCHEDULE
COMBINED SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT (FY2012) (SUPPLEMENTAL APPROPRIATION)
WASTEWATER
660
2012 799222ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10232
TASK #
016.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010171
2012
Various
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
CONSULTANT
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSO'S.
PROJECT PROBLEM
PROJECT SOLUTION
REHABILITATION 27,000 FEET OF 6-INCH TO 72-INCH SANITARY AND STORM SEWERS, CONSTRUCTION OF 2,000 FEET OF 8-INCH TO
15-INCH SEWERS, AND REMOVAL OF I/I. CONSTRUCTED SSO'S, BP-471, BP-607, AND BP-627 TO BE REMOVED.
REMARKS
This project to be designed under 11110.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I
REDUCTION (DESIGN)
WASTEWATER
660
2012 871223ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
02/01/2012 04/01/2013 06/01/2014 10/01/2014
02/01/2011 04/01/2013 06/01/2014 10/01/2014 12/01/2015
EXPENSE TYPE = C
ORACLE PROJECT #
10576
TASK #
11.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11110
2012
St. Louis County
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
CONSULTANT
$600,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN NECESSARY SYSTEM IMPROVEMENTS.
REMARKS
THIS IS THE FIRST YEAR OF A MULTI YEAR WATERSHED DESIGN PROJECT. ANTICIPATE BOARD INTRODUCTION IN FEBRUARY, 2012.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $600,000
SCHEDULE
DEER CREEK SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER
660
2012 947624ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = I
ORACLE PROJECT #
11110
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2011203
2012
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$100,000
St. Louis Metropolitan Sewer District - Fiscal Year
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN CONSTRUCTION MANAGEMENT FIRM. SERVICES WILL BE FOR FY 2012 TO 2014.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $100,000
SCHEDULE
GENERAL SERVICES AGREEMENT - CONSTRUCTION
MANAGEMENT (FY2012)
WASTEWATER
102
2012 930725ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10612
TASK #
014.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2011200
2012
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$50,000
St. Louis Metropolitan Sewer District - Fiscal Year
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES WILL BE FOR FY 2012 TO 2014.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $50,000
SCHEDULE
GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2012) CONTRACT A
WASTEWATER
102
2012 930126ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10613
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2011201
2012
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$50,000
St. Louis Metropolitan Sewer District - Fiscal Year
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES WILL BE FOR FY 2012 TO 2014.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $50,000
SCHEDULE
GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2012) CONTRACT B
WASTEWATER
102
2012 930327ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10614
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2011202
2012
Various
Various
Various
IMPROVEMENT FUND
CONSULTANT
$50,000
St. Louis Metropolitan Sewer District - Fiscal Year
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF
INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES WILL BE FOR FY 2012 TO 2014.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $50,000
SCHEDULE
GENERAL SERVICES AGREEMENT - GEOTECHNICAL
(FY2012) CONTRACT C
WASTEWATER
102
2012 930528ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10615
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010251
2012
Various
Various
Various
IMPROVEMENT FUND
DAVID MASON
$90,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
EXTEND DESIGN FIRM CONTRACT FOR AS NEEDED SANITARY SEWER DESIGN.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $90,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL
DESIGN (FY2012) (SUPPLEMENTAL) CONTRACT A
WASTEWATER
102
2012 957229ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10620
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010252
2012
Various
Various
Various
IMPROVEMENT FUND
EDM
$90,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
EXTEND DESIGN FIRM CONTRACT FOR AS NEEDED SANITARY SEWER DESIGN.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $90,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL
DESIGN (FY2012) (SUPPLEMENTAL) CONTRACT B
WASTEWATER
102
2012 957330ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10621
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010253
2012
Various
Various
Various
IMPROVEMENT FUND
MACTEC
$90,000
St. Louis Metropolitan Sewer District - Fiscal Year
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
EXTEND DESIGN FIRM CONTRACT FOR AS NEEDED SANITARY SEWER DESIGN.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $90,000
SCHEDULE
GENERAL SERVICES AGREEMENT - SEWER & CHANNEL
DESIGN (FY2012) (SUPPLEMENTAL) CONTRACT C
WASTEWATER
102
2012 957431ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10622
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008133
2012
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
HDR
$1,200,000
St. Louis Metropolitan Sewer District - Fiscal Year
EPA AND MDNR HAVE MANDATED THAT DISINFECTION FACILITIES BE CONSTRUCTED AT THE LEMAY WWTP.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE ENGINEERING SUPPORT SERVICES DURING THE CONSTRUCTION OF IMPROVEMENTS AT THE LEMAY WWTP TO MEET
REGULATORY DISINFECTION MANDATES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,200,000
SCHEDULE
LEMAY WWTP DISINFECTION FACILITIES (ENGINEERING
CONSTRUCTION SERVICES)(SUPPLEMENTAL)
WASTEWATER
660
2012 822532ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
08/01/2010 12/01/2011 04/01/2012
12/01/2011 04/01/2012 08/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10681
TASK #
11.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11109
2012
St. Louis City and County
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
CONSULTANT
$2,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
COMBINED SEWAGE OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES THAT IMPACTS WATER QUALITY.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, DEWATERING PUMP STATION, AND HIGH-
RATE TREATMENT TO CONTROL OVERFLOWS IN RDP. THIS PROJECT ALSO INCLUDES THE JB TUNNEL AND PUMP STATION
UPGRADES.
REMARKS
THIS IS THE FIRST YEAR OF A MULTI YEAR WATERSHED DESIGN PROJECT. ANTICIPATE BOARD INTRODUCTION IN MARCH, 2012.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,000,000
SCHEDULE
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER
660
2012 945433ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = I
ORACLE PROJECT #
11109
TASK #
016.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009164
2012
Various
Various
Various
SANITARY REPLACEMENT
VIEUX AND ASSOCIATES, INC.
$130,000
St. Louis Metropolitan Sewer District - Fiscal Year
ACTUAL FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS IS NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM
MODELS, WHICH ARE UTILIZED FOR PROJECT EVALUATION AND PLANNING.
PROJECT PROBLEM
PROJECT SOLUTION
INTEGRATION OF EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING AND
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $130,000
SCHEDULE
RADAR RAINFALL DATA (SUPPLEMENTAL APPROPRIATION
FY2012)
WASTEWATER
660
2012 799934ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10743
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007140
2012
Various
Various
Various
SANITARY REPLACEMENT
WOOLPERT, INC.
$1,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTO SANITARY SEWER SYSTEM CAUSES BUILDING BACKUPS AND
OVERCHARGING OF THE SYSTEM DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW AND INFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHED
THROUGH VARIOUS CONSTRUCTION OR REHABILITATION TECHNIQUES.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,500,000
SCHEDULE
SEPARATE SEWER AREA - INFLOW/INFILTRATION
ASSESSMENT (FY2012) (SUPPLEMENTAL APPROPRIATION)
WASTEWATER
660
2012 799135ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10231
TASK #
016.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007266A
2012
Various
Various
Various
IMPROVEMENT FUND
U.S. GEOLOGICAL SURVEY
$550,000
St. Louis Metropolitan Sewer District - Fiscal Year
DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND THE WATER
QUANTITY OF AREA STREAMS FOR USE IN HYDROLOGIC AND HYDRAULIC SYSTEM MODELS, PHASE II STORMWATER PROGRAM, AND
SANITARY SEWER OVERFLOW & TOTAL MAXIMUM DAILY LOAD RULES.
PROJECT PROBLEM
PROJECT SOLUTION
CONTINUE CURRENT DATA COLLECTION PROGRAM IN CONJUNCTION WITH THE U.S. DEPARTMENT OF GEOLOGICAL SURVEY.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $550,000
SCHEDULE
STREAM FLOW GAUGE OPERATION (USGS) (FY 2012)
WASTEWATER
102
2012 871736ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10766
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010172
2012
Various
Various
Various
IMPROVEMENT FUND
GEOSYNTEC CONSULTANTS, INC.
$600,000
St. Louis Metropolitan Sewer District - Fiscal Year
DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND THE WATER
QUALITY OF AREA STREAMS FOR USE IN HYDROLOGIC AND HYDRAULIC SYSTEM MODELS, PHASE II STORMWATER PROGRAM, AND
SANITARY SEWER OVERFLOW & TOTAL MAXIMUM DAILY LOAD RULES.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM DATA COLLECTION PROGRAM.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $600,000
SCHEDULE
STREAM FLOW WATER QUALITY SAMPLING (FY 2012)
WASTEWATER
102
2012 872037ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10768
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007139
2012
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
JACOBS ENGINEERING GROUP, INC.
$5,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITAL IMPROVEMENT PROGRAM EXCEEDS THE ABILITY OF EXISTING
DISTRICT STAFF.
PROJECT PROBLEM
PROJECT SOLUTION
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT, ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND
ACTIVITIES, INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THE DISTRICT, INFLOW/INFILTRATION PROFESSIONAL
SERVICES, AND SPECIALTY VENDORS.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $5,000,000
SCHEDULE
WATERSHED FACILITY PLANNING (FY2012 SUPPLEMENTAL
APPROPRIATION)
WASTEWATER
660
2012 799338ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
10230
TASK #
016.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001140
2012
St. Louis County
Meramec
Mattese Creek
SANITARY REPLACEMENT
HEIDEMAN AND ASSOCIATES, INC.
$2,700,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY BACKUPS, OVERFLOWING MANHOLES, AND OVERCHARGED SANITARY SEWERS DURING WET WEATHER EVENTS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 3,300 FEET OF 8-INCH TO 24-INCH SEWER AND APPURTENANCES FROM MATTESE CREEK WEST OF HEINTZ ROAD TO
BLACK FOREST.
REMARKS
PHASE II WILL BE CONSTRUCTED BY ST. LOUIS COUNTY HIGHWAYS AND TRAFFIC UNDER AN INTERGOVERNMENTAL AGREEMENT
WITH REIMBURSEMENT BY MSD IN FY 2013.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,700,000
SCHEDULE
BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE I
WASTEWATER
660
2012 763042ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
05/01/2005 01/01/2009 06/01/2010 07/01/2011 11/01/2011
10/01/2006 06/01/2010 07/01/2011 11/01/2011 02/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10066
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008131
2012
St. Louis City
Bissell
Bissell
SANITARY REPLACEMENT
HDR
$23,900,000
St. Louis Metropolitan Sewer District - Fiscal Year
EPA AND MDNR HAVE MANDATED THAT DISINFECTION BE INSTALLED AT THE BISSELL WASTEWATER TREATMENT PLANT.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT PHYSICAL IMPROVEMENTS AT THE PLANT TO MEET REGULATORY DISINFECTION REQUIREMENTS.
REMARKS
THE DESIGN SCHEDULE INCLUDES AN ANTICIPATED 6 MONTH MDNR REVIEW PERIOD.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $23,900,000
SCHEDULE
BISSELL WWTP DISINFECTION FACILITIES
WASTEWATER
660
2012 822043ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
08/01/2010 12/01/2011 04/01/2012
12/01/2011 04/01/2012 08/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10325
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010094
2012
Sunset Hills
Meramec
Meramec Tributary Areas
IMPROVEMENT FUND
MSD
$94,000
St. Louis Metropolitan Sewer District - Fiscal Year
TWELVE PROPERTIES ARE SERVED BY A PRIVATE SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 60 FEET OF 8-INCH SANITARY SEWER, 6 MANHOLES, AND REHABILITATE 570 FEET OF 8-INCH SANITARY SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $94,000 $0 $0
SCHEDULE
BOND PLACE SANITARY SEWERS (S.D. #2010094)
WASTEWATER
102
2012 864444ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
03/01/2011 10/01/2011 04/01/2012 09/01/2012
10/01/2011 03/01/2012 08/01/2012 05/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
11067
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010173
2012
Unincorporated
Missouri
Fee Fee Creek
SANITARY REPLACEMENT
ERM TECHNOLOGIES
$100,000
St. Louis Metropolitan Sewer District - Fiscal Year
AGING PUMP STATION CAN BE ELIMINATED.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 450 FEET OF 8-INCH SANITARY AND 80 FEET OF 18-INCH STORM SEWERS, AND ELIMINATE THE PUMP STATION.
REMARKS
CONSTRUCTION DESIGNED UNDER PROJECT 2009099.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $100,000
SCHEDULE
CHAI HOUSE PUMP STATION (P-747) ELIMINATION
WASTEWATER
660
2012 872345ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
06/01/2009 02/01/2010 11/01/2010 11/01/2011 03/01/2012
11/01/2009 11/01/2010 11/01/2011 03/01/2012 10/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10550
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11099
2012
Unincorporated
Meramec
Mattese Creek
SANITARY REPLACEMENT
MSD
$300,000
St. Louis Metropolitan Sewer District - Fiscal Year
INSUFFICIENT SEWER CAPACITY.
PROJECT PROBLEM
PROJECT SOLUTION
REPLACE 530 FEET OF 8-INCH SEWER WITH 12-INCH SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $300,000
SCHEDULE
CLAYRIDGE - BRANDY SANITARY RELIEF
WASTEWATER
660
2012 947546ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
12/01/2010 12/01/2011 05/01/2012
12/01/2011 04/01/2012 11/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
11099
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008179
2012
St. Louis County
Coldwater
Coldwater Creek
SANITARY REPLACEMENT
BLACK AND VEATCH CORPORATION
$7,100,000
St. Louis Metropolitan Sewer District - Fiscal Year
DISINFECT PLANT EFFLUENT TO COMPLY WITH FUTURE MDNR PERMITTING REQUIREMENTS BY 2013.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT DISINFECTION FACILITIES AT THE COLDWATER TREATMENT PLANT TO TREAT EFFLUENT DURING VARIOUS FLOW
CONDITIONS.
REMARKS
THE DESIGN OF THESE DISINFECTION FACILITIES WAS COMPLETED BY PROJECT 2006168. 6 MONTH MDNR PERMIT REVIEW
REQUIRED.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $7,100,000
SCHEDULE
COLDWATER TREATMENT PLANT DISINFECTION FACILITIES
WASTEWATER
660
2012 763747ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
07/01/2010 10/01/2011 04/01/2012
06/01/2011 04/01/2012 12/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10558
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2005104
2012
Richmond Heights
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
WOOLPERT
$700,000
St. Louis Metropolitan Sewer District - Fiscal Year
IMPLEMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROL PLAN TO ADDRESS COMBINED SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,030 FEET OF CIPP LINING, 1,150 FEET OF 15-INCH TO 21-INCH DIAMETER STORM SEWERS, AND APPURTENANCES.
REMARKS
PROJECT WAS ON HOLD DUE TO HIGHWAY 40 CONSTRUCTION. CURRENT DESIGN SCHEDULE IS DEPENDENT ON MODOT AND ST.
LOUIS COUNTY APPROVAL.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $700,000
SCHEDULE
CSO - CLAYTONIA TERRACE AND DALE AVE CSO
INTERCEPTOR (I-101A, 101B/L-126, 127) SEPARATION
WASTEWATER
660
2012 569148ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
02/01/2005 03/01/2006 10/01/2011 10/01/2012 03/01/2013
10/01/2005 10/01/2011 10/01/2012 03/01/2013 05/01/2014
EXPENSE TYPE = C
ORACLE PROJECT #
10449
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010217
2012
Unincorporated
Bissell
Maline Creek
SANITARY REPLACEMENT
MSD
$750,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM APPROXIMATELY 4,700 FEET OF 8-24 INCH SEWER REHABILITATION. ONE CONSTRUCTED SSO, BP-299 TO BE REMOVED.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $750,000
SCHEDULE
DELLWOOD SANITARY TRUNK SEWER REHABILITATION
WASTEWATER
660
2012 921349ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
02/01/2011 11/01/2011 04/01/2012
11/01/2011 03/01/2012 11/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
11055
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009103
2012
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$2,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY AND COMBINED SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
EASEMENT ACQUISITION COSTS FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM COMBINED AND SANITARY RELIEF
SEWER PROJECTS.
REMARKS
ANTICIPATE BOARD INTRODUCTION JUNE,2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,000,000
SCHEDULE
EASEMENT ACQUISITION FOR COMBINED / SANITARY
PROJECTS (FY 2012)
WASTEWATER
660
2012 799850ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10585
TASK #
013.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11112
2012
Berkeley
Bissell
Maline Creek
SANITARY REPLACEMENT
MSD
$870,000
St. Louis Metropolitan Sewer District - Fiscal Year
FLAT SEWER GRADES AND SHALLOW SEWERS CAUSING OVERCHARGED MAINS, AND SSO ACTIVATION.
PROJECT PROBLEM
PROJECT SOLUTION
REPLACE 1,300 FEET OF 8-INCH TO 10-INCH SANITARY SEWER, AND REMOVE TWO CONSTRUCTED SSO'S, BP-592 AND BP-301.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $870,000
SCHEDULE
EDGEWOOD SANITARY RELIEF (BP-592) (BP-301)
WASTEWATER
660
2012 873351ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
03/01/2011 10/01/2011 02/01/2012 07/01/2012
10/01/2011 01/01/2012 06/01/2012 12/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
11112
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010164
2012
Unincorporated
Lemay/RDP
Mackenzie Creek
SANITARY REPLACEMENT
ERM TECHNOLOGIES
$310,000
St. Louis Metropolitan Sewer District - Fiscal Year
SMALL PUMP STATION SERVING THREE HOMES.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 850 FEET OF 8-INCH TO 15-INCH DIAMETER SANITARY SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $310,000
SCHEDULE
ELTON PUMP STATION (P-307) ELIMINATION
WASTEWATER
660
2012 869752ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
06/01/09 02/01/2010 11/01/2010 05/01/2011 09/01/2011
11/01/2009 11/01/2010 02/01/2011 09/01/2011 09/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10591
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010161
2012
Various
Various
Various
WASTEWATER EMERGENCY
FUND
MSD
$250,000
St. Louis Metropolitan Sewer District - Fiscal Year
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUT NOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE
DISTRICT MUST ACT IMMEDIATELY, PURSUANT TO ITS CHARTER, TO EFFECT SEWER REPAIRS.
PROJECT PROBLEM
PROJECT SOLUTION
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE WASTEWATER EMERGENCY FUND, TO FACILITATE EMERGENCY RESPONSE AS
NEEDED.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN MAY, 2012.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $250,000
SCHEDULE
EMERGENCY REPAIR FUND APPROPRIATION
WASTEWATER (FY2012)
WASTEWATER
122
2012 854653ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = O
ORACLE PROJECT #
11107
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006082A
2012
Ballwin
Meramec
Kiefer Creek
SANITARY REPLACEMENT
MSD
$260,000
St. Louis Metropolitan Sewer District - Fiscal Year
ODOR IN THE AREA FROM DISCHARGE OF A FORCE MAIN FROM A LPSS. THE H2S ODOR EMITS FROM THE DOWNSTREAM GRAVITY
SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,650 FEET OF 4-INCH FORCE MAIN BY OPEN CUT METHOD IN EXISTING EASEMENT ALONG 8-INCH GRAVITY SEWER
ALIGNMENT.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $260,000
SCHEDULE
FOREST VALLEY ODOR CONTROL PHASE II
WASTEWATER
660
2012 832354ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/01/2009 03/01/2011 07/01/2011 12/01/2011
03/01/2011 06/01/2011 11/01/2011 07/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10606
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11113
2012
Valley Park
Meramec
Grand Glaize Creek
SANITARY REPLACEMENT
MSD
$200,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING 6-INCH DISCHARGE LINE IS INADEQUATE.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 140 FEET OF 18-INCH SEWER FOR A NEW LAGOON CONTROL STRUCTURE AND DISCHARGE LINE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $200,000
SCHEDULE
GRAND GLAIZE LAGOON WET WEATHER STORAGE
IMPROVEMENTS
WASTEWATER
660
2012 954855ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
02/01/2011 08/01/2011 01/01/2012
08/01/2011 12/01/2011 04/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
11113
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11084
2012
Valley Park
Meramec
Grand Glaize Creek
SANITARY REPLACEMENT
HORNER & SHIFRIN
$66,000
St. Louis Metropolitan Sewer District - Fiscal Year
DETERIORATED BRIDGE STRUCTURE ON ENTRY ROAD TO TREATMENT PLANT.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT REPAIRS TO BRIDGE STRUCTURE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $66,000
SCHEDULE
GRAND GLAIZE WWTP BRIDGE REPAIRS
WASTEWATER
660
2012 938856ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
07/01/2010 04/01/2011 08/01/2011
10/01/2010 08/01/2011 04/01/2012
EXPENSE TYPE = O
ORACLE PROJECT #
11084
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010095
2012
Frontenac
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
OATES AND ASSOCIATES, INC.
$2,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY SEWER SURCHARGING, SANITARY SEWER OVERFLOWS DURING WET WEATHER, AND TWO CONSTRUCTED SSO'S, BP-181,
BP-343.
PROJECT PROBLEM
PROJECT SOLUTION
REHABILITATION OF APPROXIMATELY 17,000 FEET OF 8-INCH TO 36-INCH SANITARY AND STORM SEWERS AND 217 MANHOLES, AND
THE REMOVAL OF OTHER PRIVATE SOURCES OF I/I.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,000,000
SCHEDULE
HERMITAGE I/I REDUCTION (SKME-615)
WASTEWATER
660
2012 864657ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
06/01/2009 12/1/2010 12/1/2011 12/1/2012 04/01/2012
11/1/2009 12/1/2011 12/1/2012 04/01/2012 01/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10645
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009106
2012
Various
Various
Various
SANITARY REPLACEMENT
MSD
$1,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT.
PROJECT PROBLEM
PROJECT SOLUTION
AS THE REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE
PROMPTLY ISSUED.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JUNE, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,000,000
SCHEDULE
INFRASTRUCTURE REPAIRS (SANITARY/COMBINED -
FY2012)
WASTEWATER
660
2012 801558ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = I
ORACLE PROJECT #
10663
TASK #
017.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009104
2012
St. Louis City and County
Various
Various
SANITARY REPLACEMENT
MSD
$15,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
OLDER, DAMAGED, AND DETERIORATED SEWER SYSTEMS PRIMARILY IN THE CITY OF ST. LOUIS (6-36 INCH DIAMETER) ARE CAUSING
PIPE COLLAPSES, BLOCKED MAINS, AND LEAKING PIPES RESULTING IN STREET COLLAPSES, WATER BACK-UPS, COMBINED AND
SANITARY SEWER OVERFLOWS.
PROJECT PROBLEM
PROJECT SOLUTION
AS REPAIR OR REHABILITATION PROBLEMS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY
CURED-IN-PLACE PIPE WILL TAKE PLACE PROMPTLY UTILIZING BLANKET REHABILITATION CONTRACTS. IT IS ANTICIPATED THAT
REHABILITATION WILL CONTINUE THROUGHOUT THE CITY OF ST. LOUIS FOR A 10 YEAR PERIOD OR UNTIL ALL SEWERS HAVE BEEN
CLEANED, INSPECTED, AND REHABILITATED AS NECESSARY.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN JULY, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $15,000,000
SCHEDULE
INFRASTRUCTURE REPAIRS(REHABILITATION)(FY 2012)
WASTEWATER
660
2012 800159ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS 03/01/2011 N/A 10/01/2011 03/01/2012
09/01/2011 N/A 01/01/2012 01/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10665
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008133
2012
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
HDR
$20,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
EPA AND MDNR HAVE MANDATED THAT DISINFECTION FACILITIES BE CONSTRUCTED AT THE LEMAY WWTP.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT IMPROVEMENTS AT THE LEMAY WWTP TO MEET REGULATORY DISINFECTION MANDATES.
REMARKS
THE DESIGN SCHEDULE INCLUDES AN ANTICIPATED 6 MONTH MDNR REVIEW PERIOD.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $20,000,000
SCHEDULE
LEMAY WWTP DISINFECTION FACILITIES
WASTEWATER
660
2012 822260ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
01/01/2010 10/01/2011 04/01/2012
10/01/2011 04/01/2012 11/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10681
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008137
2012
Unincorporated
Lemay/RDP
Lemay Creek
SANITARY REPLACEMENT
HORNER & SHIFRIN
$300,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL DAMAGE TO FLOOR IN AREA OF WATER SOFTENER IN MAINTENANCE BUILDING.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM INSPECTION, ANALYSIS AND REPAIR OF REINFORCED CONCRETE FLOORS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $300,000
SCHEDULE
LEMAY WWTP MAINTENANCE BUILDING STRUCTURAL
REPAIR
WASTEWATER
660
2012 827761ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
10/1/2010 03/01/2011 10/01/2011 02/01/2012
01/01/2011 10/01/2011 02/01/2012 08/01/2012
EXPENSE TYPE = O
ORACLE PROJECT #
10682
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2001070A
2012
Clayton
Lemay/RDP
Black Creek
CLAYTON CENTRAL OMCI
MSD
$480,000
St. Louis Metropolitan Sewer District - Fiscal Year
INADEQUATE AND SUBSTANDARD SANITARY SEWER SYSTEMS ALONG FOREST PARK PARKWAY BETWEEN MERAMEC AND
BRENTWOOD.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 1,300 FEET OF EXISTING 6-INCH AND 8-INCH
DIAMETER SANITARY SEWER WITH 8-INCH AND 12-INCH DIAMETER SANITARY SEWER, AND ABANDON EXISTING, PARALLEL 10-INCH
SANITARY SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $480,000
SCHEDULE
MERAMEC AND FOREST PARK PARKWAY SANITARY
SEWER IMPROVEMENTS
WASTEWATER
563
2012 862462ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
11/01/2009 08/01/2011 01/01/2012 06/01/2012
08/01/2011 12/01/2011 05/01/2012 05/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10704
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2010140
2012
Bridgeton
Missouri
Missouri River Tributary Areas
MO RIVER BONFIL OMCI
MSD
$2,500,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING SANITARY SEWERS ARE OVERCHARGED DUE TO EXCESSIVE INFILTRATION AND INFLOW.
PROJECT PROBLEM
PROJECT SOLUTION
REHABILITATE SANITARY SEWER MAINS, MANHOLES, AND CONNECTIONS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,500,000
SCHEDULE
MISSOURI RIVER BONFILS SANITARY SEWER
REHABILITATION
WASTEWATER
590
2012 868063ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
07/01/2011 01/01/2012 06/01/2012
07/01/2011 01/01/2012 05/01/2012 08/01/2013
EXPENSE TYPE = C
ORACLE PROJECT #
10708
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006168A
2012
Maryland Heights
Missouri
Missouri River Tributary Areas
SANITARY REPLACEMENT
BLACK AND VEATCH CORP.
$40,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
MISSOURI RIVER WWTP IS CURRENTLY APPROACHING ITS DESIGN CAPACITY FOR PEAK FLOW WET WEATHER OPERATION AND FOR
MEETING MDNR DISCHARGE REQUIREMENTS FOR SECONDARY TREATMENT AND FLOW DISINFECTION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF ADDITIONAL SECONDARY TREATMENT AND DISINFECTION FACILITIES AT THE MISSOURI RIVER WWTP TO
ACCOMMODATE PEAK FLOWS AND TO MEET MDNR DISCHARGE REQUIREMENTS.
REMARKS
ANTICIPATE BOARD INTRODUCTION IN DECEMBER, 2011.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $40,000,000
SCHEDULE
MISSOURI RIVER WWTP SECONDARY TREATMENT
EXPANSION AND DISINFECTION FACILITIES
(SUPPLEMENTAL APPROPRIATION)
WASTEWATER
660
2012 945564ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = C
ORACLE PROJECT #
10710
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11111
2012
Bellefontaine Neighbors
Bissell
Maline Creek
SANITARY REPLACEMENT
MSD
$435,000
St. Louis Metropolitan Sewer District - Fiscal Year
LEAKING STORM SEWERS CAUSING OVERCHARGED SANITARY MAINS AND SSO ACTIVATION.
PROJECT PROBLEM
PROJECT SOLUTION
REHABILITATE 3,300 FEET OF 12-INCH TO 42-INCH STORM SEWER AND REMOVE ONE CONSTRUCTED SSO, BP-290.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $435,000
SCHEDULE
NECTAR I/I REDUCTION (BP-290)
WASTEWATER
660
2012 952765ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
02/01/2011 09/01/2011 02/01/2012
09/01/2011 01/01/2012 07/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
11111
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006051
2012
Bel-Ridge
Bissell
Maline Creek
SANITARY REPLACEMENT
MSD
$220,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 700 FEET OF 12-INCH DIAMETER SANITARY RELIEF SEWERS, NEAR SPRINGDALE AVENUE AND TORCHLITE
LANE, AND ELIMINATE CONSTRUCTED SSO, BP-318.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $220,000
SCHEDULE
SPRINGDALE LATERAL SANITARY RELIEF (SKME-305)
WASTEWATER
660
2012 676466ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
003/01/2008 06/01/2011 11/01/2011
06/01/2011 10/01/2011 05/01/2012
EXPENSE TYPE = C
ORACLE PROJECT #
10759
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006109C
2012
St. Louis City
Bissell
VARIOUS
SANITARY REPLACEMENT
CORPS OF ENGINEERS
$150,000
St. Louis Metropolitan Sewer District - Fiscal Year
A CORPS OF ENGINEERS EVALUATION OF THE FLOODWALL PUMP STATIONS IS NEEDED FOR FUTURE REHABILITATION EFFORTS.
PROJECT PROBLEM
PROJECT SOLUTION
THE CORPS IS TO PERFORM A STUDY OF THE PUMP STATIONS, IN ORDER TO ENABLE FUTURE FEDERAL FUNDING OF
REHABILITATION EFFORTS.
REMARKS
THIS APPROPRIATION REPRESENTS MSD'S LOCAL MATCH SHARE REQUIRED FOR THE CORPS' STUDY. ANTICIPATE BOARD
INTRODUCTION IN JUNE, 2012.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $150,000
SCHEDULE
ST. LOUIS FLOOD PROTECTION SYSTEM - CORPS OF
ENGINEERS
WASTEWATER
660
2012 932267ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
SEE REMARKS
EXPENSE TYPE = N
ORACLE PROJECT #
11066
TASK #
016.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009267
2013
University City
Lemay/RDP
University City Branch
SANITARY REPLACEMENT
MSD
$136,000
St. Louis Metropolitan Sewer District - Fiscal Year
18-INCH STORM SEWER IS DIRECTLY CONNECTED TO 21-INCH SANITARY SEWER ALONG OLIVE BLVD.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT APPROXIMATELY 240 FEET OF 18-INCH TO 24-INCH STORM SEWER FROM NEW MANHOLE ON EXISTING 18-
INCH LINE TO AN EXISTING STORM CHANNEL.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $136,000
SCHEDULE
BLANCHA DR. TO OLIVE BLVD. SEWER SEPARATION
WASTEWATER
660
2013 860674ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10393
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2000083
2013
Unincorporated
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
KUHLMANN DESIGN GROUP
$5,300,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY SEWER SURCHARGING, OVERFLOWS, AND BUILDING BACKUPS DUE TO AN OVERCHARGED SANITARY SEWER.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 5,600 FEET OF 8-INCH TO 30-INCH SANITARY SEWER FROM MERAMEC BOTTOM ROAD AT I-55 NORTH TO BROOKTON
WAY AND GREENTON WAY. CONSTRUCTED SSO, BP-220 TO BE ELIMINATED.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $5,300,000
SCHEDULE
BROOKTON WAY TO MERAMEC BOTTOM ROAD SANITARY
RELIEF PHASE II
WASTEWATER
660
2013 849475ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10401
TASK #
015.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
11121
2013
St. Louis City
Bissell
Baden
SANITARY REPLACEMENT
MSD
$500,000
St. Louis Metropolitan Sewer District - Fiscal Year
OVERCHARGED TRUNK SEWER IN CALVARY CEMETERY PROPERTY AND BUILDING BACKUPS IN AREA IMMEDIATELY DOWNSTREAM.
PROJECT PROBLEM
PROJECT SOLUTION
PURCHASE OF MAINTENANCE FACILITY/STORAGE BASIN AREA FOR CONSTRUCTION OF POTENTIAL FUTURE STORAGE FACILITIES
FOR FLOWS FROM OVERCHARGED SOUTH BADEN TRUNK SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $500,000
SCHEDULE
CALVARY CEMETERY STORAGE BASIN (PROPERTY
ACQUISITION)
WASTEWATER
660
2013 955276ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
11121
TASK #
013.0
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009198
2013
Ladue
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
CMV- COCHRAN
$2,900,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERFLOW FROM MANHOLES DUE TO SURCHARGING OF SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
PERFORM PUBLIC AND PRIVATE I/I REDUCTION BASED ON I/I AND CCTV DATA FOR AREA TRIBUTARY TO THE PROJECT SEWERS IN
ORDER TO MINIMIZE THE FLOW IN THE SANITARY SEWERS.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2010, FOR $308,000.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,900,000
SCHEDULE
CELLA - ROLLING ROCK - GLEN CREEK I/I REDUCTION
(SKME -658, 659, & 657)
WASTEWATER
660
2013 853977ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10382
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006040A
2013
Unincorporated
Missouri
Fee Fee Creek
SANITARY REPLACEMENT
VANCE ENGINEERING
$3,650,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
REMOVAL OF PUBLIC AND PRIVATE I/I IN THE FEE FEE AREA.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,650,000
SCHEDULE
FEE FEE TRUNK SEWER (SKME-002) REHABILITATION AND
I/I REDUCTION
WASTEWATER
660
2013 867878ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10597
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
88088B
2013
Maryland Heights
Missouri
Fee Fee Creek
SANITARY REPLACEMENT
QST INFRASTRUCTURE, INC.
$1,700,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 2,360 FEET OF 8-INCH TO 36-INCH DIAMETER SEWERS, FROM FEE FEE ROAD AND MIDLAND
BOULEVARD NORTHWEST TO NEAR SMILEY ROAD. CONSTRUCTED SSO'S, BP-083 AND BP-511TO BE REMOVED.
REMARKS
PROJECT CANNOT START CONSTRUCTION UNTIL PHASE IV CONSTRUCTION IS COMPLETED.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $1,700,000
SCHEDULE
FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY RELIEF
PHASE V
WASTEWATER
660
2013 625279ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10600
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
89143
2013
Unincorporated
Lemay/RDP
Gravois Creek
SANITARY REPLACEMENT
CIVIL DESIGN INC.
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT APPROXIMATELY 680 FEET OF 12 INCH TO 15 INCH STORM SEWERS AND REMOVE INFLOW SOURCES FROM
APPROXIMATELY 14 PROPERTIES.
REMARKS
PROJECT SCOPE CHANGED FROM A SANITARY RELIEF SEWER PROJECT TO AN I/I REMOVAL PROJECT WITH STORM SEWER
CONSTRUCTION.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
GC-11 GRAVOIS CREEK SANITARY RELIEF
WASTEWATER
660
2013 534180ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10015
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009080
2013
Brentwood
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
MSD
$210,000
St. Louis Metropolitan Sewer District - Fiscal Year
WATER BACKUPS AT 2444, 2445, AND 2508 HIGH SCHOOL DR. AND 8925 & 8929 POWELL AVE.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 750 FEET OF 12-INCH STORM SEWER TO SEPARATE STORM FLOWS FROM SANITARY SYSTEM.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $210,000
SCHEDULE
HIGH SCHOOL DR. & MADGE AVE. SEWER SEPARATION
WASTEWATER
660
2013 842281ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10646
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2008133
2013
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
BLACK AND VEATCH
$11,512,000
St. Louis Metropolitan Sewer District - Fiscal Year
EPA AND MDNR HAVE MANDATED THAT DISINFECTION FACILITIES BE CONSTRUCTED AT THE LEMAY WWTP.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT IMPROVEMENTS AT THE LEMAY WWTP TO MEET REGULATORY DISINFECTION MANDATES.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $11,512,000
SCHEDULE
LEMAY WWTP DISINFECTION FACILITIES (SUPPLEMENTAL
APPROPRIATION)
WASTEWATER
660
2013 939882ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10681
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009111A
2013
Unincorporated
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
MSD
$400,000
St. Louis Metropolitan Sewer District - Fiscal Year
OVERCHARGING OF LILAC RIDGE PUMP STATION, DUE TO DETERIORATED SEWER SYSTEM.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 1,485 FEET OF 8-INCH DIAMETER SANITARY SEWERS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $400,000
SCHEDULE
LILAC RIDGE SERVICE AREA SANITARY REPLACEMENT
WASTEWATER
660
2013 867983ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10684
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
95066F
2013
Unincorporated
Meramec
Meramec Tributary Areas
SANITARY REPLACEMENT
MSD
$500,000
St. Louis Metropolitan Sewer District - Fiscal Year
EXISTING TREATMENT FACILITIES NEED TO BE EXPANDED AND UPGRADED TO MEET DEPARTMENT OF NATURAL RESOURCES
REQUIREMENTS AND POPULATION NEEDS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT AN EDUCATIONAL/RECREATIONAL FACILITY NEAR THE LOWER MERAMEC WWTP SITE.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $500,000
SCHEDULE
LOWER MERAMEC RIVER WWTP
EDUCATIONAL/RECREATIONAL FACILITY
WASTEWATER
660
2013 360384ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
11106
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006168A
2013
Maryland Heights
Missouri
Missouri River Tributary Areas
SANITARY REPLACEMENT
BLACK AND VEATCH CORP.
$17,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
MISSOURI RIVER WWTP IS CURRENTLY APPROACHING ITS DESIGN CAPACITY FOR PEAK FLOW WET WEATHER OPERATION AND FOR
MEETING MDNR DISCHARGE REQUIREMENTS FOR SECONDARY TREATMENT AND FLOW DISINFECTION.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT ADDITIONAL SECONDARY TREATMENT AND DISINFECTION FACILITIES AT THE MISSOURI RIVER WWTP TO
ACCOMMODATE PEAK FLOWS AND TO MEET MDNR DISCHARGE REQUIREMENTS. ADDITIONALLY, DESIGN DISINFECTION FACILITIES
FOR THE COLDWATER WWTP, AND STUDY DISINFECTION OPTIONS AT THE BISSELL POINT AND LEMAY WASTEWATER TREATMENT
PLANTS.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $17,000,000
SCHEDULE
MISSOURI RIVER WWTP SECONDARY TREATMENT
EXPANSION AND DISINFECTION FACILITIES
(SUPPLEMENTAL APPROPRIATION)
WASTEWATER
660
2013 801885ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10710
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009254
2013
St. Louis City
Bissell
Rocky Branch
SANITARY REPLACEMENT
KUHLMANN DESIGN GROUP, INC.
$6,300,000
St. Louis Metropolitan Sewer District - Fiscal Year
MULTIPLE STRUCTURAL FAILURES OF A REINFORCED CONCRETE HORSESHOE SEWER DOWNSTREAM OF THE FLOOD PROTECTION
EMERGENCY CLOSURE STRUCTURE.
PROJECT PROBLEM
PROJECT SOLUTION
REPLACE 120 FEET OF 18 FOOT WIDE BY 14 FOOT HIGH REINFORCED CONCRETE HORSESHOE SEWER FROM THE FLOOD
PROTECTION EMERGENCY CLOSURE STRUCTURE TO THE OUTFALL AND REPLACE THE OUTFALL STRUCTURE.
REMARKS
THIS SECTION OF THE PALM SEWER IS THE MOST DOWNSTREAM REACH OF BISSELL POINT CSO SYSTEM NO. 037.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $6,300,000
SCHEDULE
PALM SEWER REPAIR/REPLACEMENT
WASTEWATER
660
2013 859486ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10727
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006049
2013
St. Louis City
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
PARSONS WATER &
INFRASTRUCTURE
$293,000
St. Louis Metropolitan Sewer District - Fiscal Year
LOCALIZED PROPERTY AND STREET FLOODING IN THE 3200 BLOCK OF PORTIS AVENUE.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCTION OF APPROXIMATELY 800 LINEAL FEET OF 15 INCH TO 30 INCH SEWERS AND APPURTENANCES.
REMARKS
THE SCOPE OF THIS PROJECT WAS REVISED DURING DESIGN.
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $293,000
SCHEDULE
PORTIS #3242 COMBINED SEWER IMPROVEMENTS
WASTEWATER
660
2013 956587ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10145
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2007054
2013
St. Louis City and County
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
HORNER & SHIFRIN
$5,000,000
St. Louis Metropolitan Sewer District - Fiscal Year
STRUCTURAL REHABILITATION OF THE FOULWATER INTERCEPTOR SYSTEM IS NEEDED TO REDUCE I/I DURING WET WEATHER AND
HIGH RIVER STAGES.
PROJECT PROBLEM
PROJECT SOLUTION
REHAB 250 FEET OF 108" BRICK HORSESHOE SEWER, INSTALL VENT PIPES ON CURRENT FOULWATER INTERCEPTOR, ABANDON 3500
FEET OF 7' DIAMETER BRICK FOULWATER INTERCEPTOR, AND CONNECT EXISTING SEWER TO LEMAY CONSOLIDATION SEWER.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$1,000,000 $0 $0 $4,000,000
SCHEDULE
RDP FOULWATER INTERCEPTOR REHABILITATION (PHASE
I)
WASTEWATER
660
2013 693288ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10198
TASK #
15.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2006170
2013
Frontenac
Lemay/RDP
Deer Creek
SANITARY REPLACEMENT
SAIC ENERGY, ENVIRONMENTAL &
INFRA., LLC
$2,600,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY SEWER SURCHARGING, WET WEATHER SANITARY BACK-UPS, AND ONE CONSTRUCTED SSO, BP-166.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 3,310 FEET OF 8-INCH TO 15-INCH SANITARY SEWER AND APPURTENANCES, REHABILITATION OF 5,830 FEET OF 8-INCH
TO 30-INCH SEWERS AND 140 MANHOLES. ONE CONSTRUCTED SSO IS TO BE ELIMINATED.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $2,600,000
SCHEDULE
STONINGTON SANITARY RELIEF (SKME -652)
WASTEWATER
660
2013 759689ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10185
TASK #
015.1 and 15.2
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009196
2013
Unincorporated
Lemay/RDP
River Des Peres
SANITARY REPLACEMENT
MSD
$359,000
St. Louis Metropolitan Sewer District - Fiscal Year
SANITARY SEWER DISCHARGING TO SINKHOLE.
PROJECT PROBLEM
PROJECT SOLUTION
DESIGN AND CONSTRUCT 572 FEET OF 8-INCH SANITARY SEWER AND APPURTENANCES AND INSTALL 250 FEET OF 15-INCH CIPP.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $359,000
SCHEDULE
TIEMANN & NONIE AVE. SANITARY SEWER REPLACEMENT
WASTEWATER
660
2013 853790ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10775
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
90080C
2013
Ferguson
Bissell
Maline Creek
SANITARY REPLACEMENT
URS CORPORATION
$3,600,000
St. Louis Metropolitan Sewer District - Fiscal Year
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT 2,900 FEET OF 24-INCH TO 54-INCH DIAMETER RELIEF SEWER FROM WEST FLORISSANT ROAD WESTWARD TO
FERGUSON ROAD AT MALINE CREEK, IN UNINCORPORATED ST. LOUIS COUNTY AND THE CITY OF FERGUSON. ONE CONSTRUCTED
SSO, BP-303 IS TO BE REMOVED.
REMARKS
THE DESIGN WAS PREVIOUSLY FUNDED IN FISCAL YEAR 2003 FOR $ 1,500,000
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $3,600,000
SCHEDULE
UPPER MALINE TRUNK SANITARY RELIEF PHASE III
SECTION C
WASTEWATER
660
2013 341291ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10782
TASK #
015.1
FISCAL YEAR
PROJECT NO:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
FUND:
DESIGNER:
COST:
2009255
2013
Valley Park
Meramec
Grand Glaize Creek
SANITARY REPLACEMENT
MSD
$800,000
St. Louis Metropolitan Sewer District - Fiscal Year
DURING HEAVY RAINS THE TREATMENT PLANT CANNOT HANDLE THE FLOW AND SEWAGE BACKUPS OCCUR INTO BUILDINGS IN
VALLEY PARK.
PROJECT PROBLEM
PROJECT SOLUTION
CONSTRUCT PUMP STATION AND ASSOCIATED PIPING TO DIVERT FLOWS INTO THE STORAGE LAGOONS AT THE GRAND GLAIZE
TREATMENT PLANT.
REMARKS
FUNDING SOURCE FEDERAL STATE LOCAL MSD$0 $0 $0 $800,000
SCHEDULE
VALLEY PARK/GRAND GLAIZE DIVERSION & PUMP STATION
WASTEWATER
660
2013 859692ID =
START
END
PRELIMINARY DESIGN DESIGN EASEMENT ACQUISITION BID/CONTRACT AWARD CONSTRUCTION
EXPENSE TYPE = C
ORACLE PROJECT #
10787
TASK #
015.1