Loading...
HomeMy Public PortalAboutS Wastewater Engineering Projects (Contents)CHAMBERS TOELLECOBURG LANDSDARR BLISS BELLEFONTAINEK IL G O R E C A B O TASHBROOKHOYT SHEPLEYEWELLNECTAR ROXTON SEATONAVANT ELBABAKEWELLADDISON BURLINGTON NORTHERN SANTA FEA SHFORD DELHIATTICA AKRON TAPPANLAIRE LILACESQUIRE C O MET DOROTHYCRETETRIOB ALLARD MARALDOBOSWORTH FONTANSON JEPSONG O L D E N MCCARTNEYNEWB O L DBELLA FONDAC O R I NTH SURREYBYFIELDODESSAHAVILANDDRUIDENSLEYREPOSELANCESURF TOPAZCOSIE NORTHAMPTONSCIENCE HILLNORWICHU NICORN FAT H O M ALCOVE L O CHIELBELGR OVEGLOROSEFARRINGTON LA ROUXLILAC§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11684 11 TASK NO: TASK NAME: $220,000.00 BUDGET: FUND: Bellefontaine NeighborsMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 1 BELLEFONTAINE #2 LATERAL SANITARY RELIEF(BP-287)(COBURG LANDS DR) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITION OF PUBLIC SEWERS (3,750 FEET OF 8 INCH TO 12 INCHSANITARY SEWER AND 2,900 FEET OF 12 INCH TO 24 INCH STORMSEWER) AND REMOVAL OF PRIVATE I/I SOURCES FROM SANITARYSEWERS. REMOVE CONSTRUCTED SSO BP-287 Design Services 6660 - SanitaryReplacement Fund CHAMBERSBELLEFONTAINE RIVERVIEWLILACTOELLEST CYR S HEPLEY FRY BLUFF SCENIC V A LLEYCOBURG LAND S BELGROVE DARRBLISS ADRIAN K IL G O R E CABOT A SHBROOKC AMERON HOYT EWELLNECTAR BURLINGTON NORTHERN SANTA FEDURNESSRENFREWCASTLELOOKAWAYDELHILEBON MEAD SCRANTONELBACOMET COBURG CAMBRIAATTICA LEETONGLOUCESTE RDURHAMHABECKINGHOBKIRK BIRITZ ADLERPRESLEYTRIONELA N STIMSONM ARALDOBOSWORTH T AYG O LDE N FORK GRAMPIANHAVILAND ROSSTWILL JEFFREYBAGNELLTHRIFT DENNESSNORBRIDGEFOXPATHTOPAZODESSA HANSOM SIEBE RONTEL PRESTIGE COSIE LANDWEHR ZELLWEGER DUDLEYSUNBEAM GARDOLILACCASTLESHEPLEY ST CYRLEWIS N CLARK BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11685 11 TASK NO: TASK NAME: $490,000.00 BUDGET: FUND: Bellefontaine NeighborsMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 2 BISSEL HILLS SANITARY RELIEF/CALUMENT I/IREDUCTION (BP-317) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITATE PUBLIC SEWERS (45,000 FEET OF 8 INCH TO 21 INCHSANITARY SEWER) AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-317 Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11144 16 TASK NO: TASK NAME: $600,000.00 BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 3 BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT) SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM AS NEEDED PLANNING, ANALYSIS AND DESIGN SERVICESTHROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMECWATERSHEDS. Professional Services 1101 - General Fund CLAYTONLOUWEN H A L I FA X BERKSHIRE SUDBURYMCCUTCHEONR O X B U R G H HA D DIN G T ONWHITBURNST LOUIS GA LLERIA W ENNEKER §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11688 11 TASK NO: TASK NAME: $625,000.00 BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Non-recurring Page 4 BLACK CREEK - HADDINGTON COURT STORAGETANK BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGETANK AND ASSOCIATED STRUCTURES, PUMPING STATIONS ANDSEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARYRELIEF. Pre-Design Services 6660 - SanitaryReplacement Fund §¨¦170 §¨¦170 DELMAR PRICELADUE LAYDIELMANFORSYTH BRENTWOODMCKNIGHTCORNELL MET R O L IN K OLD BONHOM ME MARYLANDBEMISTON DAVIS GROBY MERAMECWE N N E K E R HANLEYLAFON F R AN CI S WARDERCELLASHAFTESBURY LE PEREJACKSONTOPTONAHERN GANNON CENTRALCLAYTON LINDENP OLO H U N TERBERICKRIO VISTAYORK ST A N D REWSGRANADA81STTEASDALEGAY BRAEB U R NGRAYBRIDGE NORTH N SOUTHWYDOWN AMHERST BONHOMME BARBYENFIELD P R IV A T E CRANDONWESTWOODDROM A RABON AIREINDIAN BALSON GLEN E A G L ESOLETAWASHINGTON LITTLE LEECARONDELETBERKLEYRAISHER CARSW O L DBON HILLS GEOFFRYKINGSBURY DAYTONA R E A R BLACK CREEK DUKETERRYDELCRESTRYEVILLA MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA ORLANDO SUDBURYMCKNIGHTPRIVATEVILLA P R I V A T E HANLEYGAYB A LSON PRIVATE GAY§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11689 11 TASK NO: TASK NAME: $1,800,000.00 BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 5 BLACK CREEK I/I REDUCTION BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 62,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. Design Services 6660 - SanitaryReplacement Fund CLARKBOONEPARKER PADDOCKST JOSEPH HUMES NEW FLORISSANTHARRISON WASHINGTONLAFAYETTEJEFFERSONRUE ST DENIS ST CATHERINE ST MARIE ST LOUISCASTELLOAUBUCHONKAYST JEANRUE ST LOUIS C ARLA WATERFORD ST DENISTHUNDERBIRDLILAC RUE ST FRANCOIS RYAN WREN S T IRRUPQUEENS FOX RUN RAVEN TROTTERPIMLIC O GRAHAMMULLANPHY FLORVALORIOLE PEPPERHILLHIALEAHJAMAICAFALCON BROWN RISSANTMARK TWAIN ST JACQUESMARQUETTEST MICHAELBEVERLY ARLINGTONSALLY FARNHAMDEBORAHGLENOROPREAKNESSKAEL REDWOOD SO R RELLDERBY MYRTLE NASHUAMARTINST FERDINANDSPRING VALLEYE L M DALEPATTERSONLAVIN KELLY CHERRYDALE ST STEPHENLOUISEMENKEST PIERREWINNERSSALLY ST FERDINANDBROWNST JEANLINDBERGHLINDBERGH§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11718 11 TASK NO: TASK NAME: $375,000.00 BUDGET: FUND: FlorissantMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 6 BRIGHTWELL I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund LINDSAY PAULKEEVEN MULLANPHY SHACKELFORDJENKEE ESTES FLORDAWN FLAMINGO KINGSFORD ASPEN DOVE LAYVEN SUNSET PARK LOEKES LOVELANDSW A NSWALLOWDEWAYNE FLICKERCENTRALHUMES HOWDERSHELLBOULDER BLU E HERON PRATTMANORALBERTHARKEEMOSELLERADFORDNAOMIDAVID TEAKWOOD MANOR DEL REY RIVERWOOD TRAILS MERCURYRIVERWOOD ESTATES THRUSHFR A N CISCA CROFTDALE PRIVATE NIGHTMOCKINGBIRD HIGH SUN DOWNINGRONDABLUFF PARKSGERALDRAYMONDBLUFFBLACK PINEMONTEREYCHARBONIER GLYNNHAMME S MILLER NORINECRANETO REROSUCASA ELWOODCLOVERMERE LINKOUSCARDINALLA VENTASHIRL EYALANDALEJEANETTE CHARBONIER NAOMIPRIVATE ALBERTPRIVATEPRIVATE NIGHTPRIVATEGERAL D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11719 11 TASK NO: TASK NAME: $700,000.00 BUDGET: FUND: FlorissantMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 7 BRINWOOD I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund CENTRAL MIDLANDRIVER VALLEYHOG HOLLOWW A T E R W O R K SJOHN PELLETPRIVATE W A TER W O RK SG L E N COVERIDGE CRES T R IDGE T R A ILLAKERIVER B E N D RIDGEME A D O W R ID G E C RESTCOLIS EUMOLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11790 11 TASK NO: TASK NAME: $950,000.00 BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Caulks CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 8 CAULKS CREEK FORCE MAIN (RIVER VALLEY RD.TO L-52) EXISTING FORCE MAIN IS UNDERSIZED AND 30 YEARS OLD. CONSTRUCT 11,500 FEET OF 30-INCH FORCEMAIN. THIS BUDGET ITEM INCLUDES $150,000 FOR FORCE MAIN DESIGN ATTHE CAULKS 'B' PUMP STATION, PROJECT 11788. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10376 16 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 9 $1,500,000.00 CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS - NORTH BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINEDSEWERS. PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OFINFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS. Vendor Services 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10377 16 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 10 $1,500,000.00 CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS - SOUTH BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINEDSEWERS. PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OFINFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS. Vendor Services 1101 - General Fund §¨¦170 §¨¦170 LADUEPRICEDIELMAN OLD BONHOMME DELMAR MCKNIGHTLE PEREBARN ES G L EN EAGL E S W E NNEK E RBRAEB U RN BERICKCELLARIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDESTACY BARBYENFIELDHEATHER HILLDRO M A RAPRIV A T EBON AIREFORDY C EKENTSPOON ALANSON ARBORGANNON MANSFIELD BERKLEYLAYKINGSBURYBON HILLS WASHINGTON APPLE TREETERRYDELCRESTRYE SHERATON BRIAR OAK RANDELAYVILLA EDGEWO O D LADUE HILLSWHITE ROSEWILLOW HILLPRICEWOO DSLINDLEY BRAZILLIANLADEL B R IA RCLIFF W A T S O N IA GLENMARYLYNNEBEAUWOODCHERRY HILL PAXTON LARKDALEVILLA PLACEPRIVATEPRIVATE MCKNIGHTMCKNIGHTVILLA §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11722 11 TASK NO: TASK NAME: $1,650,000.00 BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 11 CEDARCREST SANITARY RELIEF (SKME-561) I/IREDUCTION BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 55,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. Design Services 6660 - SanitaryReplacement Fund WYDOWN BIG BENDCLAYTON YORK AUDUBONPA R K RI DGEMOORBYRON H ILLVALEGLENRIDGEOXFORD CROMWELL PARKDALE BROADVIEWBOLANDWELLINGTON OAK KNOLLBUCKINGHAM HILLSIDECENTERASBURYBRENTMOOR SOMERSET RALPHSURREY HILLSBROOKLINECRESTWOOD OAKLANDEDWARDCLAVERACHCLAYTONIAPRIVATE CONCORDIAHARCOURT CARRSWOLD SOUTHMOOR T US CANYCOMMODOREFOREST RIDGE HI LLVALE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11115 11 TASK NO: TASK NAME: $300,000.00 BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 12 CLAVERACH PARK I/I REDUCTION AND SEWERSEPARATION EXCESSIVE I/I IN THE SANITARY SYSTEM. REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 6000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. ALSO SEPARATE 500 FEET OFCOMBINED SEWER Design Services 6660 - SanitaryReplacement Fund BYASSEE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11726 11 TASK NO: TASK NAME: $2,745,000.00 BUDGET: FUND: St. Louis CountyMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 13 COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS. THE DESIGN OF SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL PROJECT SANITARY RELIEFPROJECT. Design Services 6660 - SanitaryReplacement Fund VAILESIN KS OLD HA L L S F E RRY N E W H A L L S F E R R Y94TH M ONDO U B L E A U PRIVATEAQUEDUCT95THAVON WATERFORD 90TH MONSOLS VIE MBRATROTTERSANTIAGO W E D G W OOD CHURCHILL WELLI NGTONHIRONDELLETHUNDERBI RDLISAAB ERDEEN D E L LAGORUE DE RENARDFAIRW A Y LOGIS 9 1STINVICTADAVEYE STATE SARBRE HUMES ROB BINS MILL TREMONT SUNLANDB R U N S WI C K ANGEPYRENEESS ORRELLSEVILLE STIR RUP FOX RUN A V D E PARISJ OS T M A I NGRAVELLE S USSEXRETFORD GREENWAY CHASE SOME RSETJOST ESTATESMOHAN DEEPROUVRE RIVER OAKS DIEC K M A N N DEER VALLEYVALENCIAE S P A C E C H E L S E A BA VILLE LAVIN P R IVATEPRIVATE PRIVA TEPRIVATE LINDBERGHLINDBERGH§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10557 11 TASK NO: TASK NAME: $1,300,000.00 BUDGET: FUND: UnincorporatedMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 14 COLDWATER SANITARY TRUNK SEWER SECTION AREHABILITATION (SKME -240) EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWER. REHABILITATION OF SECTION A, TO REDUCE INFILTRATION IN THECOLDWATER TRUNK SEWER BETWEEN NEW HALLS FERRY ROADAND THE COLDWATER TREATMENT PLANT. BYPASSES TO BEREMOVED. Design Services 6660 - SanitaryReplacement Fund §¨¦40 §¨¦270 §¨¦44 §¨¦70 §¨¦55 §¨¦170 §¨¦70 §¨¦270 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10232 16 TASK NO: TASK NAME: $3,200,000.00 BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 15 COMBINED SEWER AREA - INFLOW/INFILTRATIONASSESSMENT (FY2008) EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTOSANITARY AND COMBINED SEWER SYSTEM CAUSES BUILDINGBACKUPS AND OVERCHARGING OF THE SYSTEM PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW ANDINFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHEDTHROUGH VARIOUS CONSTRUCTION OR REHABILITATION PROJECTS. THIS BUDGET INCLUDES $500,000 FOR INSPECTIONS OF CRITICALSEWER INFRASTRUCTURE IN THE CITY OF ST. LOUIS Professional Services 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 11152 16 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 16 $450,000.00 CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION. PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR TUNNELCONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS. Professional Services 6660 - SanitaryReplacement Fund MAR I NE C E N TR A L M ID L A N D C I T Y O F M A R Y LA ND HEIGHTSCRE V E COE UR MI L L PRIVATE SP OR T PO R T RU L EHOOKS R IV E R P R I V A T E P R IV A T E P R I VAT EP RI V AT E CITY OF MARYLAND HEIGHTSP RI VAT E §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11825 11 TASK NO: TASK NAME: $300,000.00 BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Creve Coeur CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 17 CREVE COEUR CREEK (L-52) FORCE MAINIMPROVEMENTS PHASE II GROWTH AND WET WEATHER INFILTRATION REQUIRES NEW FORCEMAIN. CONSTRUCTION OF 3,500 FEET OF 42-INCH FORCE MAIN ANDAPPURTENANCES. Design Services 6660 - SanitaryReplacement Fund §¨¦70 §¨¦70 LILLIANLUCAS N HUNTHILLSCOLLEGEMCLARANCALVIN SUNBURYRAVINIA NELSONJENWOOD FLETCHERBERM UDAALBIABEULAHROLANDAPRIC OTSAN DIEG O FLORIANCOUNTR Y C L UB HATZSAPPHIREOVERBROOK DAWSON ROXIEHOLBORNTHEODORE GROVELAND CHANDLER STANWOOD ROHN HARNEY F L O RIS S A N T WINCHESTER S H A RO N FOREST HILL B E L W O O D BEGGWILLOW WOODNORWAY GARESCHE SEATTLEFARLEY ELLINGTON HUNTINGTON SUNSET EMMA PINE RIDGE BURRWOOD BRISTOL CURRYUPSHAWONEILLWOODSTEAD OAKRIDGEBLUE SPRUCE N A D I N E WOODDALE FLETCHER§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11730 11 TASK NO: TASK NAME: $2,250,000.00 BUDGET: FUND: VariousMUNICIPALITY: BissellMAJOR SERVICE AREA: BadenWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 18 CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNELAND 1,300 FEET OF 8 - 30-INCH SANITARY AND STORM SEWER.ELIMINATE CONSTRUCTED CSO OUTFALL BP-059. Design Services 6660 - SanitaryReplacement Fund TRASKKEELEN HUDSON ELKIN S HALLS FERRYIMPERIALVORHOFATMORE NASHUA JETTCAPI TOLCROWN POINT L A NDSEERLINNELLREBACHAMPLIN MAYFAIRDOWD PRIOR WINKLERFOLEY CLAIRMONTGREEN VALLEYTANNERMURATCHESLEY OLNEYDELLRIDGETATEALLIANCEVENTURACARGILL JANSONHALLWOODST IVES NE W HALLS FERRY ITTNERQUAKERPANNELLGADBURY BON OAKOLD MANOR VARNUMDEEMBEECHER CLOVERDALEGREEN S L O P E LANGFORDMA LDON AINSWORTH EMERY DACEYCROWLEY MOWBRYSAFFRON OLD HALLS FERRYHALLSTEADCANFIELD H ARNE Y W O L D EM PIRE DO ANEORBITTIBISKIPPOTTKAMPCAPITOL HIL L MINNE FORDPEARSONF O S S CAVALIERSIBLEYQUAKERBEECHER H U D S O N BON OAKCARGILL H U D S O N BON OAK§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11116 11 TASK NO: TASK NAME: $150,000.00 BUDGET: FUND: DellwoodMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 19 DACEY BRANCH I/I REDUCTION (BP-313) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITATE PUBLIC SEWERS (16,500 FEET OF 8" TO 12" SANITARYSEWER AND 2,600 FEET OF 12" TO 21" STORM SEWER). REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS AND REMOVECONSTRUCTED SSO BP-313. Design Services 6660 - SanitaryReplacement Fund §¨¦40CLAYTON WARSONT R E N TSOUTH FORTY DANIELLITZSINGER KENTROANOVERHILL S PRICECELLAD E N NY BARNESMAGNOLIASPRINGWOOD MIDPARKWIND I N G R ID G E INDIANLOG CABINOVERBROOKHIGHDOWNT WIN SP R IN G SROLLING ROCKMAYFAIRWARRIDGE PRIVATETHORNWOOD RAUSCHER DUNLEIT HOAK BENDLEAGRAMWO OD ACRELADUE R I D G EWINDING BROOKP ICAR DY D E E R CREEK W OODC RESTLEELALYLEWOODPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10021 11 TASK NO: TASK NAME: $1,750,000.00 BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 20 DC-02 DEER CREEK SANITARY RELIEF BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. CONSTRUCT 2.4 MILES (12,500 FEET) OF 48-INCH TO 72-INCHDIAMETER SANITARY SEWER, FROM LITZSINGER AND OVERBROOKNORTHWEST TO WARSON ROAD. Design Services 6660 - SanitaryReplacement Fund MCKNIGHTOLD WARSON LITZSINGER PARK PRIVA T E MCKINLEYODAYROCKMANROCK HILLOVERBROOK KORTWRIGHTWARSONCHARLANEOAK LEAFGRAYSTONE CHARLEVILLELITZSING ER WOODSSHERRELL PRIVATE ROCK HILL§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11731 11 TASK NO: TASK NAME: $1,250,000.00 BUDGET: FUND: LadueMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 21 DC-02 DEER CREEK SANITARY RELIEF STORAGETANK EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOs. CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGETANK AND ASSOCIATED STRUCTURES, PUMPING STATIONS ANDSEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARYRELIEF. Pre-Design Services 6660 - SanitaryReplacement Fund §¨¦40 §¨¦270 §¨¦44 §¨¦170 §¨¦170 OLIVE BLVD W A T S O N RDS LINDBERGH BLVDS KIRKWOOD RDM A N C H E S T E R RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11110 16 TASK NO: TASK NAME: $600,000.00 BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 22 DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO'S. DESIGN NECESSARY SYSTEM IMPROVEMENTS IN THE DEER CREEKWATERSHED. Professional Services 1101 - General Fund §¨¦170 §¨¦170 DELMAR GANNON GROBY MCKNIGHT81STOLD BONHOMME LE PERELAFON BALSON STANFORDBERICK T E ASDALEGAYCENTERAMHERST BARBY P R IV A T E TULANE FORSYT H SPOON ALANSON CANTERBURYLITTLE OAKBROO K CRANDONCO RNELL GLENSI DEWASHINGTON D ELCREST BLACKBERRYKI NGDELMULBERRYSWARTHMOREPRICEWO O DSM APLEVIE W SAXONYLORE NZO VILLA BENLOUW A T S O N IA WILNERB R O O KSHIRE UNI VERSITY LOREN WOODS BIRN AWOODSROWLAND AVESDALEGREENSHIREGAYM C K NI GH T GAYMCKNIGHTCORNELL P RIV A T E §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11735 11 TASK NO: TASK NAME: $250,000.00 BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 23 DELCREST SANITARY RELIEF (SKME -565) I/IREDUCTION BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 16,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. Design Services 6660 - SanitaryReplacement Fund §¨¦270 §¨¦270 DUNN ST ANTHONY ST CATHERINE WATERFORDW A S HIN G T O N PERSHALLALLENKINGSLEYCAPRIST LOUIS JEAN ST EDWARDBARTO ST EUGENERIDGEDE RHAKE CARMONACHEYENNETANEY ROGERS N E W F L O RIS S A N T LARRYP RIVA T E COTEAUDURWOOD GRANDVIEWPUEBLOBROOK WOODENGRENOBLE BON AIRELYNN MEADOWSWILSHIREDAUPHIN ST MA R KCOUNTRYS IDE ST FRANCOI S NEWGATELILA DUCHE S N EROBI N WOODA CREDALE SADDLEDUQUETTEHOLIDAY H ILLCLEARVIEWWYCOMBS T L U K E E LIZ A B ETH PEBBLE SHAWNEEPADDOCKOZMENT PADDLEWHEELBIRCHLAWNST DA N IE L O R C HARDBROADMEREST G REG OR YCLEMENSHOLLY BRIGHTMOORELDER ST STEPHEN S T J A MESVALERIE PRIVAT E DERHAKE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11736 11 TASK NO: TASK NAME: $875,000.00 BUDGET: FUND: FlorissantMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 24 DERHAKE I/I REDUCTION & CAPRI TOS.WATERFORD SANITARY RELIEF EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund ADIE PAGE BALLS C H U E T Z L A C K LA N D ARC PAGE SERVICEPRIVATEWESTLINE INDUSTRIALCENTERLINE INDUSTRIALC E NTR A L MID L A N DVERN ALAKESIDE CRO S S IN GNORFOLK SOUTHERNHAMME RADMINISTRATION WESTPORT CENTERPAGE A D M IN IS TRATION PRIVATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10601 11 TASK NO: TASK NAME: $875,000.00 BUDGET: FUND: Maryland HeightsMUNICIPALITY: MissouriMAJOR SERVICE AREA: Fee Fee CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 25 FF-16 SCHUETZ - MEADOWSIDE TO PAGESANITARY RELIEF BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 9,940 FEET OF 27 INCH TO 36 INCH DIAMETER SANITARYRELIEF SEWERS FROM SCHUETZ ROAD NEAR MEADOWSIDE DRIVENORTHWEST TO ADIE ROAD. CONSTRUCTED SSO TO BE REMOVED. Design Services 6660 - SanitaryReplacement Fund KEEVENPAUL LINDSAYCHARBONIERFLORDAWN HOLIDAYHOWDERSHELL TAHOECOACHWAY YAQUI LYNN HAVENTESON LOEKES COACH LIGHT KOSTKA LAYVEN FLORLANDCANISIUS L A MP LIGHT ESTES MANRESA QUEEN ANNLILA ST CHARLESCAMPIONPRATTBELLARMINE FLOR AHAZELVALLEY BROWERMANORJENKEEALBERTRADFORDPALMTRINITY AVION NAOMICANDLE LIGHT IMPERIALALMA RUTH TAMMA ROS E T TANAPLESOLIANRIVERWOOD TRAILSCAL LE VISTA MERCURYBORGIA GONZAGA CROFTDALE CARRI A GEFLAMINGO ELM GROVE RIDERWOOD TANNOIAASP ENFOXT RAIL BARWICK DOWNINGRONDAHAVENTREE GERAL DRAYMOND MONTEREY GERARD PARK ACORN TRAIL MERRIA V ANT THOMPSON LA CUESTA BLANCHETTEPRIVATEBELLFLOWER HAMM E S LANDIHOLLY RIVERBRUCE FOXFIELDGEORGETOWNME S CA L E R O CAIONELA VENTAFLOWERIDGEINDUSTRIAL SLUSSERALANDALESIR LORDSJEANETTE SEMINARYSCOTTYPRATTNAOMIALBERTLINDBERGH§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11749 11 TASK NO: TASK NAME: $198,000.00 BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 26 FLORLAND SANITARY RELIEF PHASE I - I/IREDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund ZINZERGRANT GRANTVIEWGRANTWOOD P R I V A T E LACLEDE STATIONMC N A R Y BRIARVIEW FORESTATE WHITEH AVENVI CKSBURGGRAVOIS VIEWP RIVATEPRIVAT E G R A V O IS R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11750 11 TASK NO: TASK NAME: $425,000.00 BUDGET: FUND: Grantwood VillageMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 27 FORESTATE AND TEXAS SANITARY RELIEF(SKME-513) BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO. CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER.REHABILITATE 12,500 FEET OF 8-INCH TO 24-INCH SANITARY ANDSTORM SEWERS. I/I CONTROL MEASURES FOR VARIOUS PRIVATEAND PUBLIC SOURCES. ELIMINATION OF CONSTRUCTED SSO. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10612 14 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 28 $100,000.00 GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (FY2012) CAPITAL PROJECT CONSTRUCTION MANAGMENTAND PROJECT ANDPRIVATE DEVELOPEMENT INSPECTION NEEDS EXCEEDS INTERNALSTAFF CAPACITY. RETAIN CONSTRUCTION MANAGEMENT FIRM. SERVICES WILL BE FORFY 2012 TO 2014. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Construction Inspection 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10613 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 29 $50,000.00 GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT A GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Geotechnical 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10614 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 30 $50,000.00 GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT B GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Geotechnical 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10615 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 31 $50,000.00 GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT C GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF. RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Geotechnical 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10623 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 32 $300,000.00 GENERAL SERVICES AGREEMENT - SEWER &PROCESS DESIGN (FY2011) DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN.SERVICES WILL BE FOR FY 2011 TO FY 2013. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Design 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10626 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 33 $50,000.00 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT A SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Survey 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10627 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 34 $50,000.00 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT B SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Survey 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10628 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 35 $50,000.00 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT C SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Survey 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10629 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 36 $50,000.00 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT D SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Survey 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10630 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 37 $50,000.00 GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT E SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Survey 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 11779 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 38 $90,000.00 GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT A SEWER DESIGN NEEDS EXCEED CAPACITY OF EXISTINGRESOURCES. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 2013, 2014, & 2015. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Design 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 11780 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 39 $90,000.00 GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B DESIGN NEEDS EXCEED CAPACITY OF EXISTING RESOURCES. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 13 TO 15. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Design 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 11781 11 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 40 $90,000.00 GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT C DESIGN NEEDS EXCEED CAPACITY OF EXISTING RESOURCES. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 13 TO 15. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. General Services -Design 6660 - SanitaryReplacement Fund KIRKHAM GRAYDICKSONSWONGOREOLD WARSON LOCKWOOD LEE ELMESSEX UNION PACIF IC JACKSONSAPPINGTONWOOD MAPLEODAYTAYLORBELLBISMARK BROWNELL QUAN FOOTE EDWINEUCLID JEFFERSONLITHIABENNETT BACON GILL PAR HUDSON ANDREWBODLEY OA KGILBERT CORNELLHILLDEACON AUSTINM E D I N A MCKINLEYPARKLANDADAMS MADISON IOLANORTH BIG BENDLONGVIE W ROCK HILLMARK RENDERERPAPINKORTWRIGHTPARKFLANDERSCURRANPA C I F I C DWYER WILD DEER BOGEY D E S PERESHILLARD ROCKMANCOPP E R H ILL JOANNARIDGE LINED E VONBREMERTONCHELSEA P RIV A T E HIGH HAMPT O NMANI TOUJULIAN VICTORIA WARWICK WATE RBURYMOODYLEONARD OAKSFOX BARRONFREDERICKGLENMOOR HULLF A I R D A L E PARKWOODSMCDONALDHARTGREENVIEWCOLL E G E ALGONQUIN CEDAR B E R R Y HI L L SI DEWOODLAWNBELLEVIEW BEAUFORD HOCHBERRY WOOD RARITAN GASLITE ALFRED NOLAN FUHRMANN RUSSELLSTURGISELM LOCKWOODELM BERRYCHELSEA ALGONQUIN ROCK HILLPAR IOLACEDAR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11122 11 TASK NO: TASK NAME: $110,000.00 BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 41 GLENDALE SECTION D SANITARY RELIEF PHASEIV (SKME-624) I/I REDUCTION EXCESSIVE I/I IN SYSTEM. REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING80,000 FEET OF PIPE SEWERS AND MANHOLES. CONSTRUCTION OF THIS PROJECT RECEIVES PARTIAL FUNDING /SUPPLEMENTAL APPROPRIATION IN FY 14. TOTAL CONSTRUCTIONBUDGET IS $9,600,000. Design Services 6660 - SanitaryReplacement Fund LANGLEY PHILOWALDO A L L E YPILOT V IR G ILKATHLEENHARMONY LACEYROSEMARYACORNLAKEWOOD VIRG ILPI L OT PHILOPILOTKATHLEENROSEMARY G R A V O IS R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10642 11 TASK NO: TASK NAME: $760,000.00 BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Seminary BranchWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 42 HARMONY-ACORN SEWER SEPARATION AND I/IREDUCTION BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS INISOLATED AREA OF COMBINED SEWERS. CONSTRUCT 3,100 FEET OF 12-42 INCH STORM SEWER, 2,700 FEETOF 8-12 INCH SANITARY SEWER, DISCONNECT PRIVATE I/I SOURCES,AND REHABILITATE 8,800 FEET OF PUBLIC SEWERS. Design Services 6660 - SanitaryReplacement Fund §¨¦255 §¨¦55 §¨¦255 UNION PACIFICRIVERKOCHKINSWOOD GREGGUNIONBROADWAYCCCKINGSTONREAVIS BA R RAC KSGRANTLIND TELFO RD FORDER ARLEE SHERMANGENTR YFAIN PRIV ATEJOPLINCLIFFSHER ID A NHOFF M EIS T E RWACHTELRIPA LUNAG A R KLARK CLAGERRAINBOW W EMBLEYRO SYAQUA RIDGE BOUNDARYJEFFERSONIAN FIRSTPECANSOUTHSHIRELAURABUCKLEYDACE SIGSBEE J E FFERSON ELLEN BANISTERDUMONT LISIE U X CLEVES M ERRITTTACOMAKASKE BUNKERBIRCHP R IVATETELEGRAPH RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11711 11 TASK NO: TASK NAME: $2,700,000.00 BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Martigney CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 43 JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS) EXISTING SYSYEM IS NOT ADEQUATE FOR CURRENT CONDITIONS. CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, TOELIMINATE BOTH THE MARTIGNEY AND JB PUMP STATIONS. THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PRE-DESIGN BUDGET IS $4,500,000. Pre-Design Services 6660 - SanitaryReplacement Fund §¨¦170 §¨¦170BROWNMIDLAND LACKLAND WOODSONNORTH SIMSWALTONMCKIBBONARGYLEDIXOLDENREXBALTIMORE BURTON TRESCOTT EMINENCEHOODCOLESWINDOM HUMEBOSWELLTUDOR MILTONGORDONGASSTENNYSON BURNSGOODALEH O L T W O ODCHAUCER ST LOUISROY FORESTPASTEURAIRWAY WISMERGILROSERIDGEWAYORLANDOBENSON GAEBLERWENGLERARLINE SENECA ANN EVERMAN GRACELAND HILLEMANMARVINMARLOWE STELLAQUIETCALVERTMCNULTY ADDIEBRISTOL ARDELIA MORAN WALLISDAWESVERONAEDMUNDSONENGLER EZRA SPENCERHAGNER ASHLANDSUNCRESTROYALTONDAVID SHERWOODOAKLANDMAVIS SHELLEY CHARLACKMARSHALLDENNISON BELHAV ENGOTHLANDE A STRIDGEJOELCROCUS HUNTINGTONAPACHE BURDELLA MECCA ONEIDA LATROBE SHAWNEE DOYLE PATRICEBRECKENRIDGE NORTH WALLISDAVID WISMERMILTONMILTONMIDLAND BRISTOLTENNYSON CALVERTREXAIRWAYCHARLACKMILTON ROYSIMSDIXMARVINTENNYSONCALVERTWISMERDAWESHOODMARSHALLST CHARLES ROCK RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11712 11 TASK NO: TASK NAME: $600,000.00 BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 44 LACKLAND I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund KAPPEL LANGKIRKGAGEDELLWOOD VI CKI ERANDROYCEDENNISWARDLORNAWEST FLORI SSANTFARGO VENICEPERCHFORESTWOODFIR NEWTONCANFIEL D CLARI ONNESBITELLISONNEMNICHSCHLUETERFERGUSON NORTHWINDS ESTATESHIGHMONT RENSHAW EDGEHILL INAG UACADDIEFIELDFLORWOODNORLA KESHIGHM ONT §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11715 11 TASK NO: TASK NAME: $600,000.00 BUDGET: FUND: FergusonMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 45 LANG ROYCE LATERAL SANITARY RELIEF(SKME-320) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH SANITARY SEWER,REHABILITATE PUBLIC SEWERS, AND REMOVE PRIVATE I/I SOURCESFROM SANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-291. Design Services 6660 - SanitaryReplacement Fund §¨¦55 §¨¦44 §¨¦40 §¨¦270 §¨¦70§¨¦170 §¨¦255 §¨¦270 §¨¦70 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11145 16 TASK NO: TASK NAME: $600,000.00 BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 46 LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT) SYSTEM DEFICIENCIES NEEDING CORRECTION. PERFORM AS NEEDED PLANNING, ANALYSIS, AND DESIGN SERVICESIN THE LEMAY WATERSHED. Professional Services 1101 - General Fund P RIVATE UNION PACIFICUNION PACIFICPRIVATEUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFIC§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11649 11 TASK NO: TASK NAME: $1,500,000.00 BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 47 LEMAY WWTP SECONDARY IMPROVEMENTS REQUIRED TO INCREASE SECONDARY CAPACITY TO 210MGD SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY. Design Services 6660 - SanitaryReplacement Fund §¨¦55 §¨¦270 §¨¦44 §¨¦70 §¨¦40 §¨¦170 §¨¦255 §¨¦70 §¨¦270 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11109 16 TASK NO: TASK NAME: $11,000,000.00 BUDGET: FUND: VariousMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: VariousWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 48 LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT) COMBINED SEWAGE OVERFLOWS INTO THE LOWER AND MIDDLERIVER DES PERES THAT POTENTIALLY IMPACT WATER QUALITY. CONSTRUCTION OF 47,400 FEET OF CSO STORAGE TUNNEL,CONSOLIDATION SEWERS, AND DEWATERING PUMP STATION. THISPROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELDINVESTIGATIONS AND PRELIMINARY STUDIES. PROJECT WILL INCLUDE CAPITAL AND NON-CAPITAL SERVICES. Professional Services 6660 - SanitaryReplacement Fund §¨¦270 §¨¦170 §¨¦270 §¨¦170 DUNN KEEVEN HOWDERSHELLUTZ PERSHALL HOLIDAY TAHOE C OA C H W AY YAQUI PAULLYNN HAVEN FLORDAWN FORD TESON CHARBONIER LOEKES PRIVATE COACH LIGHT KOSTKA LAYVEN FL ORLAND TAYLOR LAMPLIG HT LINDSAY ELM GROVEIMPERIALWOODCREST MANRESA QUEEN ANN UNDERCLIFF BR O W N FEE FEE HILLS ST CINCAMPIONPRATTOLIVETO BELLARMINE SUNSETRIVER W O OD TRAILS ALMARADFORDCHULA PALM AVION BARWICK CANDLE LIGHT J A MES S MCDONNELL TAMMA ROSETTAMARY JOBEAM LOY OLACALLE VISTA B ELLFLOWER B ROOKESAIRSHIRE AVANT THOMPSON LA CUESTA LANDIFEE FEEALBERTFOX CRE STL E H N EBRUCE CAPOSELLE HEATHER G R O T T O ROBINWINGJANRIASERENITY PRIVATE TESON RIVERWOOD TRAILS DUNN UTZ P RIVATE PRI V A T E PRIV A T EPRIVATEP R I V ATEN LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11652 11 TASK NO: TASK NAME: $200,000.00 BUDGET: FUND: HazelwoodMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 49 LYNN HAVEN I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund R IV E R V IE W HALLFONTAINE CHAIN OF ROCKS RAFORDBEL LEFONTAINEBROADWAYRIVER RUN RIVER TRAIL M A K A LU LOWELLR IV E R V IE W §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11655 11 TASK NO: TASK NAME: $2,400,000.00 BUDGET: FUND: St. Louis CityMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 50 MALINE CREEK CSO 051 TREATMENT FACILITY CONTROL OF COMBINED SEWER OVERFLOWS. CONSTRUCT CSO TREATMENT FACILITY. PROJECT POTENTIALLY TOINCLUDE STORAGE. THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL DESIGN BUDGET IS $4,000,000. Design Services 6660 - SanitaryReplacement Fund RIVERVIEWHALLLEBON MARIAS N EL A N BURLINGTON NORTHERN SANTA FEFONTAINE CHAIN OF ROCKS P R IV ATETEURVILLELARAMIE R IVER RUNRIVER TRAIL BURLINGTON NORTHERN SANTA FERIVERVIEW§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11656 11 TASK NO: TASK NAME: $1,000,000.00 BUDGET: FUND: St. Louis CityMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 51 MALINE CREEK CSO 052 STORAGE FACILITY CONTROL OF COMBINED SEWER OVERFLOWS CONSTRUCT 1 MG STORAGE FACILITY. Design Services 6660 - SanitaryReplacement Fund CHAMBERS BELLEFONTAINEK IL G O R E C A BOTCOLONYDELHICASTLEMEAD ELBAC O M ET CAMBRIABURLINGTON NORTHERN SANTA FEA S HFORDTAPPAN DURHAML AI RE BIRITZ SURREYDWIGHTCRETE BALLARD COBURG LA N DSMARALDOBOSWORTH DUL U THGO L D E N FOREST HOME JEPSONTWILL C O R INTH BERWYN FONDANORBRIDGEADMIRAL ODE S SA HANSOM ENSLEY PRESTIGE LANCENORTHAMPTONFAT H O M NORWICHLANDWEHR DANVILLE ZELLWEGER U NICORN TRIOSUNBEAM G R E E N ACRES K ELVIN L O CHIELMOLINE FARRINGTONLA ROUXCASTLELEWIS N CLARK BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11658 11 TASK NO: TASK NAME: $200,000.00 BUDGET: FUND: Bellefontaine NeighborsMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 52 MALINE I/I REDUCTION & SEWERREHABILITATION (BP-289)(COLONY DR) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS REHABILITE PUBLIC SEWERS (9,500 FEET OF 8 INCH TO 10 INCHSANITARY SEWER AND 1,500 FEET OF 12 INCH TO 24 INCH STORMSEWER), REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS,AND REMOVE CONSTRUCTED SSO BP-289. Design Services 6660 - SanitaryReplacement Fund HILLSMETRO LI NKEASTROLANDAUGUSTAWACO BERMUDAFLORISSANT ROSEDALE LUCASMARI ETTACOUNTRY CLUBRA VINIAST ANNSPASADENACIRCLE SUNSET WARWI C K HUNTINGTON M A R IL A C FOREST VIEW WINCHESTER ST MARYSOXEYE SPRINGDALE FROWCARDWELLOAKMOUNTCANTERBU R Y ARCOLASAN D IE GOTOWER GROVEBELLER IV E PARKDALEMARK TWAIN METRO LINKEASTF L O RIS S A N TOAKMOUNTNATURAL BRIDGE RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11659 11 TASK NO: TASK NAME: $435,000.00 BUDGET: FUND: NormandyMUNICIPALITY: BissellMAJOR SERVICE AREA: Maline CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 53 MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 700 FEET OF 12"-30" STORM SEWER, REHABILITATEPUBLIC SEWERS AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-292. Design Services 6660 - SanitaryReplacement Fund NORTH BOBB HAROLD KATHLYN EMINENCEWOODSONCALVERTBROWNGORDONBOSWELLST LOUISROY GEDDE MARVINBATAAN GUTHRIE MCNULTY TUTWILER PATRICK MARSHALLCORREGIDOR PALLARDY CHARLACKROSEMORE LEENORA PATRICELINDSCOTTJANET HERBERTMARYKNOLLJONELLFRANNLYNNHAROLD MARVINMCNULTY TUTWILER KATHLYN GORDONLEENORAGO RDONMARSHALLROYBATA AN BROWNPALLARDY §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11662 11 TASK NO: TASK NAME: $1,000,000.00 BUDGET: FUND: VariousMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 54 MCNULTY - PALLARDY I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund ASHBYM ID LA N D LACKLAND PAGE WOODSONSIMSBALTIMORE FLORA RIDGE ECHO BURNSDRIVER NIBLIC POEMIRIAM TRESCOTT HOODDIXKREMDYERGOODALECANTER CHAUCERBROWNGASSTENNYSON THEODOSIA H O L T W O OD O A K REXZYKAN PASTEURM A D D O X GAEBLERWISMERHOBDAY UCEYLEWENGLERLIBERTY FARVIEW CARLYLE DECKERTHORPE EASTBROOK EVERMAN KORANDOM I LTON BRYANTMARLOWE STELLAQUIETSENECAWABADAY OCONNELLWURDACK ADDIEMARVINWALLISCOLESDAWESVERONAIVELANDLAKE ARGYLEOHARECLARENDON SPENCERBOYLSTON ST JOACHIMFOWLERCOTE BRILLIANTEPEBBLE BEACH CALVERTPROUHETAIRWAYMORVENGOCKELULLABY P I N EHURSTSCOTLAND ANGELOHIGHLANDTUDOR B ACHWESTWISE OSGOODRHYTHM BRISTOL CINNAMON HUNTINGTONL O C U S T SHERMANB RUNORONALDLATROBE GILWOODBRISTONDENNISON BRECKENRIDGE SIMSSIMSAIRWAYTHORPE MIDLAND SPENCERCOLESDAWESWALLISWISMERMILTONHUNTINGTONHOODM I R I A M MILTONCHAUCERREXBURNSMILTONCALVERTPOE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11663 11 TASK NO: TASK NAME: $525,000.00 BUDGET: FUND: OverlandMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 55 MIDLAND SANITARY RELIEF - PUBLIC ANDPRIVATE I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATION OF SEWERS AND REDUCTION OF PRIVATE SOURCESTO REMOVE EXCESSIVE INFLOW AND INFILTRATION. Design Services 6660 - SanitaryReplacement Fund PASADENA F L O RIS S A N T LUCAS N HUNTR O LAND OREONHUN TINGTON WINCHESTER BRISTOLHILLSA UGUSTA ST MARYSWARW I CK CANTERBURYARCOLATOWER GROVENORMANDY BRETONCOUNT R Y C L UBCRESTLA N DROLANDBRISTOL R OLAND CANTERBURY NATURAL BRIDGE RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11694 11 TASK NO: TASK NAME: $250,000.00 BUDGET: FUND: Pasadena HillsMUNICIPALITY: BissellMAJOR SERVICE AREA: BadenWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 56 NORTH BADEN CREEK I/I REDUCTION(BP-612)(CANTERBURY DR) EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS CONSTRUCT 450 FEET OF 12-INCH STORM SEWER, REHABILITATEPUBLIC SEWERS (2,000 FEET OF 8 INCH SANITARY SEWER), ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. REMOVECONSTRUCTED SSO BP-612 Design Services 6660 - SanitaryReplacement Fund MACKENZIEWEBERVALCOUR DANAELTONSETH FLETAMATHILDAI VYSTAELY NEW HAMPSHIREGRA MONDSEIBERT KITRADIORIVER DES PERES HEEGE MOHEGANLUCIAALICETONVASELFORMANVITA FABER GENESTA3RD ACORNJA MIESON ALT HEACOLLEENPILOTBONNIE HALEBRENDA HILDA NAGEL MAXWELLMAYLORELSA EDENELGINLANGLEY DELMA SAVIO WALDO NEIERNAVAJOELODE ASTERKIDDERSOUTHERN PHILODARLOWCRAIGHILL TALBO T LAWNSIDE CHESHIRE JOELBERWI CK A L L E YHARLAN TIEMANN WEBER TRAILDEERWOOD ARVIN IVANHOED A R L E NE HURSTGREENC R OY D O N CHIVVISMENOLAWAYNEPA V IA HARMONYPINTOALPINE WOLZWILMA DE MARA RANCHWOOD OAKDALEFELICIARABETHC AYUGACONSULTOBEY CANDACE TOMOREVA SELJOEL FLETAWEBERBRENDAHARLANHEEGE LANGLEY PILOTHEEGEHARLANWATSON RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11695 11 TASK NO: TASK NAME: $500,000.00 BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Mackenzie CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 57 OLDE ENGLISH I/I REMOVAL BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE EXCESSIVE INFLOW AND INFILTRATION FROM PUBLIC ANDPRIVATE SOURCES BY SEWER REHABILITATION AND OTHERIMPROVEMENTS. Design Services 6660 - SanitaryReplacement Fund PAGE ASHBYWARSONLACKLAND DRIVER NIBLIC UNION PACIFIC WISMERBAUR FLORA DIELMANMEEKS MESA DYERLA JOLLA OAK ECHO RIDGEENTITYMADDOX CANTER TRESCOTT HURON ZYKANLIBERTY MIRIAMUCEYLE G R A NDVIEWRESEARCHTRENTON SIMSEASTBROOK KORANDOBRYANTFAIRVIEWOCONNELLNORTH FIELDCR O C KETT WALLISLOTSIEDAWESIVELANDLAKE THEODOSIA SCOTLAND SPENCERMORVENLULLAB YHIGHLANDLACKLINK CENTRAL MIDLAND MIDWEST INDUSTRIAL B ACHBOOTH PAGE INDUSTRIALRHYTHM K AHLMEYER RIT TERRIDDLE CEDAR GLENHUNTINGTONLOCUST DIELMAN ROCK ISLAND INDUSTRIAL MOHAVEWIBRACHTKINARKWERREMEYERCHAUCER ZIMMERMANHENNEPINL O C U S T CANTER WALLISTRENTON SPENCEROAK SIMSO A K DAWES§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11697 11 TASK NO: TASK NAME: $180,000.00 BUDGET: FUND: OverlandMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 58 PAGE TO TRENTON SANITARY RELIEF OVERCHARGED SANITARY SEWER AND CONSTRUCTED SSO CONSTRUCT 36-INCH AND 48-INCH DIAMETER LINEAR STORAGETANKS. REMOVE ONE CONSTRUCTED SANITARY SEWER OVERFLOW. Design Services 6660 - SanitaryReplacement Fund LAVINIAVARGAS DANDRIDGEFARADAYBAPTIST CHURCHSHEA MUSI CKPICKWICKGAIL OASIS MALLORY WILLINDAMUGANCATHY EDGECLIFFE CORAL RIDGE KINGSMERE THREE COURT BIMINIFITE T H AY ERLAVIER CORNING LAWNBROOK BERNADINE C O N C ORD CIRCLEEDGEMOOR PALMYRAMARTINIQUE WALCHSHAUSER M U S IC K M A N O R LAVINIA§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11698 11 TASK NO: TASK NAME: $400,000.00 BUDGET: FUND: UnincorporatedMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Gravois CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 59 PICKWICK-BERNADINE-BIMINI SANITARY RELIEF BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOs. CONSTRUCT 3,100 FEET OF 8-INCH TO 18-INCH SANITARY SEWERS.REHABILITATE 40,000 FEET OF 8-INCH TO 27-INCH SANITARY ANDSTORM SEWERS. VARIOUS I/I REDUCTION MEASURES FOR PUBLICAND PRIVATE SOURCES. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 11699 16 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 60 $500,000.00 PRIVATE INFLOW/INFILTRATION PUBLICENGAGEMENT PROGRAM 2013 PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWERSYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS. PUBLIC ENGAGEMENT PROGRAM REGARDING REMOVAL OF PRIVATESTORMWATER SOURCES, CONSENT DECREE & OTHER WETWEATHER COMMUNICATIONS. Professional Services 1101 - General Fund LILACBLUFF SCENIC ADRIAN RIVERVIEWBURLINGTON NORTHERN SANTA FEV A L L E YDIAMOND SCRANTON LEETON C A L UMETKELVIN FORKGLOUCESTERST C YR MIDR I D G E PRIVATERIVERMONTLOOKOUT WESTHADDOCK MARSHFIELD P RIVATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11094 11 TASK NO: TASK NAME: $350,000.00 BUDGET: FUND: St. Louis CityMUNICIPALITY: BissellMAJOR SERVICE AREA: MISSISSIPPI RIVER (CITY)WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 61 PROSPECT HILL LANDFILL VERTICAL EXPANSION LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE. VERTICALLY EXPAND EXISTING DISPOSAL SITE. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10743 16 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 62 $120,000.00 RADAR RAINFALL DATA (FY2011) ACTUAL FLOWS FROM INFLOW AND INFILTRATION DUE TO RAINEVENTS IS NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEMMODELS. INTERGRATION OF EXISTING RAIN GAUGE NETWORK WITH RADARIMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING ANDINFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. Vendor Services 1101 - General Fund BERRYKIRKHAMWOODLAWN OLD WARSON LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK BROWNELLHARRISONQUAN LITZSINGER FOOTEWARSON SWONBENNETTBACON SARAH PAR HUDSON ANDREWOA KGILBERTDEACON GORE M E D I N A MCKINLEYIOLANORTH MAPLE D E N NY ROCK HILLMARK RENDERERKORTWRIGHTWILSON OVERBROOK F LAN D ER S CURRANSQUIRES DWYER WILD DEER BOGEY HILLARD ROCKMANPARK COPP E R H ILL ELMJOANNARIDGE LINECHELSEA P RIV A T E LITHIA EUCLID JEFFERSONHIGH HAMPT O NMANI TOUJULIAN PA C IF I C VICTORIA WARWICK WATE RBURYLEONARDBARRONFREDERICKGLENMOOR HUNTLEIGH DUNLEIT HHULLF A I R D A L E HARTJEWEL G REEN VIEWBEAUFORD HOCHGASLITE MERMOD ALFRED NOLAN FUHRMANNEARLSTURGIS B E R R Y R O A D IOLACLAYROCK HILLOAKPRIVATE PARPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11069 11 TASK NO: TASK NAME: $600,000.00 BUDGET: FUND: Rock HillMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 63 ROCK HILL SANITARY RELIEF (SKME -618) SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 48,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS Design Services 6660 - SanitaryReplacement Fund WEBERPILOTPHILO DANAWAYNEROSEMARYV IR G IL KATHLEENOVERTONA L L E Y FORMANAUTUMN CANDACE V IRGIL PHI L O§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10748 11 TASK NO: TASK NAME: $440,000.00 BUDGET: FUND: Wilbur ParkMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: River Des PeresWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 64 ROSEMARY, PHILO & KATHLEEN SEWERSEPARATION APPROXIMATELY 115 RESIDENCES HAVE DOWNSPOUTS ANDDRIVEWAY DRAINS CONNECTED TO THE SANITARY SEWER. DISCONNECT DRIVEWAY DRAINS AND DOWNSPOUTS. CONSTRUCTAPPROXIMATELY 350 FEET OF 10-INCH SANITARY SEWER AND 2000FEET OF 12-INCH TO 18-INCH INCH STORM SEWER ANDAPPURTENANCES, PUBLIC AND PRIVATE I/I REDUCTION. Design Services 6660 - SanitaryReplacement Fund §¨¦170 HANLEYCLAYTON DAVISBRENTWOOD ME T R O LI N K F RA NC IS FOREST PARK FORSYTH SHAW PARK WEN NEKERCENTRALLOUWENPOL OMERAMECBEMISTONLANGTONWATKINSHUNTERT A N G L E WO OD CARONDELET DAYTONA RE AR HALI F A X T O P TON VENETIAN COL MAR SH I RLEY CRESC E NTORLANDO ROSILINE MCCUTCHEONSUDBURYBERKSHIREPRI VATEPARKSID E WALINCA WHITBURNDROMARA MOHAWK R O X B U R G H FORESTBILTMORE COUNTRY CLUB MERAMECCENTRALMET R O L I NK CENT RALFORE S T P A R K WALINCA §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11680 11 TASK NO: TASK NAME: $500,000.00 BUDGET: FUND: ClaytonMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Black CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 65 ROXBURY I/I REDUCTION BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 16,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10231 16 TASK NO: TASK NAME: $1,200,000.00 BUDGET: FUND: St. Louis CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: VariousWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 66 SEPARATE SEWER AREA - INFLOW/INFILTRATIONASSESSMENT (FY2008) EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTOSANITARY SEWERS CAUSES BUILDING BACKUPS ANDOVERCHARGING OF THE SYSTEM. PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW ANDINFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHEDTHROUGH VARIOUS FUTURE CONSTRUCTION AND REHABILITATIONPROJECTS. Professional Services 1101 - General Fund SPOEDEWARSONLADUEGRAESERMOSLEY PRIVATECRAIGTE A L W OOD BEAVER ST ACY DWYERDAUTELELZEY C LERM O N TRUNNYMEDE OAK PARKS CH UL T ESTONEYSIDERONDELAY FIESTA SONAALD EN B R O OKTRAIL HEATHER HILLVOUGACONWAYBAL HARBO U R LARKINDONOHO ST PAUL TUREENFAIRWAYS LADUE ESTATESOLD OLIVE STREET LISA TRIESTE RENEEDAYKIN AL L E G ROBENWOOD MARFORDPICARD YNEW SALEMSHERWYNTRI LA N E FIEL D IN GC OUNTRY FAIRM A R Y HILL CLERBROOK APPLE TREEOLIVE LAKEQ UA I L W A Y S MOSLEY HILL OAK GATE PILLARCHERRI COUNTR Y V IE W NOTRE DAMEWOODFIELD D O G W O O D FORCEE Q U E E N S B R O O K CHALET SUNDOWNOLD OLIV E STREET OLIVE BLVD N LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10754 11 TASK NO: TASK NAME: $420,000.00 BUDGET: FUND: Creve CoeurMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 67 SHERWYN SANITARY RELIEF (SKME -651) & I/IREDUCTION BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS CONSTRUCT APPROXIMATELY 1200 FEET OF 12-INCH SANITARYSEWERS; REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATESOURCES BY REHABILITATING 35,000 FEET OF PIPE SEWERS ANDMANHOLES AND REMOVING PRIVATE DEFECTS Design Services 6660 - SanitaryReplacement Fund BOONEST MARIE CLARKHARRISON WASHINGTON LAFAYETTEJEFFERSONBROWNCASTELLORUE ST CATHERINE ST JACQUESRUE ST LOUIS NEW FLORISSANTRUE ST FRANCOIS RUE ST DENIS AUBUCHONRUE ST JEANST JEANREGINARUE ST PIERREST CATHERINE ST BAPTISTA ST AUGUSTA ST ALBERT BROWN§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11666 11 TASK NO: TASK NAME: $258,000.00 BUDGET: FUND: FlorissantMUNICIPALITY: ColdwaterMAJOR SERVICE AREA: Coldwater CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 68 ST MARIE SANITARY RELIEF I/I REDUCTION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10766 16 TASK NO: TASK NAME: BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 69 $550,000.00 STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS) DATA IS REQUIRED TO DETERMINE URBAN STORMWATERRAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FORWATER QUANTITY & QUALITY EVALUATION OF STREAMS CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM INCONJUNCTION WITH WATERSHED AND STORMWATER PLANNING ANDDESIGN EFFORTS. Vendor Services 1101 - General Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10768 16 TASK NO: TASK NAME: BUDGET: FUND: VariousMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE:Asset Management Page 70 $660,000.00 STREAM FLOW WATER QUALITY SAMPLING (FY2011) STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYFROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION &STORMWATER MANAGEMENT PROGRAMS PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITH MSD'S SERVICE AREA. Vendor Services 1101 - General Fund §¨¦55 §¨¦55KERTH BUTLER HILL RINGERAMBS DANTONAIREVALLEY SIDEC LAYRIDGESTARLITREGALWAY GWE N MILLO WENSLITTLE ROCKSIR BORSCHE R R YVIEWTUCKAWAY STARVIEW B RITCASTLE OLD LEMAY FERRYBARBAGALLO EILEEN ANN VENTURA PLACE OZARKGLENM ID AMERICAF UCHSI R O N S ID E PROVIDENCE PLACECAMELOT ESTATESBROOKTOP G RAN D C ASTLE ABERDOURROUNDTABLE DAIQ UIRIBRA U N GATE ZAM ORACRESTSID EMORNINGD ALEH E R IT A G E W O O D SBUTLER H ILL E S TA T E S HAWKINS GLEN GARONPRIVATE KERTH CIRCL E SUNDESERTPRIVATE LEMAY FERRY RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11670 11 TASK NO: TASK NAME: $120,000.00 BUDGET: FUND: St. Louis CountyMUNICIPALITY: MeramecMAJOR SERVICE AREA: Mattese CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 71 TUCKAWAY SANITARY REHABILITATION EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS. REMOVE EXCESSIVE INFLOW AND INFILTRATION THROUGH SEWERREHABILITATION AND OTHER METHODS. Design Services 6660 - SanitaryReplacement Fund §¨¦170 PAGE HANLEYCANTON MIDLAND TERMINAL 82NDNORTH N SOUTHLYNNWALTONWAYNE LAMB78THLIBERTY B R A D D O C K APPLETON GRANTMILAN MENDELLBELT WAYGULFMADISON V I N I T A PRIVATEELMORE RICHARD MONROE FAIRVIEWTRENTON ORCHARD CARLETON79TH EASTOVERCOOLIDGE 81STWESTOVERKOREA RABEAL ERT HAFNERARCHER FULLERTON BUCHANAN MELROSEMOUNT OLIVEPOLKJEFFERSON STILLWATERWELLINGTON DAJOBYLAUGHLIN BLOOM CRYSTALCHAPIN INDUSTRIAL A T H E RTONMONTREAL FAIRHAM HARRISONLYNDALEVAUGHANPARAMOUNT LAUGHRENMOOREANNAANNANDALEHAWTHORNER USHMOREERI T HWASHINGTON ERMESCARLETON ALERT L Y N N MILAN TERMINAL LAUGHLINWAYNE MELROSE MILAN MENDELLW A Y N E BLOOM OLIVE BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10027 11 TASK NO: TASK NAME: $800,000.00 BUDGET: FUND: University CityMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 72 UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595) BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS. CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH DIAMETER SANITARYRELIEF SEWERS AND APPURTENANCES. CONSTRUCTED SANITARYSEWER OVERFLOWS TO BE REMOVED. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10230 16 TASK NO: TASK NAME: BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 73 $4,500,000.00 WATERSHED FACILITY PLANNING PHASE II SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITALIMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTINGDISTRICT STAFF. UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT,ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THEDISTRICT, INFLOW/INFILTRATION SERVICES, AND SPECIALTYVENDORS. Professional Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RAVOISLINDBERGHMO364 MO100 MO370 TELEGRAPHMO30MO141 W A T SON ST CHARLES ROCK LEM AY FERRYHIG H WAY 67 TESSON FERRYCLARKSONCHIPPEWA KIRKWOODNATURAL BRIDGE M ANCHESTER M O 36 4 MANCHESTE R NATURAL BRIDGE LINDBERGHMANCHESTER MO370 M O30 CHIPPEWA HIGHWAY 67LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2013 PROJECT NO: 10230 16 TASK NO: TASK NAME: BUDGET: FUND: St. Louis City and CountyMUNICIPALITY: VariousMAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Asset Management Page 74 $500,000.00 WATERSHED FACILITY PLANNING PHASE II SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITALIMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTINGDISTRICT STAFF. UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT,ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THEDISTRICT, INFLOW/INFILTRATION SERVICES, AND SPECIALTYVENDORS. Professional Services 1101 - General Fund ELMCENTRA LSHORT F IR W O O D GLENDALE G O R EREAVIS OLA OAK TREE ST GEORGE W ILS H IR ETU RF W E B S T E R A C R E S WEBSTE R OAKS ELM§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11086 11 TASK NO: TASK NAME: $320,000.00 BUDGET: FUND: Webster GrovesMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Mackenzie CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 75 WEBSTER ACRES SANITARY SEWERREPLACEMENT BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DUE TOROOT INTRUSION AND STRUCTURAL DEFECTS IN THE EXISTINGMAIN. CONSTRUCT 2,500 FEET OF 8-INCH SANITARY RELIEF SEWER TOREPLACE DETERIORATED 6-INCH PIPE, 850 FEET OF 12-INCH TO18-INCH STORM SEWERS, AND PUBLIC AND PRIVATE I/I REDUCTION. Design Services 6660 - SanitaryReplacement Fund §¨¦44 §¨¦44 BIG BEN DBERRYUNION PACIF I C EDGARLOCKWOOD KIRKHAM GRAYDICKSONGORENEWPORT GLENDALE LEE ELMCLARK B U R L IN G T O N N O R T H E R N S A N T A F E BOMPARTSAPPINGTONTUXEDO MAPLEODAYLACLEDE STATIONESSEX LILACBELLSELMABAKER HOLMESBISMARK JACKSON BROWNELL ATALANTAGLEN OAK TREE EUCLID LITHIABENNETT PACIFIC PLANTBACON SUMMITJOYARGONNE BRENTWOODMADGE ANDREWJEFFERSONSYLVESTEROAKGILBERTCORNELLM A DISONOAK L A N DPARK MARYLOUISAUSTINFAIRVIEWMCKINLEY R ID G EIOLA REAVISNORTH YEATMANGA R DE NROCK HILLADAMS SALEMPAPIN IMSEKORTWRIGHTSPRINGWEIL FO R ESTDWYER F R IS C O CLARAHOLLYWOOD OAKWOOD D E S PERESFLORE NCECOP P E R HILL LANVALEJOANNA EUNICE ALICEGRA N T FIELDSTON VICTORIA WARWICK GREELEY SWON HIGH HA M PTO NMOODY FOX BARRONFREDERICKARBOR HULLRUTHMCDONALD M E R R IT T MANDERLYTYLERPORTERCOLLEGE COLLIERALGONQUIN CEDAR LOCUST GASLITE ELLIOTT ALLISON GLENELMJACKSON CLARKELMELMSUMMITMANCHESTER R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11678 11 TASK NO: TASK NAME: $400,000.00 BUDGET: FUND: Webster GrovesMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: Deer CreekWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 76 WEBSTER GROVES TRUNK "E" SANITARYREHABILITATION AND I/I REDUCTION PHASE IV BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS. REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCESTHROUGH SEWER REHABILITATION AND OTHER METHODS. Design Services 6660 - SanitaryReplacement Fund FLORA ECHO MIRIAM RIDGE SPENCERWISMERTHEODOSIA HUNTINGTONHOODWALLISCOTE BRILLIANTEDAWESHUNTINGTONCOTE BRILLIANTE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 FISCAL YEAR: 2013 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11108 11 TASK NO: TASK NAME: $300,000.00 BUDGET: FUND: OverlandMUNICIPALITY: Lemay/RDPMAJOR SERVICE AREA: University City BranchWATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE:Capital Page 77 WISMER - HUNTINGTON SANITARY RELIEF (SKME-592) BUILDING BACKUPS AND TWO CONSTRUCTED SANITARY SEWEROVERFLOWS. REPLACE 2500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER WITH12-INCH TO 21-INCH SANITARY SEWER. REMOVE TWO CONSTRUCTEDSANITARY SEWER OVERFLOWS. Design Services 6660 - SanitaryReplacement Fund