HomeMy Public PortalAboutS Wastewater Engineering Projects (Contents)CHAMBERS TOELLECOBURG LANDSDARR
BLISS
BELLEFONTAINEK IL G O R E C
A
B
O
TASHBROOKHOYT
SHEPLEYEWELLNECTAR
ROXTON
SEATONAVANT
ELBABAKEWELLADDISON
BURLINGTON NORTHERN SANTA FEA SHFORD
DELHIATTICA
AKRON
TAPPANLAIRE
LILACESQUIRE
C O MET
DOROTHYCRETETRIOB ALLARD
MARALDOBOSWORTH
FONTANSON
JEPSONG O L D E N
MCCARTNEYNEWB
O
L
DBELLA
FONDAC O R I NTH
SURREYBYFIELDODESSAHAVILANDDRUIDENSLEYREPOSELANCESURF TOPAZCOSIE
NORTHAMPTONSCIENCE HILLNORWICHU
NICORN
FAT H O M
ALCOVE
L O CHIELBELGR OVEGLOROSEFARRINGTON
LA ROUXLILAC§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11684
11
TASK NO:
TASK NAME:
$220,000.00
BUDGET:
FUND:
Bellefontaine NeighborsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 1
BELLEFONTAINE #2 LATERAL SANITARY RELIEF(BP-287)(COBURG LANDS DR)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITION OF PUBLIC SEWERS (3,750 FEET OF 8 INCH TO 12 INCHSANITARY SEWER AND 2,900 FEET OF 12 INCH TO 24 INCH STORMSEWER) AND REMOVAL OF PRIVATE I/I SOURCES FROM SANITARYSEWERS. REMOVE CONSTRUCTED SSO BP-287
Design Services
6660 - SanitaryReplacement Fund
CHAMBERSBELLEFONTAINE
RIVERVIEWLILACTOELLEST CYR
S HEPLEY
FRY
BLUFF
SCENIC
V
A
LLEYCOBURG LAND S
BELGROVE
DARRBLISS
ADRIAN
K IL G O R E CABOT
A SHBROOKC AMERON
HOYT
EWELLNECTAR
BURLINGTON NORTHERN SANTA FEDURNESSRENFREWCASTLELOOKAWAYDELHILEBON
MEAD
SCRANTONELBACOMET
COBURG
CAMBRIAATTICA
LEETONGLOUCESTE RDURHAMHABECKINGHOBKIRK
BIRITZ
ADLERPRESLEYTRIONELA
N STIMSONM ARALDOBOSWORTH
T AYG O LDE N
FORK
GRAMPIANHAVILAND
ROSSTWILL
JEFFREYBAGNELLTHRIFT DENNESSNORBRIDGEFOXPATHTOPAZODESSA
HANSOM
SIEBE
RONTEL
PRESTIGE
COSIE
LANDWEHR
ZELLWEGER DUDLEYSUNBEAM GARDOLILACCASTLESHEPLEY
ST CYRLEWIS N CLARK BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11685
11
TASK NO:
TASK NAME:
$490,000.00
BUDGET:
FUND:
Bellefontaine NeighborsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 2
BISSEL HILLS SANITARY RELIEF/CALUMENT I/IREDUCTION (BP-317)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATE PUBLIC SEWERS (45,000 FEET OF 8 INCH TO 21 INCHSANITARY SEWER) AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-317
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11144
16
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 3
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFORM AS NEEDED PLANNING, ANALYSIS AND DESIGN SERVICESTHROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMECWATERSHEDS.
Professional Services
1101 - General Fund
CLAYTONLOUWEN H A L I FA X
BERKSHIRE SUDBURYMCCUTCHEONR O X B U R G H
HA
D
DIN
G
T
ONWHITBURNST LOUIS GA LLERIA
W
ENNEKER
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11688
11
TASK NO:
TASK NAME:
$625,000.00
BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Non-recurring
Page 4
BLACK CREEK - HADDINGTON COURT STORAGETANK
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGETANK AND ASSOCIATED STRUCTURES, PUMPING STATIONS ANDSEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARYRELIEF.
Pre-Design Services
6660 - SanitaryReplacement Fund
§¨¦170
§¨¦170
DELMAR
PRICELADUE
LAYDIELMANFORSYTH
BRENTWOODMCKNIGHTCORNELL
MET R O L IN K
OLD BONHOM
ME
MARYLANDBEMISTON
DAVIS
GROBY
MERAMECWE
N
N
E
K
E
R HANLEYLAFON
F
R
AN
CI
S WARDERCELLASHAFTESBURY
LE PEREJACKSONTOPTONAHERN
GANNON
CENTRALCLAYTON LINDENP
OLO
H
U
N
TERBERICKRIO VISTAYORK
ST A N D REWSGRANADA81STTEASDALEGAY
BRAEB
U
R
NGRAYBRIDGE NORTH N SOUTHWYDOWN
AMHERST
BONHOMME
BARBYENFIELD
P R IV A T E
CRANDONWESTWOODDROM
A
RABON AIREINDIAN
BALSON
GLEN E A G L ESOLETAWASHINGTON
LITTLE
LEECARONDELETBERKLEYRAISHER
CARSW O L DBON HILLS
GEOFFRYKINGSBURY
DAYTONA
R E A R
BLACK CREEK DUKETERRYDELCRESTRYEVILLA
MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA
ORLANDO
SUDBURYMCKNIGHTPRIVATEVILLA
P
R
I
V
A
T
E
HANLEYGAYB A LSON
PRIVATE GAY§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11689
11
TASK NO:
TASK NAME:
$1,800,000.00
BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 5
BLACK CREEK I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 62,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
Design Services
6660 - SanitaryReplacement Fund
CLARKBOONEPARKER
PADDOCKST JOSEPH
HUMES
NEW FLORISSANTHARRISON
WASHINGTONLAFAYETTEJEFFERSONRUE ST DENIS
ST CATHERINE
ST MARIE ST LOUISCASTELLOAUBUCHONKAYST JEANRUE ST LOUIS
C ARLA
WATERFORD
ST DENISTHUNDERBIRDLILAC
RUE ST FRANCOIS
RYAN
WREN
S T IRRUPQUEENS
FOX RUN
RAVEN
TROTTERPIMLIC
O
GRAHAMMULLANPHY
FLORVALORIOLE
PEPPERHILLHIALEAHJAMAICAFALCON
BROWN
RISSANTMARK TWAIN
ST JACQUESMARQUETTEST MICHAELBEVERLY ARLINGTONSALLY FARNHAMDEBORAHGLENOROPREAKNESSKAEL
REDWOOD
SO R RELLDERBY
MYRTLE
NASHUAMARTINST FERDINANDSPRING VALLEYE
L
M
DALEPATTERSONLAVIN
KELLY
CHERRYDALE
ST STEPHENLOUISEMENKEST PIERREWINNERSSALLY
ST FERDINANDBROWNST JEANLINDBERGHLINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11718
11
TASK NO:
TASK NAME:
$375,000.00
BUDGET:
FUND:
FlorissantMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 6
BRIGHTWELL I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
LINDSAY
PAULKEEVEN
MULLANPHY SHACKELFORDJENKEE ESTES
FLORDAWN
FLAMINGO
KINGSFORD
ASPEN
DOVE
LAYVEN
SUNSET PARK
LOEKES LOVELANDSW A NSWALLOWDEWAYNE
FLICKERCENTRALHUMES
HOWDERSHELLBOULDER
BLU E HERON
PRATTMANORALBERTHARKEEMOSELLERADFORDNAOMIDAVID
TEAKWOOD MANOR
DEL REY
RIVERWOOD TRAILS MERCURYRIVERWOOD ESTATES THRUSHFR A N CISCA
CROFTDALE
PRIVATE NIGHTMOCKINGBIRD
HIGH SUN
DOWNINGRONDABLUFF PARKSGERALDRAYMONDBLUFFBLACK PINEMONTEREYCHARBONIER
GLYNNHAMME S
MILLER
NORINECRANETO REROSUCASA
ELWOODCLOVERMERE
LINKOUSCARDINALLA VENTASHIRL EYALANDALEJEANETTE
CHARBONIER
NAOMIPRIVATE
ALBERTPRIVATEPRIVATE NIGHTPRIVATEGERAL D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11719
11
TASK NO:
TASK NAME:
$700,000.00
BUDGET:
FUND:
FlorissantMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 7
BRINWOOD I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
CENTRAL MIDLANDRIVER VALLEYHOG HOLLOWW A T E R W O R K SJOHN PELLETPRIVATE
W A TER W O RK SG L E N COVERIDGE CRES T
R IDGE T R A ILLAKERIVER B E N D
RIDGEME A D O W
R ID G E C RESTCOLIS EUMOLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11790
11
TASK NO:
TASK NAME:
$950,000.00
BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Caulks CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 8
CAULKS CREEK FORCE MAIN (RIVER VALLEY RD.TO L-52)
EXISTING FORCE MAIN IS UNDERSIZED AND 30 YEARS OLD.
CONSTRUCT 11,500 FEET OF 30-INCH FORCEMAIN.
THIS BUDGET ITEM INCLUDES $150,000 FOR FORCE MAIN DESIGN ATTHE CAULKS 'B' PUMP STATION, PROJECT 11788.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10376
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 9
$1,500,000.00
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS - NORTH
BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINEDSEWERS.
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OFINFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
Vendor Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10377
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 10
$1,500,000.00
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS - SOUTH
BUILDING BACKUPS AND OVERCHARGED SANITARY OR COMBINEDSEWERS.
PHYSICAL INSPECTION OF SEWERS TO IDENTIFY SOURCES OFINFLOW AND INFILTRATION AND/OR PHYSICAL DEFECTS.
Vendor Services
1101 - General Fund
§¨¦170
§¨¦170
LADUEPRICEDIELMAN OLD BONHOMME
DELMAR
MCKNIGHTLE PEREBARN ES
G L EN EAGL E S
W
E
NNEK
E
RBRAEB
U
RN BERICKCELLARIO VISTAST A N D REWSGRANADAGRAYBRIDGESTONEYSIDESTACY
BARBYENFIELDHEATHER HILLDRO
M
A
RAPRIV
A
T
EBON AIREFORDY
C
EKENTSPOON
ALANSON
ARBORGANNON
MANSFIELD
BERKLEYLAYKINGSBURYBON HILLS
WASHINGTON
APPLE TREETERRYDELCRESTRYE
SHERATON
BRIAR OAK
RANDELAYVILLA
EDGEWO O D
LADUE HILLSWHITE ROSEWILLOW HILLPRICEWOO DSLINDLEY
BRAZILLIANLADEL
B R IA RCLIFF
W A T S O N IA
GLENMARYLYNNEBEAUWOODCHERRY HILL
PAXTON
LARKDALEVILLA PLACEPRIVATEPRIVATE MCKNIGHTMCKNIGHTVILLA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11722
11
TASK NO:
TASK NAME:
$1,650,000.00
BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 11
CEDARCREST SANITARY RELIEF (SKME-561) I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 55,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
Design Services
6660 - SanitaryReplacement Fund
WYDOWN
BIG BENDCLAYTON
YORK
AUDUBONPA R K RI
DGEMOORBYRON
H ILLVALEGLENRIDGEOXFORD
CROMWELL
PARKDALE
BROADVIEWBOLANDWELLINGTON
OAK KNOLLBUCKINGHAM
HILLSIDECENTERASBURYBRENTMOOR
SOMERSET
RALPHSURREY HILLSBROOKLINECRESTWOOD
OAKLANDEDWARDCLAVERACHCLAYTONIAPRIVATE CONCORDIAHARCOURT
CARRSWOLD
SOUTHMOOR
T US CANYCOMMODOREFOREST RIDGE
HI
LLVALE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11115
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 12
CLAVERACH PARK I/I REDUCTION AND SEWERSEPARATION
EXCESSIVE I/I IN THE SANITARY SYSTEM.
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 6000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS. ALSO SEPARATE 500 FEET OFCOMBINED SEWER
Design Services
6660 - SanitaryReplacement Fund
BYASSEE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11726
11
TASK NO:
TASK NAME:
$2,745,000.00
BUDGET:
FUND:
St. Louis CountyMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 13
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
THE DESIGN OF SANITARY SEWAGE WET WEATHER STORAGEFACILITIES AS PART OF THE OVERALL PROJECT SANITARY RELIEFPROJECT.
Design Services
6660 - SanitaryReplacement Fund
VAILESIN
KS
OLD HA
L
L
S F
E
RRY
N
E
W H
A
L
L
S F
E
R
R
Y94TH M
ONDO
U
B
L
E
A
U PRIVATEAQUEDUCT95THAVON
WATERFORD
90TH
MONSOLS
VIE MBRATROTTERSANTIAGO
W E D G W OOD
CHURCHILL
WELLI
NGTONHIRONDELLETHUNDERBI
RDLISAAB
ERDEEN
D E L LAGORUE DE RENARDFAIRW A Y
LOGIS
9 1STINVICTADAVEYE STATE SARBRE
HUMES ROB BINS MILL
TREMONT SUNLANDB
R
U
N
S
WI
C
K ANGEPYRENEESS ORRELLSEVILLE
STIR RUP
FOX RUN
A V D E PARISJ
OS
T
M
A
I
NGRAVELLE
S
USSEXRETFORD
GREENWAY CHASE
SOME RSETJOST ESTATESMOHAN
DEEPROUVRE
RIVER OAKS
DIEC
K
M
A
N
N
DEER VALLEYVALENCIAE S P A C E
C H E L S E A
BA VILLE
LAVIN
P R IVATEPRIVATE
PRIVA TEPRIVATE
LINDBERGHLINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10557
11
TASK NO:
TASK NAME:
$1,300,000.00
BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 14
COLDWATER SANITARY TRUNK SEWER SECTION AREHABILITATION (SKME -240)
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWER.
REHABILITATION OF SECTION A, TO REDUCE INFILTRATION IN THECOLDWATER TRUNK SEWER BETWEEN NEW HALLS FERRY ROADAND THE COLDWATER TREATMENT PLANT. BYPASSES TO BEREMOVED.
Design Services
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦70
§¨¦270
§¨¦170
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10232
16
TASK NO:
TASK NAME:
$3,200,000.00
BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 15
COMBINED SEWER AREA - INFLOW/INFILTRATIONASSESSMENT (FY2008)
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTOSANITARY AND COMBINED SEWER SYSTEM CAUSES BUILDINGBACKUPS AND OVERCHARGING OF THE SYSTEM
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW ANDINFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHEDTHROUGH VARIOUS CONSTRUCTION OR REHABILITATION PROJECTS.
THIS BUDGET INCLUDES $500,000 FOR INSPECTIONS OF CRITICALSEWER INFRASTRUCTURE IN THE CITY OF ST. LOUIS
Professional Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11152
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 16
$450,000.00
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR TUNNELCONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS.
Professional Services
6660 - SanitaryReplacement Fund
MAR
I
NE
C E N TR A L M ID L A N D
C I T Y O F M A R Y LA ND HEIGHTSCRE
V
E COE
UR MI
L
L PRIVATE
SP
OR
T PO
R
T RU
L
EHOOKS R IV E R
P
R
I
V
A
T
E
P R IV A T E
P
R
I
VAT
EP
RI
V
AT
E
CITY OF MARYLAND HEIGHTSP
RI
VAT
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11825
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Creve Coeur CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 17
CREVE COEUR CREEK (L-52) FORCE MAINIMPROVEMENTS PHASE II
GROWTH AND WET WEATHER INFILTRATION REQUIRES NEW FORCEMAIN.
CONSTRUCTION OF 3,500 FEET OF 42-INCH FORCE MAIN ANDAPPURTENANCES.
Design Services
6660 - SanitaryReplacement Fund
§¨¦70
§¨¦70
LILLIANLUCAS N HUNTHILLSCOLLEGEMCLARANCALVIN
SUNBURYRAVINIA
NELSONJENWOOD
FLETCHERBERM UDAALBIABEULAHROLANDAPRIC OTSAN DIEG
O
FLORIANCOUNTR
Y C
L
UB
HATZSAPPHIREOVERBROOK
DAWSON
ROXIEHOLBORNTHEODORE
GROVELAND
CHANDLER
STANWOOD
ROHN
HARNEY
F
L
O
RIS
S
A
N
T
WINCHESTER
S
H
A
RO
N
FOREST HILL
B
E
L
W
O
O
D
BEGGWILLOW WOODNORWAY GARESCHE
SEATTLEFARLEY
ELLINGTON
HUNTINGTON
SUNSET
EMMA
PINE RIDGE
BURRWOOD
BRISTOL CURRYUPSHAWONEILLWOODSTEAD
OAKRIDGEBLUE SPRUCE
N A D I N E
WOODDALE
FLETCHER§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11730
11
TASK NO:
TASK NAME:
$2,250,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
BissellMAJOR SERVICE AREA:
BadenWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 18
CSO - GINGRAS CREEK AND I/I REDUCTION(BP-059)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 7,500 FEET OF 66-INCH COMBINED SEWER IN TUNNELAND 1,300 FEET OF 8 - 30-INCH SANITARY AND STORM SEWER.ELIMINATE CONSTRUCTED CSO OUTFALL BP-059.
Design Services
6660 - SanitaryReplacement Fund
TRASKKEELEN
HUDSON
ELKIN
S
HALLS FERRYIMPERIALVORHOFATMORE
NASHUA
JETTCAPI
TOLCROWN POINT
L
A
NDSEERLINNELLREBACHAMPLIN
MAYFAIRDOWD
PRIOR
WINKLERFOLEY
CLAIRMONTGREEN VALLEYTANNERMURATCHESLEY OLNEYDELLRIDGETATEALLIANCEVENTURACARGILL
JANSONHALLWOODST IVES
NE
W HALLS FERRY
ITTNERQUAKERPANNELLGADBURY
BON OAKOLD MANOR
VARNUMDEEMBEECHER
CLOVERDALEGREEN S L O P E LANGFORDMA LDON
AINSWORTH
EMERY
DACEYCROWLEY
MOWBRYSAFFRON OLD HALLS FERRYHALLSTEADCANFIELD
H ARNE Y W O L D
EM PIRE
DO
ANEORBITTIBISKIPPOTTKAMPCAPITOL HIL
L
MINNE FORDPEARSONF O S S
CAVALIERSIBLEYQUAKERBEECHER
H U D S O N
BON OAKCARGILL
H U D S O N
BON OAK§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11116
11
TASK NO:
TASK NAME:
$150,000.00
BUDGET:
FUND:
DellwoodMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 19
DACEY BRANCH I/I REDUCTION (BP-313)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATE PUBLIC SEWERS (16,500 FEET OF 8" TO 12" SANITARYSEWER AND 2,600 FEET OF 12" TO 21" STORM SEWER). REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS AND REMOVECONSTRUCTED SSO BP-313.
Design Services
6660 - SanitaryReplacement Fund
§¨¦40CLAYTON
WARSONT R E N TSOUTH FORTY
DANIELLITZSINGER KENTROANOVERHILL
S PRICECELLAD E N NY BARNESMAGNOLIASPRINGWOOD
MIDPARKWIND I N G R ID G E
INDIANLOG CABINOVERBROOKHIGHDOWNT WIN SP R IN G SROLLING ROCKMAYFAIRWARRIDGE
PRIVATETHORNWOOD
RAUSCHER
DUNLEIT
HOAK BENDLEAGRAMWO OD ACRELADUE R I D G EWINDING BROOKP ICAR
DY
D E E R CREEK
W OODC RESTLEELALYLEWOODPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10021
11
TASK NO:
TASK NAME:
$1,750,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 20
DC-02 DEER CREEK SANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 2.4 MILES (12,500 FEET) OF 48-INCH TO 72-INCHDIAMETER SANITARY SEWER, FROM LITZSINGER AND OVERBROOKNORTHWEST TO WARSON ROAD.
Design Services
6660 - SanitaryReplacement Fund
MCKNIGHTOLD WARSON
LITZSINGER
PARK
PRIVA T E
MCKINLEYODAYROCKMANROCK HILLOVERBROOK
KORTWRIGHTWARSONCHARLANEOAK LEAFGRAYSTONE
CHARLEVILLELITZSING ER WOODSSHERRELL
PRIVATE
ROCK HILL§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11731
11
TASK NO:
TASK NAME:
$1,250,000.00
BUDGET:
FUND:
LadueMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 21
DC-02 DEER CREEK SANITARY RELIEF STORAGETANK
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOs.
CONSTRUCTION OF SANITARY SEWAGE WET WEATHER STORAGETANK AND ASSOCIATED STRUCTURES, PUMPING STATIONS ANDSEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARYRELIEF.
Pre-Design Services
6660 - SanitaryReplacement Fund
§¨¦40
§¨¦270
§¨¦44
§¨¦170
§¨¦170
OLIVE BLVD
W A T S O N RDS LINDBERGH BLVDS KIRKWOOD RDM A N C H E S T E R RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11110
16
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 22
DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO'S.
DESIGN NECESSARY SYSTEM IMPROVEMENTS IN THE DEER CREEKWATERSHED.
Professional Services
1101 - General Fund
§¨¦170
§¨¦170
DELMAR
GANNON
GROBY
MCKNIGHT81STOLD BONHOMME
LE PERELAFON
BALSON
STANFORDBERICK
T E ASDALEGAYCENTERAMHERST
BARBY
P R IV A T E
TULANE
FORSYT
H
SPOON
ALANSON
CANTERBURYLITTLE
OAKBROO
K
CRANDONCO RNELL GLENSI
DEWASHINGTON
D
ELCREST BLACKBERRYKI
NGDELMULBERRYSWARTHMOREPRICEWO O DSM
APLEVIE
W SAXONYLORE NZO
VILLA
BENLOUW A T S O N IA
WILNERB
R
O
O
KSHIRE UNI
VERSITY
LOREN WOODS
BIRN AWOODSROWLAND
AVESDALEGREENSHIREGAYM
C
K
NI
GH
T
GAYMCKNIGHTCORNELL
P
RIV
A
T
E
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11735
11
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 23
DELCREST SANITARY RELIEF (SKME -565) I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 16,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS.
Design Services
6660 - SanitaryReplacement Fund
§¨¦270
§¨¦270
DUNN
ST ANTHONY
ST CATHERINE
WATERFORDW
A
S
HIN
G
T
O
N
PERSHALLALLENKINGSLEYCAPRIST LOUIS
JEAN ST EDWARDBARTO ST EUGENERIDGEDE RHAKE
CARMONACHEYENNETANEY
ROGERS
N
E
W F
L
O
RIS
S
A
N
T LARRYP RIVA T E COTEAUDURWOOD
GRANDVIEWPUEBLOBROOK
WOODENGRENOBLE BON AIRELYNN MEADOWSWILSHIREDAUPHIN
ST MA
R
KCOUNTRYS IDE
ST FRANCOI S
NEWGATELILA
DUCHE S N EROBI N WOODA
CREDALE SADDLEDUQUETTEHOLIDAY H ILLCLEARVIEWWYCOMBS T L U K E
E
LIZ
A
B
ETH
PEBBLE
SHAWNEEPADDOCKOZMENT PADDLEWHEELBIRCHLAWNST DA N IE L
O R C HARDBROADMEREST G REG OR YCLEMENSHOLLY
BRIGHTMOORELDER
ST STEPHEN
S T J A MESVALERIE
PRIVAT E
DERHAKE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11736
11
TASK NO:
TASK NAME:
$875,000.00
BUDGET:
FUND:
FlorissantMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 24
DERHAKE I/I REDUCTION & CAPRI TOS.WATERFORD SANITARY RELIEF
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
ADIE
PAGE BALLS
C
H
U
E
T
Z
L A C K LA N D
ARC
PAGE SERVICEPRIVATEWESTLINE INDUSTRIALCENTERLINE INDUSTRIALC
E
NTR
A
L MID
L
A
N
DVERN
ALAKESIDE CRO S S IN GNORFOLK SOUTHERNHAMME
RADMINISTRATION
WESTPORT CENTERPAGE
A D M IN IS TRATION
PRIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10601
11
TASK NO:
TASK NAME:
$875,000.00
BUDGET:
FUND:
Maryland HeightsMUNICIPALITY:
MissouriMAJOR SERVICE AREA:
Fee Fee CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 25
FF-16 SCHUETZ - MEADOWSIDE TO PAGESANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,940 FEET OF 27 INCH TO 36 INCH DIAMETER SANITARYRELIEF SEWERS FROM SCHUETZ ROAD NEAR MEADOWSIDE DRIVENORTHWEST TO ADIE ROAD. CONSTRUCTED SSO TO BE REMOVED.
Design Services
6660 - SanitaryReplacement Fund
KEEVENPAUL LINDSAYCHARBONIERFLORDAWN
HOLIDAYHOWDERSHELL TAHOECOACHWAY
YAQUI
LYNN HAVENTESON
LOEKES
COACH LIGHT
KOSTKA
LAYVEN
FLORLANDCANISIUS
L
A
MP
LIGHT
ESTES
MANRESA
QUEEN ANNLILA
ST CHARLESCAMPIONPRATTBELLARMINE
FLOR AHAZELVALLEY
BROWERMANORJENKEEALBERTRADFORDPALMTRINITY
AVION NAOMICANDLE LIGHT
IMPERIALALMA
RUTH
TAMMA ROS E T TANAPLESOLIANRIVERWOOD TRAILSCAL
LE VISTA MERCURYBORGIA
GONZAGA
CROFTDALE
CARRI
A
GEFLAMINGO
ELM GROVE
RIDERWOOD TANNOIAASP ENFOXT RAIL
BARWICK DOWNINGRONDAHAVENTREE GERAL DRAYMOND MONTEREY
GERARD PARK
ACORN TRAIL MERRIA V ANT
THOMPSON
LA CUESTA
BLANCHETTEPRIVATEBELLFLOWER HAMM E S
LANDIHOLLY RIVERBRUCE
FOXFIELDGEORGETOWNME
S
CA
L
E
R
O
CAIONELA VENTAFLOWERIDGEINDUSTRIAL
SLUSSERALANDALESIR LORDSJEANETTE
SEMINARYSCOTTYPRATTNAOMIALBERTLINDBERGH§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11749
11
TASK NO:
TASK NAME:
$198,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 26
FLORLAND SANITARY RELIEF PHASE I - I/IREDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
ZINZERGRANT
GRANTVIEWGRANTWOOD
P
R
I
V
A
T
E LACLEDE STATIONMC
N
A
R
Y
BRIARVIEW
FORESTATE
WHITEH AVENVI
CKSBURGGRAVOIS VIEWP RIVATEPRIVAT
E
G R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11750
11
TASK NO:
TASK NAME:
$425,000.00
BUDGET:
FUND:
Grantwood VillageMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 27
FORESTATE AND TEXAS SANITARY RELIEF(SKME-513)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO.
CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER.REHABILITATE 12,500 FEET OF 8-INCH TO 24-INCH SANITARY ANDSTORM SEWERS. I/I CONTROL MEASURES FOR VARIOUS PRIVATEAND PUBLIC SOURCES. ELIMINATION OF CONSTRUCTED SSO.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10612
14
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 28
$100,000.00
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (FY2012)
CAPITAL PROJECT CONSTRUCTION MANAGMENTAND PROJECT ANDPRIVATE DEVELOPEMENT INSPECTION NEEDS EXCEEDS INTERNALSTAFF CAPACITY.
RETAIN CONSTRUCTION MANAGEMENT FIRM. SERVICES WILL BE FORFY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10613
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 29
$50,000.00
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT A
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Geotechnical
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10614
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 30
$50,000.00
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT B
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Geotechnical
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10615
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 31
$50,000.00
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2012) CONTRACT C
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES.SERVICES WILL BE FOR FY 2012 TO 2014.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Geotechnical
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10623
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 32
$300,000.00
GENERAL SERVICES AGREEMENT - SEWER &PROCESS DESIGN (FY2011)
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN.SERVICES WILL BE FOR FY 2011 TO FY 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10626
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 33
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT A
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10627
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 34
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT B
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10628
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 35
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT C
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10629
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 36
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT D
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10630
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 37
$50,000.00
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (FY2011) CONTRACT E
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEEDS THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRMS FOR AS NEEDED SURVEY SERVICES.SERVICES WILL BE FOR FY 2011, 2012, AND 2013.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Survey
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11779
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 38
$90,000.00
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT A
SEWER DESIGN NEEDS EXCEED CAPACITY OF EXISTINGRESOURCES.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 2013, 2014, & 2015.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11780
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 39
$90,000.00
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B
DESIGN NEEDS EXCEED CAPACITY OF EXISTING RESOURCES.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 13 TO 15.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11781
11
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 40
$90,000.00
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT C
DESIGN NEEDS EXCEED CAPACITY OF EXISTING RESOURCES.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICESWILL BE FOR FY 13 TO 15.
PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
General Services -Design
6660 - SanitaryReplacement Fund
KIRKHAM
GRAYDICKSONSWONGOREOLD WARSON
LOCKWOOD
LEE
ELMESSEX UNION PACIF IC
JACKSONSAPPINGTONWOOD MAPLEODAYTAYLORBELLBISMARK
BROWNELL
QUAN
FOOTE
EDWINEUCLID
JEFFERSONLITHIABENNETT
BACON
GILL
PAR
HUDSON
ANDREWBODLEY OA KGILBERT CORNELLHILLDEACON
AUSTINM E D I N A MCKINLEYPARKLANDADAMS
MADISON
IOLANORTH
BIG BENDLONGVIE
W ROCK HILLMARK
RENDERERPAPINKORTWRIGHTPARKFLANDERSCURRANPA C I F I C
DWYER
WILD DEER
BOGEY
D E S PERESHILLARD ROCKMANCOPP E R H ILL
JOANNARIDGE LINED
E
VONBREMERTONCHELSEA
P RIV A T E
HIGH HAMPT O NMANI
TOUJULIAN
VICTORIA
WARWICK
WATE RBURYMOODYLEONARD
OAKSFOX
BARRONFREDERICKGLENMOOR
HULLF
A
I
R
D
A
L
E
PARKWOODSMCDONALDHARTGREENVIEWCOLL
E
G
E
ALGONQUIN
CEDAR
B E R R Y
HI
L
L
SI
DEWOODLAWNBELLEVIEW
BEAUFORD
HOCHBERRY WOOD
RARITAN
GASLITE
ALFRED
NOLAN
FUHRMANN
RUSSELLSTURGISELM
LOCKWOODELM BERRYCHELSEA
ALGONQUIN ROCK HILLPAR IOLACEDAR
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11122
11
TASK NO:
TASK NAME:
$110,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 41
GLENDALE SECTION D SANITARY RELIEF PHASEIV (SKME-624) I/I REDUCTION
EXCESSIVE I/I IN SYSTEM.
REMOVE EXCESSIVE I/I FROM PUBLIC SOURCES BY REHABILITATING80,000 FEET OF PIPE SEWERS AND MANHOLES.
CONSTRUCTION OF THIS PROJECT RECEIVES PARTIAL FUNDING /SUPPLEMENTAL APPROPRIATION IN FY 14. TOTAL CONSTRUCTIONBUDGET IS $9,600,000.
Design Services
6660 - SanitaryReplacement Fund
LANGLEY
PHILOWALDO
A L L E YPILOT
V IR G ILKATHLEENHARMONY LACEYROSEMARYACORNLAKEWOOD
VIRG ILPI
L
OT
PHILOPILOTKATHLEENROSEMARY
G R A V O IS R D
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10642
11
TASK NO:
TASK NAME:
$760,000.00
BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Seminary BranchWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 42
HARMONY-ACORN SEWER SEPARATION AND I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS INISOLATED AREA OF COMBINED SEWERS.
CONSTRUCT 3,100 FEET OF 12-42 INCH STORM SEWER, 2,700 FEETOF 8-12 INCH SANITARY SEWER, DISCONNECT PRIVATE I/I SOURCES,AND REHABILITATE 8,800 FEET OF PUBLIC SEWERS.
Design Services
6660 - SanitaryReplacement Fund
§¨¦255
§¨¦55
§¨¦255
UNION PACIFICRIVERKOCHKINSWOOD GREGGUNIONBROADWAYCCCKINGSTONREAVIS BA
R
RAC
KSGRANTLIND TELFO RD
FORDER
ARLEE
SHERMANGENTR YFAIN PRIV ATEJOPLINCLIFFSHER ID A NHOFF
M
EIS
T
E
RWACHTELRIPA
LUNAG A R KLARK
CLAGERRAINBOW
W EMBLEYRO SYAQUA RIDGE BOUNDARYJEFFERSONIAN
FIRSTPECANSOUTHSHIRELAURABUCKLEYDACE
SIGSBEE
J
E
FFERSON
ELLEN
BANISTERDUMONT
LISIE
U
X
CLEVES
M ERRITTTACOMAKASKE
BUNKERBIRCHP
R
IVATETELEGRAPH RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11711
11
TASK NO:
TASK NAME:
$2,700,000.00
BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Martigney CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 43
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
EXISTING SYSYEM IS NOT ADEQUATE FOR CURRENT CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, TOELIMINATE BOTH THE MARTIGNEY AND JB PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL PRE-DESIGN BUDGET IS $4,500,000.
Pre-Design Services
6660 - SanitaryReplacement Fund
§¨¦170
§¨¦170BROWNMIDLAND
LACKLAND WOODSONNORTH
SIMSWALTONMCKIBBONARGYLEDIXOLDENREXBALTIMORE
BURTON
TRESCOTT EMINENCEHOODCOLESWINDOM HUMEBOSWELLTUDOR
MILTONGORDONGASSTENNYSON
BURNSGOODALEH O L T W O ODCHAUCER ST LOUISROY
FORESTPASTEURAIRWAY
WISMERGILROSERIDGEWAYORLANDOBENSON
GAEBLERWENGLERARLINE
SENECA
ANN
EVERMAN GRACELAND HILLEMANMARVINMARLOWE STELLAQUIETCALVERTMCNULTY
ADDIEBRISTOL
ARDELIA
MORAN
WALLISDAWESVERONAEDMUNDSONENGLER
EZRA
SPENCERHAGNER
ASHLANDSUNCRESTROYALTONDAVID
SHERWOODOAKLANDMAVIS
SHELLEY CHARLACKMARSHALLDENNISON
BELHAV ENGOTHLANDE A STRIDGEJOELCROCUS
HUNTINGTONAPACHE
BURDELLA
MECCA
ONEIDA
LATROBE
SHAWNEE
DOYLE PATRICEBRECKENRIDGE
NORTH
WALLISDAVID
WISMERMILTONMILTONMIDLAND
BRISTOLTENNYSON
CALVERTREXAIRWAYCHARLACKMILTON ROYSIMSDIXMARVINTENNYSONCALVERTWISMERDAWESHOODMARSHALLST CHARLES ROCK RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11712
11
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 44
LACKLAND I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
KAPPEL
LANGKIRKGAGEDELLWOOD VI
CKI
ERANDROYCEDENNISWARDLORNAWEST FLORI
SSANTFARGO
VENICEPERCHFORESTWOODFIR
NEWTONCANFIEL D
CLARI
ONNESBITELLISONNEMNICHSCHLUETERFERGUSON NORTHWINDS ESTATESHIGHMONT
RENSHAW
EDGEHILL INAG UACADDIEFIELDFLORWOODNORLA KESHIGHM ONT §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11715
11
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
FergusonMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 45
LANG ROYCE LATERAL SANITARY RELIEF(SKME-320)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 2,000 FEET OF 10-INCH TO 12-INCH SANITARY SEWER,REHABILITATE PUBLIC SEWERS, AND REMOVE PRIVATE I/I SOURCESFROM SANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-291.
Design Services
6660 - SanitaryReplacement Fund
§¨¦55
§¨¦44
§¨¦40
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦270 §¨¦70
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11145
16
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 46
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
SYSTEM DEFICIENCIES NEEDING CORRECTION.
PERFORM AS NEEDED PLANNING, ANALYSIS, AND DESIGN SERVICESIN THE LEMAY WATERSHED.
Professional Services
1101 - General Fund
P
RIVATE
UNION PACIFICUNION PACIFICPRIVATEUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFICUNION PACIFIC§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11649
11
TASK NO:
TASK NAME:
$1,500,000.00
BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 47
LEMAY WWTP SECONDARY IMPROVEMENTS
REQUIRED TO INCREASE SECONDARY CAPACITY TO 210MGD
SECONDARY IMPROVEMENTS TO EXPAND TREATMENT CAPACITY.
Design Services
6660 - SanitaryReplacement Fund
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦40
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11109
16
TASK NO:
TASK NAME:
$11,000,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
VariousWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 48
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
COMBINED SEWAGE OVERFLOWS INTO THE LOWER AND MIDDLERIVER DES PERES THAT POTENTIALLY IMPACT WATER QUALITY.
CONSTRUCTION OF 47,400 FEET OF CSO STORAGE TUNNEL,CONSOLIDATION SEWERS, AND DEWATERING PUMP STATION. THISPROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELDINVESTIGATIONS AND PRELIMINARY STUDIES.
PROJECT WILL INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
Professional Services
6660 - SanitaryReplacement Fund
§¨¦270
§¨¦170
§¨¦270
§¨¦170
DUNN
KEEVEN
HOWDERSHELLUTZ
PERSHALL
HOLIDAY
TAHOE
C
OA
C
H
W
AY
YAQUI PAULLYNN HAVEN
FLORDAWN
FORD
TESON
CHARBONIER
LOEKES
PRIVATE
COACH LIGHT
KOSTKA
LAYVEN
FL
ORLAND
TAYLOR
LAMPLIG
HT
LINDSAY
ELM GROVEIMPERIALWOODCREST
MANRESA
QUEEN ANN
UNDERCLIFF
BR O W N
FEE FEE HILLS
ST CINCAMPIONPRATTOLIVETO
BELLARMINE
SUNSETRIVER W O OD TRAILS
ALMARADFORDCHULA
PALM
AVION
BARWICK
CANDLE LIGHT
J
A
MES S MCDONNELL
TAMMA ROSETTAMARY JOBEAM LOY OLACALLE VISTA
B ELLFLOWER
B
ROOKESAIRSHIRE
AVANT
THOMPSON
LA CUESTA
LANDIFEE FEEALBERTFOX CRE STL E H N EBRUCE
CAPOSELLE
HEATHER
G
R
O
T
T
O
ROBINWINGJANRIASERENITY
PRIVATE
TESON
RIVERWOOD TRAILS
DUNN
UTZ
P
RIVATE
PRI V A T E
PRIV A T EPRIVATEP R I V ATEN LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11652
11
TASK NO:
TASK NAME:
$200,000.00
BUDGET:
FUND:
HazelwoodMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 49
LYNN HAVEN I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
R IV E R V IE W HALLFONTAINE
CHAIN OF ROCKS
RAFORDBEL
LEFONTAINEBROADWAYRIVER RUN
RIVER TRAIL
M A K A LU
LOWELLR IV E R V IE W
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11655
11
TASK NO:
TASK NAME:
$2,400,000.00
BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 50
MALINE CREEK CSO 051 TREATMENT FACILITY
CONTROL OF COMBINED SEWER OVERFLOWS.
CONSTRUCT CSO TREATMENT FACILITY. PROJECT POTENTIALLY TOINCLUDE STORAGE.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 14. TOTAL DESIGN BUDGET IS $4,000,000.
Design Services
6660 - SanitaryReplacement Fund
RIVERVIEWHALLLEBON
MARIAS
N
EL
A
N
BURLINGTON NORTHERN SANTA FEFONTAINE
CHAIN OF ROCKS
P R IV ATETEURVILLELARAMIE
R IVER RUNRIVER TRAIL BURLINGTON NORTHERN SANTA FERIVERVIEW§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11656
11
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 51
MALINE CREEK CSO 052 STORAGE FACILITY
CONTROL OF COMBINED SEWER OVERFLOWS
CONSTRUCT 1 MG STORAGE FACILITY.
Design Services
6660 - SanitaryReplacement Fund
CHAMBERS
BELLEFONTAINEK IL G O R E
C
A
BOTCOLONYDELHICASTLEMEAD ELBAC O M ET
CAMBRIABURLINGTON NORTHERN SANTA FEA S HFORDTAPPAN
DURHAML AI RE
BIRITZ
SURREYDWIGHTCRETE
BALLARD
COBURG LA N DSMARALDOBOSWORTH
DUL
U
THGO L D E N
FOREST HOME JEPSONTWILL
C O R INTH
BERWYN FONDANORBRIDGEADMIRAL ODE S SA
HANSOM
ENSLEY
PRESTIGE LANCENORTHAMPTONFAT H O M
NORWICHLANDWEHR
DANVILLE
ZELLWEGER
U
NICORN TRIOSUNBEAM
G R E E N ACRES
K
ELVIN
L O CHIELMOLINE FARRINGTONLA ROUXCASTLELEWIS N CLARK BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11658
11
TASK NO:
TASK NAME:
$200,000.00
BUDGET:
FUND:
Bellefontaine NeighborsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 52
MALINE I/I REDUCTION & SEWERREHABILITATION (BP-289)(COLONY DR)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
REHABILITE PUBLIC SEWERS (9,500 FEET OF 8 INCH TO 10 INCHSANITARY SEWER AND 1,500 FEET OF 12 INCH TO 24 INCH STORMSEWER), REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS,AND REMOVE CONSTRUCTED SSO BP-289.
Design Services
6660 - SanitaryReplacement Fund
HILLSMETRO LI
NKEASTROLANDAUGUSTAWACO BERMUDAFLORISSANT
ROSEDALE
LUCASMARI
ETTACOUNTRY CLUBRA VINIAST ANNSPASADENACIRCLE
SUNSET
WARWI C K
HUNTINGTON
M A R IL A C
FOREST VIEW
WINCHESTER
ST MARYSOXEYE SPRINGDALE
FROWCARDWELLOAKMOUNTCANTERBU R Y
ARCOLASAN D IE GOTOWER GROVEBELLER IV E
PARKDALEMARK TWAIN
METRO LINKEASTF
L
O
RIS
S
A
N
TOAKMOUNTNATURAL BRIDGE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11659
11
TASK NO:
TASK NAME:
$435,000.00
BUDGET:
FUND:
NormandyMUNICIPALITY:
BissellMAJOR SERVICE AREA:
Maline CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 53
MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 700 FEET OF 12"-30" STORM SEWER, REHABILITATEPUBLIC SEWERS AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS. REMOVE CONSTRUCTED SSO BP-292.
Design Services
6660 - SanitaryReplacement Fund
NORTH
BOBB
HAROLD
KATHLYN
EMINENCEWOODSONCALVERTBROWNGORDONBOSWELLST LOUISROY GEDDE
MARVINBATAAN
GUTHRIE
MCNULTY
TUTWILER
PATRICK
MARSHALLCORREGIDOR
PALLARDY
CHARLACKROSEMORE
LEENORA
PATRICELINDSCOTTJANET HERBERTMARYKNOLLJONELLFRANNLYNNHAROLD
MARVINMCNULTY
TUTWILER
KATHLYN
GORDONLEENORAGO RDONMARSHALLROYBATA AN
BROWNPALLARDY
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11662
11
TASK NO:
TASK NAME:
$1,000,000.00
BUDGET:
FUND:
VariousMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 54
MCNULTY - PALLARDY I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
ASHBYM ID LA N D
LACKLAND
PAGE WOODSONSIMSBALTIMORE
FLORA
RIDGE
ECHO BURNSDRIVER
NIBLIC POEMIRIAM
TRESCOTT
HOODDIXKREMDYERGOODALECANTER CHAUCERBROWNGASSTENNYSON
THEODOSIA
H O L T W O OD
O A K REXZYKAN PASTEURM A D D O X GAEBLERWISMERHOBDAY
UCEYLEWENGLERLIBERTY
FARVIEW
CARLYLE
DECKERTHORPE
EASTBROOK
EVERMAN
KORANDOM I LTON
BRYANTMARLOWE STELLAQUIETSENECAWABADAY
OCONNELLWURDACK
ADDIEMARVINWALLISCOLESDAWESVERONAIVELANDLAKE ARGYLEOHARECLARENDON
SPENCERBOYLSTON ST JOACHIMFOWLERCOTE BRILLIANTEPEBBLE BEACH CALVERTPROUHETAIRWAYMORVENGOCKELULLABY
P I N EHURSTSCOTLAND ANGELOHIGHLANDTUDOR
B ACHWESTWISE
OSGOODRHYTHM
BRISTOL
CINNAMON
HUNTINGTONL O C U S T SHERMANB RUNORONALDLATROBE
GILWOODBRISTONDENNISON
BRECKENRIDGE
SIMSSIMSAIRWAYTHORPE
MIDLAND
SPENCERCOLESDAWESWALLISWISMERMILTONHUNTINGTONHOODM I R I A M MILTONCHAUCERREXBURNSMILTONCALVERTPOE §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11663
11
TASK NO:
TASK NAME:
$525,000.00
BUDGET:
FUND:
OverlandMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 55
MIDLAND SANITARY RELIEF - PUBLIC ANDPRIVATE I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS AND REDUCTION OF PRIVATE SOURCESTO REMOVE EXCESSIVE INFLOW AND INFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
PASADENA
F
L
O
RIS
S
A
N
T
LUCAS N HUNTR
O
LAND
OREONHUN TINGTON
WINCHESTER
BRISTOLHILLSA
UGUSTA
ST MARYSWARW I CK
CANTERBURYARCOLATOWER GROVENORMANDY BRETONCOUNT
R
Y C
L
UBCRESTLA N DROLANDBRISTOL
R
OLAND
CANTERBURY
NATURAL BRIDGE RD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11694
11
TASK NO:
TASK NAME:
$250,000.00
BUDGET:
FUND:
Pasadena HillsMUNICIPALITY:
BissellMAJOR SERVICE AREA:
BadenWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 56
NORTH BADEN CREEK I/I REDUCTION(BP-612)(CANTERBURY DR)
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 450 FEET OF 12-INCH STORM SEWER, REHABILITATEPUBLIC SEWERS (2,000 FEET OF 8 INCH SANITARY SEWER), ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. REMOVECONSTRUCTED SSO BP-612
Design Services
6660 - SanitaryReplacement Fund
MACKENZIEWEBERVALCOUR
DANAELTONSETH
FLETAMATHILDAI
VYSTAELY
NEW HAMPSHIREGRA MONDSEIBERT
KITRADIORIVER DES PERES
HEEGE
MOHEGANLUCIAALICETONVASELFORMANVITA
FABER
GENESTA3RD
ACORNJA
MIESON
ALT
HEACOLLEENPILOTBONNIE
HALEBRENDA HILDA
NAGEL
MAXWELLMAYLORELSA
EDENELGINLANGLEY
DELMA SAVIO
WALDO
NEIERNAVAJOELODE
ASTERKIDDERSOUTHERN
PHILODARLOWCRAIGHILL
TALBO T
LAWNSIDE
CHESHIRE JOELBERWI CK
A L L E YHARLAN TIEMANN
WEBER TRAILDEERWOOD
ARVIN IVANHOED
A
R
L
E
NE
HURSTGREENC
R
OY
D
O
N
CHIVVISMENOLAWAYNEPA V IA HARMONYPINTOALPINE WOLZWILMA
DE MARA
RANCHWOOD
OAKDALEFELICIARABETHC AYUGACONSULTOBEY CANDACE TOMOREVA
SELJOEL FLETAWEBERBRENDAHARLANHEEGE
LANGLEY
PILOTHEEGEHARLANWATSON RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11695
11
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Mackenzie CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 57
OLDE ENGLISH I/I REMOVAL
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE EXCESSIVE INFLOW AND INFILTRATION FROM PUBLIC ANDPRIVATE SOURCES BY SEWER REHABILITATION AND OTHERIMPROVEMENTS.
Design Services
6660 - SanitaryReplacement Fund
PAGE ASHBYWARSONLACKLAND
DRIVER
NIBLIC
UNION PACIFIC WISMERBAUR
FLORA
DIELMANMEEKS
MESA DYERLA JOLLA
OAK
ECHO
RIDGEENTITYMADDOX
CANTER
TRESCOTT
HURON
ZYKANLIBERTY
MIRIAMUCEYLE
G R A NDVIEWRESEARCHTRENTON SIMSEASTBROOK
KORANDOBRYANTFAIRVIEWOCONNELLNORTH FIELDCR O C KETT WALLISLOTSIEDAWESIVELANDLAKE THEODOSIA
SCOTLAND
SPENCERMORVENLULLAB YHIGHLANDLACKLINK
CENTRAL MIDLAND
MIDWEST INDUSTRIAL
B ACHBOOTH
PAGE INDUSTRIALRHYTHM
K AHLMEYER
RIT TERRIDDLE
CEDAR GLENHUNTINGTONLOCUST
DIELMAN ROCK ISLAND INDUSTRIAL
MOHAVEWIBRACHTKINARKWERREMEYERCHAUCER
ZIMMERMANHENNEPINL O C U S T
CANTER
WALLISTRENTON SPENCEROAK
SIMSO A K DAWES§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11697
11
TASK NO:
TASK NAME:
$180,000.00
BUDGET:
FUND:
OverlandMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 58
PAGE TO TRENTON SANITARY RELIEF
OVERCHARGED SANITARY SEWER AND CONSTRUCTED SSO
CONSTRUCT 36-INCH AND 48-INCH DIAMETER LINEAR STORAGETANKS. REMOVE ONE CONSTRUCTED SANITARY SEWER OVERFLOW.
Design Services
6660 - SanitaryReplacement Fund
LAVINIAVARGAS
DANDRIDGEFARADAYBAPTIST CHURCHSHEA
MUSI
CKPICKWICKGAIL
OASIS
MALLORY
WILLINDAMUGANCATHY
EDGECLIFFE
CORAL RIDGE
KINGSMERE
THREE COURT
BIMINIFITE
T H AY ERLAVIER
CORNING
LAWNBROOK
BERNADINE
C O N C ORD CIRCLEEDGEMOOR
PALMYRAMARTINIQUE
WALCHSHAUSER
M U S IC K M A N O R
LAVINIA§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11698
11
TASK NO:
TASK NAME:
$400,000.00
BUDGET:
FUND:
UnincorporatedMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Gravois CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 59
PICKWICK-BERNADINE-BIMINI SANITARY RELIEF
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOs.
CONSTRUCT 3,100 FEET OF 8-INCH TO 18-INCH SANITARY SEWERS.REHABILITATE 40,000 FEET OF 8-INCH TO 27-INCH SANITARY ANDSTORM SEWERS. VARIOUS I/I REDUCTION MEASURES FOR PUBLICAND PRIVATE SOURCES.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 11699
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 60
$500,000.00
PRIVATE INFLOW/INFILTRATION PUBLICENGAGEMENT PROGRAM 2013
PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWERSYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS.
PUBLIC ENGAGEMENT PROGRAM REGARDING REMOVAL OF PRIVATESTORMWATER SOURCES, CONSENT DECREE & OTHER WETWEATHER COMMUNICATIONS.
Professional Services
1101 - General Fund
LILACBLUFF
SCENIC
ADRIAN
RIVERVIEWBURLINGTON NORTHERN SANTA FEV
A
L
L
E
YDIAMOND
SCRANTON
LEETON
C
A
L
UMETKELVIN FORKGLOUCESTERST C YR
MIDR I D G E
PRIVATERIVERMONTLOOKOUT
WESTHADDOCK
MARSHFIELD
P RIVATE§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11094
11
TASK NO:
TASK NAME:
$350,000.00
BUDGET:
FUND:
St. Louis CityMUNICIPALITY:
BissellMAJOR SERVICE AREA:
MISSISSIPPI RIVER (CITY)WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 61
PROSPECT HILL LANDFILL VERTICAL EXPANSION
LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE.
VERTICALLY EXPAND EXISTING DISPOSAL SITE.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10743
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 62
$120,000.00
RADAR RAINFALL DATA (FY2011)
ACTUAL FLOWS FROM INFLOW AND INFILTRATION DUE TO RAINEVENTS IS NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEMMODELS.
INTERGRATION OF EXISTING RAIN GAUGE NETWORK WITH RADARIMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING ANDINFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS.
Vendor Services
1101 - General Fund
BERRYKIRKHAMWOODLAWN OLD WARSON
LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK
BROWNELLHARRISONQUAN
LITZSINGER
FOOTEWARSON
SWONBENNETTBACON
SARAH
PAR
HUDSON
ANDREWOA KGILBERTDEACON GORE
M E D I N A MCKINLEYIOLANORTH
MAPLE
D E N NY
ROCK HILLMARK
RENDERERKORTWRIGHTWILSON
OVERBROOK
F LAN D ER S
CURRANSQUIRES
DWYER
WILD DEER
BOGEY
HILLARD ROCKMANPARK
COPP E R H ILL
ELMJOANNARIDGE LINECHELSEA
P RIV A T E
LITHIA
EUCLID
JEFFERSONHIGH HAMPT O NMANI
TOUJULIAN PA C IF I C
VICTORIA
WARWICK
WATE RBURYLEONARDBARRONFREDERICKGLENMOOR
HUNTLEIGH
DUNLEIT
HHULLF
A
I
R
D
A
L
E
HARTJEWEL
G REEN VIEWBEAUFORD
HOCHGASLITE
MERMOD
ALFRED
NOLAN
FUHRMANNEARLSTURGIS B E R R Y R O A D
IOLACLAYROCK HILLOAKPRIVATE
PARPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11069
11
TASK NO:
TASK NAME:
$600,000.00
BUDGET:
FUND:
Rock HillMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 63
ROCK HILL SANITARY RELIEF (SKME -618)
SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 48,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS
Design Services
6660 - SanitaryReplacement Fund
WEBERPILOTPHILO
DANAWAYNEROSEMARYV IR G IL
KATHLEENOVERTONA L L E Y
FORMANAUTUMN
CANDACE
V IRGIL PHI
L
O§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10748
11
TASK NO:
TASK NAME:
$440,000.00
BUDGET:
FUND:
Wilbur ParkMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
River Des PeresWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 64
ROSEMARY, PHILO & KATHLEEN SEWERSEPARATION
APPROXIMATELY 115 RESIDENCES HAVE DOWNSPOUTS ANDDRIVEWAY DRAINS CONNECTED TO THE SANITARY SEWER.
DISCONNECT DRIVEWAY DRAINS AND DOWNSPOUTS. CONSTRUCTAPPROXIMATELY 350 FEET OF 10-INCH SANITARY SEWER AND 2000FEET OF 12-INCH TO 18-INCH INCH STORM SEWER ANDAPPURTENANCES, PUBLIC AND PRIVATE I/I REDUCTION.
Design Services
6660 - SanitaryReplacement Fund
§¨¦170 HANLEYCLAYTON
DAVISBRENTWOOD
ME
T
R
O
LI
N
K
F
RA
NC
IS
FOREST PARK
FORSYTH
SHAW PARK
WEN NEKERCENTRALLOUWENPOL
OMERAMECBEMISTONLANGTONWATKINSHUNTERT
A
N
G
L
E
WO
OD
CARONDELET
DAYTONA RE AR
HALI F A X
T
O
P
TON
VENETIAN
COL MAR SH I RLEY
CRESC
E
NTORLANDO
ROSILINE
MCCUTCHEONSUDBURYBERKSHIREPRI
VATEPARKSID E
WALINCA
WHITBURNDROMARA MOHAWK
R O X B U R G H FORESTBILTMORE
COUNTRY CLUB
MERAMECCENTRALMET
R
O
L
I
NK
CENT
RALFORE S T P A R K
WALINCA
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11680
11
TASK NO:
TASK NAME:
$500,000.00
BUDGET:
FUND:
ClaytonMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Black CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 65
ROXBURY I/I REDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES BYREHABILITATING 16,000 FEET OF PIPE SEWERS AND MANHOLES ANDBY REMOVING PRIVATE DEFECTS
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10231
16
TASK NO:
TASK NAME:
$1,200,000.00
BUDGET:
FUND:
St. Louis CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
VariousWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 66
SEPARATE SEWER AREA - INFLOW/INFILTRATIONASSESSMENT (FY2008)
EXCESSIVE INFLOW AND INFILTRATION OF STORMWATER INTOSANITARY SEWERS CAUSES BUILDING BACKUPS ANDOVERCHARGING OF THE SYSTEM.
PERFORM SYSTEM-WIDE INVESTIGATIONS TO IDENTIFY INFLOW ANDINFILTRATION SOURCES. REDUCTION TO BE ACCOMPLISHEDTHROUGH VARIOUS FUTURE CONSTRUCTION AND REHABILITATIONPROJECTS.
Professional Services
1101 - General Fund
SPOEDEWARSONLADUEGRAESERMOSLEY PRIVATECRAIGTE A L W OOD
BEAVER
ST ACY
DWYERDAUTELELZEY C LERM O N TRUNNYMEDE
OAK PARKS
CH
UL
T
ESTONEYSIDERONDELAY
FIESTA
SONAALD EN
B
R
O
OKTRAIL HEATHER HILLVOUGACONWAYBAL HARBO
U
R
LARKINDONOHO
ST PAUL
TUREENFAIRWAYS
LADUE ESTATESOLD OLIVE STREET
LISA
TRIESTE
RENEEDAYKIN
AL L E G ROBENWOOD
MARFORDPICARD
YNEW SALEMSHERWYNTRI LA N E
FIEL D IN GC
OUNTRY FAIRM A R Y HILL
CLERBROOK APPLE TREEOLIVE LAKEQ UA I L W A Y S
MOSLEY HILL
OAK GATE PILLARCHERRI
COUNTR Y V IE W
NOTRE DAMEWOODFIELD
D O G W O O D
FORCEE
Q U E E N S B R O O K
CHALET
SUNDOWNOLD OLIV E STREET
OLIVE BLVD
N LINDBERGH BLVD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10754
11
TASK NO:
TASK NAME:
$420,000.00
BUDGET:
FUND:
Creve CoeurMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 67
SHERWYN SANITARY RELIEF (SKME -651) & I/IREDUCTION
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS
CONSTRUCT APPROXIMATELY 1200 FEET OF 12-INCH SANITARYSEWERS; REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATESOURCES BY REHABILITATING 35,000 FEET OF PIPE SEWERS ANDMANHOLES AND REMOVING PRIVATE DEFECTS
Design Services
6660 - SanitaryReplacement Fund
BOONEST MARIE CLARKHARRISON
WASHINGTON LAFAYETTEJEFFERSONBROWNCASTELLORUE ST CATHERINE
ST JACQUESRUE ST LOUIS
NEW FLORISSANTRUE ST FRANCOIS
RUE ST DENIS
AUBUCHONRUE ST JEANST JEANREGINARUE ST PIERREST CATHERINE
ST BAPTISTA
ST AUGUSTA
ST ALBERT BROWN§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11666
11
TASK NO:
TASK NAME:
$258,000.00
BUDGET:
FUND:
FlorissantMUNICIPALITY:
ColdwaterMAJOR SERVICE AREA:
Coldwater CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 68
ST MARIE SANITARY RELIEF I/I REDUCTION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW ANDINFILTRATION.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10766
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 69
$550,000.00
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
DATA IS REQUIRED TO DETERMINE URBAN STORMWATERRAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FORWATER QUANTITY & QUALITY EVALUATION OF STREAMS
CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM INCONJUNCTION WITH WATERSHED AND STORMWATER PLANNING ANDDESIGN EFFORTS.
Vendor Services
1101 - General Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10768
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
VariousMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Unallocated
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 70
$660,000.00
STREAM FLOW WATER QUALITY SAMPLING (FY2011)
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYFROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION &STORMWATER MANAGEMENT PROGRAMS
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITH MSD'S SERVICE AREA.
Vendor Services
1101 - General Fund
§¨¦55
§¨¦55KERTH BUTLER HILL
RINGERAMBS
DANTONAIREVALLEY SIDEC LAYRIDGESTARLITREGALWAY
GWE N MILLO WENSLITTLE ROCKSIR BORSCHE R R YVIEWTUCKAWAY
STARVIEW
B
RITCASTLE
OLD LEMAY FERRYBARBAGALLO
EILEEN ANN
VENTURA PLACE
OZARKGLENM ID AMERICAF UCHSI R O N S ID E
PROVIDENCE PLACECAMELOT ESTATESBROOKTOP
G
RAN
D
C
ASTLE
ABERDOURROUNDTABLE
DAIQ UIRIBRA U N GATE
ZAM ORACRESTSID EMORNINGD ALEH E R IT A G E W O O D SBUTLER H ILL E S TA T E S
HAWKINS GLEN
GARONPRIVATE KERTH CIRCL E
SUNDESERTPRIVATE LEMAY FERRY RD§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11670
11
TASK NO:
TASK NAME:
$120,000.00
BUDGET:
FUND:
St. Louis CountyMUNICIPALITY:
MeramecMAJOR SERVICE AREA:
Mattese CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 71
TUCKAWAY SANITARY REHABILITATION
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE EXCESSIVE INFLOW AND INFILTRATION THROUGH SEWERREHABILITATION AND OTHER METHODS.
Design Services
6660 - SanitaryReplacement Fund
§¨¦170
PAGE HANLEYCANTON
MIDLAND
TERMINAL
82NDNORTH N SOUTHLYNNWALTONWAYNE LAMB78THLIBERTY
B
R
A
D
D
O
C
K
APPLETON
GRANTMILAN
MENDELLBELT WAYGULFMADISON
V
I
N
I
T
A
PRIVATEELMORE
RICHARD
MONROE
FAIRVIEWTRENTON
ORCHARD
CARLETON79TH
EASTOVERCOOLIDGE
81STWESTOVERKOREA
RABEAL
ERT
HAFNERARCHER
FULLERTON
BUCHANAN
MELROSEMOUNT OLIVEPOLKJEFFERSON
STILLWATERWELLINGTON
DAJOBYLAUGHLIN BLOOM
CRYSTALCHAPIN INDUSTRIAL
A T H E RTONMONTREAL
FAIRHAM
HARRISONLYNDALEVAUGHANPARAMOUNT
LAUGHRENMOOREANNAANNANDALEHAWTHORNER
USHMOREERI
T
HWASHINGTON
ERMESCARLETON
ALERT
L Y N N
MILAN
TERMINAL
LAUGHLINWAYNE
MELROSE
MILAN
MENDELLW A Y N E
BLOOM
OLIVE BLVD
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 10027
11
TASK NO:
TASK NAME:
$800,000.00
BUDGET:
FUND:
University CityMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 72
UR-10 MENDELL AND WOLTER SANITARY RELIEF(SKME-595)
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.ELIMINATE TWO CONSTRUCTED SANITARY SEWER OVERFLOWS ANDMITIGATE TWO COMBINED SEWER OVERFLOWS.
CONSTRUCT 7,800 FEET OF 8-INCH TO 30-INCH DIAMETER SANITARYRELIEF SEWERS AND APPURTENANCES. CONSTRUCTED SANITARYSEWER OVERFLOWS TO BE REMOVED.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10230
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 73
$4,500,000.00
WATERSHED FACILITY PLANNING PHASE II
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITALIMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTINGDISTRICT STAFF.
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT,ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THEDISTRICT, INFLOW/INFILTRATION SERVICES, AND SPECIALTYVENDORS.
Professional Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦40
§¨¦70
§¨¦270 §¨¦55
§¨¦170
§¨¦255
OLIVE
MO109
G RAVOISLINDBERGHMO364
MO100
MO370
TELEGRAPHMO30MO141
W A T SON
ST CHARLES ROCK
LEM AY FERRYHIG H WAY 67
TESSON FERRYCLARKSONCHIPPEWA
KIRKWOODNATURAL BRIDGE
M ANCHESTER
M
O
36
4
MANCHESTE R
NATURAL BRIDGE
LINDBERGHMANCHESTER
MO370
M O30
CHIPPEWA
HIGHWAY 67LINDBERGH
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
Description of Problem/Issue
Scope of Project
Comments
Metropolitan St. Louis Sewer District
FISCAL YEAR: 2013
PROJECT NO: 10230
16
TASK NO:
TASK NAME:
BUDGET:
FUND:
St. Louis City and CountyMUNICIPALITY:
VariousMAJOR SERVICE AREA:
Various
WATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Asset Management
Page 74
$500,000.00
WATERSHED FACILITY PLANNING PHASE II
SCOPE OF PLANNING WORK ASSOCIATED WITH THE CAPITALIMPROVEMENT PROGRAM EXCEEDS THE CAPACITY OF EXISTINGDISTRICT STAFF.
UTILIZE PROFESSIONAL ENGINEERING SERVICES TO AUGMENT,ASSIST, AND FACILITATE VARIOUS PLANNING TASKS AND ACTIVITIES,INCLUDING ADMINISTRATION AND COORDINATION BETWEEN THEDISTRICT, INFLOW/INFILTRATION SERVICES, AND SPECIALTYVENDORS.
Professional Services
1101 - General Fund
ELMCENTRA LSHORT
F IR W O O D
GLENDALE
G
O
R
EREAVIS
OLA
OAK TREE
ST GEORGE
W ILS H IR ETU RF
W
E
B
S
T
E
R A
C
R
E
S
WEBSTE R OAKS ELM§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11086
11
TASK NO:
TASK NAME:
$320,000.00
BUDGET:
FUND:
Webster GrovesMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Mackenzie CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 75
WEBSTER ACRES SANITARY SEWERREPLACEMENT
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DUE TOROOT INTRUSION AND STRUCTURAL DEFECTS IN THE EXISTINGMAIN.
CONSTRUCT 2,500 FEET OF 8-INCH SANITARY RELIEF SEWER TOREPLACE DETERIORATED 6-INCH PIPE, 850 FEET OF 12-INCH TO18-INCH STORM SEWERS, AND PUBLIC AND PRIVATE I/I REDUCTION.
Design Services
6660 - SanitaryReplacement Fund
§¨¦44
§¨¦44 BIG BEN DBERRYUNION PACIF I C
EDGARLOCKWOOD
KIRKHAM
GRAYDICKSONGORENEWPORT
GLENDALE
LEE
ELMCLARK
B U R L IN G T O N N O R T H E R N S A N T A F E BOMPARTSAPPINGTONTUXEDO
MAPLEODAYLACLEDE STATIONESSEX
LILACBELLSELMABAKER
HOLMESBISMARK
JACKSON
BROWNELL
ATALANTAGLEN
OAK TREE
EUCLID
LITHIABENNETT PACIFIC
PLANTBACON
SUMMITJOYARGONNE BRENTWOODMADGE
ANDREWJEFFERSONSYLVESTEROAKGILBERTCORNELLM A DISONOAK L A N DPARK MARYLOUISAUSTINFAIRVIEWMCKINLEY
R ID G EIOLA
REAVISNORTH
YEATMANGA R DE NROCK HILLADAMS SALEMPAPIN
IMSEKORTWRIGHTSPRINGWEIL
FO R ESTDWYER
F R IS C O
CLARAHOLLYWOOD OAKWOOD
D E S PERESFLORE NCECOP P E R HILL
LANVALEJOANNA
EUNICE
ALICEGRA
N
T
FIELDSTON
VICTORIA
WARWICK GREELEY
SWON
HIGH HA M PTO NMOODY
FOX
BARRONFREDERICKARBOR
HULLRUTHMCDONALD
M E R R IT T
MANDERLYTYLERPORTERCOLLEGE COLLIERALGONQUIN
CEDAR
LOCUST
GASLITE
ELLIOTT
ALLISON
GLENELMJACKSON
CLARKELMELMSUMMITMANCHESTER R D §¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11678
11
TASK NO:
TASK NAME:
$400,000.00
BUDGET:
FUND:
Webster GrovesMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
Deer CreekWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 76
WEBSTER GROVES TRUNK "E" SANITARYREHABILITATION AND I/I REDUCTION PHASE IV
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS.
REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCESTHROUGH SEWER REHABILITATION AND OTHER METHODS.
Design Services
6660 - SanitaryReplacement Fund
FLORA
ECHO
MIRIAM
RIDGE SPENCERWISMERTHEODOSIA
HUNTINGTONHOODWALLISCOTE BRILLIANTEDAWESHUNTINGTONCOTE BRILLIANTE
§¨¦44
§¨¦55
§¨¦40
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
FISCAL YEAR: 2013
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
PROJECT NO: 11108
11
TASK NO:
TASK NAME:
$300,000.00
BUDGET:
FUND:
OverlandMUNICIPALITY:
Lemay/RDPMAJOR SERVICE AREA:
University City BranchWATERSHED:
Wastewater
PROJECT TYPE:
EXPENSE TYPE:Capital
Page 77
WISMER - HUNTINGTON SANITARY RELIEF (SKME-592)
BUILDING BACKUPS AND TWO CONSTRUCTED SANITARY SEWEROVERFLOWS.
REPLACE 2500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER WITH12-INCH TO 21-INCH SANITARY SEWER. REMOVE TWO CONSTRUCTEDSANITARY SEWER OVERFLOWS.
Design Services
6660 - SanitaryReplacement Fund