Loading...
HomeMy Public PortalAboutO1 Wastewater Engineering ProjectsHALEWEBER MACKENZIEIVY REAVIS RADIOLUCIAALICETON ELI S E ALTHEAR O C K HIL L VASEL LE NOR VALCOURBONNIE NEMO N IL E SBRENDABURLINGTON NORTHERN SANTA FEAFFTONEDEN ERIERAMBLERCORA L LA K E S ID E ASTERE V A ND A L E RADIOMKIDDERSTERLING LEMONAAVILATALBOTANTONIAUPLAND BERWICK LAKEFORD KOERBER PANCHO DORISANN L YD EL L ARVELLEN PRIVATELAVERN ARVIN CISCODAISY ARROWNEW HAMPSHIREDARLENEATW O OD PAVIA SOUTHVIEW DAMS O NL A KESHIRE MARLENE BONTON RIDGELY ALPINENEIER NIGER SHUFFLEPAULINE WAGER CANTERLEIGHCONSUL RAYWOOD LENARDTOBEY COVENT RYHALLOCK CITADEL TOCAN IRENEGRA S S O HERITAGECASSELBERRY LEONA HERIT A G E AFFTON STE RLI NG ALPINE P R IV ATEBRENDA VASEL GR AVOIS R D TESSONFERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11776 11 TASK NO: TASK NAME: $190,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Gravois Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 1 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL Design Services 6660 - Sanitary Replacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦270 §¨¦40 §¨¦270 §¨¦40 CLAYTON GEYERDESPERESBALLASOAKNORTHFORTY CA RBERRY OAK VALLEY SPOEDETOPPINGBRIDLEG RAYCEDAR VALLEYSELLENRICKPOSTOAK PORTLAND FIRETHORNCLAYCHESTER BOPP TWIN FAWNSROTHDUBON WOODGATEKEND ONCH IP P E R DUNMORR CREEKHAVEN DEVON D ALEH IC KORYDIVOTHARFLOCLAYMARKRANCH MALVERN THORNHILL PAMELA SPRINGDALE HOLIDAY TREGARON SERAMA IRON S TONEFALLBROOK OAKSPRINGSDUR B I N CO U NTRYSID E BAMBURYREVEREPUTTERDELVIN NICHOLAS T O P P I N G ACRES TINDALL BALWYCK BORCHERDINGGLENMARO RIDGEFIELDMUELLER CROYDONBICKFORD PRIVATEF R O N T E N A C F O R EST HICKORY BOPP§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11682 11 TASK NO: TASK NAME: $300,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 2 BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS, OVERCHARGING SANITARY SEWERS, AND ACTIVATING A CONSTRUCTED SSO. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦270 §¨¦270 CLAYTON DES PERESCARB ERRYBALLAS D RYRIDGEROCLARECEDAR VALLEYPOSTOAKSELLENRICK ROTHDUBON BARNBRIDGEOLD COLONY CREEKHAVEN HARFLO SERENDIPITYCLAYMARK RANCH SPRINGDALE IRONSTONE TOPPINGOAK SPRINGSWESTMOORPOINT OAK F EDE RAL DELVIN MUNICIPAL CENTERT O P P ING ACRESTOWN N COUNTRYWOODL A R K COPPERSMITH HORTON BA LWYCK BOPP TUN D RATRICORNBORCHERDINGCLAYTON PLACEGLENMAROVANDIVERCOUNTRYLIFEACR ESSPRUCEPOND MUELLERHAWTHORNE CRYSTAL VIEW TOPPING PLACE TIMMOR TOPPINGESTATES TREARCY TAUNTON DREXEL HILLKENT MANOR §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11934 11 TASK NO: TASK NAME: $140,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 3 BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 60,300 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE. FERRY GRAN D TERMIN A L 2 ND HAL L NORFOLK SOUTHERNDOUG L A S S TERMINALTERMIN A L N O RFOLK SOUTHERN §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11920 11 TASK NO: TASK NAME: $4,500,000 BUDGET: FUND: St. Louis City MUNICIPALITY: Bissell MAJOR SERVICE AREA: Bissell WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 4 BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT Design Services 6660 - Sanitary Replacement Fund EMISSION CONTROLS FOR MULTIPLE HEARTH INCINERATORS AT BISSELL & LEMAY NEED COMPLIANCE WITH NEW EMISSION STANDARDS FOR SEWAGE SLUDGE INCINERATORS. CONSTRUCT INCINERATOR SCRUBBER REPLACEMENT TO MEET NEW REGULATORY EMISSION STANDARDS. §¨¦70 §¨¦270 §¨¦170§¨¦270 §¨¦70 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11923 11 TASK NO: TASK NAME: $60,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 5 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A Design Services 6660 - Sanitary Replacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 47,300 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE METHOD. §¨¦40 §¨¦70 §¨¦270 §¨¦44 §¨¦170§¨¦40 §¨¦270 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11924 11 TASK NO: TASK NAME: $110,000 BUDGET: FUND: Various MUNICIPALITY: Missouri MAJOR SERVICE AREA: Missouri River Tributary Areas WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 6 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT B Design Services 6660 - Sanitary Replacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 31,300 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE METHOD. §¨¦70 §¨¦270 §¨¦170 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11925 11 TASK NO: TASK NAME: $80,000 BUDGET: FUND: Various MUNICIPALITY: Bissell MAJOR SERVICE AREA: Bissell WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 7 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT C Design Services 6660 - Sanitary Replacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 47,980 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE METHOD. §¨¦70 §¨¦270 §¨¦170§¨¦270 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11926 11 TASK NO: TASK NAME: $80,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 8 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT D Design Services 6660 - Sanitary Replacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE 50,200 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE METHOD. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11144 16 TASK NO: TASK NAME: $600,000 BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 9 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Professional Services 1101 - General Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM AS NEEDED PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY INCLUDE CAPITAL AND NON-CAPITAL SERVICES. LILACTOELLESHEPLEY BLUFF SCENIC VAL LE YADRIAN LOOKAWAYC A MER O N SPRINGGARDENDURNESSCAL UMETRENFREWELBABURLINGTON NORTHERN SANTA FECOBURG LEETON M I DLOTHIAN GLOUCESTERHABECKINGHOBKIRK SU R R E YDOROTHYPR E SLEYGLENG A R RYTRIOSTIMSONM ARALDOTAY FORKDIAMONDNORTHRIDGE GRA MPIAN ROSSCAITHNESS RIVER M O N T J E F F R E YMCCARTNEYBAGNELLTHRIFT BELLA BIRITZ DENNESSTOPAZ MIDRIDGE L ANARK MCALPINE HAYWARDSHELDONCOSIE LOOKOUT CHAMB ERS DUDLEYKIRKWALLGARDOMELVICH MACDOUGAL L HADDOCK MARSHFIELD MOIDAR T LILACFORK DIAMONDSHEPLEY VAL L EY§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11686 11 TASK NO: TASK NAME: $180,000 BUDGET: FUND: Various MUNICIPALITY: Bissell MAJOR SERVICE AREA: MISSISSIPPI RIVER (CITY) WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 10 BISSELL POINT I/I REDUCTION (BP-619)(VALLEY DR) Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. PROJECT COMPLETES A PORTON OF SYSTEM IMPROVEMENTS NECESSARY TO REMOVE CONSTRUCTED SSO BP-619. STRECKER VA LLEY S H E P A RDCLAYTON O R R VIL L E JO ESI N D IAN T R E E CHU RC H F IELDMCBRIDEPOINTEWILD RIDGE BEN T RIDGE WI LS O N F A R M SUNMEADOWPANORAMA HE R WORTH WILDHO R S E P A RKWAYHORSESHOE RID G E KEHR S GR OVE WOLFFGARDENVALLEYPRIV A T E G A R DEN RIDGE KEHRS R I DGEVINTAG E O A K S ADDLE CREEK ANNASL ONECABIN CHIPPE NHAM T U R NBERR Y P L A C E W I L L S T R A CELA SIA ND R A PEP P E R MILLWHITING THIEL ANDRAESRIDGLEYWOODS PI S AJOSH PRIVATE PRIVA T E M O 10 9 S T §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11720 11 TASK NO: TASK NAME: $1,120,000 BUDGET: FUND: Wildwood MUNICIPALITY: Missouri MAJOR SERVICE AREA: Caulks Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 11 CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I Design Services 6660 - Sanitary Replacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 13,580 FEET OF 8-INCH TO 36-INCH DIAMETER SANITARY RELIEF SEWERS. SCOPE OF PROJECT 10547 CAULKS TRUNK LINE A WILDWOOD ANNEXATION, NOW INCLUDED WITH THIS DESIGN. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11811 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 12 $2,000,000 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) Vendor Services 1101 - General Fund FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11810 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 13 $1,000,000 CCTV INSPECTION OF SEWERS (2014) Vendor Services 1101 - General Fund FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PRIVATE ROBBINSGROVERICH MOND FORESTBEHLMANNMEADOWSROBBINSWAY PRIVATE P R IV ATE PRIVATE§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11809 11 TASK NO: TASK NAME: $360,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 14 COLDWATER CREEK WWTP SCREENINGS & WASHER/COMPACTOR IMPROVEMENTS Design Services 6660 - Sanitary Replacement Fund EXISTING WASHER/COMPACTORS DO NOT MEET NEEDED CAPACITY. CONSTRUCT ADDITIONAL CAPACITY AND MAKE IMPROVEMENTS TO EXISTING FINE SCREENINGS TRANSPORT SYSTEM AND WASHER/COMPACTOR SYSTEM, AND MINOR PIPING CHANGES TO ALLOW DIGESTERS TO FUNCTION AS EMERGENCY STORAGE TANKS IF A SLUDGE FORCE MAIN FAILURE OCCURS. §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦44 §¨¦170 §¨¦255 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11152 16 TASK NO: TASK NAME: $1,500,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 15 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES Professional Services 6660 - Sanitary Replacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11826 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 16 $300,000 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS Professional Services 6660 - Sanitary Replacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNEL SYSTEM AND UPPER RDP TUNNEL SYSTEM. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11151 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 17 $1,050,000 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Professional Services 6660 - Sanitary Replacement Fund SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA THE CONSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OR OTHER FACILITIES. PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11125 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 18 $1,200,000 CRITICAL INFRASTRUCTURE ASSESSMENT Pre-Design Services 1101 - General Fund LARGE DIAMETER BRICK SEWER SYSTEMS LOCATED IN CRITICAL LOCATIONS NEED ASSESSMENT FOR CONDITION AND RISK OF FAILURE. PERFORM INVESTIGATIONS OF SEWER SYSTEMS IN HIGH RISK AREAS WHERE FAILURES WOULD HAVE THE POTENTIAL TO CAUSE SUBSTANTIAL PUBLIC DISRUPTION OR DAMAGE TO PROPERTY. IDENTIFY AND PRIORITIZE REHABILITATION NEEDS. THIS PROJECT IS TARGETED TO CRITICAL LOCATIONS THAT HAVE NOT BEEN PREVIOUSLY EVALUATED BY OTHER EFFORTS. §¨¦55 §¨¦55 WACHTELBA Y L ES S ZEISSHO F F M E I S T E RPARDELLAREED D A V I S FA N N I E ARLEE MILITARYGENT R Y P R I V A TEAVENUE HPAUL E M A R C E A U OR I E N T H U R C KGRAND UNION PACIFICCLYDEWEBERERSKINEMINNESOTAETTA CA T AL A N HO R N M O U N T O L I V E FELTON NA ER TVIRGO MICHIGANDALLASGOETZ JOPLINVEGASUNIONPERRINLORETTAREGINA LA G R O KA Y S E R WE I S S PLAC I D MANNCORMAR VELMARUPRECHTLANDOR BLUE RIDGESANTE N DU M O N T HOLDEN CL E VES BOBRING CATSKILL WA L L E R ES PE N S C H I EDIDAHOMAJESTY POINT RISCH CARTWRIGHT PO E P P I N G A D E L I A JE F F O R D SAVENUE ISU S A N BAUMANNPR I M M OLD CO UNT Y DAMMERTBAR T O L ET EL I A S FA W N BA Y L E SS DAMMERTVELMA WA L L E R FA NN I E WE IS S PA U L E UNIONPACIFICFELTON HO R N KA Y S E R OR I E N T UNIONPACIFIC ARLEE PRI V ATEREGINAWA L L E R ETTA W E I S S LEMAY FERRY RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11155 11 TASK NO: TASK NAME: $1,100,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Martigney Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 19 DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) Design Services 6660 - Sanitary Replacement Fund TWO SSOS AND A PUMP STATION REQUIRE ELIMINATION. CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦40 §¨¦40 CLAYTON LAYOLD WARSON MCKNIGHTT R E N T WARSONPRICELITZSINGER SO U THFORTY BARNESDANIELCELLAKENTR O ANOVERHIL L S DE N NY GODWI NCONWAYMAGNOLIASP RINGWOOD ARTHUR PIC A RDY WINDIN G R IDGE INDIAN ELLSWORTHLOG CABINPARK OVERBROOKHIGHDOWNANZEIGER P R IV ATE TWINSPRINGS R O L LINGROCKMAYFAIRWARRIDGE WILD ROSE WATE R B U R Y LYLEWOOD RAU S C H E R DUNL EIT HOAK BENDLINDW O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL D E E R CREEK LITZSINGER PR IVA TE W ARSONPRIVAT E PRIVATE S LINDBERGH BLVDS LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10021 11 TASK NO: TASK NAME: $1,700,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 20 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) Design Services 6660 - Sanitary Replacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATE SURCHARGING AND ELIMINATE CONSTRUCTED SSOS. SUPPLEMENTAL APPROPRIATION. 10021 NAME CHANGED TO INDICATE INCLUSION OF SCOPE OF PROJECT 10486, DC-03 SANITARY RELIEF. §¨¦270 §¨¦40 §¨¦44 §¨¦170 §¨¦40 §¨¦270 §¨¦170 OLIVE BLVD MANC H E S T E R R DS LINDBERGH BLVDWATSO N R DN KIRKWOOD RDN LINDBERGH BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11110 16 TASK NO: TASK NAME: $600,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 21 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Professional Services 1101 - General Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. DESIGN NECESSARY SYSTEM IMPROVEMENTS IN THE DEER CREEK WATERSHED TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY INCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦40 §¨¦44 §¨¦170 §¨¦40 DALEMETROLI N K ELMLAYPINE U N IONPACIFICFORSYTH WYDOWN PERNOD FYLER LOCKWOOD FOLK LANSDOWNEMCKNIGHTNEWPORT MARSHALL LEE YALECLARK LITZSINGER ARSENALLACLEDESTATIONBRENTWOODSOUTHWESTHANLEY G OR EPRICEW E LLS MURDOCHODAYDAVIS LINDENWOOD ETHEL FORES T P A R K BANCROFT BRADLEY WHITE ODELL BELLBREDELLBISMARK BOLANDSUTTONSCANLAN EULALIE GL E N ARUNDEL EUCLID FRANCISS WAN PAR K WEST PARK LITHIA OAKLAND WABASHDANIELPACIFIC SUMMITZEPHYR OLD WARSONCELLA FORESTLOUISMARQUETTE WILLIAMS ALAMO L A GOON MARDEL MADGEMCCUTCHEONROAN OAK LOUWENFLORA ASBURYW R ENWOO D MARYS U T H ERLAND BRUNO GLADES JEROME M ANHA T T A N PRATHERIOLAYEATMANWISE CECELIAEAG ER ROSE CE C IL OXFO R DGODWIN Y ORKPARKDALE LYLED E S P E RESARLING T O NLANGTON VILLA CROMWELL LAFAYETTETAMMKRAFTINDIAN FAUQUIER WILD ROSE DOLAN JAMIESONPORTERCEDAR B ERRY BANCROFTYALEMARYTAMMUNIONPACIFICWHITE MAN C H E S T E R R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11731 11 TASK NO: TASK NAME: $3,200,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 22 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Pre-Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. CONSTRUCT SANITARY SEWAGE WET WEATHER STORAGE TUNNEL AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF. THIS IS A SUPPLEMENTAL APPROPRIATION FOR THE PROJECT FORMERLY NAMED DC-02 DEER CREEK SANITARY RELIEF STORAGE TANK. WOODSONWISMERWRIGHTNORTH EMINENCEBALTIMORE DIXSIMSGUTHRIE REXSTJOACHIMBOBB COLESGORDONBOSWELLPOEMILTONMARGOANN BROWNCHAUCERROYGERALDINETUDORAIRWAYHAROLD BENSON CARLYLE HERBERTBATAANJANE WESTRIDGEORLANDOMARVINT I P TONST LOUIS QUIETCALVERTPASTEURISOLDASTGREGORYBRISTOLEDMUNDSON DELPHINE W IN NCORREGIDOR LILLYJEAN SUNCRESTMURIEL ROYALTONEASTRIDGETUTWILER PATRICK ROSLAN STANSBERRY CHARLACKEDMUND TENNYSONMACON LYNNTOWNDELTA KATHLYN CHESTER GEDDE AMBRO EDMIL DEHARTLIVINGSTON JOELWESTWISE ANGELOST KATHERINE HO L T W I C K OSGOODELSAMARM ARY SHERMANINDUSTRIALBURDELLA LINDSCOTTMECCA LATROBELYNROSTREFORE LEENORA BRECKE N R I D G ENACECALVERTROSLAN HAROLDSIMSBOSWELL BRECKENRIDGE SIMSMURIEL CALVERTCORREGIDOR DIXBRISTOLREX GORDONKATHLYN SIMSEDMUND TUDORAIRWAYHAROLDMARVINST C H A RL E S R O C K R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11738 11 TASK NO: TASK NAME: $750,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 23 DIXIE I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND CONSTRUCT 1,500 FEET OF 8-INCH TO 12-INCH STORM SEWER. §¨¦270 DUNN PERSHALL CLOVERF L ORA BARTO W ILLIAM S LATTY GOTTBECKER JEAN ANIS T A SI AMORAN ELBRI N G CONNOLLY BUDDIEDESMET ARGOSADONIA BASC O M GLADYSBRACKLEIGH YOUN GDUBOURGGAHANSTMAURICEBOELLNERDUCHESNEMARE C HAL S T M ARKLAFAYET T EMARLACW A D S WORTH S PRING LAUPHERPRIV A TEWASHING TON RICHW O OD CHATEAUMANNIN GTALLYHO ST JAMESLOCUST RYAN SANTAC R U Z LA HAVRES T C O R NELIUS S T GE NEVIEV E SAGEWOOD ST MICHAELWILLOW SU S I E BUDDIE GLADYS BUDDIE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11739 11 TASK NO: TASK NAME: $180,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 24 DUCHESNE AND GOTT I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND CONSTRUCT 1,220 FEET OF 12-INCH SANITARY SEWER. §¨¦44 §¨¦44 GEYERROTT RAYBURN WATSON EDDIEN P A R KROBYNDEANEMANDA CRESTOAKMONICA APEX RUSDONMAEBERN TAHITIS A MO A RICHVIEW HA R W IC H R E D O A K FLORALEA M A RE T CINEM A STURDYFOXPARKSUN S E T H IL LSGAYLELODGE BALI LOWILLKATHYLYNN M ATT H EWS PRIVATE GLENFIELD D E L V I S T A S U N S ETRECOBE T H SKY CRESTOAKSHIREASPEN COURT STARLINGCRESTWOOD FOX CREEKJOSHUA SADDLEBROOKWOODFOXS U N S E T O F F IC E RICHTERMILWAUKEEWOODPAR KMAPLE GROVEEGGELINGWESTWICKFERN GLENMORESIMEMPHISC OU RTYARDLAKE TRENTMORE F O X B RIDGEMEADOWGLENMIDDLEWOOD RYEGATEW A T SO N PLAZA P R IVATEWATSON PR I VA T ESTURDYWATSON RD SLINDBERGHBLVDS KIRKWOOD RD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11740 11 TASK NO: TASK NAME: $120,000 BUDGET: FUND: Sunset Hills MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Gravois Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 25 E. WATSON SEPARATE SEWER I/I REMOVAL Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦270 §¨¦170 §¨¦170 FROST ST ANTHONY DUNN HANLEYWA S H I N G T O N PERSHALLGRAHAM WATERFORDST CATHERINE LATTYLAFAYETTE E L I ZA B E T H ST M A R I E REASOR HA R R I S O N MID WOOD BOONECLOVERW ILLIA M S FLORA MAPLE BARTO STLOUIS ALLENAUBUCHON ELBRI N G C A L V E R T O N NYFLOT YOUN GJEFFERSON KINGSLEY BECKER MORANSADDLECAPRIJEAN JONASELM DERHAKESTCHARLES HAZELWOODZU RICH BUCKEY E M IL B A N K STDENIS H UDSON S T E DWARDCADYGAHAN ROMISSTRINITY FORDRIDGEHOLLINSSTJACQUESALDERCARMONATANEYBROWNROGERS SIELO FF LARRYARGOBROWERP R I V ATE GRANDVIEWPIMLICOPUEBLOST MA URICE ST REGISST EDITHJACKLIN B O ELLNERMA N O R BON AIRELYNNMEADOWSWILSHIRESTMA RKKNOLLLILA DUCHESNE RO B INWOODMOONLIGHTCASTELLOSTNICHOL A S KNOLLWAYST JEANLOMOND REGI N A SLUSSER CARMEL BARA T HOLLYREEBSUFFOLKKELLY CHARTIERST STEPHEN ERMANDADERHAKE P ERSHALL §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11748 11 TASK NO: TASK NAME: $350,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 26 FLORISSANT I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. §¨¦270 §¨¦170 §¨¦170 FROST ST ANTHONY DUNN HANLEYWA S H I N G T O N PERSHALLGRAHAM WATERFORDST CATHERINE LATTYLAFAYETTE E L I ZA B E T H ST M A R I E REASOR HA R R I S O N MID WOOD BOONECLOVERW ILLIA M S FLORA MAPLE BARTO STLOUIS ALLENAUBUCHON ELBRI N G C A L V E R T O N NYFLOT YOUN GJEFFERSON KINGSLEY BECKER MORANSADDLECAPRIJEAN JONASELM DERHAKESTCHARLES HAZELWOODZU RICH BUCKEY E M IL B A N K STDENIS H UDSON S T E DWARDCADYGAHAN ROMISSTRINITY FORDRIDGEHOLLINSSTJACQUESALDERCARMONATANEYBROWNROGERS SIELO FF LARRYARGOBROWERP R I V ATE GRANDVIEWPIMLICOPUEBLOST MA URICE ST REGISST EDITHJACKLIN B O ELLNERMA N O R BON AIRELYNNMEADOWSWILSHIRESTMA RKKNOLLLILA DUCHESNE RO B INWOODMOONLIGHTCASTELLOSTNICHOL A S KNOLLWAYST JEANLOMOND REGI N A SLUSSER CARMEL BARA T HOLLYREEBSUFFOLKKELLY CHARTIERST STEPHEN ERMANDADERHAKE P ERSHALL §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11932 11 TASK NO: TASK NAME: $40,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 27 FLORISSANT PUBLIC I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE PUBLIC I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 44,800 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE. §¨¦270 §¨¦270 PAGE ASHBYADIE CRAIG SCHUETZWARSONLINKSIMSFEEFE E DIELMANSCHULTE BAL LCEN T R A L MIDL A N D BAUR DAUTELDRIVER NIBLICWELDON BALTIMORE POEUNIONPACIFIC LITZ FLORA ME S AOAK SPOEDE WRIGHTBO R M A N ENGELMETRO MEEKS BRECKENRIDGE KREMDYERBRUNODELORD ECHO CANT E RMAR S SCH A E F E R ST FRANCIS GUELBRETHMIDLAND GASSRIDGE THORPELANSING RESEARCHMAD D OX TRESCOTT C H IE F T A I NGRISS O M HURONOLDDORSETTZYKANLIBERTY LACKLAND WISMERUCEYLEWURDACK MILLPARK MORR O W BENSON WARNEN OLIVAIREVILLA V A NCLEVE PORTDIANES T K ATHERINE F IE STA SONAISOLDABOOTH WIL WOOD DECORAH MACK ANDESNEWBAL L A S GRAPE TOWNLEY BOYLSTON INVE R N E S S DAYKIN LINDADE MILTONRENEEWALTERSPAM M E DIALIMETREEARC ELBRINGMIKELLINDLEY LOC UST POEFEEFEECANTER OLIVE BLVD NLINDBERGHBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 10456 11 TASK NO: TASK NAME: $260,000 BUDGET: FUND: Various MUNICIPALITY: Missouri MAJOR SERVICE AREA: Fee Fee Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 28 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016) REHABILITATION & I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF 149 PRIVATE I/I SOURCES FROM SANITARY SEWERS. BOYLEOLI V E LINDEL L WHITTIERSARAHWE S T M I N S T E R MC P H E R S ON MARYLA N D WA S H I N G T O N WE S T M I N STE R MC P H E R S O N MARYLAND §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11137 11 TASK NO: TASK NAME: $500,000 BUDGET: FUND: St. Louis City MUNICIPALITY: Bissell MAJOR SERVICE AREA: Western Mill Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Non-recurring Page 29 GASLIGHT SQUARE SEWER IMPROVEMENTS Design Services 1101 - General Fund OVERCHARGED COMBINED SEWERS CAUSING WET WEATHER BUILDING BACKUPS. IMPROVEMENTS IN GASLIGHT SQUARE AREA TO REDUCE BUILDING BACKUPS, TO INCLUDE STRAPPED PLUMBING RETROFITS FOR 95 BUILDINGS, OR PRIVATE PUMP STATION. PROJECT TO BE DESIGNED VIA AMENDMENT TO EXISTING URS CONTRACT. THE SCOPE OF THIS WORK CANNOT BE CAPITALIZED. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11751 14 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 30 $100,000 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014) General Services - Construction Inspection 6660 - Sanitary Replacement Fund CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 10613 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 31 $50,000 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT A General Services - Geotechnical 6660 - Sanitary Replacement Fund GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2014 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 10614 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 32 $50,000 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT B General Services - Geotechnical 6660 - Sanitary Replacement Fund GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. RETAIN GEOTECHNICAL FIRMS FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2014 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 10615 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 33 $50,000 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT C General Services - Geotechnical 6660 - Sanitary Replacement Fund GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2014 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11755 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 34 $400,000 GENERAL SERVICES AGREEMENT - PLANNING (FY2014) General Services - Design 1101 - General Fund WITH THE ELIMINATION OF THE WATERSHED PLANNING CONSULTANT, PLANNING NEEDS TO SUPPORT THE CAPITAL PROGRAM EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN FIRM FOR AS NEEDED PLANNING SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11759 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 35 $300,000 GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014) General Services - Design 6660 - Sanitary Replacement Fund DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER & PROCESS DESIGN SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11763 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 36 $50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A General Services - Survey 6660 - Sanitary Replacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11909 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 37 $50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B General Services - Survey 1101 - General Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11910 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 38 $50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C General Services - Survey 6660 - Sanitary Replacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11911 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 39 $50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D General Services - Survey 6660 - Sanitary Replacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11912 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 40 $50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E General Services - Survey 6660 - Sanitary Replacement Fund SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11779 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 41 $90,000 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A General Services - Design 6660 - Sanitary Replacement Fund SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11780 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 42 $90,000 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B General Services - Design 6660 - Sanitary Replacement Fund SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11781 11 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 43 $90,000 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C General Services - Design 6660 - Sanitary Replacement Fund SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. PROJECT WILL INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. CLAYTON CLAYMONT HOLLOWAYHIGHVIEWVLASISHILLSDALECREST L A N D IVYSKYLINESUNSET CORALMIMOSAA L G ON Q UI NPA R KPROVIDENCE SHIRLEYB R IA RW YC K WE S T W OOD SEVENTRAILS K E N IL W O R TH ELMCRESTGREENBRI ARSTR E I F FCLAYHEATH C ORONADO W HITETREEPACKFORDNORTHMOOR BIRCHWOODM O N T I C E LL O NANTUCKET PRI VATEMEADOW BROOK LO G H ILLAPPLEGATERAUSCHER LINDELL MONRO E M I L L SMITH GAN A H L SPRA G U E S MILLBOLTONCHURCHILL ORCHARDGLENNKEHRS MILLHATTERASANTIOCH WELLSHIRE HAPPYR O M IN E LAKEWOODWATFORDDALE ELMMIMOSAPRIVATEMANCHESTER RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11765 11 TASK NO: TASK NAME: $90,000 BUDGET: FUND: Ballwin MUNICIPALITY: Meramec MAJOR SERVICE AREA: Grand Glaize Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 44 GRAND GLAIZE TRUNK SANITARY RELIEF I/I REDUCTION (SKME-417) Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦55 §¨¦55 UNIONREAVISBARRACKS WI L L IONEFAIN RI P A MACKENZIEAVENUE HSPOKANEJEFFLEIGHCAMINOMARCHIDARDING TELFORDRAINBOWMULLALLYZ E N ITHT I M M PECANJA C I N T O BUCKLEYSHAPFIELDVIAM I R A L E STAMCCORRY EI F F E L BANISTERC O A C H E L L A MA L US M O UNT O L I V E FAB I A N VILLARIDGE M ALCO L MM A N G ROVE CO R N U S DOLBIL CA L E F PA R K C R E S T SEQUOIA B A R T H BLACKP O OL BONTONH UNTINGDONJUDITH M E L ON W E M B LEYGREENPARK ROSEGARDENR O D APAMARYVALE VIAV E N ET O N A V A J OGENE CAUSEWAYEUCALYPTUS PARK L A WND O RAN R U T H E R F O R D HIGHAIRE VES C O V OBOXRE D L A N D BUNKERH IL L REAVIS GARDENSBUCKLEYRAINB O WZENITH LEMAY F E R RY R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11766 11 TASK NO: TASK NAME: $3,200,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Gravois Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 45 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME -521) Design Services 6660 - Sanitary Replacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE CONSTRUCTION OF 11,000 FEET OF 8-INCH TO 72-INCH DIAMETER SEWER. ELMROSE TULIP HOLLY BELTONOLD WATSONROCK HILLWEXFORDDRAKE PEARL TURF JONQUILGARDENIAWEBSTER KNOLLS ROSEELM TULI P DRAKETURF §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11097 11 TASK NO: TASK NAME: $240,000 BUDGET: FUND: Webster Groves MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Mackenzie Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 46 HOLLY DRIVE SEWER SEPARATION Design Services 6660 - Sanitary Replacement Fund OVERCHARGED SANITARY SEWERS AND BYPASS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, CONSTRUCT 2,000 FEET OF 8-INCH SANITARY SEWER, AND 280 FEET OF 12-INCH TO 18-INCH STORM SEWER. §¨¦70 §¨¦70 ASHBYJANEWRIGHTST LEOPEAR TREE GERALDINESIMSTRE A D W A Y LAMBERTINTERNAT IONAL ESSELDALEAIRFLIGHTLIANACYPRESS DOUGLASS INTERNATIONAL TR A V ER SE ST DA M I A N ISABELLE TA N B A R K CRILLYST PIU S NORTH ALLEY S TKEVIN COUNTR Y STEPHENS BOBBIE DOWNS STPHILIP DABNEYJUNE C A M S H I RE FAIRWAYSTCLEMENT CABANACLUB EXE C UTIVE MILL PASS S T RAPHAEL SOUTHLAMBERTPARK TROPIC ST AMBR O S E ST LINUSJEREMIAH KODIAK NATURALBRIDGERD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11710 11 TASK NO: TASK NAME: $30,000 BUDGET: FUND: St. Ann MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 47 ISABELLE I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦55 §¨¦255 §¨¦55 §¨¦255 UNIONPACIFICKOCHRIVERK INSWOOD GREGGREA V IS B A R RACKSFO R D E R CCCGRANTLIN D TELFO R D HOFFM EI ST E RARLEE MILDS HERMAN GENT R Y IONE FAIN PRIVA TEJOPLINCLIFFRING ER SHER ID A N PA U L E PO TT L E OR I E N T RIPA LUNAPO P L A R GARK WILL LARKCLAGEROUTE R VICTOR Y M O U N T O L I V E BOUNDARY HO R N JEFFERSONIAN HAL S EYFIRSTPECAN ASHROCK JA C I N T O SOUTHSHIRE ARR A S JEF FERS O NBLUE RIDGEBANISTERAL L E N L I SI EU X KASKEBUNKERBIRCHP R IVATETELEGRAPHR D§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11711 11 TASK NO: TASK NAME: $2,050,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Martigney Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 48 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Design Services 6660 - Sanitary Replacement Fund EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE MARTIGNEY AND JEFFERSON BARRACKS PUMP STATIONS. THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FY 14. TOTAL DESIGN BUDGET IS $4,500,000. RIPA GREGGGRANTC CCTELFORDLARKOUTERWEMBLEYCLYDEBOUNDARYLUNABROOKLINNREAVIS B A R RAC K S CLAGERNEB RA S K A RIVERLA M B E T H GARK CYE SI G S B E E JE F F E R S O N I A N SADIEWALWORTH MEADOWELLEN JOPLINNORTH PRIV A T E AL L E N GRA NDASEDANLA R E D O TA C O M A SO UTHA MPTON W E ST A I R W ALDEN KASKEBELLSW O R T H EA R LS F I EL D RUTHL A NDE L L WINE TEDDYKEVIN BUNKERPOPLARFORESTOH A R A BE A T R I C E ERIEREESR OSEGARDENOLEDELR A INBOWBA R N SL E Y SHERMANB E TT Y J E ANSO UT H W A R K D O RANCHAPEL PE N T O N VIL L E E L E ANORKAYMI D D L E B O R O WOOLWICH SCEN IC DE M E RVI L L E KENNYA T L ASSHETL ANDREAV TELWINDINGW Y C L I F F E CORLISSB U R M A CCCPRIV ATERA I N B O W TELEGRAPHRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11054 11 TASK NO: TASK NAME: $25,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Martigney Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 49 KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION Design Services 6660 - Sanitary Replacement Fund INFLOW CONTRIBUTING TO OVERCHARGED SEWERS AND PUMP STATION. CONTROL SURCHARGING & BACKUPS AND ELIMINATE EXISTING PUMP STATION P-326 THROUGH I/I REDUCTION AND SEWER IMPROVEMENTS. REDIRECT TWO STREET INLETS FROM SANITARY TO STORM SYSTEM. §¨¦55 UNIONUNIONPACIFICGRANTKO E L N MINNESOTAD A V I S GREGGVIRGINIABUCKLEYS EIB ERT WACHTELBA Y L E S S PENNSYLVANIAGERMANI A ZEISSCCCM O TT PARDELLAWEBE RTELFO R D IDAHOR E A VIS B ARRACKS FA N N I EKAMMERER ARLEE MILITARYS HERMAN NA G E L GENT R Y FAIN PR IVA TEJOPLINM A R C E A U CLIFFMOHEGAN RO B E R T BL O W RI P A LUNAGRANDGARKMORGAN FORDLARKWATER CLAGEROUTE RHOFFMEISTER REILLYSP R I N G M O U N T O L IV E ETTA PR I M M AVENUE HBOUNDARY C A T A L A N HO R N JEFFERSONIAN HAL S EYPECANREGINAPE A LDANA H E E G E PHILOCO L V I N BLUE RIDGEEI F F E L TIE M ANN BANISTERAL L E N TE SS O N KASKEBUNKERRUNYONPRI V A TE WEBER §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11817 11 TASK NO: TASK NAME: $850,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: River Des Peres WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 50 LEMAY NO. 3 PUMP STATION AND FORCE MAIN Design Services 6660 - Sanitary Replacement Fund JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE MAIN. §¨¦44 §¨¦55 §¨¦40 §¨¦270 §¨¦255 §¨¦70 §¨¦270 §¨¦255 §¨¦55 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11927 11 TASK NO: TASK NAME: $220,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 51 LEMAY PUBLIC I/I REDUCTION (2016) Design Services 6660 - Sanitary Replacement Fund DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATE SEWERS USING THE CURED-IN-PLACE METHOD. D A V I S MILITARYM A RC E A UWACHTELFANN I EGRAND H U R C K WATERVULCANC A T A L A N HO R N UNION PACIFICH O F F M E I S T E R REILLYMINNESOTAGO E T Z GENT R Y PENNSYLVANIAOR I E N T LA G R O TE S S O N KA Y S E R WE I S S P O E P P I N G PARDELLAMANN VIRGINIABA Y L E S S PR I M M PRI VAT EERSKINE PL A C I D ES P E N S C H I E DPOL KWA L L E R NE L L I EIDAH O A D E L I ABAUMANN OLD CO U N T Y DAMMERTMICHIGANWAL L E R H O R N WE I S S BA Y L E SS P RIV ATEKA Y S E R UNIONPA CIFIC LA G R O WA L LE R KAYSER P R IVATE L E M A Y F E R R Y R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11123 11 TASK NO: TASK NAME: $150,000 BUDGET: FUND: St. Louis City MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: River Des Peres WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 52 LEMAY PUMP STATION NO. 1 REDUNDANT FORCE MAIN Engineering During Construction Services 6660 - Sanitary Replacement Fund NEED TO INCREASE INFLUENT PUMPING CAPACITY FROM 290 TO 340 MGD. CONSTRUCT 3,600 FEET OF REDUNDANT 96-INCH FORCE MAIN FROM LEMAY PUMP STATION 1 TO LEMAY HEADWORKS. §¨¦44 §¨¦55 §¨¦40 §¨¦270 §¨¦70§¨¦170 §¨¦255 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11145 16 TASK NO: TASK NAME: $600,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 53 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Professional Services 1101 - General Fund SYSTEM DEFICIENCIES NEEDING CORRECTION. PERFORM AS NEEDED PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY INCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦55 UNIONBA T E S MACKENZIEDE LOR GER M A NIA MORGAN FORDTA F T MINNESOTAVIRGINIAPENNSYLVANIAD A V I S RHODES RIV E R D E S P E R E SHAMPTO NWACHTELIDAHOBAY L E S S ROSA MILENT ZZEISSH ALELOUISIANAS EIBERT ALASKAWA L S H M O T T DOVER PARDELLABL O W I O NEWE B E RFINKMAN HO L L Y H ILL S WI L M I N G T O N REAVISBARRAC K S FA N N I EELTONKAMMERER SHARPIR O N ARLEE MILITARYCHRISTYBU R G E N FIELDGEN TRYMATHILDA P R IVA TERADIOM A R C EA U BO W E N UNIONPACIFICOS C E O L A HA V E N QUINCY MOHEGAN STAELY CLIFTON37THJOPLINA LM A ITA S K A KAYSC H I L L E R RO B E R T RI P A H EID ELBERG RADIOMKIT EUGENEGRANDEIL E R GRESHAM LUCIAWATERVASELFORMAN BELLE RIVEGENESTA ACORNALABAMAHOFFM EISTER REILLYJA MIESONWILL MORE M O U N T O L I V E ETTA CIRCLEVIEW ALTHEAPR IM M AVENUE HSPOKANEC A T A L A N JEFFLEIGHHOR NLEONAPILOT ZENITHPECANEL W O O D H A N N O V E R REGINARAYNAVAJOEH E E G E SOUTHERN C OL V I N CECI L JOELST E I N S BLUE RIDGEEIFFE L MAL U S T E S SON PAVIA HELMRUNYONAVABL O W VIRGINIAGRANDGRA NDRIPA ALASKAWEBER L E M A Y FERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11820 11 TASK NO: TASK NAME: $7,450,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: River Des Peres WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 54 LMRDP STORAGE TUNNEL SOUTH END Pre-Design Services 6660 - Sanitary Replacement Fund IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦44 §¨¦170 §¨¦255 §¨¦55 §¨¦170 §¨¦255 §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11109 16 TASK NO: TASK NAME: $550,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 55 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Professional Services 1101 - General Fund COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACT WATER QUALITY. CONSTRUCTION OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATION. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY INCLUDE CAPITAL AND NON-CAPITAL SERVICES. §¨¦55 §¨¦255 §¨¦255 KERTHRING E R ERB FO R D E R M A T T I S HEINTZB A U MGA R T N E R KINSWOOD MILDAMBS Y A E GE RMEHL MILBURNTHEISS OLDBA U M G A R TNERPOT T L ELIN D BUTLER HILL CLIFFSUSANCARIBEEHAWKINSBURN C OATE E A S T VIENTOOLSENB L A CKFOREST POP L A R ELIENGLANDTOWNVALMEYER T O W N E CE NTR E M A N GO P RIVATE DANTONAIREBERVIEWCLIFFCAVE AQUARID GE LEM A Y W OODS MARTIGNEY V A LLEYSIDEFUCHSFIJI L O N GVIEW IVONDALEFIRELEAFWHITSHIRESTARLITSAGEASHROCK PE A L DELOAKLITTLEROCKSIR BORS EILEEN ANN SUNHILL ADWORTHDOHACK LI S IEU X COY L E FAUST CROSSWOODPRIVATEHAWKINSAMBS PRIVATEPRIVATEPRIVATEPRIVAT ETELEGRAPHRDLEMAYFERRYRD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11650 11 TASK NO: TASK NAME: $200,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Meramec MAJOR SERVICE AREA: Mattese Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 56 LOWER MERAMEC WATERSHED I/I REMOVAL Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN EXCESSIVE FLOWS TO THE LOWER MERAMEC TREATMENT PLANT. REHABILITATE THE LOWER MATTESE CREEK TRUNK SEWER TO REMOVE EXCESSIVE INFLOW AND INFILTRATION, REDUCING FLOWS TO THE LOWER MERAMEC TREATMENT PLANT. LINDEMANLINDGATE LILLIAN TWIN PINECHOPINFRANCES LOCKETTNANADOUG HE R T Y F E R R Y GRANT TALLIEMOZA RT LYNKIRK AMHERST WHITECLIFFBEN DAVIS GREENING SH ERILINNORTHLIN DOVERGATE MONTOUR WINESAP LINDEMANNHAVERSHAMCORNHILL OAKB LUFF BEETHOVENARMAT JI LL SOUT H LINBLAC K TWIG BRI AR F ARMLIN MANOR ST CROIX CAMEO LORIEN TRINKET GREENING LY NKIRK ST CROIX §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11651 11 TASK NO: TASK NAME: $60,000 BUDGET: FUND: Kirkwood MUNICIPALITY: Meramec MAJOR SERVICE AREA: Grand Glaize Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 57 LYNKIRK STUDY AREA I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND CONSTRUCT ANY SEWERS REQUIRED FOR REMOVAL. §¨¦44 §¨¦44 ELMBERRYLOCKWOOD GRAYEDGARGORELACLEDE STATIONGLENDALEUNIONPACIFIC CHESHIREHEEGEMAPLEBURLIN G T ON N ORTHER N S A N T A F E TULIP LILACBAKER JACKSON ROCKHILLOAKOLDWATSONSELMAOAK TREEPLANT GR A N T VALCOURH O L LYROSEJEFFERSON SYLVESTERWELLST U R FSAND ER S LINU M JOYFLORENCE RIDGE REAVI S MURDOCH BELTONPARKIOLA GARDE NPAPIN IMSEC A N NONBURYALBANY WEIL SOUTHSIDE F O R E S T LANVALECLARA INNISFAIL H O LLYWOODCOFF E Y 3 R D CENT R A L P R IVATEALMACHAPELFORD YALE DOBBIN RAVENSRID G E PARDE E FIELDSTON IDAMOR L A K E BONITA GENERAL SHERIDAN SWON OAKSHAZEL LARKHILL OLIVE BUSCH MCDONALD RID G EWOODHART GROVE LOCKSLEYALGONQUIN YORKSHIRE CATALI N A CEDAR FOU RN I E R H AW K IN S CAR M E L PLYMOUTHSPENCER CATALPA NORMALMARVALEAMBERGATE KIRKY RABETHBLACKMERF ORESTON KENORA ASHBURY GRANTJACKSON SWON PARDEECEDAR ROSEG R A N TELMSELMAGARDEN WEILSELMA PRIVATEPLANT WATSON RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11653 11 TASK NO: TASK NAME: $250,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Mackenzie Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 58 MACKENZIE I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS AND CONSTRUCT 1,100 FEET OF 12-INCH TO 18-INCH SEWER. §¨¦44 §¨¦44 ELMROCK HILLEDGARGLENDALE GRAYGORETULIP LILACBAKER JACKSON SELMAOAK TREE LACLEDE STATIONCHESHIREOL D WATSON BURLIN G T ON NOR T H E R N S A N T A F E H OLLY R O S E WELLSTU R FLIN UM DRAYTONFLORENCE OLD ORCHARDMAPLERIDGE RE AVIS BELTONS HE R W O O D PARK PAPIN IMSEC A NNONBURYALBANYSOUTHSIDE ECKRICH FOREST LANVALECLARA INNISFAIL HAMPSHIRE CEN TRA L PINETREEVIRGINIA ALMASYLVESTERCOLEBROOKBRISTOL OAK DOBB IN WEXFORDFIELDSTON SIMMONS R O SEACRE GRANTBRIDLELOCKWOODPLANTCHESTNUT L A R K H ILL HAZELPAS A D ENAPRIVATE BUSCH VIOLET ALGONQUIN LACLEDE G R O VE S R O N ALDHEEGE FIRW O O D LA N D SCAPE SHORT AMBERGATE CAMELLIA WORTHINGYORKSHIRE DEE RHURSTIVANHOEVILLAWO ODTOFT OLAWINDSOR ASHBURYREGENTSELMAGRAYJACKSONELMSELMAPINETREEELMREAVISGORE LANVALEROSE PINETREETULI P WATSON RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11931 11 TASK NO: TASK NAME: $90,000 BUDGET: FUND: Webster Groves MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Mackenzie Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 59 MACKENZIE PUBLIC I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 31,500 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE. HALL BURLINGTON NORTHERN SANTA FEMARIAS CHAINOF ROCK S RI V ER T R A I L §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11656 11 TASK NO: TASK NAME: $1,600,000 BUDGET: FUND: St. Louis City MUNICIPALITY: Bissell MAJOR SERVICE AREA: Maline Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 60 MALINE CREEK CSO 052 STORAGE FACILITY Design Services 6660 - Sanitary Replacement Fund CONTROL OF COMBINED SEWER OVERFLOWS. CONSTRUCT COMBINED SEWAGE STORAGE TANK, ASSOCIATED PUMP STATION, AND SEWERS. §¨¦55 §¨¦270 §¨¦255 §¨¦255 LE MAY F E R R Y R D T E LE GRAPHRDGRAVO IS RD TE S S ONFE R RYRDSLINDB E R G H BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11661 11 TASK NO: TASK NAME: $310,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Martigney Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 61 MARTIGNEY I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦55 §¨¦270 §¨¦255 §¨¦255 LEMAY F ERRY R D T E L EGRAPHRDGRAVOI S R D T E S S O NFER R YRDSLINDB E R G H BLVD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11930 11 TASK NO: TASK NAME: $190,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Martigney Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 62 MARTIGNEY PUBLIC I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 27,000 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE METHOD. NEW HALLS FERRY M O N D OUB L EAUCHURCHILL WELLINGTONA BERDEEN M O NSOLSLOGI S WINTERGREEN WEDGWOODBRUNSWICK HIRO N D ELL E DR ESDEN DOVERINDIANCUPSE VILLEWE S TMINSTER MESERTA G R A V E L L E SUNCRESTROSANT AQUEDUCTWINDSORBROOKSHIRE AR P E N T BRAD WELL FARNHAMCR OSSKEYS COUGAR ES PACEBARCELONAR U E D ER ENARDWOODSAG ECH ESHIR EC HA D WICKC HELSEA S P RINGTIME CONCORD S O M E R S E TB A V IL L EGREENBRIAR AV O NJOSTESTATESDOMENIQUECAN T E R B U R Y E D I N B U R G SEAVIEWLINDB E R G H LIND B ERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11664 11 TASK NO: TASK NAME: $80,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 63 NEWCASTLE I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦70 PASADENALUCAS N HUNTNELSONMELBALILLIAN H U N TE R RAVINIA HILLSROLA N D FL O R I A N LAWLERCOLONIALLINCOLNIRA OREON GR O V E L A N D OAKRIDGEWINCHESTER EDI S ON FOR E S T H I L L NO R M A N D Y A U GUSTA WIL L O W WO O D AVONDALESUNSET HE N DE R S O N C OU NTRYCL U B WESTFARL E Y WARW I C KBERMUDA D O N ALD MANOLAHUNTINGTON ONEILLB RISTOL CRESTLANDROH N ST MARYSFAI R CHI L D RED E R EAST MATHE W MU R R A Y S T ANDREWS CANTERB U R Y ARCOLANEONABRETONCENTRALNA D INE DUC K W O R T H CANTERBURY COLONIALONEILLNELSONPASADENAROLANDBRISTOL MEL B A N AT U R AL B RID G E R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11693 11 TASK NO: TASK NAME: $230,000 BUDGET: FUND: Various MUNICIPALITY: Bissell MAJOR SERVICE AREA: Baden WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 64 NORTH BADEN CREEK I/I REDUCTION (BP-532)(WINCHESTER DR) Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. REPLACE 500 FEET OF 12-INCH SANITARY SEWER, AND CONSTRUCT 400 FEET OF 12-INCH STORM SEWER. PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTS NECESSARY TO REMOVE CONSTRUCTED SSO BP-532. DERHAKENEW HALLS FERRY ST ANTHONY ST CATHERINEWATERFORDPADD O C K WASHING TON NEROAVON NARA STLOUIS C ATOALLEN PRIVATE AQUEDUCTAUBUCHONOLD H A L L SFERRYHUMES POHLMANTROTTERMARIETTASADDLEKINGSLEYLISACASTELLO DANUBETHUNDERBIR D STDENI S H E L MKAMPF FAIRW A Y PAPALST EUGENE TINAS E V E NHILLSRIDGEMILETUS ESTATE S ROGERSLARRY TREMONT V A N D A L S CAPRIPYRENEESS O R R E L L SEVILLE S T I R RUP BAYMEADOWSCARLA FOX RUN GREENGRASS RHINEIN DIA N C U PBELCROFT PIMLICOFLORVALRENEEFAIRMOUNTBON AIRES H OREHAM BROWN GALLOPSTEED WILSHIREMOHAN DENISEWINDSOR LILA R O B I N WOODNARR A G A N S E T ST LUKE PENHURST KAEL COUGAR VALENCIAEADSTONEDA NA BROADMEREHOLLY BELAIRKELLY ST STEPHEN PRIVATE PRIVA TEBROWNPRIVATE LIND BERG H §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11696 11 TASK NO: TASK NAME: $210,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 65 PADDOCK CREEK I/I REDUCTION (PRIVATE) Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND CONSTRUCT ANY SEWERS REQUIRED FOR REMOVAL. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11699 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 66 $789,000 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 Professional Services 1101 - General Fund PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWER SYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS. PUBLIC ENGAGEMENT PROGRAM FOR OUTREACH REGARDING REMOVAL OF PRIVATE STORMWATER SOURCES, THE CONSENT DECREE, & OTHER WET WEATHER RELATED COMMUNICATIONS. SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. TUXEDO MARSHAL L YEATMANOXFORD LACLEDESTATI ONGREELEY KUHLMAN SUFFOLKNEWPORT PROVIDENCE CLARK EXETERTAMPABROOKSIDE ATALANTA TWINING KEY W E S T ROBINSONL E N O XBARBARA JEANCLYD E H U R ST PROVIDENCE §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11933 11 TASK NO: TASK NAME: $40,000 BUDGET: FUND: Webster Groves MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 67 PROVIDENCE PUBLIC I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER SYSTEM THAT ARE DEFECTIVE. REHABILITATE 22,500 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE. §¨¦44 §¨¦44 WEIL MARSHALL NEWPORT CLARK BOMPARTTUXEDO MURDOCHLACLEDESTATIONSHREWSBURY SELMAMETR O L I NK ATALANTA UNION PACIFICEDGARLOCKWOOD SUMMITJOYFOREST B U R L IN G T O N N O R T H E R N S A N T A F E PLANTSYLVESTERDEVONSHIRE SUTHERLAND FAIRVIEW RIDGE YEATMANGARDEN NOTTINGHAM LANSDOWNEGLENSPRINGPARKKIRKHAMOXFORDORCHARDARLINGTONSUSSEX WILSHUSENBRUNSWICKLAFAYETTE DEVILLEMASONHAWT H O R N E LENOXEUNICE SUFFOLK ST CHARLESKAINEXETERL A K E GREELEY MARIONSWON SUNNYSIDE HAZELDA L E ST VINCENTCAROLINEMICHAELP A S A D ENAGREENW O O D O A KWOOD ARBOR KUHLMAN CALVERTGLENNONSTARK KENRIDGE ST MICHAELLO G C ABINFAIRLAWNCATALPA PROVIDENCE SANDAUTAMPA PR I VATE THEATREELBART BAR T O L O MILDREDQUTTONSTANDISH GARDEN GREELEY OAKW OODHAZELPARK ATALANTA PARK G LENO A K WOOD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11700 11 TASK NO: TASK NAME: $260,000 BUDGET: FUND: Webster Groves MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Deer Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 68 PROVIDENCE SANITARY RELIEF (SKME -640) Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING A CONSTRUCTED SSO. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS, AND CONSTRUCT ANY SEWERS REQUIRED FOR REMOVAL. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11822 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 69 $350,000 PUMP STATIONS SCADA IMPROVEMENTS Vendor Services 6660 - Sanitary Replacement Fund EXISTING SCADA SOFTWARE IS INCOMPATIBLE WITH THE NEW DISTRICT STANDARD WINDOWS 7 OPERATING SYSTEM. UPGRADE EXISTING SCADA HARDWARE AND SOFTWARE. OPERATIONS TO COORDINATE PROCUREMENT THROUGH PURCHASING. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11702 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 70 $130,000 RADAR RAINFALL DATA (FY2014) Vendor Services 1101 - General Fund ACTUAL PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING AND INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. RAMSEYPARKE R CORALOLD BALLWINIVYSHIRLEYNANCY B A R TO N STEAMBOATBIRCHWOODDEBULA NEWTONROJEAN SEAWINDAPPLEGATE ST MARYSVICTORREDSTART LESLIESOLONSWEETCREEKSM I THS UN NY SIDEVAIL MANCHESTER RD §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11665 11 TASK NO: TASK NAME: $60,000 BUDGET: FUND: Ballwin MUNICIPALITY: Meramec MAJOR SERVICE AREA: Fishpot Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 71 SELVIDGE AREA I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT NEW SANITARY SEWER TO ELIMINATE INFLOW AND INFILTRATION SOURCES. §¨¦170BROWNLACKLANDBURNS RIDGE WOODSONECHO FLORA MIRIAMHOOD GOODALETRESCOTT MILTONGASSTENNYSON THEODOSIA GAEBLERWENGLERFOREST SENECA CHARLACKEVERMAN SHERWOODLESLI EMARLOWE WABADAY PALMER ADDIEWALLISDAWESKENOSHOVERONASPENCERCOTE BRILLIANTE HARTLANDS HELLEY GOTHLANDBRAS SIEM INERVA MEADOWBROOK APACHE OSAGE ONEIDA SHAWNEE KALEN BARODA SIEVERS WALLISHOODSPENCERGOODALESPENCERMILTONWALLISWABADA Y MIRIAM MILTON §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11059 11 TASK NO: TASK NAME: $900,000 BUDGET: FUND: Overland MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: University City Branch WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 72 SENECA PRIVATE I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund INFLOW AND INFILTRATION FROM PRIVATE SOURCES CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER AND REMOVE PRIVATE SOURCES OF INFLOW AND INFILTRATION FROM 156 PROPERTIES. WEBER MACKENZIEVALCOURIVY GRAMOND STAELY NEW HAMPSHIRERADIOLUCIAVASELVITA ALICETON ALTHEAR O C K HIL L BONNIE NIL E SBRENDAMAYLORELSAEDENELGINLANGLEY DELMA RAMBLERCORA LNEIER ASTERKIDDERS TERL ING TALMAARDALE JOELDARLOWCRAIGHILL ARVIN MAXWELL LAWNSIDE G R A CE BRINKERLAVERN DAISY CHESHIRE DARLENEBRITTINLONKARPAVIAAVA ALPINE BIXBY CHARLTONPALMETTODE MARAMARVALE NIGERLARRY DELDEXTER PAULINECONSULRAYWOOD V A L B ROOKSW I F TO N HAM PSTEADSECURITYG R A S S O HERITAGECASSELBERRY LA JARA PRIVATE LANGLEY HERI TA G E LANGLEY ELGINSTERLIN G VASEL ALPINE GRAVOIS R D §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11667 11 TASK NO: TASK NAME: $140,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: Gravois Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 73 STERLING PLACE SEPARATE SEWER I/I REMOVAL Design Services 6660 - Sanitary Replacement Fund BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSO. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 10766 16 TASK NO: TASK NAME: BUDGET: FUND: St. Louis City and County MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Unallocated PROJECT TYPE: EXPENSE TYPE: Asset Management Page 74 $550,000 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) Vendor Services 1101 - General Fund DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦40 §¨¦70 §¨¦55 §¨¦170 §¨¦255 OLIVE MO109 G RA V OI SLINDBERGHMO364 MO1 00 MO370 TE LEG RAPHMO30 MO141 WATSON STCHARLESROCK LEM A YF ER R YH IGH WAY67 TESSONFER R YCLARKSON CHIPPEWA KIRKWOODRIVER VIEWNATURALBRIDGE MANCHESTER MANCHESTER NATURALBRIDG ELINDBERGHMO364 MANCHESTER MO30 MO370 HIGHWAY67 CHIPPEWA LINDBERGH §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70 §¨¦270 §¨¦55 §¨¦170 §¨¦255 Description of Problem/Issue Scope of Project Comments Metropolitan St. Louis Sewer District FISCAL YEAR: 2014 PROJECT NO: 11916 16 TASK NO: TASK NAME: BUDGET: FUND: Various MUNICIPALITY: Various MAJOR SERVICE AREA: Various WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Asset Management Page 75 $726,000 STREAM FLOW WATER QUALITY SAMPLING (FY 2014) Vendor Services 1101 - General Fund STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE. §¨¦270 §¨¦270 DUNNLUSHERREDMANBENHAM CRITERIONLILACLAVIDACOVE PRIGGERAYMONDREALE COALBANKMADRIDTRAMPE JUNE MALAGA BAYONNE SPANISHMENDOZAS P A NISHPO N D VALENC IAFONTAINE DORIS CORDOVA CADIGANROSARYBOWERSP E RSHALL EDMAR TWILLMAN PIN TA MACKINROS ADO FARMVIEW G ARDENSHARDELL LERIDA UPHILLP A T TERN MURIEL CROSSETT RUESTATALISMAN PETITE BRIDGEVALENOB HILL MCQUAY ZAMORA SHEFFIELD GERONASURF S IDEPRIVATESAEGER LARIMORE CLAUDINE HALL HOUSEHAR P ERTAOS MONTICELLO L A K E MO N T FAIRMEADOWS ROS EVIEWBRIARBRAE M O L L ERUSSENATE R IO G RANDESANR ICARDOCORLYNSCENIC LAKEMIMEAUXMUNICIPALSPARROW FARMVIEW PERSHALL TRAMPE GAR D ENLEWIS N CLARK BLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11668 11 TASK NO: TASK NAME: $85,000 BUDGET: FUND: Unincorporated MUNICIPALITY: Bissell MAJOR SERVICE AREA: Watkins Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 76 SUB-TRUNK #2 LATERAL SANITARY RELIEF Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTS NECESSARY TO REMOVE CONSTRUCTED SSOS BP-210, BP-211, AND BP-213. §¨¦170 §¨¦170 PAGE WARSONASHBYWOODSONDIELMANBROWNDELMARLINKSIMSUNIONPACIFIC NORTH N SOUTHOLD B O N H O M ME BALTIMORE WALTONBURNS82NDARGYLE GANNON RIDGE SPOEDEECHO BAUR GROBY DRIVERADIE NIBLIC CANTONTERMINALPOE MCKNIGHTCE NT R A L MIDLAND ME S ATRESCOTT STANFORD81STOAK SCHUETZ MCKIBBONENGEL HOODMEEKSKREM PRIVATEDYER LAFON WINDOM G R A N DVI E WBRUNO GOODALECANT E RENDICOTTSCH A E F E RLE PEREGUELBRETHTUDOR GASSTHORPE P RI CEWAYNE RESEARCHB A LSONHILLTOPMADDOX HURON TEALWOOD FOREST ZYKAN BEAVER ALBINWISMER STACY ELMORE AHERN MILLPARK BRISTOWEADS TRENTON VANCLEVE ORCHARD GULFBARBY FLORA ALDEN BOOTH PIC K E R IN G KEM PL A N D MINERVA ANDESASHLANDARBORLITTLE BELLCODY HASTINGS DREXEL DOWNEYHAFNERHOWELBRINGLACKLAND VILLA LOCU ST THORPE OAK PAGEBURNS P RIVATECANTER OLIVE BLVD NLINDBERGHBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11672 11 TASK NO: TASK NAME: $100,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: University City Branch WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 77 UNIVERSITY CITY I/I REDUCTION - WEST Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. §¨¦170 §¨¦170 PAGE WARSONLACKLAND ASHBYWOODSONDIELMANBROWNUNION PACIFIC OLD BO NH O M M ELINKBURNSFLORA 82NDWALTONARGYLE RIDGE ECHOSIMS BAUR DRIVER NIBLIC MES AMCKNIGHTTRESCOTT GROBY 81STOAK ENTITYENGEL HOODMEEKSDYER LAJOLLA C H AUCERG R ANDV IE WBRUNO GOODALETE R M IN A L CANTER MILTO N GASSTHORPE P RICECHARLACKRESEARCHB ALSONHILLTOPHOLTWOOD M AD D OX LE PERECENTR AL MIDLAND PRIVATE TEALWOOD FOREST ZYKAN LIBERTY CANTON BEAVER WISMERSTACY UCEYLEELMORE GILROSESTANFORD TRENTON GAYSENECA ORCHARD STONEYSIDEIN D IA N ME A D OWSKORANDOLINPAGEBRYANTLACKLINK BOOTH PICKE R IN G MINERVAPOE ANDESHARN E Y ARBORBELLFOWLER MANSFIELD HARTLANDOLD O L I V E S T R E E T 79THLISA TUX FO R DBULLER HASTINGS MASHIEELBRINGLAUGHLINSEVILLE CRIXDALE VILLA CINNAMON FAYVIEWIROQUOIS MAGNETCRYSTALLOCUSTBURNS PRICEWALTONPAGE VILLAWISMEROAKOAK MEEKS BURNSSIMSOLIVE BLVD NLINDBERGHBLVD§¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11929 11 TASK NO: TASK NAME: $60,000 BUDGET: FUND: Various MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: University City Branch WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 78 UNIVERSITY CITY PUBLIC I/I REDUCTION WEST Design Services 6660 - Sanitary Replacement Fund EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER THAT ARE DEFECTIVE. REHABILITATE 21,000 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE. §¨¦70 §¨¦170 §¨¦170 WRIGHTMETROLINK NORTH HANLEYKATHLYN BOBBWOODSONGUTHRIEJANEEMINENCE HANCOCKGERALDINEENGLERMCKIBBONCALVERTSIMS MADISONASHBYLAMBERTINTERNATIONAL MARGOANN DIXWISMERSCUDDER BOSWELL5TH HAROLD BROWNEDMUNDSONST LEOFAIRFIELDBENSON HERBERTPEAR TREE BATAAN MARVINCAMT IPTONGENAIRE ISOLDASTGREGORY MCNULTYTREADWAY ROYLAGUARDIAW INNMURIEL E A STRIDGEPATRIC KLEBOURGETEDMUND L E I T HMARSHALLVANCELIVINGSTON ROYALTONISAB ELLE HO L T W I C KINDUSTRIAL HEATHGORDONAIRWAYGORDONHAROLD NORTH METROLINK §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11681 11 TASK NO: TASK NAME: $190,000 BUDGET: FUND: Various MUNICIPALITY: Coldwater MAJOR SERVICE AREA: Coldwater Creek WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 79 UPPER COLDWATER SECTION D I/I REDUCTION Design Services 6660 - Sanitary Replacement Fund EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. HANLEYMONROEVIN ITA TITUS MADISON ALE R TSTILLWATERBL O O MDRIFTWAY UN D ER H I L L BLUEMONT GARFIELD JACKSON BUCHANAN ALERTVINITAMONROE MADISON BLOOM UNDERHILL §¨¦44 §¨¦55 §¨¦40 §¨¦70 §¨¦270 §¨¦170 §¨¦255§¨¦44 §¨¦70§¨¦170 §¨¦255 FISCAL YEAR: 2014 Description of Problem/Issue Scope of Project Comments/Remarks Metropolitan St. Louis Sewer District PROJECT NO: 11089 11 TASK NO: TASK NAME: $70,000 BUDGET: FUND: Hanley Hills MUNICIPALITY: Lemay/RDP MAJOR SERVICE AREA: University City Branch WATERSHED: Wastewater PROJECT TYPE: EXPENSE TYPE: Capital Page 80 VINITA DRIVE SANITARY RELIEF Design Services 6660 - Sanitary Replacement Fund ELIMINATION OF SSO REQUIRED. CONSTRUCT 650 FEET OF 12-INCH SANITARY SEWER AND REMOVE SSO.