HomeMy Public PortalAboutP1 Wastewater Projects Listing, FY14 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 1101 - GENERAL FUND 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $600,000 11811 Vendor Services CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014) Various $2,000,000 11810 Vendor Services CCTV INSPECTION OF SEWERS (2014)Various $1,000,000 11125 Pre-Design Services CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000 11146 Construction CSO VOLUME REDUCTION GREEN INFRASTRUCTURE Various $5,000,000 11110 Professional Services DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $600,000 11137 Design Services GASLIGHT SQUARE SEWER IMPROVEMENTS St. Louis City $500,000 11755 General Services - Design GENERAL SERVICES AGREEMENT - PLANNING (FY2014) Various $400,000 11909 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT B Various $50,000 11782 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013) CONTRACT A Various $85,000 11783 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013) CONTRACT B Various $85,000 11784 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013) CONTRACT C Various $55,000 11785 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (FY2013) CONTRACT D Various $55,000 11772 Work Order Repair Costs (Non-Capital) INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2014) Various $800,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $600,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $550,000 11699 Professional Services PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 Various $789,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11702 Vendor Services RADAR RAINFALL DATA (FY2014)Various $130,000 10766 Vendor Services STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) St. Louis City And County $550,000 11916 Vendor Services STREAM FLOW WATER QUALITY SAMPLING (FY 2014) Various $726,000 11898 Work Order Repair Costs (Non-Capital) SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM Various $500,000 FUND TOTAL: $16,275,000 4122 - WASTEWATER EMERGENCY FUND 11107 Construction EMERGENCY REPAIR FUNDS (WASTEWATER) Various $250,000 FUND TOTAL: $250,000 6660 - SANITARY REPLACEMENT FUND 11776 Design Services ALPINE DRIVE SEPARATE SEWER I/I REMOVAL Unincorporated $190,000 10523 Construction AYRES SANITARY RELIEF AND I/I REDUCTION Various $2,200,000 11682 Design Services BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION Various $300,000 11934 Design Services BALLAS ROAD SUBTRUNK SOUTH PUBLIC I/I REDUCTION Various $140,000 10407 Construction BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II Unincorporated $2,500,000 11920 Design Services BISSELL & LEMAY WWTP INCINERATOR SCRUBBER REPLACEMENT St. Louis City $4,500,000 11852 Construction BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2014) Various $5,200,000 11923 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT A Various $60,000 11924 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT B Various $110,000 11925 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT C Various $80,000 11926 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016) CONTRACT D Various $80,000 11686 Design Services BISSELL POINT I/I REDUCTION (BP- 619)(VALLEY DR) Various $180,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11720 Design Services CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I Wildwood $1,120,000 11793 Construction CC-14 CREVE COEUR CREEK SANITARY RELIEF (SKME-026) PHASE II Creve Coeur $1,800,000 10549 Construction CC-17 FOUR SEASONS BRANCH SANITARY RELIEF PHASE II Chesterfield $2,100,000 11884 Construction CEDARCREST PRIVATE I/I REDUCTION (SKME-561) Various $860,000 11722 Construction CEDARCREST SANITARY RELIEF (SKME- 561) I/I REDUCTION Ladue $5,200,000 11809 Design Services COLDWATER CREEK WWTP SCREENINGS & WASHER/COMPACTOR IMPROVEMENTS Unincorporated $360,000 11152 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES Various $1,500,000 11826 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS Various $300,000 11151 Professional Services CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Various $1,050,000 11825 Construction CREVE COEUR CREEK (L-52) FORCE MAIN IMPROVEMENTS PHASE II Maryland Heights $2,500,000 10429 Construction CSO - JEFFERSON BARRACKS SUBSYSTEM NO. 72 INTERCEPTOR (I-122) SEPARATION St. Louis County $2,100,000 10430 Construction CSO - SOUTH COUNTY PARK SUBSYSTEM NO. 71 INTERCEPTOR (I-161) SEPARATION Unincorporated $1,680,000 11116 Construction DACEY BRANCH I/I REDUCTION (BP-313)Various $50,000 11155 Design Services DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) Unincorporated $1,100,000 10021 Design Services DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) Various $1,700,000 11849 Construction DEER CREEK PUBLIC I/I REDUCTION (2014)Various $5,700,000 11731 Pre-Design Services DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Various $3,200,000 11738 Design Services DIXIE I/I REDUCTION Various $750,000 11739 Design Services DUCHESNE AND GOTT I/I REDUCTION Various $180,000 10335 Construction DUCHESNE PARQUE NO. 1 PUMP STATION ELIMINATION (P-407) Unincorporated $600,000 11740 Design Services E. WATSON SEPARATE SEWER I/I REMOVAL Sunset Hills $120,000 11742 Property Rights Acquisition EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2014) St. Louis City And County $3,000,000 10600 Construction FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY RELIEF PHASE V Maryland Heights $1,700,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 10014 Construction FF-11 FEE FEE CREEK SANITARY RELIEF Maryland Heights $4,100,000 10489 Construction FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III Maryland Heights $6,000,000 11748 Design Services FLORISSANT I/I REDUCTION Various $350,000 11932 Design Services FLORISSANT PUBLIC I/I REDUCTION Various $40,000 10456 Design Services FOREST BROOK SANITARY RELIEF (SKME- 003 AND SKME-016) REHABILITATION & I/I REDUCTION Various $260,000 10142 Construction FORESTWOOD SANITARY RELIEF (SKME- 435) Unincorporated $2,100,000 10611 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF Unincorporated $3,000,000 11751 General Services - Construction Inspection GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (FY2014) Various $100,000 10613 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT A Various $50,000 10614 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT B Various $50,000 10615 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2012) CONTRACT C Various $50,000 11759 General Services - Design GENERAL SERVICES AGREEMENT - SEWER & PROCESS DESIGN (FY2014) Various $300,000 11763 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT A Various $50,000 11910 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT C Various $50,000 11911 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT D Various $50,000 11912 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (FY2014) CONTRACT E Various $50,000 11779 General Services - Design GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A Various $90,000 11780 General Services - Design GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B Various $90,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11781 General Services - Design GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C Various $90,000 10458 Construction, Phase II GLENDALE SECTION D SANITARY RELIEF PHASE III (SKME-624) I/I REDUCTION Various $630,000 11122 Construction GLENDALE SECTION D SANITARY RELIEF PHASE IV (SKME-624) I/I REDUCTION Various $9,600,000 11765 Design Services GRAND GLAIZE TRUNK SANITARY RELIEF I/I REDUCTION (SKME-417) Ballwin $90,000 10496 Construction, Phase II GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III (SKME -521) Unincorporated $1,000,000 10496 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III (SKME -521) Unincorporated $8,200,000 11766 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME -521) Unincorporated $3,200,000 10330 Construction HARTLAND TO GOTHLAND SEWER SEPARATION Overland $3,000,000 11097 Design Services HOLLY DRIVE SEWER SEPARATION Webster Groves $240,000 11706 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (FY 2013) CONTRACT A St. Louis City And County $5,000,000 11845 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2013) CONTRACT B Various $5,000,000 11846 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2013) CONTRACT C Various $5,000,000 11707 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2014) CONTRACT A St. Louis City And County $5,000,000 11864 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2014) CONTRACT B Various $5,000,000 11865 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2014) CONTRACT C Various $5,000,000 11772 Work Order Repair Costs (Capital) INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2014) Various $3,200,000 11710 Design Services ISABELLE I/I REDUCTION St. Ann $30,000 11711 Design Services JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Unincorporated $2,050,000 11054 Design Services KINGSTON I/I REDUCTION AND PUMP STATION ELIMINATION Unincorporated $25,000 11817 Design Services LEMAY NO. 3 PUMP STATION AND FORCE MAIN Unincorporated $850,000 11855 Construction LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT A Various $6,000,000 11870 Construction LEMAY PUBLIC I/I REDUCTION (2014) CONTRACT B Various $3,300,000 11927 Design Services LEMAY PUBLIC I/I REDUCTION (2016)Various $220,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11123 Engineering During Construction Services LEMAY PUMP STATION NO. 1 REDUNDANT FORCE MAIN St. Louis City $150,000 11794 Construction LEMAY WWTP ASH LAGOON ACCESS ROAD Unincorporated $50,000 11132 Construction LEMAY WWTP OUTFALL 002 ELIMINATION Unincorporated $4,500,000 11649 Construction LEMAY WWTP SECONDARY IMPROVEMENTS Unincorporated $6,300,000 11820 Pre-Design Services LMRDP STORAGE TUNNEL SOUTH END Various $7,450,000 11807 Construction LOWER MERAMEC RIVER WWTP SCREEN SHAFT LINING Unincorporated $1,000,000 10696 Construction LOWER MERAMEC RIVER WWTP SITE RESTORATION/LANDSCAPING IMPROVEMENTS (PHASE II) Unincorporated $250,000 11650 Design Services LOWER MERAMEC WATERSHED I/I REMOVAL Unincorporated $200,000 11651 Design Services LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $60,000 11653 Design Services MACKENZIE I/I REDUCTION Various $250,000 11654 Construction MACKENZIE PLACE PUMP STATION (P-325) SECONDARY POWER SUPPLY St. Louis City $260,000 11931 Construction MACKENZIE PUBLIC I/I REDUCTION Webster Groves $5,200,000 11931 Design Services MACKENZIE PUBLIC I/I REDUCTION Webster Groves $90,000 11655 Design Services MALINE CREEK CSO 051 TREATMENT FACILITY St. Louis City $2,400,000 11656 Design Services MALINE CREEK CSO 052 STORAGE FACILITY St. Louis City $1,600,000 11656 Land Purchase MALINE CREEK CSO 052 STORAGE FACILITY St. Louis City $2,000,000 11658 Construction MALINE I/I REDUCTION & SEWER REHABILITATION (BP-289)(COLONY DR) Various $50,000 10030 Construction MAPLEWOOD - BLENDON COMBINED SEWER RELIEF PHASE I Various $7,500,000 11661 Design Services MARTIGNEY I/I REDUCTION Various $310,000 11930 Design Services MARTIGNEY PUBLIC I/I REDUCTION Various $190,000 10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS Unincorporated $2,000,000 10716 Construction NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS Unincorporated $3,138,000 11664 Design Services NEWCASTLE I/I REDUCTION Various $80,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11693 Design Services NORTH BADEN CREEK I/I REDUCTION (BP- 532)(WINCHESTER DR) Various $230,000 10722 Construction OLD MILL CREEK SEWER REHABILITATION PHASE III - 14TH TO 2ND STREET St. Louis City $2,800,000 11696 Design Services PADDOCK CREEK I/I REDUCTION (PRIVATE)Various $210,000 11933 Design Services PROVIDENCE PUBLIC I/I REDUCTION Webster Groves $40,000 11700 Design Services PROVIDENCE SANITARY RELIEF (SKME - 640) Webster Groves $260,000 11114 Construction PUBLIC I/I REDUCTION REHABILITATION Various $5,000,000 11822 Vendor Services PUMP STATIONS SCADA IMPROVEMENTS Various $350,000 10198 Construction, Phase II RDP FOULWATER INTERCEPTOR REHABILITATION (PHASE I) St. Louis City $2,400,000 11885 Construction ROCK HILL PUBLIC I/I REDUCTION (SKME- 618) Various $6,600,000 11665 Design Services SELVIDGE AREA I/I REDUCTION Ballwin $60,000 11059 Design Services SENECA PRIVATE I/I REDUCTION Overland $900,000 11667 Design Services STERLING PLACE SEPARATE SEWER I/I REMOVAL Unincorporated $140,000 11668 Design Services SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $85,000 10770 Construction SUN VALLEY I/I REDUCTION Unincorporated $1,226,000 11139 Land Purchase TILLIE BADEN NEWBY SEWER IMPROVEMENTS (PROPERTY ACQUISITION) St. Louis City $1,600,000 10199 Construction TOPPING SANITARY RELIEF (SKME -421)Town And Country $1,450,000 11672 Design Services UNIVERSITY CITY I/I REDUCTION - WEST Various $100,000 11929 Design Services UNIVERSITY CITY PUBLIC I/I REDUCTION WEST Various $60,000 11681 Design Services UPPER COLDWATER SECTION D I/I REDUCTION Various $190,000 10781 Construction UPPER JESKE PARK LATERAL SANITARY RELIEF (SKME-314) Ferguson $1,000,000 11089 Design Services VINITA DRIVE SANITARY RELIEF Hanley Hills $70,000 10793 Construction WEBSTER GROVES TRUNK "E" SANITARY REHABILITATION AND I/I REDUCTION PHASE II Webster Groves $6,500,000 10029 Construction WISE AND MABEL SEWER SEPARATION Richmond Heights $3,000,000 10237 Construction WOODSMILL SANITARY RELIEF (SKME-020)Various $2,600,000 7 June 2013 WASTEWATER PROJECTS - FY14 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE FUND TOTAL: $224,614,000 GRAND TOTAL:$241,139,000