Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My Public Portal
About
L1 Contents Of Stormwater Construction Projects 16
22 April 2015 STORMWATER CONSTRUCTION PROJECTS - FY16 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11367 ANCHOR DR. AND DANA AVE. STORM SEWER $138,000 213 11213 AUSTIN PLACE AND LOCKWOOD AVE. STORM SEWER $847,000 214 11186 CALVERT AVE. #3342 STORM SEWER $42,000 215 11231 CONWAY & CHAPEL OAKS STORM IMPROVEMENTS (FRONTENAC 7-5) $176,000 216 11065 DEER CREEK WATERSHED INITIATIVE $207,500 217 10332 DESMET INDUSTRIAL CT. LOT 8 BANK STABILIZATION $545,000 218 11120 EMERGENCY REPAIR FUNDS (STORMWATER)$250,000 219 11234 GLEN ABBEY DR. STORM IMPROVEMENTS (FRONTENAC 7-3) $325,000 220 11223 GLEN RD #35 BANK STABILIZATION $53,000 221 11045 GRANT #609 BANK STABILIZATION $152,000 222 11020 HERBERT AVE. 4200-4400 BLOCK STREAMBANK STABILIZATION $250,000 223 11003 HERMITAGE HILLS BANK STABILIZATION (FRONTENAC 3-1) $315,000 224 11354 LAVINIA DR. #10709 STORM SEWER $48,000 225 10370 LIGGETT TO BIG BEND CHANNEL REPAIRS $75,000 226 10221 MADISON #708 STORM SEWER $48,000 227 11105 MANDA LANE #8901 STORM SEWER $55,000 228 11203 MARYHILL DRIVE STORM SEWER $67,000 229 22 April 2015 STORMWATER CONSTRUCTION PROJECTS - FY16 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11363 MC ADOO CT #4325 STORM SEWER $155,000 230 11005 OAK VALLEY EAST STORM SEWER (FRONTENAC 1-2) $185,000 231 11370 RAINRIDGE CT. #4125 BANK STABILIZATION & BUYOUTS (GCMB-370) $605,000 232 11127 ROANOKE AND LOEKES STORM SEWER $250,000 233 11841 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER CREEK OMCI $150,000 234 12610 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - FOUNTAIN CREEK OMCI $77,000 235 12458 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - MALINE CREEK OMCI $400,000 236 12608 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - UNIVERSITY CITY OMCI $130,000 237 11000 WEST OAK DRIVE STORM IMPROVEMENTS $35,000 238 TOTAL:$5,580,500