HomeMy Public PortalAboutJ2 Wastewater Program Listing 2017 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 1101 - GENERAL FUND 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $770,000 11999 Vendor Services CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) Various $2,000,000 12001 Vendor Services CCTV INSPECTION OF SEWERS (2017)Various $1,000,000 12720 Vendor Services CRITICAL INFRASTRUCTURE ASSESSMENT (2017) Various $1,200,000 11146 Construction Task CSO VOLUME REDUCTION GREEN INFRASTRUCTURE Various $5,000,000 11758 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A Various $70,000 12379 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B Various $70,000 12380 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C Various $70,000 12381 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D Various $70,000 12007 Work Order Repair Costs (Non-Capital) INFRASTRUCTURE REPAIRS (WASTEWATER) (2017) Various $1,500,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $790,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $540,000 12005 Vendor Services RADAR RAINFALL DATA (2017)Various $135,000 11153 Professional Services RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $600,000 10766 Vendor Services STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) St. Louis City And County $590,000 12003 Vendor Services STREAM FLOW WATER QUALITY SAMPLING (2017) Various $650,000 FUND TOTAL: $15,055,000 5563 - CLAYTON CENTRAL OMCI FUND 11716 Construction Task LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK Various $100,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE FUND TOTAL: $100,000 5564 - COLDWATER CREEK OMCI FUND 11712 Construction, Phase II LACKLAND I/I REDUCTION Various $500,000 11662 Construction, Phase II MCNULTY - PALLARDY I/I REDUCTION Various $300,000 11681 Construction, Phase II UPPER COLDWATER SECTION D I/I REDUCTION Various $970,000 FUND TOTAL: $1,770,000 5566 - DEER CREEK OMCI FUND 11682 Construction, Phase II BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION Various $590,000 11883 Construction, Phase II BLACK CREEK SANITARY SEWER AND I/I REDUCTION Various $450,000 10576 Construction, Phase II DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION Various $80,000 11735 Construction, Phase II DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION University City $840,000 11069 Construction, Phase II ROCK HILL SANITARY RELIEF (SKME-618)Rock Hill $60,000 FUND TOTAL: $2,020,000 5576 - MALINE CREEK OMCI FUND 12222 Construction Task SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) Ferguson $325,000 FUND TOTAL: $325,000 5584 - UNIVERSITY CITY OMCI FUND 11059 Construction Task SENECA PRIVATE I/I REDUCTION Overland $1,000,000 11671 Construction Task UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03) Various $300,000 FUND TOTAL: $1,300,000 5587 - WATKINS CREEK OMCI FUND 12080 Construction Task ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) Bellefontaine Neighbors $115,000 FUND TOTAL: $115,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 6660 - SANITARY REPLACEMENT FUND 12073 Design Services ADAMS I/I REDUCTION (SOUTHEAST OF I- 270 AND DOUGHERTY FERRY RD) Kirkwood $338,000 12080 Construction Task ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) Bellefontaine Neighbors $410,000 11777 Construction Task BADEN CREEK EXTENSION (BP-001) - I/I REDUCTION Various $4,070,000 11682 Construction, Phase II BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION Various $90,000 12478 Design Services BISCHOFF - EDWARDS TO MARCONI COMBINED SEWER RELIEF St. Louis City $300,000 12023 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT A Various $3,300,000 12024 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT B Various $5,100,000 12025 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT C Various $3,700,000 12617 Construction Task BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT F Various $4,400,000 12026 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2018) CONTRACT A Various $85,000 12027 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2018) CONTRACT B Various $80,000 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $710,000 11883 Construction, Phase II BLACK CREEK SANITARY SEWER AND I/I REDUCTION Various $980,000 12102 Construction Task BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) Unincorporated $35,000 11790 Construction Task CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52) Maryland Heights $6,600,000 11789 Construction Task CAULKS CREEK FORCEMAIN REHABILITATION Chesterfield $9,000,000 11788 Construction Task CAULKS CREEK PUMP STATION B FORCEMAIN Chesterfield $4,000,000 11720 Construction, Phase I (Supplemental Appropriation) CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I Wildwood $5,600,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11917 Design Services CELLA - ROLLING ROCK - GLEN CREEK SANITARY SEWER AND PUBLIC I/I REDUCTION Ladue $600,000 12119 Construction Task CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) Unincorporated $65,000 12693 Professional Services CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT A) St. Louis City $400,000 12694 Professional Services CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT B) St. Louis City $50,000 12124 Pre-Design Services CLAYTONIA CREEK SANITARY RELIEF (HAMPTON CREEK TRUNK SEWER TO CLAYTON ROAD) Richmond Heights $160,000 12126 Design Services COLDWATER UPSTREAM PUMP STATION (P- 180) STORAGE Unincorporated $200,000 11964 Construction Task CONCORDIA I/I REDUCTION (NE QUAD CLAYTON RD AND BIG BEND BLVD) Clayton $735,000 11152 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES Various $6,100,000 11826 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS Various $3,100,000 11151 Professional Services CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Various $5,500,000 12727 Professional Services COUNTY TREATMENT FACILITY DESIGN (CONTRACT A) Various $50,000 12432 Construction Task CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH Various $5,300,000 11729 Design Services CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021) Chesterfield $1,140,000 11155 Construction Task DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) Unincorporated $5,000,000 10021 Construction, Phase I (Supplemental Appropriation) DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I Brentwood $11,750,000 10576 Construction, Phase II DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION Various $20,000 12036 Construction Task DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT A Various $6,000,000 12037 Construction Task DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT B Various $5,050,000 12039 Design Services DEER CREEK PUBLIC I/I REDUCTION (2018) CONTRACT A Various $80,000 11731 Construction Task DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Various $30,000,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11731 Engineering During Construction Services DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Various $600,000 11735 Construction, Phase II DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION University City $230,000 12513 Property Rights Acquisition EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2017) Various $2,500,000 12163 Design Services ENGELHOLM AND PARK SANITARY RELIEF (SPENCER PL TO LEADALE DR) Pagedale $1,480,000 11737 Property Rights Acquisition FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) Various $1,000,000 11737 Design Services FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) Various $600,000 11747 Construction Task FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) Unincorporated $1,460,000 10601 Construction Task FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF Maryland Heights $5,000,000 12180 Design Services FORDER SANITARY INTERCONNECTION (FORDER RD TO RINGER RD) Unincorporated $65,000 12186 Design Services FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64 AND CLAYTON RD) Ladue $150,000 11752 General Services - Construction Inspection GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2016) Various $250,000 11753 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A Various $50,000 11754 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B Various $50,000 12064 General Services - Geotechnical GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C Various $50,000 11760 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016) Various $300,000 11779 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A Various $90,000 11780 General Services - Design CIRP Funds GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B Various $90,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11764 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT A Various $50,000 12394 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT B Various $50,000 12395 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT C Various $50,000 12405 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT D Various $50,000 12406 General Services - Survey GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT E Various $50,000 12175 Design Services GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-521 STORAGE (BIG BEND BLVD TO WINDSOR SPRINGS DR) Kirkwood $550,000 12719 Construction Task GRAHAM RD 100 - 232 SANITARY SEWER Florissant $550,000 12725 Design Services GRAND GLAIZE SLUDGE ODOR REDUCTION Valley Park $300,000 12495 Design Services GRAND GLAIZE WWTF BUILDING, SWITCHGEAR, TANK AND SCREEN REPAIRS Valley Park $700,000 10496 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION PHASE III (FANNIE AVE TO MARCHI DR) Unincorporated $70,000 11766 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELOCATION PHASE VI (BUCKLEY RD TO UNION RD) Unincorporated $500,000 12569 Design Services GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) Crestwood $5,400,000 12372 Design Services GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) Unincorporated $669,000 12510 Design Services GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) Unincorporated $65,000 11770 Construction Task HARLEM - BADEN RELIEF PHASE IV (HEBERT) (IMPROVEMENTS FROM BASIN TO HAMILTON TRUNK) St. Louis City $3,900,000 11800 Design Services HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK SEWER REHABILITATION Various $440,000 12297 Construction Task HARMANN ESTATES PUMP STATION (P-709) REPLACEMENT Bridgeton $705,000 12298 Design Services HARRISON SANITARY RELIEF (GRAND AVE TO W ROSE HILL AVE) Kirkwood $80,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 10863 Design Services HERMITAGE SANITARY RELIEF (SKME-615)Frontenac $605,000 12306 Construction Task HOLLENBERG PUMP STATION (P-713) REPLACEMENT Bridgeton $715,000 12011 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (2017) CONTRACT A St. Louis City And County $2,500,000 12012 Construction Task INFRASTRUCTURE REPAIRS (REHABILITATION) (2017) CONTRACT B St. Louis City And County $2,500,000 12007 Work Order Repair Costs (Capital) INFRASTRUCTURE REPAIRS (WASTEWATER) (2017) Various $5,500,000 12635 Construction Task JAGUAR TO CAROLINE LOW PRESSURE SEWER SYSTEM (LPSS) Maplewood $360,000 11711 Construction Task JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Unincorporated $18,900,000 11711 Engineering During Construction Services JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Unincorporated $415,000 11142 Design Services JENNINGS STATION ROAD / NORTH BADEN BASIN St. Louis City $400,000 11712 Construction, Phase II LACKLAND I/I REDUCTION Various $1,120,000 11714 Construction Task LADUE SUBTRUNK SANITARY RELIEF (SKME-654) Various $440,000 12324 Construction Task LANDMARK OFFICE PUMP STATION (P-411) REPLACEMENT Sunset Hills $715,000 12327 Design Services LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD) Richmond Heights $150,000 12048 Construction Task LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A Various $4,520,000 12049 Construction Task LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B Various $5,600,000 12050 Construction Task LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C Various $4,420,000 12038 Construction Task LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D Various $4,225,000 12051 Design Services LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A Various $45,000 12488 Construction, Phase II LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS St. Louis City $4,300,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $725,000 11716 Construction Task LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK Various $12,795,000 12470 Construction Task LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK Various $3,200,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12428 Construction Task LEMAY WWTF CONCRETE PRESERVATION Unincorporated $1,250,000 12721 Design Services LEMAY WWTF REDUNDANT WATER SERVICE Unincorporated $100,000 11820 Land Purchase LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) St. Louis City $4,000,000 11820 Miscellaneous Services LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) St. Louis City $514,000 11820 Design Services LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) St. Louis City $7,875,000 11959 Design Services LMRDP CSO STORAGE TUNNEL NORTH CONSOLIDATION SEWERS St. Louis City $70,000 11958 Design Services LMRDP CSO STORAGE TUNNEL SOUTH CONSOLIDATION SEWERS St. Louis City $215,000 11816 Design Services LMRDP TUNNEL DEWATERING PUMP STATION Unincorporated $1,890,000 12479 Design Services LOWELL STREET - GIMBLIN TO DODDRIDGE COMBINED SEWER IMPROVEMENT St. Louis City $120,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $220,000 12334 Pre-Design Services LOWER BLACK CREEK AND HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I Maplewood $150,000 12369 Pre-Design Services LOWER BLACK CREEK AND HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE II Richmond Heights $180,000 11746 Design Services LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL Various $3,800,000 11653 Construction Task MACKENZIE I/I REDUCTION Various $2,430,000 12336 Design Services MACKENZIE I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) Shrewsbury $630,000 12511 Design Services MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) Shrewsbury $60,000 11656 Construction, Phase I (Supplemental Appropriation) MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $23,130,000 11656 Engineering During Construction Services MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $485,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11656 Construction, Phase II MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $525,000 11661 Construction Task MARTIGNEY I/I REDUCTION Various $1,000,000 11930 Construction Task MARTIGNEY PUBLIC I/I REDUCTION Unincorporated $2,661,000 11662 Construction, Phase II MCNULTY - PALLARDY I/I REDUCTION Various $2,570,000 11663 Construction, Phase II MIDLAND SANITARY RELIEF - PUBLIC AND PRIVATE I/I REDUCTION Overland $80,000 12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION St. Louis City $545,000 12616 Construction Task MISSOURI RIVER WWTF BERM AND WATER FEED UPGRADE Maryland Heights $780,000 12708 Design Services MISSOURI RIVER WWTF FERRIC CHLORIDE STORAGE AND FEED FACILITY Maryland Heights $300,000 12502 Construction Task MISSOURI RIVER WWTF POWER FEEDER REPLACEMENT Maryland Heights $750,000 12643 Construction Task MISSOURI RIVER WWTF SECONDARY TREATMENT ELECTRICAL / MECHANICAL MODIFICATIONS Maryland Heights $900,000 10716 Construction, Phase I (Supplemental Appropriation) NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS Unincorporated $7,300,000 11693 Construction, Phase II NORTH BADEN CREEK I/I REDUCTION (BP- 532) (WINCHESTER DR) Various $2,045,000 12362 Design Services NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND MARSHALL AVE) Webster Groves $300,000 12363 Design Services NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD AND MANCHESTER) Brentwood $420,000 12702 Design Services OLIVE / WASHINGTON - GRAND TO VANDEVENTER COMBINED SEWER RELIEF St. Louis City $320,000 11989 Construction Task PARDEE - BLACKTHORN - HOLLY I/I REDUCTION (WATSON RD AND S ROCK HILL RD) Crestwood $2,237,000 11094 Design Services PROSPECT HILL LANDFILL VERTICAL EXPANSION Various $500,000 11701 Construction Task PUMP STATION REPLACEMENT PROJECTS (PHASE I) Various $1,700,000 11153 Professional Services RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $250,000 12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL Various $5,200,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12190 Design Services ROBYN I/I REDUCTION (S LINDBERGH BLVD AND ROBYN RD) Sunset Hills $53,000 11069 Construction, Phase II ROCK HILL SANITARY RELIEF (SKME-618)Rock Hill $25,000 11919 Construction Task ROLENS AND TELEGRAPH SANITARY STORAGE Unincorporated $804,000 12630 Construction Task S 2ND STREET 1200 CSO SEWER SEPARATION St. Louis City $135,000 11990 Construction Task SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RD AND SAPPINGTON RD) Sunset Hills $277,000 11059 Construction Task SENECA PRIVATE I/I REDUCTION Overland $3,324,000 12205 Design Services SOUTH COUNTY SANITARY RELIEF (P-419 TO CRIPPLE CREEK DR) Unincorporated $700,000 11667 Construction Task STERLING PLACE SEPARATE SEWER I/I REMOVAL Unincorporated $3,360,000 12222 Construction Task SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) Ferguson $1,785,000 12473 Construction Task SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) Ferguson $3,000,000 12223 Design Services SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE) Kirkwood $200,000 12235 Design Services TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE CENTRE DR) Unincorporated $740,000 12237 Construction Task TRAMPE (PARTIAL) I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) Unincorporated $45,000 11983 Construction Task UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) Various $373,000 11671 Construction Task UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03) Various $2,685,000 12437 Construction Task UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09) Various $5,960,000 12438 Construction Task UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) Various $2,295,000 11992 Land Purchase UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) University City $3,700,000 11681 Construction, Phase II UPPER COLDWATER SECTION D I/I REDUCTION Various $450,000 10026 Construction, Phase I (Supplemental Appropriation) UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A Ferguson $13,300,000 12440 Pre-Design Services UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL University City $1,500,000 12491 Design Services WATKINS CREEK PUMP STATION (P-101) UPGRADES Unincorporated $500,000 11965 Construction Task WEST WISE I/I REDUCTION (NW QUAD I-64 AND BIG BEND BLVD) Richmond Heights $5,700,000 26 February 2016 WASTEWATER PROJECTS - FY17 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12278 Design Services WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY RD) Kirkwood $160,000 12296 Design Services WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN) Town And Country $270,000 FUND TOTAL: $361,235,000 GRAND TOTAL:$381,920,000