WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $788,000
11999 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2017)
Various $2,500,000
12720 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2017)
Various $1,200,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017)Various $2,500,000
11758 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT A
Various $70,000
12379 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT B
Various $70,000
12380 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT C
Various $70,000
12381 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT D
Various $70,000
12007 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2017)
Various $1,500,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $790,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $500,000
12005 Vendor
Services
RADAR RAINFALL DATA (2017)Various $135,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $615,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$590,000
12003 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2017)
Various $650,000
FUND TOTAL: $17,048,000
5563 - CLAYTON CENTRAL OMCI FUND
11716 Construction LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK
Various $250,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $250,000
5564 - COLDWATER CREEK OMCI FUND
11712 Construction,
Phase II
LACKLAND I/I REDUCTION Various $100,000
11662 Construction,
Phase II
MCNULTY - PALLARDY I/I REDUCTION Various $1,070,000
11681 Construction,
Phase II
UPPER COLDWATER SECTION D I/I
REDUCTION
Various $100,000
FUND TOTAL: $1,270,000
5566 - DEER CREEK OMCI FUND
11682 Construction,
Phase II
BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $450,000
11883 Construction,
Phase II
BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
Various $950,000
11735 Construction,
Phase II
DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
University City $690,000
11069 Construction,
Phase II
ROCK HILL SANITARY RELIEF (SKME-618)Rock Hill $60,000
FUND TOTAL: $2,150,000
5576 - MALINE CREEK OMCI FUND
12222 Construction SUBURBAN I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE)
Ferguson $325,000
FUND TOTAL: $325,000
5584 - UNIVERSITY CITY OMCI FUND
11059 Construction SENECA PRIVATE I/I REDUCTION Overland $1,700,000
FUND TOTAL: $1,700,000
5587 - WATKINS CREEK OMCI FUND
12080 Construction ASHBROOK I/I REDUCTION (ASHBROOK DR
AND CHAMBERS RD)
Bellefontaine
Neighbors
$115,000
FUND TOTAL: $115,000
6660 - SANITARY REPLACEMENT FUND
12073 Design Services ADAMS I/I REDUCTION (SOUTHEAST OF I-
270 AND DOUGHERTY FERRY RD)
Kirkwood $180,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12080 Construction ASHBROOK I/I REDUCTION (ASHBROOK DR
AND CHAMBERS RD)
Bellefontaine
Neighbors
$410,000
11777 Construction BADEN CREEK EXTENSION (BP-001) - I/I
REDUCTION
Various $4,070,000
11682 Construction,
Phase II
BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $233,000
12478 Design Services BISCHOFF - EDWARDS TO MARCONI
COMBINED SEWER RELIEF
St. Louis City $300,000
12023 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $3,140,000
12024 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $4,850,000
12025 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT C
Various $3,520,000
12617 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT F
Various $4,180,000
11883 Construction,
Phase II
BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
Various $480,000
11790 Construction CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $6,600,000
11789 Construction CAULKS CREEK FORCEMAIN
REHABILITATION
Chesterfield $9,000,000
11788 Construction CAULKS CREEK PUMP STATION B
FORCEMAIN
Chesterfield $4,000,000
11720 Construction
(Supplemental
Appropriation)
CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $5,600,000
11917 Design Services CELLA - ROLLING ROCK - GLEN CREEK
SANITARY SEWER AND PUBLIC I/I
REDUCTION
Ladue $650,000
12119 Construction CHAPEL HILL I/I REDUCTION (MATTIS RD
AND VENARDE DR)
Unincorporated $65,000
12693 Professional
Services
CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
St. Louis City $400,000
12694 Professional
Services
CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
St. Louis City $50,000
11115 Construction,
Phase II
CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $580,000
12124 Pre-Design
Services
CLAYTONIA CREEK SANITARY RELIEF
(HAMPTON CREEK TRUNK SEWER TO
CLAYTON ROAD)
Richmond Heights $160,000
12126 Design Services COLDWATER UPSTREAM PUMP STATION (P-
180) STORAGE
Unincorporated $200,000
11964 Construction CONCORDIA I/I REDUCTION (NE QUAD
CLAYTON RD AND BIG BEND BLVD)
Clayton $735,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $2,400,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $6,800,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $5,500,000
12727 Professional
Services
COUNTY TREATMENT FACILITY DESIGN
(CONTRACT A)
Various $50,000
11729 Design Services CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE VI (SKME-021)
Chesterfield $760,000
11155 Construction DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $5,000,000
10021 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE I
Brentwood $11,750,000
12036 Construction DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $5,700,000
12037 Construction DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $4,950,000
12039 Design Services DEER CREEK PUBLIC I/I REDUCTION (2018)
CONTRACT A
Various $80,000
11731 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $1,500,000
11731 Construction DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $30,000,000
11735 Construction,
Phase II
DELCREST SANITARY RELIEF (SKME-565) I/I
REDUCTION
University City $370,000
12513 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2017)
Various $2,500,000
12163 Design Services ENGELHOLM AND PARK SANITARY RELIEF
(SPENCER PL TO LEADALE DR)
Pagedale $1,480,000
11737 Property Rights
Acquisition
FERGUSON SANITARY SEWER (OLIVE TO
PAGE) (DIAMOND PARK)
Various $1,000,000
11737 Design Services FERGUSON SANITARY SEWER (OLIVE TO
PAGE) (DIAMOND PARK)
Various $800,000
11747 Construction FF-04 QUIET VILLAGE SANITARY RELIEF
(THAMES COURT TO FIESTA CIRCLE)
Unincorporated $1,460,000
10601 Construction FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
Maryland Heights $5,000,000
11748 Construction,
Phase II
FLORISSANT I/I REDUCTION Various $442,000
12180 Design Services FORDER SANITARY INTERCONNECTION
(FORDER RD TO RINGER RD)
Unincorporated $58,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12186 Design Services FRONTENAC, WINDING RIDGE, DEER CREEK
HILL I/I REDUCTION (S QUAD I-64 AND
CLAYTON RD)
Ladue $150,000
11752 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2016)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
Various $50,000
11754 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
Various $50,000
12064 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
Various $50,000
11760 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2016)
Various $300,000
11779 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT A
Various $90,000
11780 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11764 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT A
Various $50,000
12394 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT B
Various $50,000
12395 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
Various $50,000
12405 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
Various $50,000
12406 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
Various $50,000
12175 Design Services GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD
TO WINDSOR SPRINGS DR)
Kirkwood $578,000
12719 Construction GRAHAM RD 100 - 232 SANITARY SEWER Florissant $600,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12725 Design Services GRAND GLAIZE SLUDGE ODOR REDUCTION Valley Park $620,000
12495 Design Services GRAND GLAIZE WWTF BUILDING,
SWITCHGEAR, TANK AND SCREEN REPAIRS
Valley Park $700,000
11766 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELOCATION PHASE VI
(BUCKLEY RD TO UNION RD)
Unincorporated $445,000
12569 Design Services GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $2,800,000
12372 Design Services GREEN PARK AND LAKESHIRE I/I
REDUCTION (TESSON FERRY RD AND
GREEN PARK RD)
Unincorporated $500,000
11770 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $3,900,000
11800 Design Services HARLEM BADEN RELIEF PHASE IV
(HEBERT) - TRUNK SEWER
REHABILITATION
Various $440,000
12297 Construction HARMANN ESTATES PUMP STATION (P-709)
REPLACEMENT
Bridgeton $500,000
12298 Design Services HARRISON SANITARY RELIEF (GRAND AVE
TO W ROSE HILL AVE)
Kirkwood $90,000
10863 Design Services HERMITAGE SANITARY RELIEF (SKME-615)Frontenac $500,000
12306 Construction HOLLENBERG PUMP STATION (P-713)
REPLACEMENT
Bridgeton $715,000
12011 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2017) CONTRACT A
St. Louis City And
County
$2,500,000
12012 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2017) CONTRACT B
St. Louis City And
County
$2,500,000
12007 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2017)
Various $5,500,000
12635 Construction JAGUAR TO CAROLINE LOW PRESSURE
SEWER SYSTEM (LPSS)
Maplewood $650,000
11711 Construction JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $18,900,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $410,000
11142 Design Services JENNINGS STATION ROAD / NORTH BADEN
BASIN
St. Louis City $400,000
11712 Construction,
Phase II
LACKLAND I/I REDUCTION Various $1,520,000
11714 Construction LADUE SUBTRUNK SANITARY RELIEF
(SKME-654)
Various $440,000
12324 Construction LANDMARK OFFICE PUMP STATION (P-411)
REPLACEMENT
Sunset Hills $550,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12327 Design Services LAY RD - GALLERIA I/I REDUCTION
(CLAYTON RD AND LAY RD)
Richmond Heights $180,000
12048 Construction LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $4,300,000
12049 Construction LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $5,320,000
12050 Construction LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT C
Various $4,200,000
12051 Design Services LEMAY PUBLIC I/I REDUCTION (2018)
CONTRACT A
Various $31,000
12488 Construction LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
St. Louis City $5,300,000
11716 Construction LEMAY WATERSHED I/I REMOVAL - NORTH
HAMPTON CREEK
Various $5,270,000
12470 Construction LEMAY WATERSHED PUBLIC I/I REMOVAL -
NORTH HAMPTON CREEK
Various $2,800,000
12428 Construction LEMAY WWTF CONCRETE PRESERVATION Unincorporated $1,250,000
11820 Land Purchase LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $4,000,000
11820 Miscellaneous
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $514,000
11820 Design Services LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $7,500,000
11958 Design Services LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS I/O STRUCTURES
- FIELDS (I-019/L-011) AND GERMANIA (I-
012/L-014) TO LOUIS (I-007/L-012)
St. Louis City $180,000
11959 Design Services LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS I/O STRUCTURES
- PERNOD (I-056/L-031) TO MARDEL (I-054/L-
030)
St. Louis City $70,000
11816 Design Services LMRDP TUNNEL DEWATERING PUMP
STATION
Unincorporated $1,890,000
12479 Design Services LOWELL STREET - GIMBLIN TO DODDRIDGE
COMBINED SEWER IMPROVEMENT
St. Louis City $120,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $320,000
12334 Pre-Design
Services
LOWER BLACK CREEK AND HAMPTON
CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE I
Maplewood $150,000
12369 Pre-Design
Services
LOWER BLACK CREEK AND HAMPTON
CREEK SANITARY RELIEF (DEER CREEK
TRUNK TO OXFORD DR) PHASE II
Richmond Heights $180,000
11746 Design Services LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $3,700,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11653 Construction MACKENZIE I/I REDUCTION Various $2,430,000
12336 Design Services MACKENZIE I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER
PARK, KENRICK SEMINARY, AND NERINX
HALL)
Shrewsbury $500,000
11656 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $30,000,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $485,000
11656 Construction,
Phase II
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $525,000
11661 Construction MARTIGNEY I/I REDUCTION Various $1,000,000
11930 Construction MARTIGNEY PUBLIC I/I REDUCTION Unincorporated $2,550,000
11662 Construction,
Phase II
MCNULTY - PALLARDY I/I REDUCTION Various $1,800,000
11663 Construction,
Phase II
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $87,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $545,000
12616 Construction MISSOURI RIVER WWTF BERM AND WATER
FEED UPGRADE
Maryland Heights $1,000,000
12708 Design Services MISSOURI RIVER WWTF FERRIC CHLORIDE
STORAGE AND FEED FACILITY
Maryland Heights $300,000
12502 Construction MISSOURI RIVER WWTF POWER FEEDER
REPLACEMENT
Maryland Heights $750,000
12643 Construction MISSOURI RIVER WWTF SECONDARY
TREATMENT ELECTRICAL / MECHANICAL
MODIFICATIONS
Maryland Heights $900,000
11693 Construction,
Phase II
NORTH BADEN CREEK I/I REDUCTION (BP-
532) (WINCHESTER DR)
Various $2,440,000
12362 Design Services NORTH FOREST AND BROOKSIDE I/I
REDUCTION (SUMMIT AVE AND MARSHALL
AVE)
Webster Groves $350,000
12363 Design Services NORTH WEBSTER CC, POCAHONTAS,
SOUTH BRENTWOOD I/I REDUCTION (S
BRENTWOOD BLVD AND MANCHESTER)
Brentwood $500,000
12702 Design Services OLIVE / WASHINGTON - GRAND TO
VANDEVENTER COMBINED SEWER RELIEF
St. Louis City $320,000
11989 Construction PARDEE - BLACKTHORN - HOLLY I/I
REDUCTION (WATSON RD AND S ROCK
HILL RD)
Crestwood $2,237,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11698 Construction,
Phase II
PICKWICK - BERNADINE - BIMINI SANITARY
RELIEF
Unincorporated $350,000
11094 Design Services PROSPECT HILL LANDFILL VERTICAL
EXPANSION
Various $500,000
11701 Construction PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $1,700,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $250,000
12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $5,000,000
12190 Design Services ROBYN I/I REDUCTION (S LINDBERGH BLVD
AND ROBYN RD)
Sunset Hills $35,000
11069 Construction,
Phase II
ROCK HILL SANITARY RELIEF (SKME-618)Rock Hill $25,000
11919 Construction ROLENS AND TELEGRAPH SANITARY
STORAGE
Unincorporated $804,000
11990 Construction SAPPINGTON CREEK I/I REDUCTION
(GRAVOIS RD AND SAPPINGTON RD)
Sunset Hills $260,000
11059 Construction SENECA PRIVATE I/I REDUCTION Overland $2,624,000
12205 Design Services SOUTH COUNTY SANITARY RELIEF (P-419
TO CRIPPLE CREEK DR)
Unincorporated $800,000
11667 Construction STERLING PLACE SEPARATE SEWER I/I
REMOVAL
Unincorporated $3,800,000
12222 Construction SUBURBAN I/I REDUCTION (HARRISON DR
AND SUBURBAN AVE)
Ferguson $1,785,000
12473 Construction SUBURBAN PUBLIC I/I REDUCTION
(HARRISON DR AND SUBURBAN AVE)
Ferguson $2,615,000
12223 Design Services SUGAR CREEK I/I REDUCTION (W ADAMS
AVE AND COUCH AVE)
Kirkwood $230,000
12235 Design Services TOWNE SOUTH AND BRUNSTON I/I
REDUCTION (AMBS RD AND TOWNE
CENTRE DR)
Unincorporated $260,000
11983 Construction UNIVERSITY CITY I/I REDUCTION - EAST
(UR-10)
Various $373,000
12437 Construction UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-08 AND UR-09)
Various $5,500,000
12438 Construction UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-10)
Various $2,200,000
11992 Land Purchase UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
University City $3,700,000
11681 Construction,
Phase II
UPPER COLDWATER SECTION D I/I
REDUCTION
Various $1,320,000
10026 Construction
(Supplemental
Appropriation)
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $9,100,000
22 April 2016
WASTEWATER PROJECTS - FY17
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12440 Pre-Design
Services
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $1,500,000
12491 Design Services WATKINS CREEK PUMP STATION (P-101)
UPGRADES
Unincorporated $500,000
11965 Construction WEST WISE I/I REDUCTION (NW QUAD I-64
AND BIG BEND BLVD)
Richmond Heights $5,700,000
12278 Design Services WESTBOROUGH - LUTHER - MERMOD
PLACE I/I REDUCTION (N KIRKWOOD RD TO
I-44 AND BERRY RD)
Kirkwood $180,000
12296 Design Services WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
Town And Country $276,000
FUND TOTAL: $331,422,000
GRAND TOTAL:$354,280,000