HomeMy Public PortalAboutG2 Wastewater Construction Projects Detail SheetsFISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ASHBROOK I/I REDUCTION (ASHBROOK DR ANDCHAMBERS RD)
Construction
5587 - Watkins CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 680 FEET OF 10-INCH SANITARY SEWER, 75 FEET OF 12-INCHSTORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARYSEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦270
DUKEDUNN
EARLLORDLILACTOELLECOUNTBARONROYALSCENIC
BELGROVE
COBURGLAND S
VISCOUNTDARRBLISS
V
ALLEY
SHEPLEY
B ER W Y N
K IL G O R E CABOTPRINCEASHBROOK
BURLINGTONNORTHERNSANTAFEHOYT
EWELLQUIE T
VORHOFNECTAR
LANIERDUCHESS
DURNESSPRINCESS
RENFREWJERRIESCASTLEMON
ARCHBARONESS
DELHICOLLETT
MACKIN
E LBACOMET
CAMBRIAATTICA CADIGANMURIEL
RUESTAHOBKIRKBIRITZ
SURRE
Y
DURHAMDOROTHYCRE T ESUGARTRAILLEWISLANDING
KELVIN
COBURG
PERSHALL
STIMSONPRIVATEBOSWORTH
KING
LARIMORE
G OL D E N
FORKDIAMONDNORTHRIDGE
H AV IL A N D
HAR PERTWILL
IRIS
TAOS
MCCARTNEYBAGNELLL O V E T T
MONTICELLO
BREEZYPOINTNORBRIDGEFOXPATHO D E S S A
HANSOM SHELDONLYDIAMUNICIPALSPARROW
MELVICHCASTLEC ASTLEPRIVATELEWISNCLARKBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12080
Wastewater
15
$115,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
82Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ASHBROOK I/I REDUCTION (ASHBROOK DR ANDCHAMBERS RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 680 FEET OF 10-INCH SANITARY SEWER, 75 FEET OF 12-INCHSTORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARYSEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦270
DUKEDUNN
EARLLORDLILACTOELLECOUNTBARONROYALSCENIC
BELGROVE
COBURGLAND S
VISCOUNTDARRBLISS
V
ALLEY
SHEPLEY
B ER W Y N
K IL G O R E CABOTPRINCEASHBROOK
BURLINGTONNORTHERNSANTAFEHOYT
EWELLQUIE T
VORHOFNECTAR
LANIERDUCHESS
DURNESSPRINCESS
RENFREWJERRIESCASTLEMON
ARCHBARONESS
DELHICOLLETT
MACKIN
E LBACOMET
CAMBRIAATTICA CADIGANMURIEL
RUESTAHOBKIRKBIRITZ
SURRE
Y
DURHAMDOROTHYCRE T ESUGARTRAILLEWISLANDING
KELVIN
COBURG
PERSHALL
STIMSONPRIVATEBOSWORTH
KING
LARIMORE
G OL D E N
FORKDIAMONDNORTHRIDGE
H AV IL A N D
HAR PERTWILL
IRIS
TAOS
MCCARTNEYBAGNELLL O V E T T
MONTICELLO
BREEZYPOINTNORBRIDGEFOXPATHO D E S S A
HANSOM SHELDONLYDIAMUNICIPALSPARROW
MELVICHCASTLEC ASTLEPRIVATELEWISNCLARKBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12080
Wastewater
15
$410,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
83Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BADEN CREEK EXTENSION (BP-001) - I/IREDUCTION
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 4,860 FEET OF 12-INCH TO 18-INCH STORM SEWER, REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12060.
§¨¦70
§¨¦70
LILLIAN
LUCAS N HUNTPASADENA
BEGGCOLLEGENELSONEDG E W O ODKENWOOD
JUNE
MELBAFLETCHERSA N D I E G O
RAVINIA
O AKW OODRAVENW OODBEULAHROLAND
FLORIAN
HUNTER COLONIALDAWSON
HATZTHEODORE
ROXIELAWLERIRAOREON
DAIBER
MATHEW
GROVELAND
S T IV E R S
ROHN
OAKRIDGEOVERBROOK
GARESCHEFOREST HILL
IDLEWILD
EMMA
JENNINGS STATIONWILLOW WOOD
HA
Z
E
N
D
ONAL
D SEATTLEWESTFARLEY
BEACHW OODKENEWAHONEILL
BO
L
E
S
PINE RIDGE
BURRWOOD
BRISTOL
AVONDALEFLORENCE
UPSHAWNORSTEAD
MARYELLEN
EASTCOUNTRYC
L
UBAMMANNWYMANEONANADINE
DUCKWORTH
PRIVATE
BEGGROLANDNELSONOAKRIDGEEMMA
FLETCHERONEILLPASADE
N
AMELBA
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11777
Wastewater
15
$4,070,000
Various
Bissell
Baden
Capital
84Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTIONPART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSO BP-556.
CONSTRUCT 1,060 FEET OF 12-INCH TO 24-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES AT 2 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11934. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦270
§¨¦64
§¨¦270
§¨¦64
CLAYTON
GEYERDESPERESBALLASOAKNORTHFORTY
CARBERRY
OAK V ALLEY SPOEDETOPPINGBRIDLEG RAYCEDAR VALLEYSELLENRICKPOSTOAK PORTLAND
FIRETHORNCLAY C H E STER
BOPP
TWIN FAWN SROTHDUBON
WOODGATEKEND
ONCH IPPE R
DUNMORR
CREEKHAVEN
DEVON DALEHICKORYDIVOTHARFLOCLAYMARKRANCH
MALVERN
THORNHILL PAMELA
SPRINGDALE
HOLIDAY
TREGARON
SERAMA
IRON S TONEFALLBROOK
OAKSPRINGSDUR B IN
COUNTRYSI D E
BAMBURYREVEREPUTTERDELVIN
T O P P IN G ACRES
TINDALL
BALWYCK
BORCHERDINGGLENMARO
RIDGEFIELDMUELLER CROYDONBICKFORD
PRIVATEF R O N T E N A C F O R EST
HICKOR Y
BOPP§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11682
Wastewater
15
$233,000
Various
Lemay/RDP
Deer Creek
Capital
85Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTIONPART 2
Construction, Phase II
5566 - Deer CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSO BP-556.
CONSTRUCT 1,060 FEET OF 12-INCH TO 24-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES AT 2 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11934. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦270
§¨¦64
§¨¦270
§¨¦64
CLAYTON
GEYERDESPERESBALLASOAKNORTHFORTY
CARBERRY
OAK V ALLEY SPOEDETOPPINGBRIDLEG RAYCEDAR VALLEYSELLENRICKPOSTOAK PORTLAND
FIRETHORNCLAY C H E STER
BOPP
TWIN FAWN SROTHDUBON
WOODGATEKEND
ONCH IPPE R
DUNMORR
CREEKHAVEN
DEVON DALEHICKORYDIVOTHARFLOCLAYMARKRANCH
MALVERN
THORNHILL PAMELA
SPRINGDALE
HOLIDAY
TREGARON
SERAMA
IRON S TONEFALLBROOK
OAKSPRINGSDUR B IN
COUNTRYSI D E
BAMBURYREVEREPUTTERDELVIN
T O P P IN G ACRES
TINDALL
BALWYCK
BORCHERDINGGLENMARO
RIDGEFIELDMUELLER CROYDONBICKFORD
PRIVATEF R O N T E N A C F O R EST
HICKOR Y
BOPP§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11682
Wastewater
15
$450,000
Various
Lemay/RDP
Deer Creek
Capital
86Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 55,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12128 AND 12304.
§¨¦270
§¨¦55
§¨¦270
MATTIS
KENNERLY
T
H
E
I
S
SSAPPINGTONALSWELLMUSICKSCHUESSLERMENTZHILLBAPTIST CHURCHR O BYNVONTALGEDENNY
LEEBUR
LITTIE
AMBSROXANNABAUERGEYER SUNSETGERALD
KEMPF MUELLERGREGORY
RUSTYDIERSTESSHIREELIA
NTO
NGRAVOIS
TOWNECENTRE TESCORDGATESBURYPRIVATEHADLEYHILLEMILMEPPEN
GEMINI
DORSIE
LANGTREEVARGAS
FLORITWILIGHTMAYOTEALBYFARADAY
MAPLELINCORDEIMESAKURA
JAMIEJOSSEJAN
CHERYLMUSICMEAT H
CONCORDCRESTWICKPICKWICKROOSEVELT
LARKINCONCORD V ILLA G E
TEALRIDGE
S T A R H ILLW ORTH IN G T O N FIVEOAKSBIRD HAVENROANNA ARCTICSTOLZ
TAMMY
KAY SONATASUNHILL
TIOGA
J
O
A
N
SOLAR
BASLERA LLP I N E
JUENGEL
DU BOURGROBERT WOOD
COSMOS
ADAMSLAVINIAOLD TESSONPRIVATEGRAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12023
Wastewater
15
$3,140,000
Various
Meramec
Mattese Creek
Capital
87Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 56,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12314 AND 12137.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12024
Wastewater
15
$4,850,000
Various
Various
Various
Capital
88Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT C
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 45,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11704, 12209, AND APORTION OF 12125.
§¨¦44
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦70§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12025
Wastewater
15
$3,520,000
Various
Various
Various
Capital
89Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT F
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 44,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM A PORTION OF PROJECT 12125.
§¨¦70§¨¦70
ASHBYADIEWOODSONFEEFEELINKWRIGHTBALTIMORELONGHIGHDIXIE NORTH
AVERY
DIXSIMSJANEPOECYPRESSGUTHRIE
LITZ
BROWNREXEMINENCEBOBB
METROLINK
OLDSTCHARLES
MERT GERALDINEARGYLEKREMFALCONCOLESGORDON
HOODBURNSST FRANCISBANKS
THORPE TENNYSONS
CHAEFE
R RAYMONDP R IVATEMARGOANN
CHAUCERBRUNOST X A V IE R
PASTEURAIRWAYMILTONFARVIEW
HAROLD
WURDACK
MORROW
TUDORSANJOSEST LEOWISMERBENSON
HUNTER
IVAN
HERBERTPEAR TREE
VANCLEVE
BATAAN
CLARENDON
STKATHERINE
MARVINTIPTONQUIETBENEDETTA
CALVERTISOLDAW IL WOOD
ST
PHILIP
SPRING
TREADWAY
W INNAIRFLIGHTINVERNESSNORA MURIEL
FLORENCE
LINDADE
S
A
X
O
N
H
ALL
SHELLEY
ANN MAR
EDMUND
ANGELOKINGBEE
G RA NDCIRCLE
EDMIL JOELCINNAMON
BRYANTFAIRWAYJUNE
LYNROSGRABEN
WISMERADIE
POESIMSST CHARLES ROCK RD
NATURALBRIDGE RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12617
Wastewater
15
$4,180,000
Various
Coldwater
Coldwater Creek
Capital
90Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BLACK CREEK SANITARY SEWER AND I/IREDUCTION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 2,200 FEET OF 12-INCH STORM SEWER AND REMOVEPRIVATE I/I SOURCES AT 22 PROPERTIES.
SCOPE OF WORK ORIGINALLY PART OF PROJECT 11689. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦170
§¨¦170
DELMAR
PRICELADUE
LAYDIELMANFORSYTH
BRENTWOODMCKNIGHTCORNELL
MET R O L IN K
OLD BONHOM
ME
MARYLANDBEMISTON
DAVIS
GROBY
MERAMECWE
N
N
E
K
E
R HANLEYLAFON
F
R
AN
C
I
S NORTH N SOUTHWARDERCELLALE PEREJACKSONTOPTONAHERN
GANNON
CENTRALCLAYTON LINDENDREXEL
P
OLO
H
U
N
TERBERICKRIO VISTAYORK
ST A N D REWSGRANADATEASDALEGAY
BRAE
BU
R
NGRAYBRIDGE 81STWYDOWN
AMHERST
BONHOMME
BARBYENFIELD
P R IV A T E
CRANDONWESTWOODDROM
A
RABON AIREINDIAN
BALSON
GLEN E A G L ESOLETAWASHINGTON
LITTLE
LEECARONDELETBERKLEY
CARSW O L DBONHILLSGEOFFRYKINGSBURY
DAYTONA
R E A R
BLACK CREEK DUKETERRYDELCRESTRYEVILLA
MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA
ORLANDO
SUDBURYMCKNIGHTGAYVILLA
PRIVATEHANLEYPRIVATE
P
RIV
A
T
E
B A LSON
GAY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11883
Wastewater
15
$480,000
Various
Lemay/RDP
Black Creek
Capital
91Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BLACK CREEK SANITARY SEWER AND I/IREDUCTION PART 2
Construction, Phase II
5566 - Deer CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 2,200 FEET OF 12-INCH STORM SEWER AND REMOVEPRIVATE I/I SOURCES AT 22 PROPERTIES.
SCOPE OF WORK ORIGINALLY PART OF PROJECT 11689. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦170
§¨¦170
DELMAR
PRICELADUE
LAYDIELMANFORSYTH
BRENTWOODMCKNIGHTCORNELL
MET R O L IN K
OLD BONHOM
ME
MARYLANDBEMISTON
DAVIS
GROBY
MERAMECWE
N
N
E
K
E
R HANLEYLAFON
F
R
AN
C
I
S NORTH N SOUTHWARDERCELLALE PEREJACKSONTOPTONAHERN
GANNON
CENTRALCLAYTON LINDENDREXEL
P
OLO
H
U
N
TERBERICKRIO VISTAYORK
ST A N D REWSGRANADATEASDALEGAY
BRAE
BU
R
NGRAYBRIDGE 81STWYDOWN
AMHERST
BONHOMME
BARBYENFIELD
P R IV A T E
CRANDONWESTWOODDROM
A
RABON AIREINDIAN
BALSON
GLEN E A G L ESOLETAWASHINGTON
LITTLE
LEECARONDELETBERKLEY
CARSW O L DBONHILLSGEOFFRYKINGSBURY
DAYTONA
R E A R
BLACK CREEK DUKETERRYDELCRESTRYEVILLA
MISSIONWHITE ROSEEXMOORLORENZOSAXONYW A T S O N IA
ORLANDO
SUDBURYMCKNIGHTGAYVILLA
PRIVATEHANLEYPRIVATE
P
RIV
A
T
E
B A LSON
GAY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11883
Wastewater
15
$950,000
Various
Lemay/RDP
Black Creek
Capital
92Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN REHABILITATION
Construction
6660 - SanitaryReplacement Fund
FORCEMAIN IS BEING CONVERTED TO A REDUNDANT FORCEMAIN ANDREQUIRES LINING DUE TO AGE AND CONDITION.
REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROMPUMP STATION A TO THE 36-INCH FORCEMAIN AT THE MISSOURIAMERICAN WATER PLANT.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 18. TOTAL BUDGET IS $15,000,000.
§¨¦64§¨¦64
THF CEN TR A L M IDLA N DLADUEEDISONW
E
S
T
WILS
O
N
WI L D H O R SEC R E E K RIVER VALLEYAPPALACHIANRHL
NORTH OUTER FORTYHOGHOLLOWPRIVATESWINGLEYRIDGE
WESTMEADE WOODSMILLCHE S T E R FIELDH IG H CROFTGL E N COVE
W
HITE
BAX T E R PETZOLDRAINYLAKENOONING
TREE
LYDIAHILL
BOXFORD
WINEMAW HITE
P
RIV
A
T
E
O LIV E BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11789
Wastewater
15
$9,000,000
Chesterfield
Missouri
Caulks Creek
Capital
93Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK TRUNK SEWER (SKME-011) PHASEI
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 16,225 FEET OF 8-INCH TO 36-INCH DIAMETER SANITARYSEWER.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $9,600,000.
V
A
L
L
E
Y
STRECKER
S
H
EPARDOR R V I L L E
CLAY TONJOESINDIANTREEMCBRIDEPOINTE SUNMEADOWQU
A
ETH
EM
PR I V ATEGARD ENRIDGE
KE HR S RIDGE
A
NNASLONECAB I N
WILL STRACELASIANDRA
PEPPERMILLCHIPPENHAM
HIGHLANDSUMMIT
AUTUMNRUNBASKIN FARM
THIEL
RIDGLEYWOODS
BEAR VALLEYLEWISSPRINGFARMS
YULETIDETRAILHIGHLAN DVALLEYPRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11720
Wastewater
15
$5,600,000
Wildwood
Missouri
Caulks Creek
Capital
94Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CHAPEL HILL I/I REDUCTION (MATTIS RD ANDVENARDE DR)
Construction
6660 - SanitaryReplacement Fund
INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS IN SOMESEGMENTS OF SEWER.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11923.
§¨¦270
§¨¦55
§¨¦270
§¨¦55
MATTIS
AMBST
H
EIS
S
C ONCORD
VONTALGEKEN
NE
RLY
BUTLERHILLSUNSETCAR IBEEGERALD
KEMPF
GREGORY
RUSTYDIERSELIVALMEYERTOWNECENTRESAPPINGTON TESCORDGATESBURYPRIVATELEEBUR
GRIFFINCONCORDSCHO
OL
GEMINI
DORSIE
B R UNSTONLANGTREE
FAROVERMILION FLORIFUCHSBA U E R
STANHOPE
KERTHFIJIREYNOSA
LO
N
G
VIEWTEALBYFOULKPATSYEIMESAKURAJAMIELONGSPURJOSSEMUSICYUMACH
A
P
ELHILL
AUDJI L L
K
A
S
S
EB
AU
MLARKINSCHUESSLERREVEREWORTHINGTONFIVEOAKSROANNACAROLYNNE
SUNHILL
ARTHUR
CHAR WICKH
U
R
SLE
Y
MEADOWFIELD
BASLERLEONARDKRAMPERS
T
G
E
MME
OLDESILVER FAWNWOODLODGEWOODBLACKHALLOLD TESSONASHLEYFUCHSKERTHPRIVATETESSON FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12119
Wastewater
15
$65,000
Unincorporated
Meramec
Mattese Creek
Capital
95Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAVERACH PARK I/I REDUCTION AND SEWERSEPARATION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 540 FEET OF 6-INCH TO 8-INCH SANITARY SEWER, 650 FEETOF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849.
WYDOWN
CLAYTON
YORK
AUDUBONPA R K RI
DGEMOORBYRON
H ILLVALEGLENRIDGEOXFORD
CROMWELL
PARKDALE
BROADVIEWWELLINGTON
BOLANDOAKKNOLLBUCKINGHAM
HILLSIDEBRENTMOOR
CENTERASBURYSOMERSET
BROOKLINE
RALPHSURREY HILLSCRESTWOODOAKLAND
C L A V ERACHEDWARDCONCORDIACLAYTONIAHARCOURT
PRIVATEMOORLANDSCARRSWOLD
SOUTHMOOR
T U S CANYCOMMODOREFORESTRIDGE
HI
LLVALE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11115
Wastewater
15
$580,000
Clayton
Lemay/RDP
Black Creek
Capital
96Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONCORDIA I/I REDUCTION (NE QUAD CLAYTONRD AND BIG BEND BLVD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
CLAYTON
ETHEL
HOOVER
PRIVATE
DE MUNARUNDEL
RI
DGEMOORALAMO
ABERDEEN
YALEBROADVIEWCLAYTONIAWYDOWN
OAKKNOLLHIGHLANDDARTFORDBELLEVUEST RITAMOORLANDSSEMINARY
SANBONITAHILLVALE
KUHSBLENDONCONCORDIASOUTHMOOR
T US CANYARCHIVESCOMMODOREHARCOURT
SOUTHWOOD
ROSEBURY
FORESTRIDGE
OAKLAND
OAKLAND SEMINARYPRIVATE
PRIVATEDE MUNPRIVATEAR U N DEL
PRIVATE
PRIVATE
SAN BONITA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11964
Wastewater
15
$735,000
Clayton
Lemay/RDP
Deer Creek
Capital
97Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AREREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦64
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦64 §¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Various
Non-recurring
98Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DAMMERT AND BROADWAY SANITARY RELIEF(SKME-551)
Construction
6660 - SanitaryReplacement Fund
TWO SSOS AND A PUMP STATION MUST BE ELIMINATED.
CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALLS BP-515 AND BP-624, AND PUMP STATIONP-327.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 18. TOTAL BUDGET IS $6,825,000. PUBLIC I/IREDUCTION IN PROJECT 11927.
§¨¦55
§¨¦55
WACHTELBAYLESS
ZEISSHOFFMEISTERPARDELLAREED DAVIS
FANNIE
ARLEE MILITARYGENTRYP R IV ATEAVENUE HPAULE
MARCEAU
ORIENT
HURCKGRAND
UNION PACIFICCLYDEERSKINEWEBERMINNESOTAETTA
CATALAN
HORNMOUNT OLIVE
FELTON
NAERTVIRGO MICHIGANDALLASGOETZVEGAS
JOPLINPERRINUNIONLORETTAREGINA LAGRO
KAYSER
WEISS
PLACID MANNCORMAR
VELMARUPRECHTLANDOR
BLUE RIDGEDUMONT
SANT EN
HOLDEN
CLEVES
BOBRING
CATSKILL
WALLER
ESPENSCHIEDIDAHOMAJESTY
POINT
RISCH
CARTWRIGHT
POEPPING
ADELIA
JEFFORDSAVENUE ISUSAN BAUMANNPRIMM
O L D C O U N TY
DAMMERTBARTOLET
ELIAS
FAWN
BAYLESS
DAMMERTVELMA
WALLER
FANNIE
WEISSPAULE
FELTON
HORN
KAYSER
ORIENT
UNIONPACIFICPRIV
A
T
EREGINAWALLER
ETTA
WEISS
LEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11155
Wastewater
15
$5,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
99Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE I
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED TRUNK SEWER.
CONSTRUCT 7,900 FEET OF 6-INCH TO 78-INCH SANITARY SEWER TOALLEVIATE SURCHARGING. FACILITATE FUTURE REMOVAL OF BP-545,BP-170, BP-198, BP-348, BP-349, BP-155, AND BP-591.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $21,750,000.GLENBELLBRENTWOODELMMADGE
MARYTHORNTON
RUSSELL
MARSHALL
WAYMIRE
FLORENCE
CORNELLUNIONPACIFICPENDLETONPRIVATEBRAZEAU
ATALANTA RUTHLITHIA
M E R R IT T
MANDERLYPOWELL
C R A W F O R D
HILLDALECOLLIERR
O
CKF
OR
D
JOSEPH
MASON
HOLLANDLAWNDELL
ALMENTOR
ALLISONREASNOR
MAGDALEN
WILLIS BOMPARTKIRKHAMBREMERTONC
R
E
V
E
C
O
E
U
R
KEYSTONE
BREMERTONWILLIS
GLENATALANTA
PRIVATE
GLENMARYCOLLIERBOMPARTMANCHESTER RD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10021
Wastewater
15
$11,750,000
Brentwood
Lemay/RDP
Deer Creek
Capital
100Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2017)CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 69,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11996 AND 11997.
§¨¦64
§¨¦270
§¨¦64
§¨¦270
CLAYTON
GEYERPRICEBALLASDES PERESSPOEDEBERRYLADUE
WOODLAWNKIRKHAMGRAESERDIELMANNORTH FORTY
LEE
SOUTHFORTY
THORNHILL EMERSON
DICKSONFALAISE
TRE NTRUTHWARSONEVANSWOODODAYTAYLORCLAYOAKBISMARKMOSLEYBARNES
TOPPINGWILSON
LITZSINGER
WOODGATEDANIELBENNETTCARBERRY
SQUIRES CELLAVOUGAOAK VAL L E YTAMMANY
PARTWIN PINEANDREWROANOVERHILLS
TEALWOOD
ROCLAREBRIDLEWAL LIN G
NANAOLD COLONY
MASO
N MCKINLEYRIO VISTASELLENRICKPORTLAND
DENNY
ROCK HILLELZEY
JE WE L
BOPPSARAH
DUBON PRIVATEDWYER
SAMS CONWAYALDEN
CLIONARTHURDONOHO
OGEPARK
ELAINE ARBORLISA
PRIVATECLAYLITZSINGER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12036
Wastewater
15
$5,700,000
Various
Lemay/RDP
Deer Creek
Capital
101Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2017)CONTRACT B
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 61,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11994 AND 11995.
§¨¦64
GEYERCLAYTON
ADAMS BERRYKIRKHAM
GRAYDICKSONGOREOLD WARSON MCKNIGHTLAYLEE
JEFFERSON ELMSWON
CLAYLOCKWOOD
ESSEX
SAPPINGTONUNIONPACIFICTR ENTTAYLORRUTHWARSONEVANSWOODWAY ODAYOAK
D OUGHERTYFE R R Y
BISMARK
WILSON
LITZSINGER
WOODGATEPINE
LITHIA
NORTHFORT Y
DANIELBENNETTSQUIRES
EUCLID
OAK VALLEY
GILL
PARTWIN PINESOUTHFORTY
IRISANDREWROANOVER
HIL
LSDEACONAUSTINNANAMEDINA MCKINLEYIOLATALLIEPORTLAND
LINWOOD
MAPLEFIRETHORNDEN N Y
ROCK HILLMARK
JEWEL
PAPIN
BOPP
EASTGODWIN
BERNICEWILDDEER
Y ORKGRUPPKEND
ONC H IP PE R
DESPERESBARNBRIDGEDEVONDALELINDEMANFOLGERHICKORYLOGCABIN
PARKJOANNA
P R IV ATE
BURNSWARWICK
WILD ROSE
SWANDERBY LEAGRAMWOODLAWNG R AYOAKWARSONCLAYLITZSINGER
G
O
R
E
ELMROCKHILLELM§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12037
Wastewater
15
$4,950,000
Various
Lemay/RDP
Deer Creek
Capital
102Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTED SSOOUTFALLS REQUIRED.
CONSTRUCT 20,000 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $216,000,000.PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦44
§¨¦64
§¨¦170
§¨¦170
DALE
M
E
T
R
OLI
N
K
CLAYTON
PINELAY
ELMU N IO NPACIFICFOLKMCKNIGHT
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEBRENTWOODHANLEYKIRKHAMPERNOD
DAVIS
ETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHA
EULALIE
GLENFYLERCLAYTONIA
LEE
ARUNDEL
EUCLID
SWAN
PAR KLITHIA
PACIFICFOREST
ABERDEEN
LOUISDELNORTEPLATEAU
WILL IA MS
ALAMO
MARDEL
MADGE
HANCOCKMCCUTCHEONWISE
ARSENALFLORASALEMB
U
C
K
HICKSWRENWOOD
ST CLAIRMARYGOR
E AUDUBONBRUNO
FAIRVIEW M A NHATTANPRATHERBARTOLDRUSSELL
YEATMANROCK HILLEA G E R
ROSE
FLORENCE MARTINIOXFOR D
GODWI N
C O M M ONWEALTHMOORLANDSY ORKBACON LYLEDESPERESANNA
WAYMIRE SOUTHELLSWORTH
JAMES
SUFFOLKMAPLE
PRIVATE
CIRCLEARLINGTONCOLLINS
GREELEY ECOFFKUHLMAN
ARBOR
HALIFAX
PORTERHORNER
WARNER
B E R R Y RICHERTHATTONSANBONITA
OAKLAND
GLENWISE
UNIONPACIFIC FORESTELM
OXFORD
EAGER PRIVATEMARYWHITE
YORK
M AN C H E S T E R RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$30,000,000
Various
Lemay/RDP
Deer Creek
Capital
103Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DELCREST SANITARY RELIEF (SKME-565) I/IREDUCTION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 1,500 FEET OF 12-INCH STORM SEWERS, AND REMOVEPRIVATE I/I SOURCES AT 10 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦170
§¨¦170
DELMAR
GANNON
GROBY
MCKNIGHTOLD BONHOMME 81STLE PERELAFON
BALSON
STANFORDBERICK
T E ASDALEGAYCENTERAMHERST
BARBY
P R IV A T E
TULANE
FORSYT
H
SPOON
ALA
NSON
CANTERBURYLITTLE
OAKBROO
K
CRANDONCO RNELL GLENSI
DEWASHINGTON
D
ELCREST BLACKBERRYKI
NGDELMULBERRYSWARTHMORECOL ONIAL
PRICEWO O DSM
APLEVIE
W SAXONYVILLA
LORE NZO BENLOUW A T S O N IA
WILNERUNI
VERSITY
LOREN WOODS
BIRN A WOODSROWLAND
AVESDALEGREENSHIREGAYM
C
K
NI
GH
T
GAYMCKNIGHTCORNELL
P
RIV
A
TE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11735
Wastewater
15
$370,000
University City
Lemay/RDP
Black Creek
Capital
104Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DELCREST SANITARY RELIEF (SKME-565) I/IREDUCTION PART 2
Construction, Phase II
5566 - Deer CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 1,500 FEET OF 12-INCH STORM SEWERS, AND REMOVEPRIVATE I/I SOURCES AT 10 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11849. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦170
§¨¦170
DELMAR
GANNON
GROBY
MCKNIGHTOLD BONHOMME 81STLE PERELAFON
BALSON
STANFORDBERICK
T E ASDALEGAYCENTERAMHERST
BARBY
P R IV A T E
TULANE
FORSYT
H
SPOON
ALA
NSON
CANTERBURYLITTLE
OAKBROO
K
CRANDONCO RNELL GLENSI
DEWASHINGTON
D
ELCREST BLACKBERRYKI
NGDELMULBERRYSWARTHMORECOL ONIAL
PRICEWO O DSM
APLEVIE
W SAXONYVILLA
LORE NZO BENLOUW A T S O N IA
WILNERUNI
VERSITY
LOREN WOODS
BIRN A WOODSROWLAND
AVESDALEGREENSHIREGAYM
C
K
NI
GH
T
GAYMCKNIGHTCORNELL
P
RIV
A
TE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11735
Wastewater
15
$690,000
University City
Lemay/RDP
Black Creek
Capital
105Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR WASTEWATERPROJECTS (2017)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENTPROGRAM AND CONSENT DECREE REQUIRES PROPERTY RIGHTSACQUISITION FUNDING FOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12513
Wastewater
13
$2,500,000
Various
Various
Various
Asset Management
106Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FERGUSON SANITARY SEWER (OLIVE TO PAGE)(DIAMOND PARK)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS. ELIMINATION OFCONSTRUCTED SSO OUTFALLS REQUIRED.
CONSTRUCT A 2 MILLION GALLON SANITARY STORAGE TANK, PUMPSTATION, AND COLLECTION SEWERS.
PAGETERMINAL
FERGUSONJULIANPURDUEHANLEYPENNSYLVANIACANTONRAFT ROBBINS
PARTRIDGEQUENDOPLYMOUTH
MALLARD
WATTSUTICALYNN
MEYERMILAN
TEAL
MELROSE
ROBERTSWALDRONRAYMOND
CORBITTNIXON KINGSLANDDUSKY
MADISON
WELLINGTON FARISR ACIN E
BACKERBELRUEMO
N
R
OELEROYWILSO N GEORGEFALCONPRIVATE
W A YNE
COLBYLIBERTY
H
AYWOOD
RABEDOVERBRADFORDVERLBALFOUR
H AZELWOOD
BUCKNERRUDDY
PURCELLSCHOFIELDIONACARLETONWOODR UFFMILFORDWILLOWTREE
BURCHGRIEFIELDCA MDENMIDLANDMOOREBAINBRIDGEWHITE OAK
NORFOLKSOUTHERN
A
L
LE
N
GREEN LARCHELTORA
PRIVATE
MELROSE
MELROSE
PRIVATE
MILAN LEROYPRIVATE
PLYMOUTH
PRIVATE
MALLARD
PRIVATE
PRIVATE
ROBERTS
LYNN
OLIVEBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11737
Wastewater
13
$1,000,000
Various
Lemay/RDP
University City Branch
Capital
107Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-04 QUIET VILLAGE SANITARY RELIEF (THAMESCOURT TO FIESTA CIRCLE)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 2,180 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.ELIMINATE CONSTRUCTED SSO OUTFALL BP-086.
S
C
H
U
L
T
E
P EM
FIESTABARDOTMOMARTETRIESTE
CRAIG VIEW
D E M ALLEVILLAGEMONCOEUR
DAYKINLEISU RELAUDERMEADOW LA KEB O N J O U R
OAKBA RKN IEH A U S THAMESM O O R L A NDMAN
ORBAVARIANMONACCO
LEISURE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11747
Wastewater
15
$1,460,000
Unincorporated
Missouri
Fee Fee Creek
Capital
108Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-16 SCHUETZ - MEADOWSIDE TO PAGESANITARY RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 8,880 FEET OF 8-INCH TO 42-INCH SANITARY SEWERS.ELIMINATE CONSTRUCTED SSO BP-076.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 18. TOTAL BUDGET IS $8,890,000.
PAGE
ADIE
SCHUETZL A C K L A N D
B
A
L
L
B O RM ANC
E
N
T
R
A
L
MIDLAND
SCHAEFER
W
E
L
DONGRISSOMGRAELERFEE FEED O R S ETTMILLPARK
C H IE F T A I N
VIL L A D O R A D OCHAFFEE
GAND YT I V OLI
SCHULTECONCOURSEDECORAH
MEADOWSIDEPRI V AT E
W E S T L IN E INDUSTRIAL
MONT
A
UKNORFOL K S O U TH E RN
ME DIAGOLDLEAFLIMETREE WESTPORTCENTERARC
C H A N DELLAY
PAGESERVICE
ALTOMS
H
A
LLOW B R O O KCONGRESSIONAL M U E LL E R
L IN F R E DVERNABRO
NCOWOODLAND LACKLAND HILL
PRIVATEPAGE PRIVATEPRIVATEPRIVATEMEDIA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10601
Wastewater
15
$5,000,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
109Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORISSANT I/I REDUCTION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11932.
§¨¦270
§¨¦170
§¨¦170
FROST
ST ANTHONY
DUNN
HANLEYWASHINGTON
PERSHALLGRAHAM WATERFORDST CATHERINE
LATTYLAFAYETTE ELIZA
B
E
T
H
ST MARIE
REASOR
HARRISON
MIDWOODCLOVERBOONEWILLIAMSFLORA
MAPLE
BARTO
STLOUIS
ALLENAUBUCHON
ELBRINGC A L VER T ONNYFLOT
YOUNGKINGSLEYJEFFERSON
BECKER
MORANCAPRIJEAN SADDLEELM
DERHAKE
JONASSTCHARLESHAZELWOODZURICHBUCKEYE MILBANKH U DSON
STDENIS
S T EDWARDCADYGAHANROMISSTRINITY PADDOCKRIDGEHOLLINSFORDSTJACQUESALDERCARMONATANEYROGERS
SIELOFF LARRYBROWNA
R
G
O
BROWERP R IV ATE GRANDVIEWPUEBLOST MA URICE
ST REGISST EDITHJACKLIN
B OELLNERMANOR BON AIRELYNNMEADOWSWILSHIRESTMA
RKKNOLLLILA
DUCHESNE
R O B INWOODMOONLIGHTCASTELLOSTNICHOL A S
KNOLLWAYST JEANLOMOND
REGINA
SLUSSER
CARMEL
BARAT
HOLLY
R
E
E
B
CHARTIERST STEPHEN
ERMANDAP ERSHALL
DERHAKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11748
Wastewater
15
$442,000
Various
Coldwater
Coldwater Creek
Capital
110Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11758
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
111Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12379
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
112Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12380
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
113Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12381
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
114Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAHAM RD 100 - 232 SANITARY SEWER
Construction
6660 - SanitaryReplacement Fund
FAILING CONCRETE SEWER UNDER HEAVY TRAFFIC AREA.
REPLACE 935 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.ST CHARLESGRAHAMST MARIE
ST JACQUESST JEANHARRISON
ELMDALEREEB
BELLMJEFFERSONWESCOTTST FERDINANDQUICKST PIERREST ALBERT
BROWER VENETIA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12719
Wastewater
15
$600,000
Florissant
Coldwater
Coldwater Creek
Capital
115Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARMANN ESTATES PUMP STATION (P-709)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-709 REQUIRES REPLACEMENT.
REPLACE PUMP STATION P-709.
§¨¦70
§¨¦70
BEAVERTONARCHERTONBROOKINGTONHARMANN ESTATESBIRMINGTONMARK TWAIN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12297
Wastewater
15
$500,000
Bridgeton
Missouri
Bonfils
Capital
116Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HOLLENBERG PUMP STATION (P-713)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-713 REQUIRES REPLACEMENT.
REPLACE PUMP STATION P-713.
§¨¦270
§¨¦270
H
O
LLE
N
B
E
R
GFOERSTER
DEPAUL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12306
Wastewater
15
$715,000
Bridgeton
Missouri
Bonfils
Capital
117Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2017) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCHIN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, ANDBUILDING BACKUPS.
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BYCURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIAREHABILITATION CONTRACTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12011
Wastewater
15
$2,500,000
St. Louis City and County
Various
Various
Capital
118Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2017) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCHIN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, ANDBUILDING BACKUPS.
AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BYCURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIAREHABILITATION CONTRACTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12012
Wastewater
15
$2,500,000
St. Louis City and County
Various
Various
Capital
119Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2017)
Work Order Repair Costs(Non-Capital)
1101 - General Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATERINFRASTRUCTURE DISTRICTWIDE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12007
Wastewater
17
$1,500,000
Various
Various
Various
Asset Management
120Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2017)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATERINFRASTRUCTURE DISTRICTWIDE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12007
Wastewater
17
$5,500,000
Various
Various
Various
Asset Management
121Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JAGUAR TO CAROLINE LOW PRESSURE SEWERSYSTEM (LPSS)
Construction
6660 - SanitaryReplacement Fund
EXISTING COMBINED SEWER IN POOR CONDITION AND CANNOTCONTINUE TO SERVE ONE COMMERCIAL AND TWO RESIDENTIALPROPERTIES.
CONSTRUCT 550 FEET OF 2-INCH LPSS FORCE MAIN, ONE PUMPSTATION, AND 140 FEET OF 8-INCH SANITARY SEWER.HANL
EYBARTOLDMETROLINKFLORA
COLEMANPACIFIC JAGUARUNION PACIFICMERCANTILE
SUMMITMELVINPORTERLACLEDESTATIONCAROLINE
UNIONPACIFIC
BARTOLDMETROLINKBARTOLDMANC H E S T E R R D§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12635
Wastewater
15
$650,000
Maplewood
Lemay/RDP
Deer Creek
Capital
122Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$106,900,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
UNIONPACIFICKOCHRIVERKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFORDER CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFR IN G E R
SHER ID A NPOTTLE
ORIENT
RIPA
LUNAPOPLAR
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHORN
JEFFERSONIAN
PAULE
HAL S EYFIRSTPECAN
A
SHROCK
JACINTO
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALLEN
LISIE
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$18,900,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
123Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LACKLAND I/I REDUCTION PART 2
Construction, Phase II
5564 - Coldwater CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 2,550 FEET OF 12-INCH TO 18-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦170
§¨¦170BROWNLACKLAND
NORTH
WOODSONARGYLE
MCKIBBONDIXOLDENREXBURTON
BALTIMORECOLES
WINDOMEMINENCETUDOR
MILTONGASSMARSHALLTENNYSON
H O LT W OOD
TRESCOTT
ST LOUISROY
FORESTPASTEURAIRWAY
WISMERBOSWELLHOODLESLIEGORDONGOODALEORLANDOARLINE
BURNSEVERMAN GRACELAND HILLEMANHUMEMARVINSIMS
MARLOWE STELLAQUIETCALVERTBENSON
BRISTOL
GILROSEWALLISDAWESVERONAEDMUNDSONADDIEEZRA
SPENCERASHLANDSUNCRESTWENGLERGAEBLERROYALTONHARTLANDDAVID
OAKLANDMAVIS
SHELLEY CHARLACKANGELOGOTHLANDJOELCROCUS
HAGNER
HUNTINGTONAPACHELINDSCOT TMECCA
ANNAPOLISLATROBE
SHAWNEE
DOYLE
BRECKENRIDGEDIXBRECKENRIDGETENNYSON
SPENCERFOREST
BRISTOL
TENNYSONWALLISWISMERBURNSTUDOR
BRISTOL
MARSHALLMILTONRE XAIRWAYMILTONCALVERTT
E
NN
Y
S
O
N ROYCALVERTHOODMILTONCHARLACKST CHARLES ROCK RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11712
Wastewater
15
$100,000
Various
Coldwater
Coldwater Creek
Capital
124Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LACKLAND I/I REDUCTION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 2,550 FEET OF 12-INCH TO 18-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦170
§¨¦170BROWNLACKLAND
NORTH
WOODSONARGYLE
MCKIBBONDIXOLDENREXBURTON
BALTIMORECOLES
WINDOMEMINENCETUDOR
MILTONGASSMARSHALLTENNYSON
H O LT W OOD
TRESCOTT
ST LOUISROY
FORESTPASTEURAIRWAY
WISMERBOSWELLHOODLESLIEGORDONGOODALEORLANDOARLINE
BURNSEVERMAN GRACELAND HILLEMANHUMEMARVINSIMS
MARLOWE STELLAQUIETCALVERTBENSON
BRISTOL
GILROSEWALLISDAWESVERONAEDMUNDSONADDIEEZRA
SPENCERASHLANDSUNCRESTWENGLERGAEBLERROYALTONHARTLANDDAVID
OAKLANDMAVIS
SHELLEY CHARLACKANGELOGOTHLANDJOELCROCUS
HAGNER
HUNTINGTONAPACHELINDSCOT TMECCA
ANNAPOLISLATROBE
SHAWNEE
DOYLE
BRECKENRIDGEDIXBRECKENRIDGETENNYSON
SPENCERFOREST
BRISTOL
TENNYSONWALLISWISMERBURNSTUDOR
BRISTOL
MARSHALLMILTONRE XAIRWAYMILTONCALVERTT
E
NN
Y
S
O
N ROYCALVERTHOODMILTONCHARLACKST CHARLES ROCK RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11712
Wastewater
15
$1,520,000
Various
Coldwater
Coldwater Creek
Capital
125Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LADUE SUBTRUNK SANITARY RELIEF (SKME-654)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 80 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS.WARSONLADUE
SPOEDEDIELMANENGEL
OLDBONHOMME
BARNESCLAYTON CELLAKENTPRIV ATET E A L W O OD
G L E NEAG L E S
BEAVER
S T ACY
DWYERB RAEBUR
N
C LER M O N T GRAYBRIDGESTONEYSIDEOAKPARKSONACONWAYALDE N HEATHER HILLP IC A RDY BON AIRERONDELAY
FO
R
D
Y
CELARKINDONOHO
WHITEBRIDGE
MANSFIELD
LISA
MAYFAIRALLE G ROH A S T IN G S
PRINCESSSHERWYN
FIE L D IN GC
OUNTRY FAIRRADFORDM A R Y HILL
CLERBROOK APPLE TREETERRYQUA I L W A Y S
BRIAROAK
RANDELAYWHITE ROSEBRAZILLIANOAK GATE ELKINGTONCHERRI
COUNTR Y V IE W
NOTRE DAMED O G W O O D
LEELASUNDOWN
PRIVATEPRIVATE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11714
Wastewater
15
$440,000
Various
Lemay/RDP
Deer Creek
Capital
126Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANDMARK OFFICE PUMP STATION (P-411)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-411 REQUIRES REPLACEMENT.
REPLACE PUMP STATION P-411.
§¨¦44
§¨¦44GEYER
SU N S E T H IL L SCRAGWOLDBALMAGOUN SUNSET OFF
I
CERO Y A L S P R INGSW I C K S W O R TH
W A T S O N R D
M O 3 6 6 H W Y
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12324
Wastewater
15
$550,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
127Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 53,900 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12075 AND 12078.
§¨¦55
§¨¦55 UNIONMACKENZIEBATES
UNIONPACIFICGERMANIA
PENNSYLVANIAVIRGINIADAVIS
GREGGMORGAN FORDREAVISBARRA
CKS
WILLVALCOUR WACHTELBAYLESS
ZEISSH
A
LE
SEIBERT
CCCIDAHOMOTT
DOVER
PARDELLARIVER
DESPERES DEWEYWEBE
R
IO NETELFORDBLOW
GRANTFANNIEELTON
CORDESSHARPIRON
ARLEE FIELDGENTRYMATHILDAFAIN PRIVATEI
VYJOPLINREAVIS
RADIOBOWEN
MOHEGANNEW HAMPSHIREKAY
GREENPARK
RIPA
HURCK
HEIDELBERG
KITEUGENEGRANDEILER
ELISE LUCIALARKWATERFORMAN
VITA
CLAGERACORNALABAMAHOFF
M
EIS
T
E
R
SUNSHINE
MOUNT OLIVE
CLYDEALTHEAPRIMMVASEL
AVENUE HLEONASPOKANECATALAN
JEFFLEIGHCAMINOHORN
AFFTON
PECANWALSH
ELWOODWANDA
REGINABUCKLEYALASKASIGSBEE
HEEGE
KIDDERVICTORY PHILOHEALY
FATIMA
WIL BESCECIL
JOELKOERBER HARLANEIFFEL
ALLEN
PINOAKPEARIRON
DOVER
IDAHOFANNIE
HEEGE
EILER
WEBER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12048
Wastewater
15
$4,300,000
Various
Lemay/RDP
Various
Capital
128Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 64,200 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12317.
§¨¦270
§¨¦44 GEYERADAMS
BALLASBERRYCLAYU N IO N P A C IF IC
ROTT DICKSONWOODLAWNTAYLORHARRISONB U R L IN G T O N N O R T H E R N S A N T A F E
COUCHC R A I G
M A R SH A LL
ANN
ROSE HILL
KIRKHAM
JEFFERSON
D O UG H ERTYFERRYELMNIRK
RAYBURN
ESSEX
LIG
GETT
MADISON
BOAZ
FORESTA R BANLARK EVANSWOODEDNAWAYSIMMONS
GARBER
BROWNELL
SAPPI
NGTONL E M P
HI
T
Z
E
R
T WILTONWILSON LEE
EDWINVAN BURENORCHARDDEANE
MANDAFILLMOREL OCKWOODGILL
HIG
H
L
A
NDTWIN PINEY ARNE
L
L
C
RAGWOLDCA
S
S
E
NS IRISBISMARK
SCOTT
CREST OAKREDOAKRUTHOAKL A N D
S
A
N
D
ERS
SAMO
A AUSTINNANAR
US
DON
CLU
B
MAEB ERN IOLATALLIER AYN E R
LINWOOD
PRIVATEMAPLE
ORLEANSMEIERGOETHEBERNICEMILWAUKEEWESTVIEW
WAT SONGRUPP DELVISTACHOPINTRELAN E
G
R
A
N
TLINDEMANWOODBINE
PON CA
LAUMEIE R PARKJOANNA
PARKBRENTGRANDVIEW
BALI
ACORN
BONITA
WARWICKWINSLOW
SWAN
DULEY
ASPEN
COURT
SPITZ
MADISONBALLASCLAY CLUBWATSON RDSKIRKWOODRD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12049
Wastewater
15
$5,320,000
Various
Lemay/RDP
Various
Capital
129Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 43,800 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12420 AND 12253.
§¨¦55
§¨¦44
§¨¦44
UNIONMACKENZIEELMEDGARWEBER
ROCKHILL
SAPPINGTONRIV
ER
DESPERESBERRYLACLEDE STATIONPARDEEMUSICKRHODESJANUARYDELORWALSH
GRANT VALCOURMACKLINDZEISSH
ALEGRAY SEIBERT
GREENPARK
REAVISBARRAC
K
S
GARBER
BLOW
CHESHIREIO NEBAPTIST CHURCHA RBANFINKMANGORE
ELTONBAYLESS
LIG
GETT
TELFORDP R IV A T E
TULIP
EDDIE N PARK
LIT TIE LILACTAMMMATHILDAREAVIS
RADIOALICETON CLIFTONGERMANIA
MOHEGAN
STAELY
ELISE
ROXANNASELMARIPA
TESSHIR E
MUELLERHEIDELBERG
KITGRESHAM
VAUK
LUCIALARKFORMAN
VITA
KAY
R O S E
WELLSSUN
R
A
Y ACORNHOFFME I S TE R
S
A
N
D
E
R
S
JAMIESON
MOUNT OLIVEAUSTINEMILALTHEAVASELAVENUE HTWILIGHTJEFFLEIGHARLEE
CAMINOMAYOCOLLEENIMSEBONITA
ZINZERBRENDABUFFTON
FOXCROFT
LINCORDAFFTON
HAMBURG
JAN
PECANPICKWICKALMALAKESIDE
SHAPFIELDHEEGEPHILOYALE
ARCTICD OBBIN
FATIMA
LAWNSIDE
SONATAHARLANSWON
EIFFELOAKSHAZEL PEARWEBER
RHODES
GRANTROCK HILLGR
A
NT
PRIVATE
GRAYHEEGE
W A TSO NRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12050
Wastewater
15
$4,200,000
Various
Lemay/RDP
Various
Capital
130Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
AGING AND FAILING SYSTEMS IN NEED OF REPLACEMENT ANDUPGRADE TO ENSURE CONSENT DECREE COMPLIANCE.
CONSTRUCT MECHANICAL GATE REPLACEMENT, UPGRADEELECTRICAL SYSTEMS AND SWITCH GEAR, AND UPGRADE PUMPS.
FY16 CONSTRUCTION BUDGET WAS FOR EQUIPMENT PROCUREMENT,WITH THE BALANCE OF CONSTRUCTION WORK FUNDED IN FY17.
MARCEAU
HURCKVIRGINIA
CATALANMINNESOTAESPENSCHIED
ADELIA
NELLIE
PENNSYLVANIAMICHIGANWEBERMICHIGAN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12488
Wastewater
15
$5,300,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
131Page
2017
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WATERSHED I/I REMOVAL - NORTHHAMPTON CREEK
Construction
5563 - Clayton CentralOMCI Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
Scope of ProjectCONSTRUCT 210 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12470. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
METROLINK FORSYTH
CLAYTON
WISEBRENTWOODFORESTPARKWYDOWNHANLEY
PINE
MARYLAND
BRUNO BELLEVUEDAVIS
ETHELWE
N
N
E
K
E
R
PERSHING
BOLANDLADUE
LAWN
YORK
CLAYTONIAHOOVERMERAMECFR
A
N
C
I
S
SWAN
PARK
LINDENKINGSBURY
GAYBEMISTONYALEMCCUTCHEONASBURYCENTRALLACLEDESTATIONDE MUNAUDUBONPRIVATE
B
U
C
K
HICKSTOPTON
WRENWOOD
OXFORD
P
OLO
HUNTERURBAN
ALICIA RUPERT
LILE
ELINOR
LINDELL
E A G E R
ALAMO
ROSE HI
LLV
A
LECECILWILLIAMSWATERMAN
UNIVERSITY
MOORLANDSMORITZ
PARKDALE
SNOW
SHEPLEY
LINDBER G HSOUTH
HIGHOLETAEDGEWOODLEEPLATEAUHIAWATHASTRAS
S
N
E
R BENNETTCOLLINSRALPHPOINTEROAKKNOLLDARTFORDGALLERIA
MITCHELLGARDEN
WARNER
DELTAEDWARDSANBONITA
ORLANDO
BRIDGEPORTSUDBURY ALABAMALYLEWALINCA SILVERTONROBINFORESTROSSIOAKLAND
THRUSHALICIA YALEMARYLAND
UNIVERSITY
PRIVATE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11716
Wastewater
15
$250,000
Various
Lemay/RDP
Various
Capital
132Page
2017
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WATERSHED I/I REMOVAL - NORTHHAMPTON CREEK
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
Scope of ProjectCONSTRUCT 210 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12470. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
METROLINK FORSYTH
CLAYTON
WISEBRENTWOODFORESTPARKWYDOWNHANLEY
PINE
MARYLAND
BRUNO BELLEVUEDAVIS
ETHELWE
N
N
E
K
E
R
PERSHING
BOLANDLADUE
LAWN
YORK
CLAYTONIAHOOVERMERAMECFR
A
N
C
I
S
SWAN
PARK
LINDENKINGSBURY
GAYBEMISTONYALEMCCUTCHEONASBURYCENTRALLACLEDESTATIONDE MUNAUDUBONPRIVATE
B
U
C
K
HICKSTOPTON
WRENWOOD
OXFORD
P
OLO
HUNTERURBAN
ALICIA RUPERT
LILE
ELINOR
LINDELL
E A G E R
ALAMO
ROSE HI
LLV
A
LECECILWILLIAMSWATERMAN
UNIVERSITY
MOORLANDSMORITZ
PARKDALE
SNOW
SHEPLEY
LINDBER G HSOUTH
HIGHOLETAEDGEWOODLEEPLATEAUHIAWATHASTRAS
S
N
E
R BENNETTCOLLINSRALPHPOINTEROAKKNOLLDARTFORDGALLERIA
MITCHELLGARDEN
WARNER
DELTAEDWARDSANBONITA
ORLANDO
BRIDGEPORTSUDBURY ALABAMALYLEWALINCA SILVERTONROBINFORESTROSSIOAKLAND
THRUSHALICIA YALEMARYLAND
UNIVERSITY
PRIVATE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11716
Wastewater
15
$5,270,000
Various
Lemay/RDP
Various
Capital
133Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WATERSHED PUBLIC I/I REMOVAL -NORTH HAMPTON CREEK
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
REHABILITATE 38,600 FEET OF PUBLIC SEWERS USING THECURED-IN-PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11716.
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
M E T R O L IN K FORSYTH
CLAYTON
WISEBRENTWOODFORESTPARKWYDOWNHANLEY
PINE
MARYLAND
BRUNO BELLEVUEDAVIS
ETHELWE
N
N
E
K
E
R
PERSHING
BOLANDLADUE
LAWN
YORK
CLAYTONIAHOOVERMERAMECFR
A
N
C
I
S
SWAN
PARK
LINDENKINGSBURY
GAYBEMISTONYALEMCCUTCHEONASBURYCENTRALLACLEDESTATIONDE MUNAUDUBONPRIVATE
B
U
C
K
HICKSTOPTON
WRENWOOD
OXFORD
P
OLO
HUNTERURBAN
ALICIA RUPERT
LILE
ELINOR
LINDELL
E A G E R
ALAMO
ROSE HI
LLV
A
LEC E C ILWILLIAMSWATERMANUNIVERSITY
MOORLANDSMORITZ
PARKDALE
SNOW
SHEPLEY
LINDBER G HSOUTH
HIGHOLETAEDGEWOODLEEPLATEAUHIAWATHASTRASSNERBENNETTCOLLINSRALPHPOINTEROAKKNOLLDARTFORDGALLERIA
MITCHELLGARDEN
WARNER
DELTAEDWARDSANBONITA
ORLANDO
BRIDGEPORTSUDBURY ALABAMALYLEWALINCA SILVERTONROBINFORESTROSSIOAKLAND
THRUSHALICIA YALEMARYLAND
UNIVERSITY
PRIVATE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12470
Wastewater
15
$2,800,000
Various
Lemay/RDP
Deer Creek
Capital
134Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF CONCRETE PRESERVATION
Construction
6660 - SanitaryReplacement Fund
CONCRETE DECKS AND EFFLUENT CHANNELS ARE IN VARIOUS STATESOF DETERIORATION.
REPAIR AND/OR REPLACE DETERIORATED CONCRETE DECKS IN ALLOUTSIDE PROCESS AREAS AND FINAL SETTLING TANK EFFLUENTCHANNEL.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
ETTA
H
O
FF
M
EISTE
R
WEISS
PRIVATE
UNION PACIFICMANN
RUBYHORN
CARTWRIGHT
UNIONPACIFICUNION PACIFICP
RIV
A
T
E
UNION PACIFICP
R
I
V
ATE
P
RIV
A
T
E
UNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12428
Wastewater
15
$1,250,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
135Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Land Purchase
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 - 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDMAN C H EST E R R D
W A T S O NRDCHIPPEWABLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
13
$4,000,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
136Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MACKENZIE I/I REDUCTION
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 3,000 FEET OF 12-INCH TO 18-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11931.
§¨¦44
§¨¦44 ELMROCK HILLEDGARGLENDALE GRAYGORETULIP LILACBAKER
JACKSON
SELMAOAK TREE
LACLEDE STATIONCHESHIREO L DWATSON
B U R L IN G T O N N O R T H E R N S A N T A F E
ROS E
HOLLY
WELLSTU R FLIN UM DRAYTONFLORENCE
R ID G E
OLD ORCHARDREAVISBELTONPARKMAPLEPAPIN
IMSEC A NNONBURYALBANYSOUTHSIDE
ECKRICH
FO R ES T
LANVALECLARA
INNISFAIL
HAMPSHIRECENTRAL
PINETREEV IR G IN IA
ALMACOLEBROOKBRISTOL
SYLVESTEROAK
DOBB IN
WEXFORDFIELDSTON
SIMMONS
R O SEACRE
BRIDLEPLANTG
R
AN
T
CHESTNUT
L AR K H ILL
P A S A D ENAPRIVATE BUSCH
MCDONALD HAZELLOCKSLEYVIO LET
ALGONQUIN
HEEGE
LACLEDE G R O V E S
RONALDFIRW OODLANDS CAPE
WOODLAWN
SHORT
A M B E R G A T E
CAMELLIA
WORTHINGYORKSHIRE DEE RHURSTVILLAWO ODTOFT
OLA ASHBURYSELMAGRAYJACKSONELMSELMAPINETREEELMGORE
LANVALEROSE
R E A V I S
PINETREETULIP
W A T S O N R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11653
Wastewater
15
$2,430,000
Various
Lemay/RDP
Mackenzie Creek
Capital
137Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOW IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTOR SEWERS. BUDGET INCLUDES $525,000FOR AMEREN FACILITY RELOCATION AND SERVICE TO THE NEWFACILITY.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
ST
O R A N
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
15
$30,000,000
St. Louis City
Bissell
Maline Creek
Capital
138Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Construction, Phase II
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOW IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTOR SEWERS. BUDGET INCLUDES $525,000FOR AMEREN FACILITY RELOCATION AND SERVICE TO THE NEWFACILITY.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
ST
O R A N
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
15
$525,000
St. Louis City
Bissell
Maline Creek
Capital
139Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARTIGNEY PUBLIC I/I REDUCTION
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 20,200 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11661.
§¨¦55
§¨¦270
§¨¦255
§¨¦255 LEMAY FERRY RDTELEGRAPHRDG R A V O IS R D
TESSONFERRYRDSLINDBERGHBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11930
Wastewater
15
$2,550,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
140Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MCNULTY - PALLARDY I/I REDUCTION PART 2
Construction, Phase II
5564 - Coldwater CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 4,360 FEET OF 12-INCH TO 24-INCH STORM SEWER, 710 FEETOF 8-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871. THIS PROJECTINCLUDES THE SCOPE OF WORK FROM PROJECT 11187. OMCI BUDGETFUNDS STORM SEWERS.
NORTH
BOBB EMINENCEWOODSONGUTHRIE
DIXBROWNREXMCKIBBONCOLESGORDONBOSWELLST LOUISROYHAROLD GEDDE
BATAAN FAIRFIELDMARVINCALVERTMCNULTY
EDMUNDSONBESSEMER
EZRA
MARGO ANN
CORREGIDOR HERBERTMURIEL
STANSBERRY
TUTWILER
PATRICK
DAVID
MAVIS
ROSLAN
CHARLACKEDMUND
SUSAN MARSHALLKATHLYNTIPTON
CHESTER
AMBRO
JOELBURDELLA
LINDSCOTTHAVENBROOKTREFORE
PALLARDY
LAMBE
R
T
AIRWAYROSEMORE
LEENORA
MARVISTAPATRICE
BRECKENRIDGE
A
MITY
CALWOOD
CENTRAL
CHES TERDIXKATHLYN
EDMUND HERBERTROSLAN
LINDSCOTTBROWNCALVERTTREFORE
HAROLD
CALVERTROYDAVID
MURIEL BOSWELLGORDONMCNULTYGORDON STANSBERRY
KATHLYN
BATAAN
MARVINTUTWILERCORREGIDOR MARSHALLMARSHALL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11662
Wastewater
15
$1,070,000
Various
Coldwater
Coldwater Creek
Capital
141Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MCNULTY - PALLARDY I/I REDUCTION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 4,360 FEET OF 12-INCH TO 24-INCH STORM SEWER, 710 FEETOF 8-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871. THIS PROJECTINCLUDES THE SCOPE OF WORK FROM PROJECT 11187. OMCI BUDGETFUNDS STORM SEWERS.
NORTH
BOBB EMINENCEWOODSONGUTHRIE
DIXBROWNREXMCKIBBONCOLESGORDONBOSWELLST LOUISROYHAROLD GEDDE
BATAAN FAIRFIELDMARVINCALVERTMCNULTY
EDMUNDSONBESSEMER
EZRA
MARGO ANN
CORREGIDOR HERBERTMURIEL
STANSBERRY
TUTWILER
PATRICK
DAVID
MAVIS
ROSLAN
CHARLACKEDMUND
SUSAN MARSHALLKATHLYNTIPTON
CHESTER
AMBRO
JOELBURDELLA
LINDSCOTTHAVENBROOKTREFORE
PALLARDY
LAMBE
R
T
AIRWAYROSEMORE
LEENORA
MARVISTAPATRICE
BRECKENRIDGE
A
MITY
CALWOOD
CENTRAL
CHES TERDIXKATHLYN
EDMUND HERBERTROSLAN
LINDSCOTTBROWNCALVERTTREFORE
HAROLD
CALVERTROYDAVID
MURIEL BOSWELLGORDONMCNULTYGORDON STANSBERRY
KATHLYN
BATAAN
MARVINTUTWILERCORREGIDOR MARSHALLMARSHALL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11662
Wastewater
15
$1,800,000
Various
Coldwater
Coldwater Creek
Capital
142Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MIDLAND SANITARY RELIEF - PUBLIC ANDPRIVATE I/I REDUCTION PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871.ASHBYLACKLANDSIMS WOODSONBALTIMORE
FLORA
ECHO
DRIVER
NIBLIC
BURNSPOETRESCOTT
HOODKREMPAGE DYERCANTER
BRECKENRIDGE
CHAUCERGASSTENNYSON
THEODOSIA
H O L T W OOD REXPASTEURGAEBLERMIRIAMWISMERUCEYLELESLIE WENGLERCALVERTCARLYLE
EASTBROOK
EVERMAN
KORANDOBRYANTMARLOWEQUIET
OCONNELLADDIEM ADDOX WALLISDAWESVERONAIVELAND DIXSPENCERGOODALEBOYLSTON
FARVIEW
COTE BRILLIANTEMILTONPEBBLEBEACH
MORVENGO CKEDECKER
LULLAB Y AIRWAYTHORPE
P I N EHURSTANGELOHIGHLANDO A K WABADAY
WESTWISE
OSGOODOHARERHYTHM
EAGLEWOOD
HUNTINGTONSHERMANFOWLERRONALDANNAPOLISGILWOODBRISTONST DENNIS
DENNISON
KALEN
HANDOM
T
E
N
NY
S
ON
WISMERWALLISMILTON
THORPE CHAUCERWALLISNIBLIC
SPENCERSIMSPOEWISMERBURNSSIMSDAWESSPENCERMILTONHOODOAK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11663
Wastewater
15
$87,000
Overland
Coldwater
Coldwater Creek
Capital
143Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTF POWER FEEDERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
DETERIORATED POWER FEEDER CABLES AT THE MISSOURI RIVERWWTF.
REPLACE POWER FEEDER CABLES THAT CONNECT THE PRIMARYCLARIFIER BUILDING AND EFFLUENT PUMP STATION TO THE MOTORCONTROL CENTER.
P
RI
VATE
P
RI
VAT
EP R IV A T E
P
R
I
V
AT
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12502
Wastewater
15
$750,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
144Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH BADEN CREEK I/I REDUCTION (BP-532)(WINCHESTER DR) PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 2,110 FEET OF 12-INCH TO 15-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTSNECESSARY TO REMOVE CONSTRUCTED SSO BP-532. PUBLIC I/IREDUCTION INCLUDED IN PROJECT 11925.
§¨¦70
LUCAS N HUNTPASADENA
LILLIAN
HILLSNELSONMELBAEDISON BEGGRAVINIA
LAWLERHUNTER
LINCOLNROHNROLAND
FLORIANAUGUST
A
COLONIALMANOLAAVONDALEHATZBERMUDAGREENWAY
IRACOU
N
T
R
YCLUB
ORE ON
DAIBER
MATHEW
GROVELAND
SALOMESANDIE
G
O
OAKRIDGEOVERBROOK
WINCHESTER
FOREST HILL
NORMANDY
WILLOW WOOD
KENWOODROXI ECI
RCLE
H
AZ
E
NSUNSET
HENDERSON DONAL
D
WESTFARLEY
HUNTINGTON
ONEILLBRISTOL
FOREST VIEW
MAYWOODSYLVANST MARYSEASTOAKMOUNTS T A NDREWS CANTERBURYAMMANNWRI
GH
TARCOLANEONATOWER GROVEN A D I N E
DUCKWORTH
P
AS
A
DEN
AONEILLNELSONEASTMELBAROLAND
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11693
Wastewater
15
$2,440,000
Various
Bissell
Baden
Capital
145Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PARDEE - BLACKTHORN - HOLLY I/I REDUCTION(WATSON RD AND S ROCK HILL RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 2,200 FEET OF 12-INCH TO 18-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALL BP-631 AFTER POST-CONSTRUCTIONMONITORING.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061.ELMTULIP
PARDEE
GRANT CHESHIREOLD WATSONROCKHILL SELMAHOL
L
Y
ROSE
WELLSSUN
R
AYARBANTU R FLI N UM BELTONDRAYTONHEATHERGENERAL GRANTFLAMINGOAZALEALANVALEDOBBI N
WEXFORDBLACKTHORNDRAKE
BRA
CKENBRIDLEPRIVAT
E
B
R
OOKVIE
W
WHIT E C L IFFPARK
RIDGEWOOD
LODGEPOLEJONQUI
LVIOLET
RONALDMISSY BURNTOAKF
O
U
R
NIE
R
LURLINECAPILIACONSERGARDENIAFORESTGREEN
HONEYSUC K L E
GENERALSHE R ID A NPINETREECAMELLIA
CASSIA
WORTHI N G
CAME LOTROYAL ARMS
KENORA
WEBSTER FO R ES T
HARBORELMVALLEYCRABAP
P
L
E
ULYSSESM A S T I S PINETREEG
R
A
N
T
PRIVATEGRANT ELMPRIVATEROCK HILLPRIVATE
ROSE
WA T S O N R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11989
Wastewater
15
$2,237,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
146Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PICKWICK - BERNADINE - BIMINI SANITARYRELIEF PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
CONSTRUCT 1,100 FEET OF 12-INCH TO 15-INCH REPLACEMENTSANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP-401.
MUSICKBAPTIST CHURCHLITTIE
ROXANNAEMILVARGAS
DANDRIDGE
TWILIGHTPATRINA MAYOMUELLERFARADAY
MAPLESHEA
LINCORDSAKURA
JAN
F AWNH A VEN
MEATH
CONCORDGOLF CREST
SAPPINGTONACRESPICKWICKGAIL
KAPPBRIARSTONE
CONCORD V IL L A G ECONCORDSCHOOL BEHRCHERYLCHARRETTE
WISTERIATEALRIDG E
STOLZ
MARLEYPINE FOREST
SONATAARTHUR
SLEVINKA MPINGVALDAM EREWILLINDAGENELMUGAN
SOLAR
L
A
S
VEGASFABICKKINGSMERE
TESCORDTESSHIREKNOLLSHIREMEADOWFIELD
SOUTHFIELD
COLCHIS
COSMOS
ALP ENATHREE COURT LAVINIAPEBBLE OAK
FITETHAYER
L A VIER KILLORENKILRUSHLA RKSPUR
PRIVATE
ANTRIM
KILMEADECHILESMEATHPRIVATE
LAVINIASLINDBERGHBLVDTESSONFERRYR DG R AVO IS R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11698
Wastewater
15
$350,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
147Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROCK HILL SANITARY RELIEF (SKME-618) PART 2
Construction, Phase II
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 70 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATEI/I SOURCES AT 2 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11885. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.BERRYKIRKHAMWOODLAWN OLD WARSON
LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK
BROWNELLHARRISONQUAN
LITZSINGER
FOOTEWARSONBENNETTBACON
SARAH
PAR
HUDSON
ANDREWOA KGILBERTDEACON GORE
M E D I N A MCKINLEYIOLANORTH
MAPLE
DE N NY
ROCK HILLMARK
RENDERERWILSON KORTWRIGHTOVERBROOK
F LAN D ERS
CURRANSQUIRES
DWYER
WILDDEER
BOGEY
HILLARD ROCKMANPARK
COPP E R H ILL
ELMJOANNARIDGE LINECHELSEA
P RIV A T E
LITHIA
EUCLID
HIGHHAMPT O NMANI
TOUJULIAN
JEFFERSONVICTORIA
WARWICK
WATE RBURYLEONARDBARRONGLENMOOR
HUNTLEIGH
DUNLEIT
HHULLF
AI
R
DA
L
E
WINGFIELD
HARTJEWEL
G REEN VIEWBEAUFORD
HOCHGASLITE
MERMOD
ALFRED
NOLAN
FUHRMANNEARLSTURGIS IOLAROCKHILLOAKPRIVATE
PARCLAYPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11069
Wastewater
15
$25,000
Rock Hill
Lemay/RDP
Deer Creek
Capital
148Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROCK HILL SANITARY RELIEF (SKME-618) PART 2
Construction, Phase II
5566 - Deer CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 70 FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATEI/I SOURCES AT 2 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11885. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.BERRYKIRKHAMWOODLAWN OLD WARSON
LEE MCKNIGHTT R ENTDICKSONWOODODAYTAYLORCLAYBISMARK
BROWNELLHARRISONQUAN
LITZSINGER
FOOTEWARSONBENNETTBACON
SARAH
PAR
HUDSON
ANDREWOA KGILBERTDEACON GORE
M E D I N A MCKINLEYIOLANORTH
MAPLE
DE N NY
ROCK HILLMARK
RENDERERWILSON KORTWRIGHTOVERBROOK
F LAN D ERS
CURRANSQUIRES
DWYER
WILDDEER
BOGEY
HILLARD ROCKMANPARK
COPP E R H ILL
ELMJOANNARIDGE LINECHELSEA
P RIV A T E
LITHIA
EUCLID
HIGHHAMPT O NMANI
TOUJULIAN
JEFFERSONVICTORIA
WARWICK
WATE RBURYLEONARDBARRONGLENMOOR
HUNTLEIGH
DUNLEIT
HHULLF
AI
R
DA
L
E
WINGFIELD
HARTJEWEL
G REEN VIEWBEAUFORD
HOCHGASLITE
MERMOD
ALFRED
NOLAN
FUHRMANNEARLSTURGIS IOLAROCKHILLOAKPRIVATE
PARCLAYPRIVATES LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11069
Wastewater
15
$60,000
Rock Hill
Lemay/RDP
Deer Creek
Capital
149Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROLENS AND TELEGRAPH SANITARY STORAGE
Construction
6660 - SanitaryReplacement Fund
ELIMINATION OF CONSTRUCTED SSO OUTFALLS REQUIRED.
CONSTRUCT 420 FEET OF 60-INCH SANITARY SEWER FOR STORAGE, AND220 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. ELIMINATECONSTRUCTED SSO OUTFALLS BP-222 AND BP-516.
ROLENS
KINGS PARKPRIVATE
C ATHEDRAL
IRONDALEASHFIELD EL PAULOASHROCK
GRAYLAND
GRAYFORDPEGASUS
BURNCOATE
PINEDALETELEGRAPH RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11919
Wastewater
15
$804,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
150Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RDAND SAPPINGTON RD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061.
§¨¦270
§¨¦270
EDDIE N PARK
SAPPINGTONGARBER
PARDEEWATSON
BAPTIST CHURCHDENNY
GRANT
LITTIE
HILLTO
PP R IVA TE
GEYERROXANNAMANDAVAUK
CRESTOAKBUXTONLAVINIAREDOAK
R O BYN
EMILHADLEY HILLRUSDO
N
VARGAS
DANDRIDGEEWERSTWILIGHTHELTA
LARKSPUR
LINCOLN
MAPLELAVANT
LINCORDFAWNHAVEN
CONCORDGOLFCREST
PICKWICKCIN NABAR
KAPPBRIARSTONE
CONCORD V IL L AG EMEAT HDEVESTEALRIDGE
GLEN
W
O
OD
CRAIGWOOD
CHARRETTE
STOLZ
LOWILL
FO
X
GLEND O VERHIL L
VALDA M E R E
TIOGA
J
O
A
N GENELMUGANSUNSETBETHSKY CRESTGLENROSE
LARKRIDGE
PINE SPRAY
SPITZRICHTER
REBECCAEGGELINGCAMBROOKD R E W
TRENTMORE
PRIVATEPRIVATE
PRIVATEGRAVOIS RDSLINDBERGHBLVD
T E S S O N FERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11990
Wastewater
15
$260,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
151Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SENECA PRIVATE I/I REDUCTION
Construction
5584 - University CityOMCI Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
OMCI BUDGET FUNDS STORM SEWERS TO BE BUILT AS A PART OF THISPROJECT.
§¨¦170
§¨¦170BROWNLACKLANDBURNSECHO
RIDGE WOODSONFLORA
MIRIAMHOODTRESCOTT GOODALEMILTONGASSTENNYSON
THEODOSIA
OLDEN
FOREST
GAEBLERLESLIEWENGLERCHARLACKSENECA
EVERMAN
SHERWOODMARLOWE
WABADAY
PALMER
ADDIEWALLISDAWESKENOSHOVERONAROMAINESPENCERCOTE BRILLIANTE HARTLANDSHELLEY
MINERVA BRASSIE
BELT WAYGOTHLANDH O L T W O O D
GRACELAND
MEADOWBROOK
APACHE
OSAGE
MASHIELEONDALEONEIDA
CEDARGLEN
SHAWNEE
DOYLE
KALEN
SIEVERS
SPENCERMILTONBURNSWABADAYWALLISWALLIS
GOODALEHOODDAWESMILTON
SPENCER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11059
Wastewater
15
$1,700,000
Overland
Lemay/RDP
University City Branch
Capital
152Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SENECA PRIVATE I/I REDUCTION
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
OMCI BUDGET FUNDS STORM SEWERS TO BE BUILT AS A PART OF THISPROJECT.
§¨¦170
§¨¦170BROWNLACKLANDBURNSECHO
RIDGE WOODSONFLORA
MIRIAMHOODTRESCOTT GOODALEMILTONGASSTENNYSON
THEODOSIA
OLDEN
FOREST
GAEBLERLESLIEWENGLERCHARLACKSENECA
EVERMAN
SHERWOODMARLOWE
WABADAY
PALMER
ADDIEWALLISDAWESKENOSHOVERONAROMAINESPENCERCOTE BRILLIANTE HARTLANDSHELLEY
MINERVA BRASSIE
BELT WAYGOTHLANDH O L T W O O D
GRACELAND
MEADOWBROOK
APACHE
OSAGE
MASHIELEONDALEONEIDA
CEDARGLEN
SHAWNEE
DOYLE
KALEN
SIEVERS
SPENCERMILTONBURNSWABADAYWALLISWALLIS
GOODALEHOODDAWESMILTON
SPENCER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11059
Wastewater
15
$2,624,000
Overland
Lemay/RDP
University City Branch
Capital
153Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STERLING PLACE SEPARATE SEWER I/I REMOVAL
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 3,900 FEET OF 12-INCH TO 30-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. PART 2 SCOPEIS TO CONSTRUCT 700 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061 AND PROJECT11927.
WEBER MACKENZIEHEEGE
VALCOURMATHILDAROCKHILL
I
VYREAVIS
ALICETONLACLEDE STATIONSTAELY
HALENEW HAMPSHIREGRAMOND
KITLUCIAVITA
TIBERAL
T
H
EAVASEL PILOTRADIOBONNIE
NIL
E
SBRENDAMAXWELLMAYLORELSA
AFFTONEDEN
ERIEELGINLANGLEY
PORTDELMA
RAMBLERNEIERASTEREVANDALEKIDDERSTERLING TALMAARDALE DARLOWCRAIGHILL
AVILAARVIN
TALBOT
LAWNSIDE
UPLAND
B ERWICK JOELG R A CE
BRINKERIDAMOR
PRIVATEL A V E R N
HOSMER
DA
R
L
E
N
E
CHESHIRE CHIVVISM ARLENEPROVOGENERALSHERMAN
ALPINE
YORKSHIRE
BIXBY
LETA CHARLTONCREEKVIEW
PONTIACMCGEEPALMETTONIGER
ZANEFORESTA TEBLUEWATER
VILLATONDEXTER
PAULINECONSULRAYWOODIRENEGRASSO JONMARHE RITA G ECYRUSAFFTON
ALPINE RADIOWEBERVASEL
ARVINVA
SEL
CHESHIRE
G R A V O IS R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11667
Wastewater
15
$3,800,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
154Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUBURBAN I/I REDUCTION (HARRISON DR ANDSUBURBAN AVE)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 780 FEET OF 12-INCH TO 15-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12473. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.MABLE5TH
HARVEYFAYS U B U R B A N
CARSON ELI
ZABETHDARST
DADEW IE G E L
P AULCLARK
GEORGIAL E E
TIFFIN
ZOE
WESLEY
EVELYNPLAZAMONROERUG G LE S
COURTNEY
GRAFJEFFERSONSCUDDER
BROTHERTON
CHURCH
LURCH
KINGWARING
GRANBERRY
HANLEY
SCOTT
MUELLERJANUARY ROBERT
ELKAN
NORFOLKSOUTHERN
HERNA IR PO R T
ROYAL
GREGORY
E N IDEATONST LOUISWITT
JONESMARI
E
L O U IS A CLAYSPRINGWARWICK
THOROUGHMAN LAURELALINE
SCHOOLWAY
P A TR IC IA
HUGO
R OBE R T A MI
LLMANFERMOJEANHARRISONMARGUERITEWULFFNEWELLBUSIEK
FAIRVIEWNANCYHENQUINGRO
V
E
WYLINRECTOR
ADELLETHOMASBEACONM
ARVINABBOTTAVILA O L IV E R
ADA MSANABELSHIRLEYABSTONROLWES
ELSIEEVERETT PARKERESTELLE
WALTERS
ALLENNAPIERMAYMEBANGERTMI
LLERNEVI
S
ROYAL
CLARKLURCH MARGUERITEA D A MS
LEEJONESCLAYCLAYWESLEY
WA R W I C K
HERNROYAL
DADETIFFIN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12222
Wastewater
15
$1,785,000
Ferguson
Bissell
Maline Creek
Capital
155Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUBURBAN I/I REDUCTION (HARRISON DR ANDSUBURBAN AVE)
Construction
5576 - Maline CreekOMCI Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 780 FEET OF 12-INCH TO 15-INCH STORM SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12473. OMCI BUDGETFUNDS STORM SEWERS TO BE BUILT AS A PART OF THIS PROJECT.MABLE5TH
HARVEYFAYS U B U R B A N
CARSON ELI
ZABETHDARST
DADEW IE G E L
P AULCLARK
GEORGIAL E E
TIFFIN
ZOE
WESLEY
EVELYNPLAZAMONROERUG G LE S
COURTNEY
GRAFJEFFERSONSCUDDER
BROTHERTON
CHURCH
LURCH
KINGWARING
GRANBERRY
HANLEY
SCOTT
MUELLERJANUARY ROBERT
ELKAN
NORFOLKSOUTHERN
HERNA IR PO R T
ROYAL
GREGORY
E N IDEATONST LOUISWITT
JONESMARI
E
L O U IS A CLAYSPRINGWARWICK
THOROUGHMAN LAURELALINE
SCHOOLWAY
P A TR IC IA
HUGO
R OBE R T A MI
LLMANFERMOJEANHARRISONMARGUERITEWULFFNEWELLBUSIEK
FAIRVIEWNANCYHENQUINGRO
V
E
WYLINRECTOR
ADELLETHOMASBEACONM
ARVINABBOTTAVILA O L IV E R
ADA MSANABELSHIRLEYABSTONROLWES
ELSIEEVERETT PARKERESTELLE
WALTERS
ALLENNAPIERMAYMEBANGERTMI
LLERNEVI
S
ROYAL
CLARKLURCH MARGUERITEA D A MS
LEEJONESCLAYCLAYWESLEY
WA R W I C K
HERNROYAL
DADETIFFIN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12222
Wastewater
15
$325,000
Ferguson
Bissell
Maline Creek
Capital
156Page
2017
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUBURBAN PUBLIC I/I REDUCTION (HARRISON DRAND SUBURBAN AVE)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
Scope of ProjectREHABILITATE 29,000 FEET OF PUBLIC SEWERS USING THE CURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12222.MABLE5TH
HARVEYFAYSUBURBA
N
CARSON ELIZABETH
DARST
DADEWIEGEL
P AULCLARK
GEORGIALEE
TIFFIN
ZOE
WESLEY
EVELYNPLAZAMONROERUGGLES
COURTNEY
GRAFJEFFERSONSCUDDER
BROTHERTON
CHURCH
LURCH
KINGWARING
GRANBERRY
HA
N
L
E
Y
SCOTT
MUELLERJANUARY ROBERT
ELKAN
NORFOLKSOUTHERN
HERNAIRPORT
ROYAL
GREGORY
E N IDEATONST
L
O
U
I
SWITT
JONESMARI
E
LOUISA CLAYSPRINGWARWICK
THOROUGHMAN
LAURELALINE
SCHOOLWAY
PATRICIA
HUGO
ROBERTA MILLMAN
FERMOJEANHARRISONMARGUERITEWULFFNEWELLBUSIEK
FAIRVIEWNANCYHENQUINGRO
V
E
WYLINRECTOR
ADELLETHOMASBEACONM
A
R
V
I
NABBOTTAVILA OLIVER
ADA MSANABELSHIRLEY
ABSTONROLWES
EL
S
I
EEVERETT PARKE
R
ESTELLE
WALTERS
ALLENNAPIERMAYMEBANGERTMILLERNEVI
S
ROYAL
CLARKLURCH MARGUERITEADAMS
LEEJONESCLAYCLAYWESLEY
WARWICK
HERNROYAL
DADETIFFIN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12473
Wastewater
15
$2,615,000
Ferguson
Bissell
Maline Creek
Capital
157Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY I/I REDUCTION - EAST (UR-10)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12438.
§¨¦170
§¨¦170
PAGEHANLEY
CANTONWOODSONTERMINAL
L A C K L A N D
BROWNNORTH N SOUTHBURNS82NDWALTONG R OBYPURDUE81STLYNN
RIDGE
U N ION PACIFIC RAFTGOODALEMONR
O
E
ECHO
WAYNE
HILLTOPQUENDOAHERN LAMB78THPRICE
BLOO
MGAEBLERNOLAALBIN
LIBERTY MALLARD
B
RADDOCK
A
L
E
R
T
WATTSELMORE GILROSEWENGLERGRANTBRISTOWEADS
RICHARDBELTW AY TITUS
S
H
E
RID
A
N
MCKNIGHTUT
I
CASENECA
MENDELLMEYERMILAN
WELLINGTONGULFSHERWOODMARLOWE NIXONVINITAADDIEPICKER I N GMINERVA
PRIVATECARSONWILS O NLINK KENOSHOMILTONFARISR A C IN E
ELLERTON
FAIRVIEWALLEN
HARNE Y ASHLANDWINFIELD
CARLETONBRASSIE
MERIDIAN
RABEFULLERTONPENNELL
BRADFORDHAFNERHOW
MELROSE
SHELLBARK
VILLA
IROQUOISLEONDALE
REAR
MILLET
TABER
LOCUST
PARK
NOEL
BLANCHA
PUTTERERI
THKALEN
BURNSMILTONWAYNE
PRICEPRICEMELROSE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11983
Wastewater
15
$373,000
Various
Lemay/RDP
University City Branch
Capital
158Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-08 AND UR-09)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
REHABILITATE 70,800 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11984.
§¨¦170
§¨¦170
PAGE
DELMAR HANLEYCANTON
TERMINAL
82NDWOODSONRIDGE
GROBY NORTH N SOUTHCORNELL
MIRIAM
MCKNIGHTU N I O N P A CIFIC
OLD BONHO
MME81STLYNNWALTON
SHAFTESBURY
LE PEREPRICEWAYNE
TEASDALE
MONROE
HILLTOPLAFON
GANNON
AHERN LAMB78THWILSON
B
RADDOCK
A
L
E
R
T
ELMORE
DREXELGRANT
BERICKRICHARDBELT WAY
BURNSS
H
E
RID
A
N
GAYMENDELLMILAN
AMHERST GULFBLOOM
BARBYENFIELDPICKERINGBON AIREPRIVATELINK
BALSONSPENCERSPOONFAIRVIEWWELLINGTON
HARNE Y
BELL
CARLETON
TULANEBRASSIE
GARFIELD
BON HILLS RABEFULLERTONPENNELL
GEOFFRYHAFNERHOW
BUCHANAN
WASHINGTON
MELROSEELBRING
DUKEDELCRESTRYE LAUGHLINCRIXDALE
VILLA
IROQUOIS CRYSTALSTANFORDELKINGTONSAXONYWATSONIA
LOCUST BLANCHA
PARAMOUNT
ANNAERI
THPRIVATEPRIVATE
VILLA
P
R
I
V
A
T
EPRICE BALSON
PAGE
PRICEHARNEYWAYNE
GAYOLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12437
Wastewater
15
$5,500,000
Various
Lemay/RDP
University City Branch
Capital
159Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-10)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGED SEWERS, AND ACTIVATING CONSTRUCTED SSOS.
REHABILITATE 32,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11983.
§¨¦170
§¨¦170
PAGEHANLEY
CANTONWOODSONTERMINAL
L A C K L A N D
BROWNNORTH N SOUTHBURNS82NDWALTONG R OBYPURDUE81STLYNN
RIDGE
U N ION PACIFIC RAFTGOODALEMONR
O
E
ECHO
WAYNE
HILLTOPQUENDOAHERN LAMB78THPRICE
BLOO
MGAEBLERNOLAALBIN
LIBERTY MALLARD
B
RADDOCK
A
L
E
R
T
WATTSELMORE GILROSEWENGLERGRANTBRISTOWEADS
RICHARDBELTW AY TITUS
S
H
E
RID
A
N
MCKNIGHTUT
I
CASENECA
MENDELLMEYERMILAN
WELLINGTONGULFSHERWOODMARLOWE NIXONVINITAADDIEPICKER I N GMINERVA
PRIVATECARSONWILS O NLINK KENOSHOMILTONFARISR A C IN E
ELLERTON
FAIRVIEWALLEN
HARNE Y ASHLANDWINFIELD
CARLETONBRASSIE
MERIDIAN
RABEFULLERTONPENNELL
BRADFORDHAFNERHOW
MELROSE
SHELLBARK
VILLA
IROQUOISLEONDALE
REAR
MILLET
TABER
LOCUST
PARK
NOEL
BLANCHA
PUTTERERI
THKALEN
BURNSMILTONWAYNE
PRICEPRICEMELROSE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12438
Wastewater
15
$2,200,000
Various
Lemay/RDP
University City Branch
Capital
160Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY SANITARY STORAGE FACILITY(HAFNER CT)
Land Purchase
6660 - SanitaryReplacement Fund
SANITARY STORAGE IS NECESSARY IN THE UNIVERSITY CITYWATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENTFACILITY DURING WET WEATHER EVENTS.
CONSTRUCT A 9 MILLION GALLON STORAGE FACILITY, PUMP STATION,AND COLLECTION SEWERS.
§¨¦170
82NDGROBY
CANTON
TERMINAL
81STNORTH N SOUTHWAYNE
MCKNIGHTWOODSON78THAHERN
B
R
A
D
D
O
C
K
SHAFTESBURY
ELMORE
APPLETON
GRANTRICHARD
S
H
E
RID
A
N
ORCHARD MENDELLTRENTON
LYNN
MILAN
GAYM
O
N
AKEMPLANDC
O
O
LID
G
E
WILSHIREFAIRVIEWHARRISON79THDREXELEASTOVERRAISHEROLDBONHOM
M
E WESTOVERFULLERTON
HAFNERARCHER
HOWMOUNT OLIVEPOLKGLENSI
DELAUGHLINCARLETON
SEVILLE
CRIXDALE
AL
A
NSON ALBEYMONTREAL
FAIRHAM
MELROSELYNDALE
MULBERRYBLANCHA
PARAMOUNT
LAUGHRENMORGAN
HAWTHORNE
REMLEYERI
THPARK
WA
Y
BRIAR
BRADDOCK
WAYNE
MILAN
COOLIDGE
DREXE LMENDELLOLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11992
Wastewater
13
$3,700,000
University City
Lemay/RDP
University City Branch
Capital
161Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION A
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALLBP-305.
Comments/Remarks
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FY 17. TOTAL CONSTRUCTION BUDGET IS$16,600,000.HARVEYBERMUDAWOODSTOCK
NORF
O
L
K
S
O
U
T
H
E
R
N
PAUL BARATCARSON
SUBURBA
N WIEGEL
FERG
U
S
O
N
DARST
DADEGEORGIAWESLEY CLARKLEE
EVANS
TIFFIN CLAYKIRK
HILL
HALEYRUGGLES
DUPREEBLANDINGELIZABETH ROYCEFORESTWOODBROTHERTON
CHURCH
HILLSHALPIN
CA STR O
HAWKESBURY BRA N D
HIGHMONT
ELKAN
GRAF HERNBEHLEPAYNEEDGE
H
I
L
L
WELEBAST
L
O
U
I
S
LOUISA
ROWLESSPRING RENSHAWHARTNETT
PATRICIA
ROBERTA
FERMOHARRISON
FEN
WICKEMERALDDARTMOORMARGUERITEOAK MEADOWCRE
S
TELMDALE
RED
M
O
N
D
FAIRVIEWGRO
V
E
LAURETTEWYLINPRIVATETHOMASMA
R
V
I
N
LAGONDASCHLUETEROLIVER
ADA M SANNEX
ANABEL
HASTING DAMESANITA
GOD
FREYF A LMOUTHEL
S
I
E
WEEKSESTELLE
TILFORDBRUCENORINE WILLMANNMILLER
TUXEDOHERNDADE HIG H M O N TCLARKTIFFIN
LEEADAMS §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10026
Wastewater
15
$9,100,000
Ferguson
Bissell
Maline Creek
Capital
162Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEST WISE I/I REDUCTION (NW QUAD I-64 ANDBIG BEND BLVD)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
CONSTRUCT 5,000 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11851.
§¨¦64§¨¦64
DALE
WISE
CLAYTON
BOLANDCLAYTONIAPARK
ETHEL
HOOVER
LILE
LOVELLAMOO RLANDSCROMWELL
ARCHBENNETTRALPHLACLEDESTATIONCENT
E
R
SOUTHOAKKNOLLHILLSIDEARTHUR RI
DGEMOORWARNERBROADVIEWGISSLERAUDUBONEDWARDHARTERSURREY HILLSHILLV A LESOMERSET
HIGHLANDMURPHYCRESTWOODBROOKLINE
PRIVATEOAKLAND
C L A VERACHWOODLANDT US CANYCOMMODOREARGUSWISE
WARNER
WOODLAND§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11965
Wastewater
15
$5,700,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
163Page
2017