Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ADAMS I/I REDUCTION (SOUTHEAST OF I-270 ANDDOUGHERTY FERRY RD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 355 FEET OF 8-INCH SANITARY SEWER, AND PERFORMPRIVATE I/I REDUCTION ON 82 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12027.
§¨¦270
§¨¦270
BALLASA DAMS
U N IO N P A C IF IC
C R A IG
ANN
COUCHBOAZ
LARK
EDNADOUGHERT Y F E RRY
ESSEX
DES PERESCRESTHIG
H
L
A
N
D
RIETH
NIRKIRIS
FRIEDAALTUSNELDABACHRAYNER
JANET
WESTVIEW
THURSBY
LINDEMAN
GLENWOODOLDB IG BENDCOULTER GRANDVIEW
WOODBINE
BRIARGATE
VIRGINIA ROSE HILL
SH ARICUL
LODENRI
F
L
ERANGE
GABR IE L
S O M M E TWI
LDWOOD
GRASSY RIDG EWINDY HILL
A PP L E H IL L
PRIV
A
T
E
DUBOISMEYERBRYANTHORNCLIFF PORTERBALLAS
BAC
H
UNIONPACIFIC
WOODBINE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12073
Wastewater
11
$180,000
Kirkwood
Meramec
Grand Glaize Creek
Capital
1Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISCHOFF - EDWARDS TO MARCONI COMBINEDSEWER RELIEF
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND STREET FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 1,300 FEET OF 12-INCH TO 72-INCH STORM SEWER.
WILSON
BISCHOFF
MARCONIEDWARDSMACKLINDDAGGETT
ELIZABETH
UNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12478
Wastewater
11
$300,000
St. Louis City
Bissell
Tower Grove-Manchester
Capital
2Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$788,000
Various
Various
Various
Asset Management
3Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2017)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMSAND QUANTIFY REQUIRED REPAIRS/IMPROVEMENTS AND CLEANING.
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OFSELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11999
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
4Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CELLA - ROLLING ROCK - GLEN CREEK SANITARYSEWER AND PUBLIC I/I REDUCTION
Design Services
6660 - SanitaryReplacement Fund
DEFICIENT NON-STANDARD 6-INCH AND DEFECTIVE 8-INCH SEWERSCONTRIBUTING TO BUILDING BACKUPS AND SANITARY SEWEROVERFLOWS.
CONSTRUCT 9,200 FEET OF 8-INCH SANITARY SEWER TO REPLACEDEFICIENT 6-INCH AND 8-INCH SANITARY SEWER.
§¨¦64
§¨¦170
LADUE
LAYMCKNIGHTPRICEC LA Y TO NWARSON BARNESSOUTHFORTY CELLAKENTMCCUTCHEONROANOVERHILLS
G L E NEAG L E S
B RAEBUR
N
DANIELSW A N
ST A N DREWSGODWI N
EAGER
YO RKCONWAYLITZSINGER MAGNOLIALINDWOR T H
DROM
A
RADIELMANSPRINGWOOD
P IC A RDY
INDIANLOG CABINCLE R MO N T
LAWNHIGHDOWNWINDINGRIDGE
TWINSPRINGS ROLLINGROCK BERKLEYMAYFAIRWARRIDGEPRIVATERAUSCHERTIRRILL FARMSAPPLE TREEFORDYCES A R A NACRANDELAYEXMOORLORENZOD E E R CREEK
DEER CREEK WOODS CANARYPAXTON
PRIVATE
PRIVATE
PRIVATE
YORK
LITZSINGER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11917
Wastewater
11
$650,000
Ladue
Lemay/RDP
Deer Creek
Capital
5Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CITYSHED MITIGATION PROGRAM DESIGN(CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE CITYSHED COMBINED SEWER SYSTEM CAUSINGSURFACE FLOODING AND BUILDING BACKUPS.
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDEINFRASTRUCTURE SUCH AS SOFT SEPARATION, GREENINFRASTRUCTURE, SEWERS, STRUCTURES, AND DETENTION BASINS.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS PROJECTS,INCLUDING BUT NOT LIMITED TO 11786, 11862, 11863, 11135, 11141, 11143,11828, AND 11142.
§¨¦70
§¨¦270
§¨¦64
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12693
Wastewater
16
$400,000
St. Louis City
Various
Various
Asset Management
6Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CITYSHED MITIGATION PROGRAM DESIGN(CONTRACT B)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE CITYSHED COMBINED SEWER SYSTEM CAUSINGSURFACE FLOODING AND BUILDING BACKUPS.
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDEINFRASTRUCTURE SUCH AS COMBINED SEWER CONSTRUCTION ANDREPLACEMENT, SOFT SEWER SEPARATION, AND STORM SEWERCONSTRUCTION AND STORAGE.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS PROJECTS,INCLUDING BUT NOT LIMITED TO 12478, 12479, 12702, AND 10756.
§¨¦70
§¨¦270
§¨¦64
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12694
Wastewater
16
$50,000
St. Louis City
Various
Various
Asset Management
7Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAYTONIA CREEK SANITARY RELIEF (HAMPTONCREEK TRUNK SEWER TO CLAYTON ROAD)
Pre-Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALLS REQUIRED.
CONSTRUCT 6,900 OF 18-INCH TO 48-INCH SANITARY SEWER. ELIMINATECONSTRUCTED SSO OUTFALL BP-605.
§¨¦64§¨¦64
DALE
WISEHANLEYCLAYTON
BRUNO
BELLEVUEME
T
R
O
LIN
K
ETHEL
BOLANDYORK
CLAYTONIAHOOVER
PARK
WI L L I A M S YALELACLEDE STATIONPRIVATE
DEMUNAUDUBONBYRON
HIGHLANDHICKS
DAVIS OXFORD
ALAMO
EAGER
ALICIA
D
E
L
N
O
R
TE
R U PERT
LILE
ELINOR
ABERDEEN
H I LLVALEMcCAUSLANDLOVELLAMOO RLANDSPARKDALE
WESTWOODHAMPT
ON
P
ARKCROMWELL
ARCHSOUTH
HIGH
POLO
WELLINGTON
GOFF
BUCKINGHAM
RANKEN
B
UC
K BROADV
I
E
WHIAWATHA
PRINCETONBENNETTCOLLINSRALPHNASHVILLE
RANKINJONES LA VETA
BREDELLWESTONHAN
L
E
Y
IN
D
US
T
R
I
ALBEMISTON HILLSIDESNOWDON
ST ALBANS DARTFORDMITCHELLST RITAWARNER
SUNSETBLENDONDELTAEDWARDHARTER
BEULAHSAN BONITA
EL MOROCONCORDIAHARCOURTBARGERSOUTHMOOR
WOODMONT ARCHIVESDUMAS
ARGUSWOODLANDOAKLAND
YALEALICIA PRIVATEBLENDONYALEM
ET
R
O
L
I
NKWARNER DE MUN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12124
Wastewater
11
$160,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
8Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER UPSTREAM PUMP STATION (P-180)STORAGE
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION P-180 HAS INSUFFICIENT CAPACITY FOR THE 5-YEARSTORM, AND DOES NOT HAVE PROVISIONS FOR EMERGENCY STORAGE.
CONSTRUCT 500 FEET OF 96-INCH PIPE IN ORDER TO PROVIDE 180,000GALLONS OF TEMPORARY STORAGE.
S IL V E R F O X
E P P IN G H AMWILD FOXD
U
N
S
T
O
N
EJANETLOST FOXSEDGEMOO RFOX CHASE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12126
Wastewater
11
$200,000
Unincorporated
Coldwater
Coldwater Creek
Capital
9Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLERDP AREAS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDMAN C H EST E R R D
W A T S O NRDCHIPPEWABLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$2,400,000
Various
Lemay/RDP
Various
Asset Management
10Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNELSYSTEM AND UPPER RDP TUNNEL SYSTEM.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦255
§¨¦170
§¨¦55
§¨¦44 §¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$6,800,000
Various
Various
Various
Asset Management
11Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CONSTRUCTION OF STORAGE TANKS AND PUMP STATIONS, ANDTREATMENT FACILITY IMPROVEMENTS.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUTTHE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$5,500,000
Various
Various
Various
Asset Management
12Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COUNTY TREATMENT FACILITY DESIGN(CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
TREATMENT PLANTS IN ST. LOUIS COUNTY ARE IN NEED OF VARIOUSIMPROVEMENTS TO REPAIR AGING AND DETERIORATED FACILITIESAND MAINTAIN PERMIT COMPLIANCE.
DESIGN COUNTY TREATMENT FACILITY REPAIRS AND IMPROVEMENTSTO INCLUDE ITEMS SUCH AS SWITCHGEAR REPLACEMENT, REPAIRS TOTANKS, BUILDINGS, AND INFLUENT SCREENS, SLUDGE PROCESSINGIMPROVEMENTS, AND PROCESS BUILDING ADDITIONS.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS PROJECTS,INCLUDING BUT NOT LIMITED TO 12495, 12708, AND 12725.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12727
Wastewater
16
$50,000
Various
Various
Various
Asset Management
13Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CREVE COEUR CREEK SANITARY TRUNK SEWERRELIEF PHASE VI (SKME-021)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 7,750 FEET OF 15-INCH TO 24-INCH SANITARY SEWER.ELIMINATE CONSTRUCTED SSO OUTFALLS BP-036 AND BP-037.
S
C
H
O
E
T
T
L
E
R
ISLEVIEWS
T
R
A
U
BCOUNTRYRIDGECEDARMILLPRIVATE
C LAYTON
WHITE LAN E
S
C
H
O
ETTLER
V
A
LLEY
GOLDEN RAIN
GRANT L E Y
SUM M E R LAKE
H IG H CROFTMIL L S P R IN G
R IDGE LA K E
G R E E N L E AFVALLEYSTRO LLWAYS
STRAUB HILLPARAS
OLL
A
KECLAYSUMMERRIDGE
SILVER
W
O
O
D ROYALBROOKSQUI RES W A Y
CLAYMILLS
NA
R
R
O
WSMAN ORR I D G E
PINE RUN
C H E Q UERBROO K HILLC H A M IS A LH
O
N
E
Y RID
G
ECOUNTRYMILL
W O O D S B L U F F
C R ATER
P H E A S A NTHILLTWINGATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11729
Wastewater
11
$760,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
14Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT (2017)
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS PROJECT INSPECTION, RECONNAISSANCE,INSPECTION PRIORITIZATION, PROJECT SET-UP, FIELD VERIFICATION,MAP UPDATES, WORK ORDER MANAGEMENT, AND CCTV VIDEOREVIEW. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ONPERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12720
Wastewater
16
$1,200,000
Various
Various
Various
Asset Management
15Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2018)CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 78,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12186, 12327, 12362,AND 12363.
§¨¦270
§¨¦64
§¨¦44
§¨¦170
§¨¦64
§¨¦270 §¨¦170 OLIVEBLVD
S LINDBERGH BLVDWATSONRDN KIRKWOOD RDN LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12039
Wastewater
11
$80,000
Various
Lemay/RDP
Deer Creek
Capital
16Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTED SSOOUTFALLS REQUIRED.
CONSTRUCT 20,000 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $216,000,000.PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦44
§¨¦64
§¨¦170
§¨¦170
DALE
M
E
T
R
OLI
N
K
CLAYTON
PINELAY
ELMU N IO NPACIFICFOLKMCKNIGHT
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEBRENTWOODHANLEYKIRKHAMPERNOD
DAVIS
ETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHA
EULALIE
GLENFYLERCLAYTONIA
LEE
ARUNDEL
EUCLID
SWAN
PAR KLITHIA
PACIFICFOREST
ABERDEEN
LOUISDELNORTEPLATEAU
WILL IA MS
ALAMO
MARDEL
MADGE
HANCOCKMCCUTCHEONWISE
ARSENALFLORASALEMB
U
C
K
HICKSWRENWOOD
ST CLAIRMARYGOR
E AUDUBONBRUNO
FAIRVIEW M A NHATTANPRATHERBARTOLDRUSSELL
YEATMANROCK HILLEA G E R
ROSE
FLORENCE MARTINIOXFOR D
GODWI N
C O M M ONWEALTHMOORLANDSY ORKBACON LYLEDESPERESANNA
WAYMIRE SOUTHELLSWORTH
JAMES
SUFFOLKMAPLE
PRIVATE
CIRCLEARLINGTONCOLLINS
GREELEY ECOFFKUHLMAN
ARBOR
HALIFAX
PORTERHORNER
WARNER
B E R R Y RICHERTHATTONSANBONITA
OAKLAND
GLENWISE
UNIONPACIFIC FORESTELM
OXFORD
EAGER PRIVATEMARYWHITE
YORK
M AN C H E S T E R RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
17Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ENGELHOLM AND PARK SANITARY RELIEF(SPENCER PL TO LEADALE DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTED SSO OUTFALLSREQUIRED.
CONSTRUCT A 1 MILLION GALLON SANITARY STORAGE TANK, 5,100FEET OF 12-INCH TO 36-INCH SANITARY SEWER, AND A WET WEATHERPUMP STATION. ELIMINATE SSO OUTFALLS BP-451 AND BP-621.METRO LI
NKMARKET
70THPENNSYLVANIAFERGUSONLEADALE
LUCASNHUN
T
TEAL
KINGSLANDMARILLACHILLSDALENORMANDY
SALERNOLEROYLULUPARK LINCOLNH
AYWOOD
RUDDYCOLFAX PRIVATEGREENDA LEMAINL UDWIGGRAND
MYRON
VASSIERMALLARD ENGELHOLMCORYATWATER
BALFOUR
CURTIS
CASTLEPARK
METRO LI
NKSALERNOFERGUSONLUCAS N HUNTST CHARLES ROCK RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12163
Wastewater
11
$1,480,000
Pagedale
Lemay/RDP
University City Branch
Capital
18Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FERGUSON SANITARY SEWER (OLIVE TO PAGE)(DIAMOND PARK)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS. ELIMINATION OFCONSTRUCTED SSO OUTFALLS REQUIRED.
CONSTRUCT A 2 MILLION GALLON SANITARY STORAGE TANK, PUMPSTATION, AND COLLECTION SEWERS.
PAGETERMINAL
FERGUSONJULIANPURDUEHANLEYPENNSYLVANIACANTONRAFT ROBBINS
PARTRIDGEQUENDOPLYMOUTH
MALLARD
WATTSUTICALYNN
MEYERMILAN
TEAL
MELROSE
ROBERTSWALDRONRAYMOND
CORBITTNIXON KINGSLANDDUSKY
MADISON
WELLINGTON FARISR ACIN E
BACKERBELRUEMO
N
R
OELEROYWILSO N GEORGEFALCONPRIVATE
W A YNE
COLBYLIBERTY
H
AYWOOD
RABEDOVERBRADFORDVERLBALFOUR
H AZELWOOD
BUCKNERRUDDY
PURCELLSCHOFIELDIONACARLETONWOODR UFFMILFORDWILLOWTREE
BURCHGRIEFIELDCA MDENMIDLANDMOOREBAINBRIDGEWHITE OAK
NORFOLKSOUTHERN
A
L
LE
N
GREEN LARCHELTORA
PRIVATE
MELROSE
MELROSE
PRIVATE
MILAN LEROYPRIVATE
PLYMOUTH
PRIVATE
MALLARD
PRIVATE
PRIVATE
ROBERTS
LYNN
OLIVEBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11737
Wastewater
11
$800,000
Various
Lemay/RDP
University City Branch
Capital
19Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING AND MONITORING (2017)
Vendor Services
1101 - General Fund
COMPUTER MODELING OF THE SEWER SYSTEM REQUIRES FLOW DATAIN ORDER TO BE ACCURATELY CALIBRATED TO FIELD CONDITIONS.
CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATERSYSTEM TO COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEMRESPONSE DURING WET WEATHER EVENTS. THIS INFORMATION WILLBE USED TO CALIBRATE HYDRAULIC MODELS TO DETERMINE IFPROJECTS ARE REQUIRED.
SERVICES MAY BE RENEWED THROUGH FY2019 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12759
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
20Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FORDER SANITARY INTERCONNECTION (FORDERRD TO RINGER RD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 100 FEET OF 10-INCH SANITARY SEWER.
FORDER
RI
NGERFORDERR ID G E
PATIO
RING FORD
S
AJAKEE
D
FORDER CROSSI
NGFORDER OAKSTIFFANY TRAILFORDER MANORFORDER CIRCLEFORDER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12180
Wastewater
11
$58,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
21Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FRONTENAC, WINDING RIDGE, DEER CREEK HILLI/I REDUCTION (S QUAD I-64 AND CLAYTON RD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 30 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.
§¨¦64CLAYTON
GEYERSPOEDEOLD WARSON
T R ENTWARSONSOUTHFORTY
LITZSINGER
DANIELCELLAKENTBARNESROANOVERHILLS
D E N NY
HICKO R Y
CH IPPE R MAGNOLIACONWAYSPRINGWOOD
ARTHUR
P IC A RDY
WIND I N GR I D G E
INDIANLOG CABINOVERBROOKHI
GHDOWNP RIV AT E
TREGARON
ANZEIGER
TWINSPRINGS R
OLLINGROCKMAYFAIRWARRIDGELYLEWOOD
NORTH FO R TY
RAUSCHER
DUNLEIT
HTIRRILL FARMSOAK BENDDWYERLEAGRAMW OODACREOAK GATE
CAPITOL
D E E R CREEK
L Y N N B R O O KPRIVATEPRIVATEPRIVATE
PRIVATE
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12186
Wastewater
11
$150,000
Ladue
Lemay/RDP
Deer Creek
Capital
22Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2016)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNALSTAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDEDSERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11752
Wastewater
14
$250,000
Various
Various
Various
Asset Management
23Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT A
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11753
Wastewater
11
$50,000
Various
Various
Various
Asset Management
24Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT B
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11754
Wastewater
11
$50,000
Various
Various
Various
Asset Management
25Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT C
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12064
Wastewater
11
$50,000
Various
Various
Various
Asset Management
26Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2016)
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11760
Wastewater
11
$300,000
Various
Various
Various
Asset Management
27Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT A
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUTTHE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAYBE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11779
Wastewater
11
$90,000
Various
Various
Various
Asset Management
28Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUTTHE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAYBE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11780
Wastewater
11
$90,000
Various
Various
Various
Asset Management
29Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT A
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11764
Wastewater
11
$50,000
Various
Various
Various
Asset Management
30Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT B
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12394
Wastewater
11
$50,000
Various
Various
Various
Asset Management
31Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT C
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12395
Wastewater
11
$50,000
Various
Various
Various
Asset Management
32Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT D
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12405
Wastewater
11
$50,000
Various
Various
Various
Asset Management
33Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT E
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF RENEWAL MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12406
Wastewater
11
$50,000
Various
Various
Various
Asset Management
34Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GEYER SANITARY RELIEF AND WINDSOR SPRINGSP-521 STORAGE (BIG BEND BLVD TO WINDSORSPRINGS DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 6,020 FEET OF 6-INCH FORCEMAIN AND WINDSOR SPRINGSPUMP STATION UPGRADES, AND PERFORM PRIVATE I/I REMOVAL ON 11PROPERTIES.
§¨¦44 §¨¦44 GEYERFORESTLEMP
WILTONORCHARDC R A G W OLDB U R L IN G T O N N O R T H E R N S A N T A F ECOUCH G R A ND
MARYHURSTDEANE
PRIVATE
S UNSET H IL LS
WINDSOR
MONICA
MIDWAY
MARCO OAKSHIREWINDSORSPR IN G
GRANDVIEW
FOREST GLEN
S U N S E T O F F IC E
GEYER FOREST
PROSPECT
TAYLORFLORALEA
ASHWOOD
STATION BENDHUTHMAKEREASTVIEWBOXWOOD
MIDWAY
S KIRKWOOD RDWATSON RD
M O 3 6 6 H W Y S KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12175
Wastewater
11
$578,000
Kirkwood
Lemay/RDP
Gravois Creek
Capital
35Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE SLUDGE ODOR REDUCTION
Design Services
6660 - SanitaryReplacement Fund
SLUDGE DISPOSAL AT LANDFILLS IS BEING RESTRICTED DUE TOSLUDGE ODORS.
CONSTRUCT SLUDGE HANDLING FACILITY TO REDUCE ODORSTHROUGH ENHANCED PROCESSING OF SLUDGE.
WESTERMAN
SPINDLE
PRIVATEAPPLE TREEGRAND GLAIZET W IN L A K E S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12725
Wastewater
11
$620,000
Valley Park
Meramec
Glaize Creek
Capital
36Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF BUILDING, SWITCHGEAR,TANK AND SCREEN REPAIRS
Design Services
6660 - SanitaryReplacement Fund
BUILDING AND TANK DETERIORATION, AND SWITCHGEAR AND SCREENRELIABILITY ISSUES.
CONSTRUCT REPAIRS TO ADDRESS BUILDING SETTLING, TANKDETERIORATION, SWITCHGEAR PROBLEMS, AND INFLUENT PUMPINGSTATION SCREEN ISSUES.
WESTERMAN
SPINDLE
PRIVATEAPPLE TREET W IN L A K E S
GRAND GLAIZE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12495
Wastewater
11
$700,000
Valley Park
Meramec
Grand Glaize Creek
Capital
37Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYRELOCATION PHASE VI (BUCKLEY RD TO UNIONRD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 2,425 FEET OF 54-INCH SANITARY SEWER, 350 FEET OF8-INCH SANITARY SEWER, 9 MANHOLES, AND 2 ACCESS STRUCTURES.ELIMINATE CONSTRUCTED SSO OUTFALL BP-588.
§¨¦55
§¨¦55
WILLUNION CAMINOJACINTOSUNRISE WAY
BUCKLEYPECANVIA M I R ALESTABANISTERCOACHELLA
DILLONCALEF BURBECKFAIN
TAHQUITZ
MELONBIRCH
RO DAPA
COLONY GARDENS GENECAUSEWAYHENZLER
CAROUSELINWOOD
THREE ACRESGREENP
A
R
K
CHANUTEREDLAND
S
C
H
L
O
GLDARDING
PARK HILL
SHORESSOUTHER
N
AIR
E
M A N G ROVECOPENHAGENUNION TERRACE
BUCKLEYBUCKLEY
BUCKLEY
LEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11766
Wastewater
11
$445,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
38Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTED SSOOUTFALLS REQUIRED.
CONSTRUCT 9 MILLION GALLON SANITARY STORAGE FACILITY TOSTORE WET WEATHER SANITARY FLOW TO MITIGATE SURCHARGING.ELIMINATE CONSTRUCTED SSOS BP-588 AND BP-599.
PARDEE
GRANT
ARBANLODGEPOLEHEATHERFLAMINGOBLACKTHORNB
ROOKVIEW
RIDGEWOOD
PR IV ATELURLINE LOUWHITECLIFFPARKPI
N
E
WOOD
ROYAL ARMS
WA T SO N INDUSTRIAL
SILVER C RESTOLD WATSONBUX TON LA
NTANA
M A R Y GLEN
TRE L A N E
ULYSSESM
A
D
EIR
A
SIGNATURE
C
A
MELOT
PRI V ATE
P
RIVATE
PRIVATEP
RIVATE
PRIVATEGRA
NT
PR IVATE
PRI
VATEPRIVATEGRANTPRIVATE
W A TSO N R D§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
11
$2,800,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
39Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GREEN PARK AND LAKESHIRE I/I REDUCTION(TESSON FERRY RD AND GREEN PARK RD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 28 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12510.
§¨¦55
§¨¦270 §¨¦55 UNIONMACKENZIEMUSICKGRANT
WILLCONCORD
H
ALEGREEN PARK
BURLINGTONNORTHERNSANTAFEIONEP R IV A TE
BAPTIST CHURCHWEBER
PARDEELITTIE
I
VYREAVIS RADIOALICETON
REAVISBARRACKS
ELISE
CORDESRIPA
THEISS TESSHIRE
MUELLERRADIOMKIT
KOHRSLUCIAFORMANVAUK
FAIN
ANTIGOLEN O R
TESCORDTIBERL EMONAALTHEA
DORSIE
VARGAS
VASEL
FLORIALIX SPOKANEJEFFLEIGHCAMINOMAYOBONNIE
LANZINZER
FARADAY BRENDABUFFTON
LINCORDAFFTONGARBEREDEN
SAKURA
JOSSEJAN
PECANYUM A
MEA T H W OLFFPICKWICKBUCKLEYDANALARKINCONCORD V ILLA G E
EVANDALEMCNAR
YFIVEOAKSBULL RUN
PAPOOSEWIL BESSTOLZ
SONATAB
ELLEWOOD
PANCHO
J A D E F O R ES TEIFFEL
BANISTERGENELMALUS
ARVIN
SOLARFABICK MADAFORDWILLDAN WAYNEJUENGEL
OPAL
LOIS
LETA
SAXONLAVINIA GENEL A R KSPUR
BUCKLEYWEBER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12372
Wastewater
11
$500,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
40Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -TRUNK SEWER REHABILITATION
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 109,900 SQUARE FEET OF SHOTCRETE LINER, 1,240 FEET OFCIPP LINING, AND 6,400 SQUARE FEET OF SPOT REPAIRS, ALONG 7,000FEET OF 8 TO 12 FOOT DIAMETER SEWER.TERMINALKIENLENBELTCLARAST LOUISGOODFELLOWMYRON
BURDSEMPLEWABADA
WELLS
TERRY
ARLINGTONGREERDARBY
HODIAMONTTHEODOSIA
MAFFITT
LABADIE
UNIONPAGE MORTONGARY67TH69TH68THELWARDKEMPMAYWOOD
LOTUS
RIDGE
HERBERT
MOUNT
ABNERBROW N
ELLA EDMUNDF
E
RRIS
GLENMORE
VALLESALZMANLENOX ERICKDERBY
WELLSMAR
PALMCRESCENTPERRYHAMILTON
IRVINGPINE GROVEOGDENLESCHEN
HIGHLAND
HOBART
VETTER
LINDELLKENNERLY
ROWANDARDENNECHERRYMCA
RTHURDRE
SSELL
GRIMSHA
W
WOODROW
PRIVATEOAKDALEOVERLEAROSEBUDARDENMYRTLECAPEHART
WELLSTONLAURELASHLAND
CREST
ONCOTE BRILLIANTE SIEMERSIDADALE
MOLL ROWANLOTUS
PRIVATE
ASHLAND
WABADAWELLSTON
WELLS HAMILTONCHERRYRIDGE
T E R M IN A L
KENNERLY
ELLA
ASHLAND
TERRY
HIGHLAND
RIDGE CRESCENTOGDENRIDGE
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11800
Wastewater
11
$440,000
Various
Bissell
Bissell
Capital
41Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARRISON SANITARY RELIEF (GRAND AVE TO WROSE HILL AVE)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 700 FEET OF 18-INCH SANITARY SEWER.
LEE
ROSE HILL
G R A N DHARRISONCLAYMIDWAY
B U R L IN G T O N N O R T H E R N S A N T A F E PROSPECT
ASHWOOD MINNIECLAYBINE
BO X E L D ERCOLLEGE
ROLLINGWOOD MIDWAY
HARRISONB U R L IN G T O N N O R T H E R N S A N T A F E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12298
Wastewater
11
$90,000
Kirkwood
Lemay/RDP
Gravois Creek
Capital
42Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HERMITAGE SANITARY RELIEF (SKME-615)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS. ELIMINATION OFCONSTRUCTED SSO OUTFALLS REQUIRED.
CONSTRUCT 3,500 FEET OF 12-INCH TO 18-INCH SANITARY SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALLS BP-181, BP-333, BP-343, AND BP-555.
GEYER
EASTCHIPPER
DIVOTCOUNTRYSIDE
PORTLAND
FIRETHORNF O X RUN
FOX RIDGE
H ICKORYHUNTLEIGHWOODSWILLOWLEAFOUTER LADUE
COACH N FOUR
PRIVATESTEEPLECHASE
HERMITAGEHILL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10863
Wastewater
11
$500,000
Frontenac
Lemay/RDP
Deer Creek
Capital
43Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$106,900,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
UNIONPACIFICKOCHRIVERKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFORDER CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFR IN G E R
SHER ID A NPOTTLE
ORIENT
RIPA
LUNAPOPLAR
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHORN
JEFFERSONIAN
PAULE
HAL S EYFIRSTPECAN
A
SHROCK
JACINTO
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALLEN
LISIE
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
11
$410,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
44Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JENNINGS STATION ROAD / NORTH BADEN BASIN
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS, OVERCHARGED SEWERS, AND FLOODING.
CONSTRUCT DETENTION BASIN, 185 FEET OF 12-INCH TO 48-INCHSTORM SEWER, AND RAIN GARDENS.JANETHELENHARNEYGAYLORDJENNINGS STATIONPRIVATEPAISLEY
HODIAMONTMANETTEROSLYN
MINNIE
BRANDON
GREENHAVEN GLENBOROGREENHAVEN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11142
Wastewater
11
$400,000
St. Louis City
Bissell
Baden
Capital
45Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LAY RD - GALLERIA I/I REDUCTION (CLAYTON RDAND LAY RD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 37 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.
§¨¦64
§¨¦170
§¨¦64 LAYCLAYTON
MCKNIGHTBRENTWOODEAGER
SWANMCCUTCHEON F
R
A
N
C
ISLOUWEN
GODWIN
YORKPRICELADUECREST
LIN D WORTH
WILD ROSE SUSSEXSTLOUISGALLERIALANGTONTHORNDELL
BLACK CREEK
GREENRIDGE
HAL I F A X
SARA NACMONM O U T HFAIR
O
A
KSEXMOORN ORTH C OTE
B ERKSHIREWRENWOOD
COL M A RTWIN OAKS
R ID G ETO P SUDBURY
CRICKETSCARSDALECLAY
PRICE WHITBURNLAYTON
PEACOCKBOBOLINKFLAMINGO EAG E R§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12327
Wastewater
11
$180,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
46Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 12,710 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12190.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦70§¨¦270 §¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12051
Wastewater
11
$31,000
Various
Lemay/RDP
Various
Capital
47Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11145
Wastewater
16
$790,000
Various
Lemay/RDP
Various
Asset Management
48Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Miscellaneous Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 - 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDMAN C H EST E R R D
W A T S O NRDCHIPPEWABLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
11
$514,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
49Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 - 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDMAN C H EST E R R D
W A T S O NRDCHIPPEWABLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
11
$7,500,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
50Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL CONSOLIDATIONSEWERS I/O STRUCTURES - FIELDS (I-019/L-011)AND GERMANIA (I-012/L-014) TO LOUIS (I-007/L-012)
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT THE FIELDS AND GERMANIA TO LOUIS CONSOLIDATIONSEWERS TO DELIVER FLOWS TO THE DEEP STORAGE TUNNEL SYSTEM.
§¨¦55
§¨¦55 UNIONBATES
MORGAN FORDGERMANIA
WALSH
DAVIS
RHODES
RIVER
DESPERES
U NIO N PACIFIC
ROSA
BAYLESS
MILE
N
T
Z
GOET
H
E
H
ALEJANUARYSEIBERT
VIRGINIAMINNESOTADEWEYCHRISTYBLOW
IDAHOWEBER
FINKMAN
HOLLYHILLSMACKENZIEDELOR
ZEISSRAYFANNIEELTONKAMMERER SHARPMACKLINDIRON
FIELDMATHILDARADIOMARCEAU
BOWEN
CARONDELETCLIFTONHAVEN
QUIN
CY
MOHEGAN
WILMINGTONWANDA
LANGLEY
ALMA
PARDELLAPRIVATE
KAY
SCHILLER
STAELY GUSTINEROBERT
RADIOMKIT EUGENEGRANDHORN ULENALUCIADOVER
WATEREICHEL B E RGER
VASELFORMANPAULEGENESTAACORN ALABAMALOUIS
REILLYJAMIESON
SPRINGTIBERLEMONA
UPTON
SUNSHINEWILLMORE
CIRCLEVIEW
PRIMMADKINS
IONECATALAN
FRENCHLEONA
PILOTKIN
G
S
HAMBURG
ELGINS A V IO
AVENUEHDANANEIERALASKAHEEGE
KAYSERSTOLLEWES TPHILOTYROLEAN
HEALY
COLVINJOEL STEINSRUTH
WEBER TRAILTESSON
ARVIN
CISCOKINSEY
TIFFANYALEXANDERBREUERMENOLADUKEFRIEDA
NELLIEORIENTRADOMWANDA BLOWLEONA
DANARAYDELOR
RAYVA
SEL WANDAR
OSAWEBER RAYREILLYWALSH
GRANDGRAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11958
Wastewater
11
$180,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
51Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL CONSOLIDATIONSEWERS I/O STRUCTURES - PERNOD (I-056/L-031)TO MARDEL (I-054/L-030)
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT THE PERNOD TO MARDEL CONSOLIDATION SEWER TODELIVER FLOWS TO THE DEEP STORAGE TUNNEL SYSTEM.
§¨¦44
DALE
FYLER
ARSENAL
U N I O N PA C I F I C
PERNODMET
R
OLI
N
K
MARDELHANLEY SUBLETTEWEIL
BRANNONWATSONDELOR ITASKAWALSH MORGAN FORDMACKLINDLANSDOWNE BENTCOLUMBIA
RHODES
WEST PARK
LACLEDESTATIONBATES
SHAW
NOTTINGHAM
FOLK
ELLENWOOD
BECK
ROSA
NEOSHO
WINONAREGAL
MIL
E
NT
Z
WISE
CHRISTYYALEOAK HILLSOUTHW E S TMcCAUSLANDMCCAUSLANDODELL
SCANLAN TAMMTHOLOZAN TOWER GROVES W A N
MCREE
ARCO
MURDOCH
RIV
E
RDESPER
E
SFINKMAN
BANCROFT
RAYTAFT
PARKER ALFREDTUXEDO
DONOVANBRADLEY
MIAMI
H U N TBREDELL
MACKENZIESUTTONCLIFTONMAGNOLIAVANDEVENTE RPOTOMAC
WANDASMILEY
SCHILLER
ZEPHYR
MARSHALL
GRESHAM
MARQUETTE
JUNIATA
OLEATHA
ULENAWI LL IA MS
LORAN
GARNER
FLORA
S U THERLAND
HICKS
WILLMORE
BRUNO
GLADES
JEROME
LILLYNAGEL
M ANHATTANIVANHOEHANCOCK
WESTSOUTH
SPRINGKIN
G
S59THPRIVATESPROULE HEREFORDBINGHAMESTHERREBERLYLE
WALLACE
VILLA
ANNA
HAZELLENOX
WESTEASTCUTTERS
I
GE
L
JONES
WINNEBAGO HALFWABASHECOFFLEONAPORTERBISCHOFF
WISE
LENOXWALSH
BECK
UNIONPACI
FIC
TAFT
DELORTAMMBRUNO
W ATS O NRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11959
Wastewater
11
$70,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
52Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP TUNNEL DEWATERING PUMP STATION
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWAGEFROM THE TUNNEL STORAGE SYSTEM TO THE LEMAY TREATMENTPLANT.
PRIVATE
KAYSER
HORN
WALLER
P
RIV
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11816
Wastewater
11
$1,890,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
53Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWELL STREET - GIMBLIN TO DODDRIDGECOMBINED SEWER IMPROVEMENT
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
REPLACE 710 FEET OF 27-INCH COMBINED SEWER WITH 42-INCHCOMBINED SEWER, AND CONSTRUCT A JUNCTION CHAMBER.HALLLOWELLCONCORDGIMBLINHORNSBY
MCLARAN DODDRIDGEGIMBLINGIMBLINLOWELLDODDRIDGE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12479
Wastewater
11
$120,000
St. Louis City
Bissell
Baden
Capital
54Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦270
§¨¦55
§¨¦70
§¨¦64
§¨¦44
§¨¦170
§¨¦255§¨¦255
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$320,000
Various
Lemay/RDP
Various
Asset Management
55Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦270
§¨¦55
§¨¦70
§¨¦64
§¨¦44
§¨¦170
§¨¦255§¨¦255
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$500,000
Various
Lemay/RDP
Various
Asset Management
56Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER BLACK CREEK AND HAMPTON CREEKSANITARY RELIEF (DEER CREEK TRUNK TOOXFORD DR) PHASE I
Pre-Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALLS REQUIRED.
CONSTRUCT 5,690 FEET OF 60-INCH TO 72-INCH SANITARY SEWER.
§¨¦44
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
M E T R O L IN K
CLAYTONLAY
PINE
UN IO N PACIFICFORSYTH
HANLEYWYDOWN
FOLKMCKNIGHT
YALELACLEDESTATIONBELLEVUEBRENTWOODMcCAUSLANDFOREST P A R K
MARSHALL
SOUTHWEST
DAVIS
ETHEL
ARSENAL
WHITE LINDENBREDELLPRIVATE
BOLANDSUTTONLAWN
EULALIE
GLENSWAN
PARK
BELLLITHIA
ELMPACIFIC
BRADLEY
PLATEAU
WISE
FORESTLOUIS SMILEY
WE L LS
DELNORTEWIL L IA MS
ALAMO
HIGHSCHOOLSCANLANMCCUTCHEONASBURYLOUWENGARNER
FLORA
ATALANTA SALEMB
U
C
K
HICKSWRENWOOD
ST CLAIRMARYBRUNO GLADES
ELLENWOOD
BARTOLDOAKLAND
RUSSELL HOYTOXFORD
EA G E R
ROSE
FLORENCE MARTINIBREMERTONY ORKPARKDALE
LYLED ESPERESSHEPLEY
LANGTONVILLA
ANNASOUTH KRAFTJAMES
MAPLEANNALEECIRCLE FAUQUIER
BENNETTARLINGT ON
COLLINSRALPHJAMIESONECOFFSOUTHWOODDARTFORDGALLERIA
NORTHWOOD
PORTERHORNER
WARNER
B E R R Y RICHERTHATTONLA D U E MANOR
OXFORDUNIONPACIFIC
EAGER
ALAMO
MARYPRIVATEME
T
R
O
LI
N
KYORK
YALEWISE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12334
Wastewater
11
$150,000
Maplewood
Lemay/RDP
Deer Creek
Capital
57Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER BLACK CREEK AND HAMPTON CREEKSANITARY RELIEF (DEER CREEK TRUNK TOOXFORD DR) PHASE II
Pre-Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALLS REQUIRED.
CONSTRUCT 7,960 FEET OF 30-INCH TO 54-INCH SANITARY SEWER, AND710 FEET OF 36-INCH PIPE-IN-TUNNEL UNDER I-64. CONSTRUCT 2,600FEET OF VERTICAL WALL CHANNEL, AND CONSTRUCT 235 FEET OF48-INCH BY 66-INCH BOX CULVERT. ELIMINATE BP-634.
§¨¦44
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
M E T R O L IN K
CLAYTONLAY
PINE
UN IO N PACIFICFORSYTH
HANLEYWYDOWN
FOLKMCKNIGHT
YALELACLEDESTATIONBELLEVUEBRENTWOODMcCAUSLANDFOREST P A R K
MARSHALL
SOUTHWEST
DAVIS
ETHEL
ARSENAL
WHITE LINDENBREDELLPRIVATE
BOLANDSUTTONLAWN
EULALIE
GLENSWAN
PARK
BELLLITHIA
ELMPACIFIC
BRADLEY
PLATEAU
WISE
FORESTLOUIS SMILEY
WE L LS
DELNORTEWIL L IA MS
ALAMO
HIGHSCHOOLSCANLANMCCUTCHEONASBURYLOUWENGARNER
FLORA
ATALANTA SALEMB
U
C
K
HICKSWRENWOOD
ST CLAIRMARYBRUNO GLADES
ELLENWOOD
BARTOLDOAKLAND
RUSSELL HOYTOXFORD
EA G E R
ROSE
FLORENCE MARTINIBREMERTONY ORKPARKDALE
LYLED ESPERESSHEPLEY
LANGTONVILLA
ANNASOUTH KRAFTJAMES
MAPLEANNALEECIRCLE FAUQUIER
BENNETTARLINGT ON
COLLINSRALPHJAMIESONECOFFSOUTHWOODDARTFORDGALLERIA
NORTHWOOD
PORTERHORNER
WARNER
B E R R Y RICHERTHATTONLA D U E MANOR
OXFORDUNIONPACIFIC
EAGER
ALAMO
MARYPRIVATEME
T
R
O
LI
N
KYORK
YALEWISE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12369
Wastewater
11
$180,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
58Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Design Services
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THEFENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT ATTHE LOWER MERAMEC WWTF.
THIS PROJECT ALSO ELIMINATES MERAMEC BOTTOMS PUMP STATION489 AND FORCEMAIN, PER THE CAPACITY ASSURANCE EVALUATIONREPORT.
§¨¦55
§¨¦270
§¨¦55 KERTHMATTIS
G RA V O I S
WELLSKELLERMERAMEC BOT T O M AMBSKENNERLY
T
H
EI
SSEAST
CONCORD
ALL
E
N ALSWELLSC H U E S SLERMENTZHILL
RI N G ERBA UERBUT L E R HIL L
GREENTONPOI N T E
CARIBEEHAWKINSGERALD
KEMPF
H
AGEMANNOLSENGREGORY
DIERSPRIVATE
MAIN
RIVERCURVE VALMEYERTESCORDMAN GOWA
T
S
O
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYRENULSEN
OPPS
FERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYLE
TOWNE SO UTHB A U E R
PRIVATEPRIVATEPRIVATE A M B S
HAWKINSPRIVATE
T ES S ONFERRYRDLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$3,700,000
Various
Meramec
Meramec Tributary Areas
Capital
59Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MACKENZIE I/I REDUCTION (RESURRECTIONCEMETERY, WEHNER PARK, KENRICK SEMINARY,AND NERINX HALL)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 78 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12511.
§¨¦44
§¨¦44ELM
HEEGE
WEIL
EDGARMACKENZIELACLEDE STATIONCHESHIRELANSDOWNELOCKWOOD
MAPLEMURDOCH
LILACRIV
E
R
D
E
S
PERESFLETAJACKSON
STAELY
MCC
A
U
SLANDSELMAGRAMOND
OAK TREEPLANTGLENDALE JOYBURLINGTONNORTHERNSANTAFEWINONA
SYLVESTERGENESTABANCROFT
WELLSGLEN
ROSE
S UTHERLAND
CIRCLEVIEW
FLORENCE
ROCKHILL VALCOURR ID G E
BELTONPARK
GARDE NPLAINVIEW
COLLEENIMSEC A N N ONBURY SUMMITALBANYSOUTHSIDE
P RIVATE
F ORE S T
LANVALETERRILYNN
INNISFAIL
ASHBURY
SAVIOWILSHUSENBRUNSWICK
RHODESDEVILLE
NAVAJOECHAPELFORDCEDAR
LENOXYALE
RAVENSRIDGE
JOELBOMPARTHARLANMATHILDAGENERAL S H ERIDAN
SWON HAZEL
CHESTNUT
LARKHILL
P A S ADENABUSCH
CR
O
Y
D
ON
CHIVVISHURSTGREENVERGUENE
LA BELLECARMEL
PONTIACCATALPA
NORMALA M B E R G AT E
KIRKY
RABETHSANDAUF R IS C O
KENORA
PRIVATE
CHESHIRE
SWON
PLANTMAPLEW ATSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12336
Wastewater
11
$500,000
Shrewsbury
Lemay/RDP
Mackenzie Creek
Capital
60Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOW IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTOR SEWERS. BUDGET INCLUDES $525,000FOR AMEREN FACILITY RELOCATION AND SERVICE TO THE NEWFACILITY.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLFONTAINE
GUSTAVMELV IN
JORDANLOWELLCHAIN OF ROCKS
NASSAU
HARLAN
LOGAN
DONNELL
RAFORD
JENNINGS STATION
CHURCH
G
A
ST
O R A N
JACKSON
FREMONT RIVERRUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
11
$485,000
St. Louis City
Bissell
Maline Creek
Capital
61Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION
Design Services
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 19. TOTAL CONSTRUCTION BUDGET IS $5,000,000.
§¨¦70
§¨¦270
§¨¦64
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12483
Wastewater
11
$545,000
St. Louis City
Various
Various
Capital
62Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTF FERRIC CHLORIDESTORAGE AND FEED FACILITY
Design Services
6660 - SanitaryReplacement Fund
TREATMENT FACILITY CHEMICAL ISSUE WITH STRUVITEACCUMULATION CAUSING PROBLEMS WITH PUMPS, PIPING, ANDCENTRIFUGES.
CONSTRUCT FERRIC CHLORIDE STORAGE FACILITY, AND RELATEDPUMPS AND PIPING.
P
RI
VATE
P R IV A T E
P
RI
V
A
T
E
PRIVATEP
R
I
V
AT
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12708
Wastewater
11
$300,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
63Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH FOREST AND BROOKSIDE I/I REDUCTION(SUMMIT AVE AND MARSHALL AVE)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 46 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.
§¨¦44
TUXEDO
MARSHALL
CLARK
BOMPARTUNION PACIFIC
NEWPORT
ATALANTAGLEN M
ETROLINK
PACIFIC
FOREST
LACLEDESTATIONFLORA
SUMMITHANL
EYFAIRVIEW
YEATMANSPRINGSHREWSBURYP
A
RKOXFORD
SUTHERLAND
A R L IN G T O NHAWTHORNE
JOYEUNICE
SUFFOLKCOLEMANMARYGREELEY
MARIONSUNNYSIDE BARTOLDOA K WOOD DALECAROLINE SUNN EN
KUHLMAN
J
AGUAR
EXETERAMELIA
MASON
COMFORT
PROVIDENCE
TAMPA
THEATREBROOKS ID E
MILDREDCORNELIAKEY WESTQUTTONJAMESON
SUMMITGREELEY SUMMITFAIRVIEW
UNIONPACIFIC
GLENMETROLI
NKMARION
PARKGLEN OAKWOOD
COMFORT
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12362
Wastewater
11
$350,000
Webster Groves
Lemay/RDP
Deer Creek
Non-recurring
64Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH WEBSTER CC, POCAHONTAS, SOUTHBRENTWOOD I/I REDUCTION (S BRENTWOODBLVD AND MANCHESTER)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 1,000 FEET OF 12-INCH STORM SEWER. REMOVE PRIVATE I/ISOURCES AT 84 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12039.ELMLITZSINGER
BRENTWOODMCKNIGHTODAYBELLBISMARK GLENEUCLID DOROTHYLITHIA
WHITE
BACON
THORN T O N
MADGE
UNION PACIFICOLD WARSON
KIRKHAMCORNELLHIGHSCHOOLMARYCLARK
MARSHALL
HOLLANDEULALIE
MCKINLEYFAIRVIEW
MADISON TUXEDO
ROSALIE
RUSSELLROCK HILLKORTWRIGHTELDRIDGE
R
O
CKF
O
R
DBREMERTONST CLAIRMORITZ
FLORENCE
D E SPERESENNISWAYMIRE
PRIVATE
LAFAYETTEROCKMANPARK
SONORA
ANNALEEMAN
IT
O
U ATALANTAPARKRIDGEB
L
OS
S
O
MHARRISON
STANLEY
GREELEY
T
AV
AL
O
N LEONARDPLAINFIELDBRAZEAUM E R R IT T
JOSEPH
MUECK POCAHONTASKENTLANDOAKBENDGARDEN
COLLIERBAHIABARRONOVERBROOKDANIEL
HELENMASON
W A RSONCHARLEVILLES U T T O N
RARITAN
HENRIETTA
BRIDGEPORT
BROWNBERT
ALLISONCHARLANE BOMPARTCYRILHINSDALEMARYROCK HILLP R IVAT
E
PRIVATE
WHITE
M A N C H E S T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12363
Wastewater
11
$500,000
Brentwood
Lemay/RDP
Deer Creek
Capital
65Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OLIVE / WASHINGTON - GRAND TO VANDEVENTERCOMBINED SEWER RELIEF
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AT COMMERCIAL PROPERTIES DUE TOOVERCHARGED COMBINED SEWERS.
CONSTRUCT 3,000 FEET OF 12-INCH TO 36-INCH STORM SEWER.
OLIVE
LINDELL SPRINGWASHINGTON
DELMAR
WESTMINSTERVANDEVENTER FRANKLIN
GRANDEL SQUARE
MCPHERSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12702
Wastewater
11
$320,000
St. Louis City
Bissell
Western Mill Creek
Capital
66Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PROSPECT HILL LANDFILL VERTICAL EXPANSION
Design Services
6660 - SanitaryReplacement Fund
LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE.
CONSTRUCT NEW LEACHATE FIELD AND INTERMEDIATE LINER,RETROFIT EXISTING LEACHATE FIELD, AND GRADING.
BLUFFLILACSCENIC
ADRIAN
SCRANTON
BURLINGTONNORTHERNSANTAFELEETON DIAMONDPRIVATELOOKOUT
V
A
L
L
E
Y
CALUMETLUDLOW
HADDOCK
P R IV ATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11094
Wastewater
11
$500,000
Various
Bissell
MISSISSIPPI RIVER (CITY)
Capital
67Page
2017
FISCAL YEAR:
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (2017)
Vendor Services
1101 - General Fund
Description of Problem/Issue
SEWER SYSTEM FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC MODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASEDON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12005
Wastewater
16
$135,000
Various
Various
Various
Asset Management
68Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦64
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$250,000
Various
Various
Various
Asset Management
69Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦64
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$615,000
Various
Various
Various
Asset Management
70Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
Design Services
6660 - SanitaryReplacement Fund
COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, ANDCLAYTONIA WATERSHEDS REQUIRE MAJOR SYSTEM CONTROLS TOOBTAIN CONSENT DECREE COMPLIANCE.
CONSTRUCT 16,300 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 28 MILLION GALLONS.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
M A N C H ESTER RD
W A T S O N R D GRAVOISRDS LINDBERGH BLVDCH IP P EWABLVD
OLIVEBLVD
S KIRKWOOD RDN KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12441
Wastewater
11
$5,000,000
Various
Lemay/RDP
Deer Creek
Capital
71Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROBYN I/I REDUCTION (S LINDBERGH BLVD ANDROBYN RD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 12 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12051.
§¨¦270§¨¦270
ROBYN
ROTT
WATSONEDDI E N P AR KMANDA
GEYERCRESTOAKDENNYRUSDONCINEMA
REDOAK
LINCOLN
RICHVIEW
HA RW ICH
MARE TROOSEV ELT ST
U
RDYFOX
PARKN ANELL
SUNLIND
LOWILLKATHYLYNN
M ATTH
E
WSPRIVATE
G L ENFIELD
FAIRLIND
S U NSETS U N S E TH ILLSBETH
SKY CRESTTIMBER C R EEKGAYLECOURT
RICHTER
SADDLEBROOKWOODFOXCHAVEZWOODPARKMAPLE GROVEEGGELINGBLA CKOAK
WESTWICK
MORESID R E W
COURTYARDLAKE
TRENTMORE
FOXBRIDGEWEMBLEYWOODSMEADOWGLENMIDDLEWOOD RYEGATEFOXBURY
OAKWOOD MANORWATSON
PRIVATEP
RIV
A
T
E
PRIVATESLINDBERGHBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12190
Wastewater
11
$35,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
72Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SOUTH COUNTY SANITARY RELIEF (P-419 TOCRIPPLE CREEK DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 8,900 FEET OF 12-INCH TO 21-INCH SANITARY SEWER.BECKERUNION PACIFICCHRISTOPHER
MERAMA R
LIDO
BEETREEQUEEN BEETALLOA
KPOINT
PINEYPOINTE BIRDIEB LUFF RIDGE
OLDEWICK
N ET T I E
SPRINGWATER
BALTUS R O L
P R I V ATECHINALAKEARMONA
BLUFFWOOD
WOODBR I D G E ESTATES
COR A M
BRUSH CREEK
RIVER WINDS
HILLYHAVEN
E L K PEAKBUMBLE BEEZAHARIAS BLOWT E L E GRAPHRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12205
Wastewater
11
$800,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
73Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFFRESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER QUANTITYAND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM INCONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING ANDDESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS REQUIREDPURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$590,000
St. Louis City and County
Various
Various
Asset Management
74Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (2017)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF THE CSO LTCP, SSOELIMINATIONS, & STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGHFY2019 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12003
Unallocated
16
$650,000
Various
Various
Various
Asset Management
75Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUGAR CREEK I/I REDUCTION (W ADAMS AVE ANDCOUCH AVE)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 61 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12027.
§¨¦270
§¨¦44§¨¦270
ADAMS
GEYERCLAYU N IONPACIF IC DICKSONTAYLORCOUCHWOODLAWNCRAIGANN
ROSE HILL
WOODBINE
BALLASNIRK
JEFFERSON
LARK EVANSEDNAWAY
BOAZ DOUGHERTYFERRYPEEKE WOODSIMMONSMADISON
WILSON QUAN
LEEVANBUREN BODLEY
CRESTSARAH
FILLMOREGILL
PAR
RI
ETH IRISCLARKMONROE
ESSEX
B U R L IN G T O N N O R T H E R N S A N T A F EFRIEDAALTUSCENTRAL
BAC
HLEFFINGWELL
LINWOOD
MAPLE
LONGVIEWTWIN PINESCOTT
JEWELNANA
ARGONNE
LINDGATE
KIRKSHIRE
GOETHEGRUPPBOGEY
LILLIAN
ATTUCKS
LINDEMANSUNNY
OLDB IGBEN
D CAROLINECOULTERKNIERIM
GRA NDVIEW ANDREWSJULIAN
M C L AIN
CLINTON
SWAN
GRANT
MIDWAY MIRIAMPEARLMOZARTLYNKIRK
ORRICK
AMHERST
MAGNOLIAERBERIDLEWILD
ALFRED
PRIVATE
DUBOISCHESTER
WASHINGTONCLARIDGE
KI
NYONLAVINIACLAYCLINTON
ARGONNE
FILLMOREPRIVATEESSEX
BALLAS
PAR
MONROELYNKIRKN KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12223
Wastewater
11
$230,000
Kirkwood
Meramec
Grand Glaize Creek
Capital
76Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TOWNE SOUTH AND BRUNSTON I/I REDUCTION(AMBS RD AND TOWNE CENTRE DR)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 104 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12026.
§¨¦270
§¨¦55
§¨¦255
§¨¦55
MATTIS
KERTHBUTLER HILLKELLERAMBSKENNERLY
T
H
E
IS
S
RINGEREAST
CONCORD
S C HUESSLER
BURLINGTONNORTHERNSANTAFELEEBUR
WELLSS
U
SONHILLS
B AUERALSWELLSUNSETCARIBEEGERALD
KEMPF
VIENTOGREGORY
DIERSGREENTONMENTZHILLA
NTO
N
VALMEYERTOWNECENTRE TESCORDGATESBURYPRIVATE
GRIFFINGEMINI
DORSIE
LANGTREEDANTONAIREVALLEYSIDEFUCHSSAPPINGTON
STANHOPE
FIJILO
NGVIEW
BAHNFYRETEALBYAREVALOFERN BEACHED LOUCLAYRIDGEEIMELONGSPURJOSSE YUMA
BRITTINGERCHERYLK
A
S
S
E
B
A
U
MLARKINSAKURA
R E G A L W AY
W ORTH IN G T O N
LITTLEROCKSIR BORSPOCASSETTAMMY
KAY
M C I L R O Y
SUNHILL
TIOGA
ALLP INE
JUENGEL
DU BOURGADAMSPEBBLE OAK
OLD TESSONPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12235
Wastewater
11
$260,000
Unincorporated
Meramec
Mattese Creek
Capital
77Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER RDP (UNIVERSITY CITY) CSO STORAGETUNNEL
Pre-Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE UPPER RIVER DES PERES ANDTHE UNIVERSITY CITY WATERSHED IS REQUIRED BY THE CONSENTDECREE.
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 30 MILLION GALLONS.
DELMAR
PAGE
FORSYTH
C A NTON
METROLINK
ETZELHANLEY
FORESTPARK
VERNONPURDUETERMINALFERGUSON
MARYLAND
JULIAN
TULANE PENNSYLVANIASUTTERCENTRALBEMISTONMETRO LI
NKSHAFTESBURY81ST
MERAMECLYNN
PERSHING YALEBARTMER
COR N E LLNORTHNSOUTH
TRINITYWASHINGTONPARTRIDGESTANFORDWARDERLAFONTEASDALE
WAYNE
TOPTONPRI
VATEGANNON
AHERN QUENDOLAMBBRENTWOODWILSON
LINDEN78THWILLIAMSWATTSHOYTDREXEL KINGSLANDNORTHMOORGROBYDORSETGAYLINDELL LELANDCHAMBERLAINMEYERMILAN
WELLINGTON
COLGATE 66THCATES
M
O
N
A NIXONMENDELLSNOW
WESTMORELAND
AMHERST FARISBALSONFAIRVIEW
NORTHBELRUELEROY
LEECARLETON COLBYCORBITTRABEBRADFORD
CRESTVERLHAFNER
VANDERBILTWARRENHOW
MELROSE
BLANDMELVILLEDUKEWATERMANOVERHILL ENRIGHT
PRINCETON
MISSIONKINGSBURY HAYSWOODRUFFMALLARD
SAXONYMAPLEMILFORDNOELGRUNER
LYLECENTERPRIVATE
TRINITYLINDELL
MARYLAND
PRIVATE
PURDUEWASHINGTON
FORESTPARKKINGSLANDKINGSLANDGAYKINGSBURY
WAYNE
CORNELL
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12440
Wastewater
11
$1,500,000
University City
Lemay/RDP
University City Branch
Capital
78Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)UPGRADES
Design Services
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS ARE IN NEED OFUPGRADE TO CURRENT STANDARDS, AND SECONDARY CONTAINMENTIS NEEDED FOR ON-SITE CHEMICALS.
CONSTRUCT UPGRADE OF ELECTRICAL AND MECHANICAL EQUIPMENTAND SECONDARY CONTAINMENT FOR CHEMICALS STORAGE.
HOBATH
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
11
$500,000
Unincorporated
Bissell
Mississippi River Tributary Areas
Capital
79Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WESTBOROUGH - LUTHER - MERMOD PLACE I/IREDUCTION (N KIRKWOOD RD TO I-44 AND BERRYRD)
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REMOVE PRIVATE I/I SOURCES AT 102 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12059.
§¨¦44GEYER BERRYCLAYADAMS
U N IO N P A C IF ICDICKSONTAYLOR
HARRISONKIRKHAM
JEFFERSON ELMESSEX
MADISONMONROE
HOLMESEVANSWOODWAY
ROSE HILL
PEEKE
GRA
NT
WOODBINE
B U R L IN G T O N N O R T H E R N S A N T A F ESIMMONS BROWNELL
LOCKWOODWILSON QUAN
LEE EDWINWASHINGTON
VAN BURENLIG
G
E
TT
BODLEY
SARAH
FILLMOREGILL
PAR
SCOTT
FOOTE
S
ANDERS
HILL
AUSTINDIVERSEY
BACON
PARKLANDIOLAMAPLE
CENTRAL
LONGVIE
W
ARGONNE
ELLIOTTROSE
G R A N D CURRANDWYER
F R IS C OSMITH
L INUM
BOGEY
HOLLYWOODOAKPARKD
E
VONBRENTCHELSEA
ALGONQUIN
JULIAN
VICTORIA
BAKER
BONITA
JO ANNWARWICK
OAKSBARRONCLINTON
GLENMOOR
SWAN
OAKWAY
OLIVE
WINGFIELD
PARKWOODSSCHULTZHARTJEWEL
SAPPINGTONPEARLH
A
W
KIN
S
ORRICK
A
R
MIN
BERRYWOOD
GASLITE
ERBERIDLEWILD
ALFRED
MINTURNFUHRMANN
WOODLAWNEARLF O R E S T O N
PRIVATE
F R IS C O
LEE
CLAYOAKLOCKWOOD
ESSEX
CLINTON
MONROE
CLAYHOLM
ESSCOTTCLAYPAR
MONROE IOLAHOLMESARGONNE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12278
Wastewater
11
$180,000
Kirkwood
Lemay/RDP
Gravois Creek
Capital
80Page
2017
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WOODS MILL SANITARY RELIEF (I-64 TO BROOKMILL LN)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS.
CONSTRUCT 2,790 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦64 §¨¦64
SAVVISS O U T H OUTERF O R T Y
WOODSMILLOLDWOODSMILLBROO KM IL L
P R IVA TELAKEMILLK E L L W O ODMARYVILLECENTRES MO141 HWYN MO141 HWY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12296
Wastewater
11
$276,000
Town and Country
Missouri
Creve Coeur Creek
Capital
81Page
2017