HomeMy Public PortalAboutP1 Wastewater Project Listing 2018 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 1101 - GENERAL FUND 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $650,000 11999 Vendor Services CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) Various $2,500,000 12720 Vendor Services CRITICAL INFRASTRUCTURE ASSESSMENT (2017) Various $1,500,000 11146 Construction CSO VOLUME REDUCTION GREEN INFRASTRUCTURE Various $5,000,000 12759 Vendor Services FLOW METERING AND MONITORING (2017)Various $2,500,000 12382 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT A Various $60,000 12383 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B Various $60,000 12384 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C Various $60,000 12385 Appraisal Services GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT D Various $60,000 12008 Work Order Repair Costs (Non-Capital) INFRASTRUCTURE REPAIRS (WASTEWATER) (2018) Various $2,500,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $650,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $500,000 12005 Vendor Services RADAR RAINFALL DATA (2017)Various $140,000 11153 Professional Services RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $750,000 10766 Vendor Services STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) St. Louis City And County $605,000 12003 Vendor Services STREAM FLOW WATER QUALITY SAMPLING (2017) Various $270,000 FUND TOTAL: $17,805,000 4102 - IMPROVEMENT FUND 12893 Work Order Repair Costs (Capital) INFRASTRUCTURE REPAIRS (FACILITIES) (2018) Various $3,000,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE FUND TOTAL: $3,000,000 5566 - DEER CREEK OMCI FUND 11884 Construction, Phase III CEDARCREST PRIVATE I/I REDUCTION (SKME-561) Various $470,000 12471 Construction DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II Various $30,000 12177 Construction GLENDALE SECTION D SANITARY RELIEF PHASE V (SKME-624) I/I REDUCTION Glendale $1,032,000 11680 Construction, Phase II ROXBURY I/I REDUCTION Clayton $700,000 FUND TOTAL: $2,232,000 5591 - MERAMEC RIVER BASIN SUBD #449 OMCI FUND 12833 Construction FENTON WWTF HEADWORKS GATE IMPROVEMENTS Fenton $300,000 12832 Construction FENTON WWTF LEVEE IMPROVEMENTS Fenton $1,370,000 12830 Construction GRAND GLAIZE WWTF FLOOD PROTECTION IMPROVEMENTS Valley Park $200,000 12785 Construction LOWER MERAMEC PUMP STATIONS FLOOD MITIGATION Various $277,000 FUND TOTAL: $2,147,000 6660 - SANITARY REPLACEMENT FUND 12078 Construction APPLE ORCHARD - SINGERSON - BAYLESS PLACE I/I REDUCTION (LEMAY FERRY RD AND BAYLESS AVE) Bella Villa $930,000 12092 Design Services BELLEFONTAINE #2 SANITARY RELIEF (CHAMBERS RD TO COBURG LANDS DR) Bellefontaine Neighbors $322,000 12029 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT A Various $81,000 12026 Design Services BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT C Various $88,000 11144 Professional Services BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $1,150,000 12691 Professional Services BISSELL POINT WWTF REPAIR AND IMPROVEMENT DESIGN (CONTRACT A) St. Louis City $2,450,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11847 Design Services BLACK CREEK - HADDINGTON COURT RELIEF SEWERS Ladue $890,000 12098 Construction BRADFORD WOODS PUMP STATION (P-429) REPLACEMENT Sunset Hills $500,000 12858 Construction BRANCH FLOODWALL ORS PUMP STATION REHABILITATION St. Louis City $500,000 12099 Construction BRENTMORE PUMP STATION (P-773) REPLACEMENT Wildwood $500,000 12100 Design Services BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/I REDUCTION (I-64 AND LAY RD) Brentwood $260,000 12104 Design Services BROOKSHIRE SANITARY RELIEF (BROOKSHIRE DR TO COUGAR DR) Unincorporated $480,000 12111 Design Services CAPILIA SANITARY RELIEF (GRANT RD TO CAPILIA DR) Crestwood $260,000 12112 Design Services CARSON VILLA I/I REDUCTION (MARCELLA AVE AND WALES AVE) Bel-Ridge $300,000 11790 Construction CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52) Maryland Heights $6,600,000 12892 Construction CAULKS CREEK FORCEMAIN (WATERWORKS ROAD TO RIVER VALLEY) Maryland Heights $3,500,000 11788 Construction CAULKS CREEK PUMP STATION B FORCEMAIN Chesterfield $6,000,000 11884 Construction, Phase III CEDARCREST PRIVATE I/I REDUCTION (SKME-561) Various $340,000 12794 Construction CITY LAKES STORAGE MODIFICATIONS FOR CSO CONTROL St. Louis City $625,000 12693 Professional Services CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT A) St. Louis City $3,483,000 12504 Construction COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT Unincorporated $5,500,000 12882 Construction COLDWATER UPSTREAM PUMP STATION (P- 180) FORCE MAIN REPLACEMENT Unincorporated $2,090,000 12127 Construction COLLINGWOOD DRIVE CONSOLIDATION SEWER Olivette $1,100,000 12128 Construction CONCORD I/I REDUCTION (TESSON FERRY RD AND E CONCORD RD) St. Louis County $215,000 11152 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES Various $3,500,000 11826 Professional Services CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS Various $7,500,000 11151 Professional Services CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Various $7,360,000 12131 Design Services CONWAY VILLAGE SANITARY RELIEF (CONWAY RD TO I-64) Town And Country $457,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12138 Design Services CROSSROADS, HANLEY INDUSTRIAL, LITZSINGER EAST I/I REDUCTION (SW I-64 AND S HANLEY RD) Brentwood $175,000 10851 Construction CSO - MCKNIGHT ROAD #2737 CSO INTERCEPTOR (I-298)/OUTFALL (L-161) Various $5,370,000 11155 Construction, Phase II DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) Unincorporated $3,800,000 12144 Design Services DARTMOUTH AVENUE SEWER SEPARATION University City $230,000 10021 Construction (Supplemental Appropriation) DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I Brentwood $4,000,000 12471 Construction DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II Various $17,000,000 12471 Engineering During Construction Services DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II Various $300,000 11997 Construction DC-09 WEST I/I REDUCTION (S LINDBERGH BLVD AND LADUE RD) Ladue $600,000 12039 Construction DEER CREEK PUBLIC I/I REDUCTION (2018) CONTRACT A Various $6,500,000 12042 Design Services DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A Various $70,000 11731 Engineering During Construction Services DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Various $1,000,000 11731 Construction DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) Various $50,000,000 12514 Property Rights Acquisition EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2018) Various $2,100,000 12160 Design Services EDNA-THURSBY I/I REDUCTION (HIGHLAND AVE TO BIG BEND BLVD) Various $65,000 12841 Land Purchase ENGELHOLM RELIEF SANITARY STORAGE FACILITY (ENGELHOLM AVENUE AND ST. CHARLES ROCK ROAD) Pagedale $2,000,000 12164 Design Services ESSEX I/I REDUCTION (W. ADAMS AVE AND SUGAR CREEK RIDGE DR) Kirkwood $55,000 12457 Construction FARMERS MILL PUMP STATION (P-774) REPLACEMENT Chesterfield $550,000 11996 Construction FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I REDUCTION (MANCHESTER RD W OF N GEYER RD) Des Peres $250,000 12832 Construction FENTON WWTF LEVEE IMPROVEMENTS Fenton $1,530,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11737 Design Services FERGUSON SEWER RELIEF SANITARY STORAGE FACILITY (ELTORA AVE AND PENNSYLVANIA AVE) Various $800,000 10012 Design Services FF-07 FEE FEE CREEK SANITARY RELIEF (MEADOWSIDE DR TO WILLOW BROOK DR) Unincorporated $600,000 10601 Construction FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF Maryland Heights $12,300,000 10018 Construction FF-18 VILLA DORADO - LACKLAND - PAGE SANITARY RELIEF (ADIE RD TO VILLA DORADO DR) Maryland Heights $6,590,000 11752 General Services - Construction Inspection GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2016) Various $250,000 12396 GSA - (Design) CIRP Funds GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) CONTRACT A Various $400,000 12894 GSA - (Design) CIRP Funds GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) CONTRACT B Various $400,000 12388 GSA - Geotechnical CIRP Funds GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT A Various $50,000 12389 GSA - Geotechnical CIRP Funds GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT B Various $50,000 12390 GSA - Geotechnical CIRP Funds GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT C Various $50,000 12408 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT A Various $50,000 12409 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT B Various $50,000 12410 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT C Various $50,000 12411 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT D Various $50,000 12412 GSA - (Survey) CIRP Funds GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT E Various $50,000 12177 Construction GLENDALE SECTION D SANITARY RELIEF PHASE V (SKME-624) I/I REDUCTION Glendale $2,305,000 12269 Design Services GOLFWOOD REHABILITATION (RIES RD AND BIG BEND RD) Ballwin $20,000 12495 Construction GRAND GLAIZE WWTF BUILDING, SWITCHGEAR, TANK AND SCREEN REPAIRS Valley Park $3,321,000 10496 Design Services GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE AVE TO PARDEE LANE) Various $50,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12510 Design Services GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) Unincorporated $65,000 11770 Construction (Supplemental Appropriation) HARLEM - BADEN RELIEF PHASE IV (HEBERT) (IMPROVEMENTS FROM BASIN TO HAMILTON TRUNK) St. Louis City $6,500,000 12846 Design Services HEIMOS PUMP STATION (P-503) ELIMINATION Unincorporated $160,000 12304 Construction HELTA, SAPPINGTON, AND GREGORY COURT I/I REDUCTION (SAPPINGTON RD AND I-270) Unincorporated $705,000 11994 Construction HUNTLEIGH MANOR, OLD WARSON, TIMBERWYCK I/I REDUCTION (S LINDBERGH BLVD SOUTH OF LITZSINGER RD) Ladue $550,000 12014 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (2018) CONTRACT A St. Louis City And County $2,500,000 12015 Construction INFRASTRUCTURE REPAIRS (REHABILITATION) (2018) CONTRACT B St. Louis City And County $2,500,000 12008 Work Order Repair Costs (Capital) INFRASTRUCTURE REPAIRS (WASTEWATER) (2018) Various $6,000,000 12635 Construction JAGUAR TO CAROLINE LOW PRESSURE SEWER SYSTEM (LPSS) Maplewood $650,000 11711 Construction (Supplemental Appropriation) JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Unincorporated $26,100,000 11711 Engineering During Construction Services JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Unincorporated $410,000 12317 Construction KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S KIRKWOOD RD) Various $1,361,000 11995 Construction KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON, W SARAH I/I REDUCTION (MANCHESTER RD AND KIRKWOOD RD) Kirkwood $400,000 12320 Construction LADUE FARMS PUMP STATION (P-733) REPLACEMENT Chesterfield $650,000 12051 Construction LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A Various $1,835,000 12488 Engineering During Construction Services LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS St. Louis City $260,000 11145 Professional Services LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $390,000 12721 Design Services LEMAY WWTF REDUNDANT WATER SERVICE Unincorporated $155,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12545 Construction LEMAY WWTF ROADWAY REPAIRS PHASE I Unincorporated $480,000 12329 Design Services LINDLEY DRIVE SANITARY RELIEF (I-170 TO ASHMONT DR) (UR-07) Olivette $820,000 11820 Miscellaneous Services LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) St. Louis City $520,000 11109 Professional Services LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Various $320,000 11746 Property Rights Acquisition LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL Various $1,000,000 11746 Design Services LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL Various $1,800,000 12499 Design Services LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS Unincorporated $500,000 12511 Design Services MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) Shrewsbury $70,000 11656 Construction (Supplemental Appropriation) MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $29,000,000 11656 Engineering During Construction Services MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) St. Louis City $470,000 12342 Design Services MARK TWAIN I/I REDUCTION (MANCHESTER RD AND BOMPART AVE) Brentwood $420,000 12348 Design Services MEACHAM AND SPELLMAN I/I REDUCTION (I-44 AND S KIRKWOOD RD) Kirkwood $40,000 10869 Design Services MERAMEC BOTTOMS PUMP STATION (P-489) INTERCEPTOR SEWER Unincorporated $310,000 12483 Construction MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION St. Louis City $2,000,000 12708 Construction MISSOURI RIVER WWTF FERRIC CHLORIDE STORAGE AND FEED FACILITY Maryland Heights $1,000,000 12502 Construction MISSOURI RIVER WWTF POWER FEEDER REPLACEMENT Maryland Heights $750,000 12536 Construction NATURAL BRIDGE RD - DARBY TO CHEVROLET COMBINED SEWER RELIEF St. Louis City $1,630,000 10715 Design Services NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS Unincorporated $500,000 10716 Design Services NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544) IMPROVEMENTS Unincorporated $400,000 12799 Land Purchase ODELL 6942 - 44 FLOOD MITIGATION St. Louis City $200,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 12163 Design Services PARK DRIVE SANITARY RELIEF (ENGELHOLM AVENUE) Pagedale $450,000 11698 Construction, Phase II PICKWICK - BERNADINE - BIMINI SANITARY RELIEF Unincorporated $441,000 11877 Work Order Repair Costs (Capital) PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM Various $500,000 11094 Construction, Phase II PROSPECT HILL LANDFILL VERTICAL EXPANSION Various $1,000,000 12697 Professional Services PUMP STATION REPAIR AND IMPROVEMENT DESIGN (CONTRACT A) Various $575,000 12441 Land Purchase RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL Various $3,000,000 12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL Various $3,800,000 12530 Design Services ROSARY LANE SANITARY RELIEF (CLAUDINE DRIVE TO MAKIN AVE) Unincorporated $59,000 11680 Construction, Phase II ROXBURY I/I REDUCTION Clayton $517,000 12193 Construction ROYAL PINES PUMP STATION (P-739) REPLACEMENT Maryland Heights $550,000 11667 Construction, Phase II STERLING PLACE SEPARATE SEWER I/I REMOVAL Unincorporated $400,000 12218 Design Services STONINGTON PLACE SANITARY RELIEF (CLAYTON RD TO GEORGIAN ACRES ST) Frontenac $90,000 12835 Construction SULPHUR YARD - VACTOR TRUCK DISPOSAL BUILDING St. Louis City $750,000 12228 Design Services TESSON CREEK I/I REDUCTION (TESSON FERRY RD AND TIFFANY SQUARE PKY) Unincorporated $110,000 12229 Design Services THURSTON I/I REDUCTION (CHURCH ST AND N FLORISSANT RD) Ferguson $50,000 12230 Design Services TILLES PARK, LITZSINGER AND PARKRIDGE I/I REDUCTION (LITZSINGER RD AND S MCKNIGHT RD) Ladue $320,000 12238 Design Services TREASURE COVE I/I REDUCTION (RIES RD AND BROOKSIDE LN) Ballwin $129,000 12240 Construction UNION CREEK I/I REDUCTION (I-55 BETWEEN S LINDBERGH BLVD AND BUCKLEY RD) Unincorporated $260,000 11991 Construction UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL-NOR) Various $3,400,000 11671 Construction, Phase II UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03) Various $1,880,000 11992 Land Purchase UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) University City $3,700,000 12244 Design Services UPPER LADUE CREEK I/I REDUCTION (NE QUAD OF S WARSON RD AND LADUE RD) Ladue $175,000 24 April 2017 WASTEWATER PROJECTS - FY18 PROJECT NUMBER TASK DESC PROJECT NAME MUNICIPALITY COST ESTIMATE 11791 Engineering During Construction Services UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B Ferguson $200,000 11791 Construction UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B Ferguson $7,000,000 12440 Pre-Design Services UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL University City $700,000 12273 Design Services WAYFARER EAST I/I REDUCTION (HANNA RD AND BIG BEND WOODS DR) Manchester $20,000 11212 Design Services WHITE AND ROSALIE STORM SEWER IMPROVEMENTS AND SEWER SEPARATION Brentwood $500,000 12309 Design Services YARNELL CREEK WEST I/I REDUCTION (BOWLES AVE AND 141) Unincorporated $25,000 FUND TOTAL: $304,034,000 GRAND TOTAL:$329,218,000