HomeMy Public PortalAboutP2 Wastewater Project Listing 2019 11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11999 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2017)
Various $2,500,000
12720 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2017)
Various $1,400,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017)Various $2,500,000
12382 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT A
Various $60,000
12383 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT B
Various $60,000
12384 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT C
Various $60,000
12385 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT D
Various $60,000
12009 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2019)
Various $2,500,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $365,000
12005 Vendor
Services
RADAR RAINFALL DATA (2017)Various $145,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$615,000
12003 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2017)
Various $280,000
FUND TOTAL: $17,445,000
4102 - IMPROVEMENT FUND
12896 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2019)
Various $3,000,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $3,000,000
5566 - DEER CREEK OMCI FUND
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $100,000
FUND TOTAL: $100,000
6660 - SANITARY REPLACEMENT FUND
12073 Construction ADAMS I/I REDUCTION (SOUTHEAST OF I-
270 AND DOUGHERTY FERRY RD)
Kirkwood $570,000
12075 Construction AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
Unincorporated $510,000
11862 Design Services ASHLAND AVENUE - CLARA TO BELT
COMBINED SEWER RELIEF
St. Louis City $500,000
11863 Design Services ASHLAND AVENUE - SEMPLE TO UNION
COMBINED SEWER RELIEF
St. Louis City $500,000
12478 Construction BISCHOFF - EDWARDS TO MARCONI
COMBINED SEWER RELIEF
St. Louis City $1,500,000
12029 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT A
Various $8,671,000
12027 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT B
Various $83,000
12026 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2019)
CONTRACT C
Various $6,195,000
12033 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $55,000
12030 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
Various $204,000
12095 Design Services BISSELL HILLS SANITARY REHAB PHASE III
(SERVICE LATERAL CONNECTIONS)
(CHAMBERS RD AND COBURG LANDS DR)
Bellefontaine
Neighbors
$200,000
12096 Design Services BISSELL HILLS SANITARY RELIEF (ST CYR
RD TO LEETON AVE)
Bellefontaine
Neighbors
$280,000
12494 Construction BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR REPLACEMENT
St. Louis City $2,750,000
12828 Construction BISSELL POINT WWTF REDUNDANT
SLUDGE ACCEPTANCE SYSTEM
St. Louis City $3,000,000
12248 Design Services CAULKS CREEK A PUMP STATION (P-750)
REPLACEMENT
Chesterfield $3,770,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11790 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $8,400,000
11789 Construction CAULKS CREEK FORCEMAIN
REHABILITATION
Chesterfield $9,000,000
12836 Construction CLARA 523 COMBINED SEWER
IMPROVEMENT
St. Louis City $80,000
11724 Design Services COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $500,000
12125 Construction COLDWATER SOUTHWEST SUBWATERSHED
I/I REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
Various $3,105,000
12126 Construction COLDWATER UPSTREAM PUMP STATION (P-
180) STORAGE
Unincorporated $1,670,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $5,000,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $7,500,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $7,300,000
12629 Design Services CREVE COEUR CREEK (L-52) FORCEMAIN
REHABILITATION (P-718 TO MO RIVER
WWTF)
Maryland Heights $500,000
11729 Construction CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE VI (SKME-021)
Chesterfield $9,470,000
12142 Design Services DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
Unincorporated $410,000
11155 Construction,
Phase II
(Supplemental
Appropriation)
DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
Unincorporated $3,100,000
12471 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE II
Various $16,100,000
12472 Engineering
During
Construction
Services
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Various $1,000,000
12472 Construction DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Various $10,000,000
12042 Construction DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
Various $5,745,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11731 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $1,000,000
11731 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $50,000,000
12615 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Various $1,000,000
12615 Construction DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Various $15,000,000
11136 Construction DEGIVERVILLE COMBINED SEWER
RELOCATION
St. Louis City $3,000,000
12152 Design Services E. WATSON SANITARY RELIEF (RUDSON LN
TO RICHVIEW DR)
Crestwood $210,000
12154 Construction EARTH CITY LAKE FRONT NORTH PUMP
STATION (P-711) REPLACEMENT
Unincorporated $500,000
12155 Construction EARTH CITY SHORELINE PUMP STATION (P-
704) REPLACEMENT
Unincorporated $500,000
12515 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2019)
Various $1,000,000
12158 Design Services ED LOU LANE I/I REDUCTION (BROOKTON
WAY AND GREENTON WAY)
Unincorporated $20,000
11786 Design Services ESSEX PLACE COMBINED SEWER RELIEF St. Louis City $500,000
11737 Construction FERGUSON SEWER RELIEF SANITARY
STORAGE FACILITY (ELTORA AVE AND
PENNSYLVANIA AVE)
Various $10,000,000
10601 Construction
(Supplemental
Appropriation)
FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
Maryland Heights $12,200,000
12179 Design Services FLORLAND SANITARY RELIEF PHASE II (N.
LINDBERGH BLVD TO MANRESA LN)
Florissant $315,000
12180 Construction FORDER SANITARY INTERCONNECTION
(FORDER RD TO RINGER RD)
Unincorporated $237,000
12186 Construction FRONTENAC, WINDING RIDGE, DEER CREEK
HILL I/I REDUCTION (S QUAD I-64 AND
CLAYTON RD)
Ladue $190,000
11137 Construction GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $7,500,000
12386 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
Various $250,000
12396 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2018)
CONTRACT A
Various $400,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12894 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2018)
CONTRACT B
Various $400,000
12388 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT A
Various $50,000
12389 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT B
Various $50,000
12390 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT C
Various $50,000
12398 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2019) CONTRACT A
Various $150,000
12408 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT A
Various $50,000
12409 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
Various $50,000
12410 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
Various $50,000
12411 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
Various $50,000
12412 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT E
Various $50,000
10496 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE
TO PARDEE LANE)
Various $15,000,000
11766 Construction GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELOCATION PHASE VI
(BUCKLEY RD TO UNION RD)
Unincorporated $3,720,000
12569 Construction GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $20,000,000
12569 Engineering
During
Construction
Services
GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $700,000
12372 Construction GREEN PARK AND LAKESHIRE I/I
REDUCTION (TESSON FERRY RD AND
GREEN PARK RD)
Unincorporated $231,000
12510 Construction GREEN PARK AND LAKESHIRE PUBLIC I/I
REDUCTION (TESSON FERRY RD AND
GREEN PARK RD)
Unincorporated $5,340,000
11769 Construction HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (GOODFELLOW TO HAMILTON)
St. Louis City $4,430,000
11797 Design Services HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $670,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11800 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - TRUNK SEWER
REHABILITATION
Various $6,500,000
12695 Professional
Services
HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
St. Louis City $50,000
12297 Construction HARMANN ESTATES PUMP STATION (P-709)
ELIMINATION
Bridgeton $1,340,000
12298 Construction HARRISON SANITARY RELIEF (GRAND AVE
TO W ROSE HILL AVE)
Kirkwood $463,000
10863 Construction HERMITAGE SANITARY RELIEF (SKME-615)Frontenac $2,065,000
12017 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2019) CONTRACT A
St. Louis City And
County
$2,500,000
12018 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2019) CONTRACT B
St. Louis City And
County
$2,500,000
12009 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2019)
Various $6,000,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $20,000,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $485,000
11142 Construction JENNINGS STATION ROAD / NORTH BADEN
BASIN
St. Louis City $1,900,000
12323 Design Services LAKE FOREST DR SEWER SEPARATION Richmond Heights $497,000
12325 Design Services LANG ROYCE SANITARY RELIEF (FARGO
DR TO FLORIDALE CT)
Dellwood $80,000
12327 Construction LAY RD - GALLERIA I/I REDUCTION
(CLAYTON RD AND LAY RD)
Richmond Heights $198,000
12038 Construction LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT D
Various $4,020,000
12057 Design Services LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $155,000
12054 Design Services LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT B
Various $77,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $160,000
12721 Construction LEMAY WWTF REDUNDANT WATER
SERVICE
Unincorporated $470,000
11820 Miscellaneous
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $365,000
12479 Construction LOWELL STREET - GIMBLIN TO DODDRIDGE
COMBINED SEWER IMPROVEMENT
St. Louis City $525,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $320,000
12499 Construction LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
Unincorporated $2,500,000
12255 Design Services LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $2,000,000
12511 Construction MACKENZIE PUBLIC I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER
PARK, KENRICK SEMINARY, AND NERINX
HALL)
Shrewsbury $6,840,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $485,000
11656 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $9,000,000
12341 Design Services MARIETTA SANITARY RELIEF (CIRCLE DR
TO FLORISSANT RD)
Normandy $80,000
12349 Design Services MEAD SANITARY RELIEF (LANDWEHR LN
TO HEMLOCK DR)
Bellefontaine
Neighbors
$91,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12483 Construction
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $3,000,000
12362 Construction NORTH FOREST AND BROOKSIDE I/I
REDUCTION (SUMMIT AVE AND MARSHALL
AVE)
Webster Groves $333,000
12363 Construction NORTH WEBSTER CC, POCAHONTAS,
SOUTH BRENTWOOD I/I REDUCTION (S
BRENTWOOD BLVD AND MANCHESTER)
Brentwood $691,000
12460 Construction OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
12702 Construction OLIVE / WASHINGTON - GRAND TO
VANDEVENTER COMBINED SEWER RELIEF
St. Louis City $1,200,000
11701 Construction,
Phase II
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $1,300,000
12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $4,000,000
12840 Construction RIVERSIDE AND YARNELL SANITARY
RELIEF REPLACEMENT
Fenton $5,000,000
12190 Construction ROBYN I/I REDUCTION (S LINDBERGH BLVD
AND ROBYN RD)
Various $78,000
12201 Design Services SHREWSBURY SANITARY RELIEF SEWER
AND I/I REDUCTION (WEIL AVE AND I-44)
Shrewsbury $1,300,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10756 Design Services SOUTH BROADWAY AT MERAMEC
COMBINED SEWER REPLACEMENT
St. Louis City $150,000
12208 Design Services SPRING AVE SANITARY RELIEF (YEATMAN
AVE TO DALE AVE)
Webster Groves $240,000
12213 Design Services ST. JACQUES SANITARY RELIEF (ST.
JACQUES ST TO N LAFAYETTE ST)
Florissant $130,000
12221 Design Services SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
Unincorporated $260,000
11669 Design Services SUB-TRUNK #3 SANITARY RELIEF (MURIEL
DR TO JENNER LN)
Unincorporated $457,000
12223 Construction SUGAR CREEK I/I REDUCTION (W ADAMS
AVE AND COUCH AVE)
Kirkwood $590,000
12235 Construction TOWNE SOUTH AND BRUNSTON I/I
REDUCTION (AMBS RD AND TOWNE
CENTRE DR)
Unincorporated $60,000
12239 Design Services TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $680,000
11984 Construction UNIVERSITY CITY I/I REDUCTION - EAST
(UR-08 AND UR-09)
Various $5,506,000
11791 Construction
(Supplemental
Appropriation)
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION B
Ferguson $6,000,000
12440 Pre-Design
Services
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
12253 Construction VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD
AND WATSON RD)
Unincorporated $3,000,000
12490 Design Services VANCE RD PUMP STATION (P-472)
UPGRADES
Valley Park $1,000,000
12491 Construction WATKINS CREEK PUMP STATION (P-101)
UPGRADES
Unincorporated $2,300,000
12271 Design Services WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $290,000
11677 Construction WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $1,000,000
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $1,803,000
11679 Design Services WEST LOCKWOOD SANITARY RELIEF Webster Groves $250,000
12278 Construction WESTBOROUGH - LUTHER - MERMOD
PLACE I/I REDUCTION (N KIRKWOOD RD TO
I-44 AND BERRY RD)
Kirkwood $220,000
12296 Construction WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
Town And Country $1,415,000
11 April 2017
WASTEWATER PROJECTS - FY19
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $392,450,000
GRAND TOTAL:$412,995,000