HomeMy Public PortalAboutF1-Wastewater Construction Projects Table of Contents 17 January 2018 WASTEWATER CONSTRUCTION PROJECTS - FY19 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11993 82ND STREET TO I-170 SANITARY RELIEF (UR- 08, UR-09) $4,000,000 84 12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND DOUGHERTY FERRY RD) $525,000 85 12075 AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND HAMBURG) $510,000 86 12029 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT A $8,900,000 87 12026 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT C $5,900,000 88 12828 BISSELL POINT WWTF REDUNDANT SLUDGE ACCEPTANCE AND BELT FILTER PRESS REPLACEMENT $6,500,000 89 11789 CAULKS CREEK FORCEMAIN REHABILITATION $9,000,000 90 12836 CLARA 523 COMBINED SEWER IMPROVEMENT $100,000 91 12125 COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD) $2,000,000 92 12126 COLDWATER UPSTREAM PUMP STATION (P- 180) STORAGE $1,280,000 93 11729 CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021) $7,500,000 94 11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE $5,000,000 95 12471 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II $9,970,000 96 12042 DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A $5,745,000 97 11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) $50,000,000 98 11136 DEGIVERVILLE COMBINED SEWER IMPROVEMENTS $3,000,000 99 12154 EARTH CITY LAKE FRONT NORTH PUMP STATION (P-711) REPLACEMENT $550,000 100 17 January 2018 WASTEWATER CONSTRUCTION PROJECTS - FY19 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12155 EARTH CITY SHORELINE PUMP STATION (P- 704) REPLACEMENT $600,000 101 12515 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2019) $1,000,000 102 12161 ELINOR AVE. TEMPORARY SANITARY STORAGE FACILITY $125,000 103 10856 ERA AVE. 5800 BLOCK SEWER SEPARATION $113,000 104 10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF $4,700,000 105 12180 FORDER SANITARY INTERCONNECTION (FORDER RD TO RINGER RD) $237,000 106 12186 FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64 AND CLAYTON RD) $190,000 107 12914 GLEN EAGLES PUMP STATION (P-189) RELOCATION / REPLACEMENT $600,000 108 10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE AVE TO PARDEE LANE) $15,000,000 109 11766 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELOCATION PHASE VI (BUCKLEY RD TO UNION RD) $2,500,000 110 12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) $20,000,000 111 12372 GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) $231,000 112 12510 GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) $5,340,000 113 11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON) $4,430,000 114 10863 HERMITAGE SANITARY RELIEF (SKME-615)$2,065,000 115 12896 INFRASTRUCTURE REPAIRS (FACILITIES) (2019) $3,000,000 116 12017 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT A $2,500,000 117 17 January 2018 WASTEWATER CONSTRUCTION PROJECTS - FY19 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 12018 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT B $2,500,000 118 12009 INFRASTRUCTURE REPAIRS (WASTEWATER) (2019) $8,500,000 119 11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) $20,000,000 120 11142 JENNINGS STATION ROAD / NORTH BADEN BASIN $2,100,000 121 12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD) $500,000 122 13041 LEMAY 1 PUMP STATION (P-301) SLUICE GATE REPLACEMENT $1,500,000 123 12038 LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT D $4,223,000 124 12721 LEMAY WWTF REDUNDANT WATER SERVICE $470,000 125 12499 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS $2,500,000 126 12511 MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) $6,840,000 127 11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) $9,000,000 128 12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION $3,700,000 129 12444 N CLARK AVE 49 SANITARY SEWER REPLACEMENT $610,000 130 12786 N HIGHWAY 67 AT COLDWATER CREEK SANITARY SEWER REPLACEMENT $560,000 131 12362 NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND MARSHALL AVE) $500,000 132 12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD AND MANCHESTER) $600,000 133 12702 OLIVE / WASHINGTON - GRAND TO VANDEVENTER COMBINED SEWER RELIEF $1,250,000 134 17 January 2018 WASTEWATER CONSTRUCTION PROJECTS - FY19 PROJECT NUMBER PROJECT NAME COST ESTIMATE PAGE 11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I) (P-708) $1,300,000 135 12901 RDP FOULWATER SEWER GRIT CHAMBER ELIMINATION (DEER CREEK) $660,000 136 13079 RIVERSIDE AND YARNELL SANITARY RELIEF REHABILITATION $1,600,000 137 12840 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT $3,300,000 138 12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE) $590,000 139 12235 TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE CENTRE DR) $125,000 140 11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR- 08 AND UR-09) $5,506,000 141 11791 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B $7,000,000 142 12253 VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR RD AND WATSON RD) $500,000 143 11677 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE III $1,130,000 144 11678 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE IV PART 3 $100,000 145 11678 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE IV PART 3 $1,803,000 146 12278 WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY RD) $220,000 147 12296 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN) $1,375,000 148 TOTAL:$273,673,000