Loading...
HomeMy Public PortalAboutMAP Index 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 1 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS 2 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT A 3 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT B 4 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT C 5 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 6 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 7 BISSELL HILLS SANITARY RELIEF (ST CYR RD TO LEETON AVE) 8 CANTERBURY DRIVE LATERAL SANITARY RELIEF (NELSON DR TO CANTERBURY DR) 9 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS 10 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) 11 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT A) 12 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT B) 13 COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT 14 COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B REHABILITATION 15 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 16 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 17 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 18 CRITICAL INFRASTRUCTURE ASSESSMENT (2017) 19 CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I-118)/OUTFALL (L- 111) ELIMINATION AND SEWER SEPARATION 20 CSO - MARY AVENUE SOUTH OF MANCHESTER. CSO INTERCEPTOR (I- 132)/OUTFALL (L-106) ELIMINATION 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 21 DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR) 22 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III AND PHASE IV 23 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 24 E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR) 25 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES COURT) 26 FLOW METERING AND MONITORING (2017) 27 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2019) 28 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016) 29 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) CONTRACT A 30 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) CONTRACT B 31 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT A 32 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT B 33 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT C 34 GENERAL SERVICES AGREEMENT - LANDSCAPE DESIGN (2019) 35 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT A 36 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B 37 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C 38 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT D 39 GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2019) 40 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT A 41 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT B 42 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT C 43 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT D 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 44 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT E 45 GRAND GLAIZE WWTF FLOODWALL PROTECTION 46 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 47 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I 48 HARLEM BADEN RELIEF SYSTEM IMPROVEMENT DESIGN (CONTRACT A) 49 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 50 LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT) 51 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 52 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A 53 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 54 LEMAY WWTF REDUNDANT WATER SERVICE 55 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) 56 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 57 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 58 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 59 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS 60 LOWER MERAMEC WWTF EXPANSION PHASE II 61 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 62 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE) 63 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION 64 PUMP STATION REPLACEMENT PROJECTS (PHASE I) (P-708) 65 RADAR RAINFALL DATA (2017) 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 66 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 67 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 68 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 69 ROLAND SANITARY RELIEF (NELSON DR TO ROLAND BLVD) 70 SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND I-44) 71 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE) 72 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) 73 STREAM FLOW WATER QUALITY SAMPLING (2017) 74 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN) 75 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN) 76 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO HILDESHEIM AVE) 77 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL 78 VANCE RD PUMP STATION (P-472) UPGRADES 79 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL BANK RD TO SPRING GARDEN DR) 80 WATKINS CREEK PUMP STATION (P-101) UPGRADES 81 WEST LOCKWOOD SANITARY RELIEF 82 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09) 83 ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND DOUGHERTY FERRY RD) 84 AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND HAMBURG) 85 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT A 86 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT C 87 BISSELL POINT WWTF REDUNDANT SLUDGE ACCEPTANCE SYSTEM 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 88 CAULKS CREEK FORCEMAIN REHABILITATION 89 CLARA 523 COMBINED SEWER IMPROVEMENT 90 COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD) 91 COLDWATER UPSTREAM PUMP STATION (P-180) STORAGE 92 CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021) 93 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE 94 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II 95 DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A 96 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 97 EARTH CITY LAKE FRONT NORTH PUMP STATION (P-711) REPLACEMENT 98 EARTH CITY SHORELINE PUMP STATION (P-704) REPLACEMENT 99 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2019) 100 ELINOR AVE. TEMPORARY SANITARY STORAGE FACILITY 101 ERA AVE. 5800 BLOCK SEWER SEPARATION 102 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF 103 FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64 AND CLAYTON RD) 104 GLEN EAGLES PUMP STATION (P-189) RELOCATION / REPLACEMENT 105 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE AVE TO PARDEE LANE) 106 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELOCATION PHASE VI (BUCKLEY RD TO UNION RD) 107 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 108 GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) 109 GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 110 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON) 111 HERMITAGE SANITARY RELIEF (SKME-615) 112 INFRASTRUCTURE REPAIRS (FACILITIES) (2019) 113 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT A 114 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT B 115 INFRASTRUCTURE REPAIRS (WASTEWATER) (2019) 116 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 117 JENNINGS STATION ROAD / NORTH BADEN BASIN 118 LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD) 119 LEMAY 1 PUMP STATION (P-301) SLUICE GATE REPLACEMENT 120 LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT D 121 LEMAY WWTF REDUNDANT WATER SERVICE 122 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS 123 MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) 124 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 125 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION 126 N CLARK AVE 49 SANITARY SEWER REPLACEMENT 127 N HIGHWAY 67 AT COLDWATER CREEK SANITARY SEWER REPLACEMENT 128 NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND MARSHALL AVE) 129 NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD AND MANCHESTER) 130 OLIVE / WASHINGTON - GRAND TO VANDEVENTER COMBINED SEWER RELIEF 131 RDP FOULWATER SEWER GRIT CHAMBER ELIMINATION (DEER CREEK) 132 RIVERSIDE AND YARNELL SANITARY RELIEF REHABILITATION 133 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 134 SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE) 135 TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE CENTRE DR) 136 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) 137 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B 138 VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR RD AND WATSON RD) 139 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE III 140 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE IV PART 3 141 WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY RD) 142 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN) 169 GENERAL SERVICES AGREEMENT - WATER QUALITY GENERAL SUPPORT (2017) 170 HALL STREET STORM SEWERS 171 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT) 172 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT A) 173 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT B) 174 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT C) 175 STORMWATER STREAMBANK STABILIZATION DESIGN (CONTRACT B) 176 BARKMAN STORM SEWER IMPROVEMENTS 177 BAXTER ROAD #273 AND #301 STORM SEWER 178 BRADBURY DR. #5468 STORM SEWER 179 BROGAN DALE CIRCLE STORM SEWER 180 BROOKVALE TERRACE - PARKFIELD TERRACE STORM IMPROVEMENTS 181 CORONA PARK STORM SEWER PHASE 2B 182 CRESTWICK DRIVE #9733 AND 9741 STORM SEWER (SUNSET HILLS 11) 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 183 DEER CREEK WATERSHED INITIATIVE 184 DICKENS AVENUE #470 STORM SEWER 185 DIPLOMAT LANE OUTFALL STABILIZATION 186 EASEMENT ACQUISITION FOR STORMWATER PROJECTS (2019) 187 GRAND GLEN DR. #702 STORM IMPROVEMENTS 188 HANCOCK AVENUE 5600 BLOCK STORM SEWER 189 HARVEST HILL CT. BANK STABILIZATION 190 HOFFMEISTER - PARDELLA STORM SEWER IMPROVEMENTS 191 INFRASTRUCTURE REPAIRS (REHABILITATION) STORMWATER (2019) 192 LACKLAND RD. - UCEYLE AVE. STORM SEWER 193 LADUE FARM ROAD #125 STORM SEWER 194 LIBERTY AVE. 10000 BLOCK STORM SEWER 195 MAR ANN CT. #9819 STORM IMPROVEMENT 196 MARTYRIDGE CT. #4307 STORM SEWER (MGMB-170) 197 MEAUX MART - GRAY STORM CHANNEL 198 PATRINA COURT BANK STABILIZATION 199 QUEEN ANNE PLACE AT SAPPINGTON STORM IMPROVEMENTS 200 SAXONHALL - VENUS - BRISTOL HALL STORM SEWER 201 SCHAEFFER PLACE 2000 BLOCK STORM SEWER 202 SCHUETZ ROAD AND WILLOW BROOK COVE STORM SEWERS 203 STEEPLECHASE STORM SEWER IMPROVEMENTS (FRONTENAC 3-3) 204 STONE HILL DR 4701 STORM SEWER 205 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DISTRICTWIDE (2019) 206 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - ORIGINAL BOUNDARY (2019) 207 SUMMER LAKE DR. #15637 STORM SEWER 5 April 2018 CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM MAP INDEX - FY19 PAGE NUMBER PROJECT NAME 208 SUMMERHAVEN DRIVE #11656 STORM SEWER 209 TIMBER TRAIL - BRIAR RIDGE CHANNEL IMPROVEMENTS 210 TINA TERRACE DRIVE STORM SEWER 211 VILLAGE MEAD DR. #294 STORM SEWER 212 WILLOW HILL STORM SEWER (LADUE 1614A) 213 WINCHESTER DRIVE 7120 BANK STABILIZATION 214 WISE AND WEST PARK STORM IMPROVEMENT