Loading...
HomeMy Public PortalAboutProject Index By Municipality 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11569 HARVEST HILL CT. BANK STABILIZATION STORMWATER BALLWIN 189 11593 BAXTER ROAD #273 AND #301 STORM SEWER STORMWATER BALLWIN 177 11604 VILLAGE MEAD DR. #294 STORM SEWER STORMWATER BALLWIN 211 12096 BISSELL HILLS SANITARY RELIEF (ST CYR RD TO LEETON AVE) WASTEWATER BELLEFONTAINE NEIGHBORS 7 12140 CSO - MARY AVENUE SOUTH OF MANCHESTER. CSO INTERCEPTOR (I-132)/OUTFALL (L-106) ELIMINATION WASTEWATER BRENTWOOD 20 11397 LADUE FARM ROAD #125 STORM SEWER STORMWATER CHESTERFIELD 193 11447 DIPLOMAT LANE OUTFALL STABILIZATION STORMWATER CHESTERFIELD 185 11592 SUMMER LAKE DR. #15637 STORM SEWER STORMWATER CHESTERFIELD 207 11729 CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021) WASTEWATER CHESTERFIELD 92 11789 CAULKS CREEK FORCEMAIN REHABILITATION WASTEWATER CHESTERFIELD 88 12248 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS WASTEWATER CHESTERFIELD 9 12152 E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR) WASTEWATER CRESTWOOD 24 12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) WASTEWATER CRESTWOOD 46 12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) WASTEWATER CRESTWOOD 107 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT) WASTEWATER DELLWOOD 50 11171 MEAUX MART - GRAY STORM CHANNEL STORMWATER DES PERES 197 12840 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT WASTEWATER FENTON 133 13079 RIVERSIDE AND YARNELL SANITARY RELIEF REHABILITATION WASTEWATER FENTON 132 12444 N CLARK AVE 49 SANITARY SEWER REPLACEMENT WASTEWATER FERGUSON 126 12786 N HIGHWAY 67 AT COLDWATER CREEK SANITARY SEWER REPLACEMENT WASTEWATER FLORISSANT 127 10863 HERMITAGE SANITARY RELIEF (SKME-615)WASTEWATER FRONTENAC 111 11224 TIMBER TRAIL - BRIAR RIDGE CHANNEL IMPROVEMENTS STORMWATER FRONTENAC 209 11239 STEEPLECHASE STORM SEWER IMPROVEMENTS (FRONTENAC 3-3) STORMWATER FRONTENAC 203 12767 QUEEN ANNE PLACE AT SAPPINGTON STORM IMPROVEMENTS STORMWATER GLENDALE 199 10210 CORONA PARK STORM SEWER PHASE 2B STORMWATER KIRKWOOD 181 11299 DICKENS AVENUE #470 STORM SEWER STORMWATER KIRKWOOD 184 12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND DOUGHERTY FERRY RD) WASTEWATER KIRKWOOD 83 12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE) WASTEWATER KIRKWOOD 134 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12186 FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64 AND CLAYTON RD) WASTEWATER LADUE 103 12938 WILLOW HILL STORM SEWER (LADUE 1614A)STORMWATER LADUE 212 11600 BROOKVALE TERRACE - PARKFIELD TERRACE STORM IMPROVEMENTS STORMWATER MANCHESTER 180 11611 GRAND GLEN DR. #702 STORM IMPROVEMENTS STORMWATER MANCHESTER 187 10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF WASTEWATER MARYLAND HEIGHTS 102 11745 FEE FEE TRUNK SEWER RELIEF (SKME-002, LONG LEAF CIRCLE TO THAMES COURT) WASTEWATER MARYLAND HEIGHTS 25 11026 WINCHESTER DRIVE 7120 BANK STABILIZATION STORMWATER NORTHWOODS 213 12110 CANTERBURY DRIVE LATERAL SANITARY RELIEF (NELSON DR TO CANTERBURY DR) WASTEWATER NORTHWOODS 8 12191 ROLAND SANITARY RELIEF (NELSON DR TO ROLAND BLVD) WASTEWATER NORTHWOODS 69 11304 LACKLAND RD. - UCEYLE AVE. STORM SEWER STORMWATER OVERLAND 192 11306 LIBERTY AVE. 10000 BLOCK STORM SEWER STORMWATER OVERLAND 194 12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE) WASTEWATER OVERLAND 62 11477 WISE AND WEST PARK STORM IMPROVEMENT STORMWATER RICHMOND HEIGHTS 214 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12139 CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I-118)/OUTFALL (L-111) ELIMINATION AND SEWER SEPARATION WASTEWATER RICHMOND HEIGHTS 19 12161 ELINOR AVE. TEMPORARY SANITARY STORAGE FACILITY WASTEWATER RICHMOND HEIGHTS 100 10070 HALL STREET STORM SEWERS STORMWATER ST. LOUIS CITY 170 10856 ERA AVE. 5800 BLOCK SEWER SEPARATION WASTEWATER ST. LOUIS CITY 101 11142 JENNINGS STATION ROAD / NORTH BADEN BASIN WASTEWATER ST. LOUIS CITY 117 11621 SCHAEFFER PLACE 2000 BLOCK STORM SEWER STORMWATER ST. LOUIS CITY 201 11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) WASTEWATER ST. LOUIS CITY 61 11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) WASTEWATER ST. LOUIS CITY 124 11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON) WASTEWATER ST. LOUIS CITY 110 11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) WASTEWATER ST. LOUIS CITY 55 11954 HANCOCK AVENUE 5600 BLOCK STORM SEWER STORMWATER ST. LOUIS CITY 188 12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION WASTEWATER ST. LOUIS CITY 63 12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION WASTEWATER ST. LOUIS CITY 125 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12693 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT A) WASTEWATER ST. LOUIS CITY 11 12694 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT B) WASTEWATER ST. LOUIS CITY 12 12695 HARLEM BADEN RELIEF SYSTEM IMPROVEMENT DESIGN (CONTRACT A) WASTEWATER ST. LOUIS CITY 48 12702 OLIVE / WASHINGTON - GRAND TO VANDEVENTER COMBINED SEWER RELIEF WASTEWATER ST. LOUIS CITY 130 12828 BISSELL POINT WWTF REDUNDANT SLUDGE ACCEPTANCE SYSTEM WASTEWATER ST. LOUIS CITY 87 12836 CLARA 523 COMBINED SEWER IMPROVEMENT WASTEWATER ST. LOUIS CITY 89 12901 RDP FOULWATER SEWER GRIT CHAMBER ELIMINATION (DEER CREEK) WASTEWATER ST. LOUIS CITY 131 12922 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL BANK RD TO SPRING GARDEN DR) WASTEWATER ST. LOUIS CITY 79 13041 LEMAY 1 PUMP STATION (P-301) SLUICE GATE REPLACEMENT WASTEWATER ST. LOUIS CITY 119 10766 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) UNALLOCATED ST. LOUIS CITY AND COUNTY 72 12017 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT A WASTEWATER ST. LOUIS CITY AND COUNTY 113 12018 INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT B WASTEWATER ST. LOUIS CITY AND COUNTY 114 10282 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT) STORMWATER ST. LOUIS COUNTY 171 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11514 CRESTWICK DRIVE #9733 AND 9741 STORM SEWER (SUNSET HILLS 11) STORMWATER SUNSET HILLS 182 12296 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN) WASTEWATER TOWN AND COUNTRY 142 10380 BROGAN DALE CIRCLE STORM SEWER STORMWATER UNINCORPORAT ED 179 11018 PATRINA COURT BANK STABILIZATION STORMWATER UNINCORPORAT ED 198 11033 STONE HILL DR 4701 STORM SEWER STORMWATER UNINCORPORAT ED 204 11392 BARKMAN STORM SEWER IMPROVEMENTS STORMWATER UNINCORPORAT ED 176 11395 SUMMERHAVEN DRIVE #11656 STORM SEWER STORMWATER UNINCORPORAT ED 208 11407 TINA TERRACE DRIVE STORM SEWER STORMWATER UNINCORPORAT ED 210 11488 MAR ANN CT. #9819 STORM IMPROVEMENT STORMWATER UNINCORPORAT ED 195 11511 SCHUETZ ROAD AND WILLOW BROOK COVE STORM SEWERS STORMWATER UNINCORPORAT ED 202 11594 MARTYRIDGE CT. #4307 STORM SEWER (MGMB-170) STORMWATER UNINCORPORAT ED 196 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11613 BRADBURY DR. #5468 STORM SEWER STORMWATER UNINCORPORAT ED 178 11647 HOFFMEISTER - PARDELLA STORM SEWER IMPROVEMENTS STORMWATER UNINCORPORAT ED 190 11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN) WASTEWATER UNINCORPORAT ED 75 11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) WASTEWATER UNINCORPORAT ED 49 11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) WASTEWATER UNINCORPORAT ED 116 11724 COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B REHABILITATION WASTEWATER UNINCORPORAT ED 14 11766 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELOCATION PHASE VI (BUCKLEY RD TO UNION RD) WASTEWATER UNINCORPORAT ED 106 11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT ED 51 12075 AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND HAMBURG) WASTEWATER UNINCORPORAT ED 84 12126 COLDWATER UPSTREAM PUMP STATION (P-180) STORAGE WASTEWATER UNINCORPORAT ED 91 12142 DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR) WASTEWATER UNINCORPORAT ED 21 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12154 EARTH CITY LAKE FRONT NORTH PUMP STATION (P-711) REPLACEMENT WASTEWATER UNINCORPORAT ED 97 12155 EARTH CITY SHORELINE PUMP STATION (P-704) REPLACEMENT WASTEWATER UNINCORPORAT ED 98 12221 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN) WASTEWATER UNINCORPORAT ED 74 12235 TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE CENTRE DR) WASTEWATER UNINCORPORAT ED 135 12239 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO HILDESHEIM AVE) WASTEWATER UNINCORPORAT ED 76 12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT ED 60 12372 GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) WASTEWATER UNINCORPORAT ED 108 12491 WATKINS CREEK PUMP STATION (P-101) UPGRADES WASTEWATER UNINCORPORAT ED 80 12499 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS WASTEWATER UNINCORPORAT ED 59 12499 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS WASTEWATER UNINCORPORAT ED 122 12504 COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT WASTEWATER UNINCORPORAT ED 13 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12510 GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) WASTEWATER UNINCORPORAT ED 109 12721 LEMAY WWTF REDUNDANT WATER SERVICE WASTEWATER UNINCORPORAT ED 54 12721 LEMAY WWTF REDUNDANT WATER SERVICE WASTEWATER UNINCORPORAT ED 121 12914 GLEN EAGLES PUMP STATION (P-189) RELOCATION / REPLACEMENT WASTEWATER UNINCORPORAT ED 104 12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL WASTEWATER UNIVERSITY CITY 77 12490 VANCE RD PUMP STATION (P-472) UPGRADES WASTEWATER VALLEY PARK 78 13072 GRAND GLAIZE WWTF FLOODWALL PROTECTION WASTEWATER VALLEY PARK 45 10496 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE AVE TO PARDEE LANE) WASTEWATER VARIOUS 105 11065 DEER CREEK WATERSHED INITIATIVE STORMWATER VARIOUS 183 11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 56 11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 57 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 5 11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 6 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 53 11146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE WASTEWATER VARIOUS 93 11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES WASTEWATER VARIOUS 17 11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES WASTEWATER VARIOUS 15 11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 66 11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) WASTEWATER VARIOUS 67 11420 SAXONHALL - VENUS - BRISTOL HALL STORM SEWER STORMWATER VARIOUS 200 11701 PUMP STATION REPLACEMENT PROJECTS (PHASE I) (P-708) WASTEWATER VARIOUS 64 11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) WASTEWATER VARIOUS 23 11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) WASTEWATER VARIOUS 96 11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL WASTEWATER VARIOUS 58 11760 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016) WASTEWATER VARIOUS 28 11791 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B WASTEWATER VARIOUS 137 11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS WASTEWATER VARIOUS 16 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) WASTEWATER VARIOUS 136 11993 82ND STREET TO I-170 SANITARY RELIEF (UR- 08, UR-09) WASTEWATER VARIOUS 82 11999 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) WASTEWATER VARIOUS 10 12003 STREAM FLOW WATER QUALITY SAMPLING (2017) UNALLOCATED VARIOUS 73 12005 RADAR RAINFALL DATA (2017)WASTEWATER VARIOUS 65 12009 INFRASTRUCTURE REPAIRS (WASTEWATER) (2019) WASTEWATER VARIOUS 115 12026 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT C WASTEWATER VARIOUS 86 12027 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT C WASTEWATER VARIOUS 4 12029 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT A WASTEWATER VARIOUS 85 12030 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT B WASTEWATER VARIOUS 3 12033 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT A WASTEWATER VARIOUS 2 12038 LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT D WASTEWATER VARIOUS 120 12042 DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A WASTEWATER VARIOUS 95 12057 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A WASTEWATER VARIOUS 52 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12125 COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD) WASTEWATER VARIOUS 90 12201 SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND I-44) WASTEWATER VARIOUS 70 12253 VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR RD AND WATSON RD) WASTEWATER VARIOUS 138 12278 WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY RD) WASTEWATER VARIOUS 141 12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD) WASTEWATER VARIOUS 118 12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I WASTEWATER VARIOUS 47 12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD AND MANCHESTER) WASTEWATER VARIOUS 129 12382 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT A UNALLOCATED VARIOUS 35 12383 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B UNALLOCATED VARIOUS 36 12384 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C UNALLOCATED VARIOUS 37 12385 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT D UNALLOCATED VARIOUS 38 12386 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2019) WASTEWATER VARIOUS 27 12388 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT A WASTEWATER VARIOUS 31 12389 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT B WASTEWATER VARIOUS 32 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12390 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2018) CONTRACT C WASTEWATER VARIOUS 33 12396 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) CONTRACT A WASTEWATER VARIOUS 29 12398 GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2019) WASTEWATER VARIOUS 39 12408 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT A WASTEWATER VARIOUS 40 12409 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT B WASTEWATER VARIOUS 41 12410 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT C WASTEWATER VARIOUS 42 12411 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT D WASTEWATER VARIOUS 43 12412 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT E WASTEWATER VARIOUS 44 12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 68 12471 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II WASTEWATER VARIOUS 94 12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III AND PHASE IV WASTEWATER VARIOUS 22 12511 MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) WASTEWATER VARIOUS 123 12515 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2019) WASTEWATER VARIOUS 99 12565 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS WASTEWATER VARIOUS 1 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 12674 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DISTRICTWIDE (2019) STORMWATER VARIOUS 205 12678 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - ORIGINAL BOUNDARY (2019) STORMWATER VARIOUS 206 12682 EASEMENT ACQUISITION FOR STORMWATER PROJECTS (2019) STORMWATER VARIOUS 186 12687 STORMWATER STREAMBANK STABILIZATION DESIGN (CONTRACT B) STORMWATER VARIOUS 175 12688 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT A) STORMWATER VARIOUS 172 12689 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT B) STORMWATER VARIOUS 173 12690 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT C) STORMWATER VARIOUS 174 12716 GENERAL SERVICES AGREEMENT - WATER QUALITY GENERAL SUPPORT (2017) STORMWATER VARIOUS 169 12720 CRITICAL INFRASTRUCTURE ASSESSMENT (2017) WASTEWATER VARIOUS 18 12759 FLOW METERING AND MONITORING (2017)WASTEWATER VARIOUS 26 12894 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) CONTRACT B WASTEWATER VARIOUS 30 12896 INFRASTRUCTURE REPAIRS (FACILITIES) (2019)WASTEWATER VARIOUS 112 13043 INFRASTRUCTURE REPAIRS (REHABILITATION) STORMWATER (2019) STORMWATER VARIOUS 191 13044 GENERAL SERVICES AGREEMENT - LANDSCAPE DESIGN (2019) UNALLOCATED VARIOUS 34 5 April 2018 PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19 PROJECT NUMBER PROJECT NAME PROJECT TYPE MUNICIPALITY PAGE NUMBER 11677 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE III WASTEWATER WEBSTER GROVES 139 11678 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE IV PART 3 WASTEWATER WEBSTER GROVES 140 11679 WEST LOCKWOOD SANITARY RELIEF WASTEWATER WEBSTER GROVES 81 12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE) WASTEWATER WEBSTER GROVES 71 12362 NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND MARSHALL AVE) WASTEWATER WEBSTER GROVES 128