HomeMy Public PortalAboutProject Index By Municipality 5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11569 HARVEST HILL CT. BANK STABILIZATION STORMWATER BALLWIN 189
11593 BAXTER ROAD #273 AND #301 STORM SEWER STORMWATER BALLWIN 177
11604 VILLAGE MEAD DR. #294 STORM SEWER STORMWATER BALLWIN 211
12096 BISSELL HILLS SANITARY RELIEF (ST CYR RD
TO LEETON AVE)
WASTEWATER BELLEFONTAINE
NEIGHBORS
7
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER.
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION
WASTEWATER BRENTWOOD 20
11397 LADUE FARM ROAD #125 STORM SEWER STORMWATER CHESTERFIELD 193
11447 DIPLOMAT LANE OUTFALL STABILIZATION STORMWATER CHESTERFIELD 185
11592 SUMMER LAKE DR. #15637 STORM SEWER STORMWATER CHESTERFIELD 207
11729 CREVE COEUR CREEK SANITARY TRUNK
SEWER RELIEF PHASE VI (SKME-021)
WASTEWATER CHESTERFIELD 92
11789 CAULKS CREEK FORCEMAIN REHABILITATION WASTEWATER CHESTERFIELD 88
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
WASTEWATER CHESTERFIELD 9
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
WASTEWATER CRESTWOOD 24
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 46
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 107
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO
FLORIDALE CT)
WASTEWATER DELLWOOD 50
11171 MEAUX MART - GRAY STORM CHANNEL STORMWATER DES PERES 197
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
WASTEWATER FENTON 133
13079 RIVERSIDE AND YARNELL SANITARY RELIEF
REHABILITATION
WASTEWATER FENTON 132
12444 N CLARK AVE 49 SANITARY SEWER
REPLACEMENT
WASTEWATER FERGUSON 126
12786 N HIGHWAY 67 AT COLDWATER CREEK
SANITARY SEWER REPLACEMENT
WASTEWATER FLORISSANT 127
10863 HERMITAGE SANITARY RELIEF (SKME-615)WASTEWATER FRONTENAC 111
11224 TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
STORMWATER FRONTENAC 209
11239 STEEPLECHASE STORM SEWER
IMPROVEMENTS (FRONTENAC 3-3)
STORMWATER FRONTENAC 203
12767 QUEEN ANNE PLACE AT SAPPINGTON STORM
IMPROVEMENTS
STORMWATER GLENDALE 199
10210 CORONA PARK STORM SEWER PHASE 2B STORMWATER KIRKWOOD 181
11299 DICKENS AVENUE #470 STORM SEWER STORMWATER KIRKWOOD 184
12073 ADAMS I/I REDUCTION (SOUTHEAST OF I-270
AND DOUGHERTY FERRY RD)
WASTEWATER KIRKWOOD 83
12223 SUGAR CREEK I/I REDUCTION (W ADAMS AVE
AND COUCH AVE)
WASTEWATER KIRKWOOD 134
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12186 FRONTENAC, WINDING RIDGE, DEER CREEK
HILL I/I REDUCTION (S QUAD I-64 AND
CLAYTON RD)
WASTEWATER LADUE 103
12938 WILLOW HILL STORM SEWER (LADUE 1614A)STORMWATER LADUE 212
11600 BROOKVALE TERRACE - PARKFIELD TERRACE
STORM IMPROVEMENTS
STORMWATER MANCHESTER 180
11611 GRAND GLEN DR. #702 STORM IMPROVEMENTS STORMWATER MANCHESTER 187
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
WASTEWATER MARYLAND
HEIGHTS
102
11745 FEE FEE TRUNK SEWER RELIEF (SKME-002,
LONG LEAF CIRCLE TO THAMES COURT)
WASTEWATER MARYLAND
HEIGHTS
25
11026 WINCHESTER DRIVE 7120 BANK
STABILIZATION
STORMWATER NORTHWOODS 213
12110 CANTERBURY DRIVE LATERAL SANITARY
RELIEF (NELSON DR TO CANTERBURY DR)
WASTEWATER NORTHWOODS 8
12191 ROLAND SANITARY RELIEF (NELSON DR TO
ROLAND BLVD)
WASTEWATER NORTHWOODS 69
11304 LACKLAND RD. - UCEYLE AVE. STORM SEWER STORMWATER OVERLAND 192
11306 LIBERTY AVE. 10000 BLOCK STORM SEWER STORMWATER OVERLAND 194
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD
TO SIMS AVE)
WASTEWATER OVERLAND 62
11477 WISE AND WEST PARK STORM IMPROVEMENT STORMWATER RICHMOND
HEIGHTS
214
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12139 CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
WASTEWATER RICHMOND
HEIGHTS
19
12161 ELINOR AVE. TEMPORARY SANITARY
STORAGE FACILITY
WASTEWATER RICHMOND
HEIGHTS
100
10070 HALL STREET STORM SEWERS STORMWATER ST. LOUIS CITY 170
10856 ERA AVE. 5800 BLOCK SEWER SEPARATION WASTEWATER ST. LOUIS CITY 101
11142 JENNINGS STATION ROAD / NORTH BADEN
BASIN
WASTEWATER ST. LOUIS CITY 117
11621 SCHAEFFER PLACE 2000 BLOCK STORM SEWER STORMWATER ST. LOUIS CITY 201
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 61
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 124
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
WASTEWATER ST. LOUIS CITY 110
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
WASTEWATER ST. LOUIS CITY 55
11954 HANCOCK AVENUE 5600 BLOCK STORM SEWER STORMWATER ST. LOUIS CITY 188
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
WASTEWATER ST. LOUIS CITY 63
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
WASTEWATER ST. LOUIS CITY 125
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
WASTEWATER ST. LOUIS CITY 11
12694 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
WASTEWATER ST. LOUIS CITY 12
12695 HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
WASTEWATER ST. LOUIS CITY 48
12702 OLIVE / WASHINGTON - GRAND TO
VANDEVENTER COMBINED SEWER RELIEF
WASTEWATER ST. LOUIS CITY 130
12828 BISSELL POINT WWTF REDUNDANT SLUDGE
ACCEPTANCE SYSTEM
WASTEWATER ST. LOUIS CITY 87
12836 CLARA 523 COMBINED SEWER IMPROVEMENT WASTEWATER ST. LOUIS CITY 89
12901 RDP FOULWATER SEWER GRIT CHAMBER
ELIMINATION (DEER CREEK)
WASTEWATER ST. LOUIS CITY 131
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
WASTEWATER ST. LOUIS CITY 79
13041 LEMAY 1 PUMP STATION (P-301) SLUICE GATE
REPLACEMENT
WASTEWATER ST. LOUIS CITY 119
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
72
12017 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2019) CONTRACT A
WASTEWATER ST. LOUIS CITY
AND COUNTY
113
12018 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2019) CONTRACT B
WASTEWATER ST. LOUIS CITY
AND COUNTY
114
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
STORMWATER ST. LOUIS
COUNTY
171
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11514 CRESTWICK DRIVE #9733 AND 9741 STORM
SEWER (SUNSET HILLS 11)
STORMWATER SUNSET HILLS 182
12296 WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
WASTEWATER TOWN AND
COUNTRY
142
10380 BROGAN DALE CIRCLE STORM SEWER STORMWATER UNINCORPORAT
ED
179
11018 PATRINA COURT BANK STABILIZATION STORMWATER UNINCORPORAT
ED
198
11033 STONE HILL DR 4701 STORM SEWER STORMWATER UNINCORPORAT
ED
204
11392 BARKMAN STORM SEWER IMPROVEMENTS STORMWATER UNINCORPORAT
ED
176
11395 SUMMERHAVEN DRIVE #11656 STORM SEWER STORMWATER UNINCORPORAT
ED
208
11407 TINA TERRACE DRIVE STORM SEWER STORMWATER UNINCORPORAT
ED
210
11488 MAR ANN CT. #9819 STORM IMPROVEMENT STORMWATER UNINCORPORAT
ED
195
11511 SCHUETZ ROAD AND WILLOW BROOK COVE
STORM SEWERS
STORMWATER UNINCORPORAT
ED
202
11594 MARTYRIDGE CT. #4307 STORM SEWER
(MGMB-170)
STORMWATER UNINCORPORAT
ED
196
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11613 BRADBURY DR. #5468 STORM SEWER STORMWATER UNINCORPORAT
ED
178
11647 HOFFMEISTER - PARDELLA STORM SEWER
IMPROVEMENTS
STORMWATER UNINCORPORAT
ED
190
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR
TO JENNER LN)
WASTEWATER UNINCORPORAT
ED
75
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
49
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
116
11724 COLDWATER SANITARY RELIEF SECTION B, C
& D - SECTION B REHABILITATION
WASTEWATER UNINCORPORAT
ED
14
11766 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY RELOCATION PHASE VI (BUCKLEY
RD TO UNION RD)
WASTEWATER UNINCORPORAT
ED
106
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
51
12075 AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
WASTEWATER UNINCORPORAT
ED
84
12126 COLDWATER UPSTREAM PUMP STATION (P-180)
STORAGE
WASTEWATER UNINCORPORAT
ED
91
12142 DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
WASTEWATER UNINCORPORAT
ED
21
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12154 EARTH CITY LAKE FRONT NORTH PUMP
STATION (P-711) REPLACEMENT
WASTEWATER UNINCORPORAT
ED
97
12155 EARTH CITY SHORELINE PUMP STATION (P-704)
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
98
12221 SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
WASTEWATER UNINCORPORAT
ED
74
12235 TOWNE SOUTH AND BRUNSTON I/I REDUCTION
(AMBS RD AND TOWNE CENTRE DR)
WASTEWATER UNINCORPORAT
ED
135
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
WASTEWATER UNINCORPORAT
ED
76
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
60
12372 GREEN PARK AND LAKESHIRE I/I REDUCTION
(TESSON FERRY RD AND GREEN PARK RD)
WASTEWATER UNINCORPORAT
ED
108
12491 WATKINS CREEK PUMP STATION (P-101)
UPGRADES
WASTEWATER UNINCORPORAT
ED
80
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
59
12499 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
122
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
13
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12510 GREEN PARK AND LAKESHIRE PUBLIC I/I
REDUCTION (TESSON FERRY RD AND GREEN
PARK RD)
WASTEWATER UNINCORPORAT
ED
109
12721 LEMAY WWTF REDUNDANT WATER SERVICE WASTEWATER UNINCORPORAT
ED
54
12721 LEMAY WWTF REDUNDANT WATER SERVICE WASTEWATER UNINCORPORAT
ED
121
12914 GLEN EAGLES PUMP STATION (P-189)
RELOCATION / REPLACEMENT
WASTEWATER UNINCORPORAT
ED
104
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
WASTEWATER UNIVERSITY
CITY
77
12490 VANCE RD PUMP STATION (P-472) UPGRADES WASTEWATER VALLEY PARK 78
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
WASTEWATER VALLEY PARK 45
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
WASTEWATER VARIOUS 105
11065 DEER CREEK WATERSHED INITIATIVE STORMWATER VARIOUS 183
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 56
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 57
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 5
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 6
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 53
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 93
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 17
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 15
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 66
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 67
11420 SAXONHALL - VENUS - BRISTOL HALL STORM
SEWER
STORMWATER VARIOUS 200
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I) (P-708)
WASTEWATER VARIOUS 64
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 23
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 96
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 58
11760 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2016)
WASTEWATER VARIOUS 28
11791 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION B
WASTEWATER VARIOUS 137
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 16
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11984 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09)
WASTEWATER VARIOUS 136
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
WASTEWATER VARIOUS 82
11999 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2017)
WASTEWATER VARIOUS 10
12003 STREAM FLOW WATER QUALITY SAMPLING
(2017)
UNALLOCATED VARIOUS 73
12005 RADAR RAINFALL DATA (2017)WASTEWATER VARIOUS 65
12009 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2019)
WASTEWATER VARIOUS 115
12026 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT C
WASTEWATER VARIOUS 86
12027 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT C
WASTEWATER VARIOUS 4
12029 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2019) CONTRACT A
WASTEWATER VARIOUS 85
12030 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT B
WASTEWATER VARIOUS 3
12033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT A
WASTEWATER VARIOUS 2
12038 LEMAY PUBLIC I/I REDUCTION (2019)
CONTRACT D
WASTEWATER VARIOUS 120
12042 DEER CREEK PUBLIC I/I REDUCTION (2019)
CONTRACT A
WASTEWATER VARIOUS 95
12057 LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
WASTEWATER VARIOUS 52
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12125 COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
WASTEWATER VARIOUS 90
12201 SHREWSBURY SANITARY RELIEF SEWER AND
I/I REDUCTION (WEIL AVE AND I-44)
WASTEWATER VARIOUS 70
12253 VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD AND
WATSON RD)
WASTEWATER VARIOUS 138
12278 WESTBOROUGH - LUTHER - MERMOD PLACE I/I
REDUCTION (N KIRKWOOD RD TO I-44 AND
BERRY RD)
WASTEWATER VARIOUS 141
12327 LAY RD - GALLERIA I/I REDUCTION (CLAYTON
RD AND LAY RD)
WASTEWATER VARIOUS 118
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
WASTEWATER VARIOUS 47
12363 NORTH WEBSTER CC, POCAHONTAS, SOUTH
BRENTWOOD I/I REDUCTION (S BRENTWOOD
BLVD AND MANCHESTER)
WASTEWATER VARIOUS 129
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
UNALLOCATED VARIOUS 35
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
UNALLOCATED VARIOUS 36
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
UNALLOCATED VARIOUS 37
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
UNALLOCATED VARIOUS 38
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
WASTEWATER VARIOUS 27
12388 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT A
WASTEWATER VARIOUS 31
12389 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT B
WASTEWATER VARIOUS 32
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12390 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2018) CONTRACT C
WASTEWATER VARIOUS 33
12396 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT A
WASTEWATER VARIOUS 29
12398 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2019)
WASTEWATER VARIOUS 39
12408 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT A
WASTEWATER VARIOUS 40
12409 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT B
WASTEWATER VARIOUS 41
12410 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT C
WASTEWATER VARIOUS 42
12411 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT D
WASTEWATER VARIOUS 43
12412 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2018) CONTRACT E
WASTEWATER VARIOUS 44
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 68
12471 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE II
WASTEWATER VARIOUS 94
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE
IV
WASTEWATER VARIOUS 22
12511 MACKENZIE PUBLIC I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER PARK,
KENRICK SEMINARY, AND NERINX HALL)
WASTEWATER VARIOUS 123
12515 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2019)
WASTEWATER VARIOUS 99
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 1
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12674 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2019)
STORMWATER VARIOUS 205
12678 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - ORIGINAL BOUNDARY (2019)
STORMWATER VARIOUS 206
12682 EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (2019)
STORMWATER VARIOUS 186
12687 STORMWATER STREAMBANK STABILIZATION
DESIGN (CONTRACT B)
STORMWATER VARIOUS 175
12688 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT A)
STORMWATER VARIOUS 172
12689 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT B)
STORMWATER VARIOUS 173
12690 STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (CONTRACT C)
STORMWATER VARIOUS 174
12716 GENERAL SERVICES AGREEMENT - WATER
QUALITY GENERAL SUPPORT (2017)
STORMWATER VARIOUS 169
12720 CRITICAL INFRASTRUCTURE ASSESSMENT
(2017)
WASTEWATER VARIOUS 18
12759 FLOW METERING AND MONITORING (2017)WASTEWATER VARIOUS 26
12894 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT B
WASTEWATER VARIOUS 30
12896 INFRASTRUCTURE REPAIRS (FACILITIES) (2019)WASTEWATER VARIOUS 112
13043 INFRASTRUCTURE REPAIRS (REHABILITATION)
STORMWATER (2019)
STORMWATER VARIOUS 191
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
UNALLOCATED VARIOUS 34
5 April 2018
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY19
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11677 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE III
WASTEWATER WEBSTER
GROVES
139
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
PART 3
WASTEWATER WEBSTER
GROVES
140
11679 WEST LOCKWOOD SANITARY RELIEF WASTEWATER WEBSTER
GROVES
81
12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE
TO DALE AVE)
WASTEWATER WEBSTER
GROVES
71
12362 NORTH FOREST AND BROOKSIDE I/I
REDUCTION (SUMMIT AVE AND MARSHALL
AVE)
WASTEWATER WEBSTER
GROVES
128