Metropolitan St. LouisSewer DistrictSt. Louis, Missouri2019-2020BUDGETSUPPLEMENT
DEER CREEK TUNNEL PROJECT
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2020
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer
District's intended Capital Improvement and Replacement Program during Fiscal Year 2020 (July 1, 2019 to
June 30, 2020). This document is divided into the following sections:
• Program Summary (includes a glossary of terms used in the Budget Supplement) • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects
that have scheduled construction starts during Fiscal Year 2020. The Wastewater Engineering Projects and
Stormwater Engineering Projects sections list projects that have scheduled engineering starts during Fiscal
Year 2020 (which includes design, planning, and data collection/system investigation services). Due to the
magnitude and complexity of these projects and the requirements for permitting and easement acquisition,
their construction is scheduled in future years. The Contingency Projects sections detail projects that are
currently scheduled for Fiscal Year 2021, but may be expedited to begin construction during Fiscal Year
2020, if revenue becomes available and project schedules allow. The Wastewater and Stormwater Program
sections summarize the capital program by fund.
For each new project identified for funding in Fiscal Year 2020, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal
years, only the estimated construction cost and reason for continuance are provided. Specific information
regarding Continued Projects was included in previous Budget Supplement documents in the fiscal years in
which the projects were initially identified. Lastly, a listing of all Fiscal Year 2020 projects sorted by
municipality is provided in the Appendix.
On the Cover: Construction photo shows activity and progress on the 19 foot diameter, 4 mile long Deer Creek
Sanitary Tunnel project. Shown are three 40 foot diameter, 183 feet deep shafts and a smaller shaft excavated at
the tunnel’s pump station location. The tunnel boring machine used to excavate the tunnel will be lowered into the
shaft on the left of the photo and all of the material mined from the tunnel will be removed through this shaft. The
tunnel will provide enough storage and conveyance to enable the elimination of 19 SSOs.
")
")
")")
")
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")
")
")
")")
")
")
!(
!(
!(
!(
!(
!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(MSD Bounda
ry
St. Louis County Boundary§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 44
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 55
§¨¦170
§¨¦255
139
143
126125
124
142
134133
129128
123
130
174
141
176
144
122
170
138
175
172
171
135
132
136
127
140
131173
145
121
54
7
6
1
9
62
60
48
52
7071
53
13
85
81
90
9437
59
96
51
43
41
89
15
82
69
86
68
61
72
56
47
93
67
79
78
10
5049
66
36
77
84
54
63
4645
40
55
38
17
95
88
58
80
16 39
92
76
44
83
149
118
115
150
164
110
106
159158
108
109
160
161
113
119
112
153
111
163
154162
148
104
147
156
151
114
168
155
116
169
102
120
87
14
105
117
157
167
103
101
Map produced by MSD GIS Mapping, April 2019
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2020
Legend
FISCAL YEAR 2020
!(Wastewater
!(Stormwater
FISCAL YEAR 2021
")Stormwater
")Wastewater
Combined Sewer Area
PAGE NO. SYSTEM23811121819202122232425262728293031323334354257646573747591979899100107146152165166
PAGE NO. SYSTEM137
MSD DISTRICT WIDE PROJECTSFISCAL YEAR 2020
FISCAL YEAR 2021
12 April 2019
Page 1 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
1 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
2 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
3 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
4 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
5 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
6 BISSELL POINT WWTF TRICKLING FILTER MEDIA REPLACEMENT
7 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52)
8 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020)
9 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
10 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
11 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
12 CRITICAL INFRASTRUCTURE ASSESSMENT AND ASSET INVESTIGATION (2020)
13 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
14 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
15 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
16 FENTON CREEK PUMP STATION (P-425) IMPROVEMENTS
17 FISHPOT TRUNK WEST AND ED LOU LANE I/I REDUCTION (SMITH DR AND
VLASIS DR)
18 FLOW METERING AND MONITORING (2017)
19 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2019)
20 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020)
CONTRACT A
12 April 2019
Page 2 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
21 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020)
CONTRACT B
22 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT A
23 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT B
24 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT C
25 GENERAL SERVICES AGREEMENT - LANDSCAPE DESIGN (2019)
26 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT
A
27 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B
28 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C
29 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT
D
30 GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2019)
31 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT A
32 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT B
33 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT C
34 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT D
35 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT E
36 GRAND GLAIZE TRUNK SANITARY RELIEF (BALLWIN GOLF CLUB TO
CLAYMONT COVE CT)
37 GRAND GLAIZE WWTF FLOODWALL PROTECTION
38 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
39 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS
40 LANGLEY AND PHILO SANITARY STORAGE
41 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
42 LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A
43 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES)
44 LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-113) UPGRADES
12 April 2019
Page 3 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
45 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
46 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
47 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
48 LOWER MERAMEC TUNNEL I/I SOURCE REDUCTION
49 LOWER MERAMEC WWTF EXPANSION PHASE II
50 LOWER MERAMEC WWTF EXPANSION PHASE II
51 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
52 MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A)
53 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION
54 OAKWOOD FARMS PUMP STATION (P-470) ELIMINATION
55 PRICE TO PIONEER SANITARY RELIEF
56 PUMP STATION REPAIR AND IMPROVEMENT DESIGN (CONTRACT A)
57 RADAR RAINFALL DATA (2020)
58 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
59 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
60 SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR TO S GREENTRAILS DR)
61 SCHUETZ ROAD SANITARY RELIEF (FOREST BROOK LN TO SUNNY WOOD CT)
62 ST. GEORGE CREEK SANITARY RELIEF (DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
63 ST. JACQUES SANITARY RELIEF (ST. JACQUES ST TO N LAFAYETTE ST)
64 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
65 STREAM FLOW WATER QUALITY SAMPLING (2020)
66 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL
67 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD)
12 April 2019
Page 4 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
68 WW-2 AND WW-3 WARSON WOODS SANITARY RELIEF
69 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09)
70 BADEN AND MILL CREEK ORS PUMP STATIONS - PUMP REHABILITATION
71 BADEN CITYSHED MITIGATION BASINS (CALVARY, FREDERICK, PARTRIDGE
AND TILLIE)
72 BELLEFONTAINE #2 SANITARY RELIEF (CHAMBERS RD TO COBURG LANDS
DR)
73 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
74 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
75 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
76 BISSELL POINT WWTF MAIN SUBSTATION SWITCHGEAR AND MCC
REPLACEMENT
77 BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/I REDUCTION (I-64 AND LAY
RD)
78 BROOKSHIRE SANITARY RELIEF (BROOKSHIRE DR TO COUGAR DR)
79 CAPILIA SANITARY RELIEF (GRANT RD TO CAPILIA DR)
80 CARSON VILLA, ROSARY LANE AND THURSTON I/I REDUCTION
81 CAULKS CREEK FORCEMAIN REHABILITATION
82 CELLA - ROLLING ROCK - GLEN CREEK SANITARY SEWER IMPROVEMENTS
83 CONWAY VILLAGE SANITARY RELIEF (CONWAY RD TO I-64)
84 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH
85 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
86 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
87 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
88 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
89 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
12 April 2019
Page 5 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
90 DEGIVERVILLE COMBINED SEWER IMPROVEMENTS
91 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2020)
92 EDNA-THURSBY, ESSEX, TREASURER COVE, WAYFARER EAST AND YARNELL
CREEK WEST I/I REDUCTION
93 GASLIGHT SQUARE SEWER IMPROVEMENTS
94 GRAND GLAIZE WWTF FLOODWALL PROTECTION
95 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE
AVE TO PARDEE LANE)
96 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE
RD)
97 INFRASTRUCTURE REPAIRS (FACILITIES) (2020)
98 INFRASTRUCTURE REPAIRS (REHABILITATION) (2020) CONTRACT A
99 INFRASTRUCTURE REPAIRS (REHABILITATION) (2020) CONTRACT B
100 INFRASTRUCTURE REPAIRS (WASTEWATER) (2020)
101 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
102 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS
103 KINGSLAND SANITARY STORAGE FACILITY (ENGELHOLM)
104 LANGLEY AND PHILO SANITARY STORAGE
105 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
106 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
107 LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A
108 LOWER MERAMEC WWTF FITTING REPLACEMENT
109 MACKENZIE I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK,
KENRICK SEMINARY, AND NERINX HALL)
110 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
111 MARK TWAIN I/I REDUCTION (MANCHESTER RD AND BOMPART AVE)
112 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE II
113 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
12 April 2019
Page 6 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
114 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544)
IMPROVEMENTS
115 RAINRIDGE CT. PROPERTY BUYOUT
116 SOUTH COUNTY SANITARY RELIEF (P-419 TO CRIPPLE CREEK DR)
117 TILLES PARK, LITZSINGER AND PARKRIDGE I/I REDUCTION (LITZSINGER RD
AND S MCKNIGHT RD)
118 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) PHASE II
119 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION C PUBLIC I/I
REDUCTION
120 VANCE RD PUMP STATION (P-472) UPGRADES
146 GENERAL SERVICES AGREEMENT - WATER QUALITY SUPPORT SERVICES
(2020)
147 HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230)
148 STORMWATER STREAMBANK STABILIZATION DESIGN (CONTRACT A)
149 BELDON DRIVE STORM SEWER
150 CHERRY TREE LANE STORM IMPROVEMENT
151 CRAIG ROAD #1485 STORM SEWER IMPROVEMENTS
152 EASEMENT ACQUISITION FOR STORMWATER PROJECTS (2020)
153 FAIRCHILD #6816 STORM SEWER
154 GUENEVERE DR - BARHAM DOWN STORM IMPROVEMENTS
155 HICKORY TREE LN. STORM SEWER
156 HUNTER'S GLEN CT. #305 STORM SEWER
157 KAYSER AVE. - WALLER AVE. STORM SEWER
158 KENWOOD - JUNE CREEK BANK STABILIZATION
159 LALITE #6145 - 6151 STORM IMPROVEMENTS
160 LARKIN LN. #8 STORM IMPROVEMENTS (ME-260)
161 MIDRIDGE DRIVE STORM SEWER
162 NOTTINGHAM - MAYFAIR STORM SEWER
12 April 2019
Page 7 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY20
PAGE NUMBER PROJECT NAME
163 SCOTT AVE #1213 STORM SEWER
164 SHIVA COURT CHANNEL IMPROVEMENTS (CAU3-A)
165 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - DISTRICTWIDE
(2020)
166 STORMWATER QUALITY GREEN INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
167 UNION ROAD 100 BLOCK STORM IMPROVEMENTS
168 WHITNEY POINTE DR. #2210 CHANNEL IMPROVEMENTS
169 WOODLAKE VILLAGE 1009 BANK STABILIZATION
12 April 2019
Page 1 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY21
PAGE NUMBER PROJECT NAME
121 BISSELL POINT WWTF MAIN SUBSTATION SWITCHGEAR AND MCC
REPLACEMENT
122 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
123 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52)
124 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
125 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
126 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
127 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
128 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
129 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
130 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON)
131 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS
132 LANGLEY AND PHILO SANITARY STORAGE
133 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
134 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
135 LINDLEY DRIVE SANITARY RELIEF (I-170 TO ASHMONT DR) (UR-07)
136 PARK DRIVE SANITARY RELIEF (ENGELHOLM AVENUE)
137 PUMP STATION REPLACEMENT PROJECTS (PHASE I)
138 RIVERPORT 6 PUMP STATION (P-781) REHABILITATION
139 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT
140 SOUTH COUNTY SANITARY RELIEF (P-419 TO CRIPPLE CREEK DR)
141 SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736) REPLACEMENT
142 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL
BANK RD TO SPRING GARDEN DR)
143 WATKINS CREEK PUMP STATION (P-101) REPLACEMENT
144 WHITE BIRCH PUMP STATION (P-725) ELIMINATION
12 April 2019
Page 2 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY21
PAGE NUMBER PROJECT NAME
145 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN)
170 BARTOLET TO PAULE AVE. STORM SEWER REPLACEMENT
171 BRUNSTON DR. #4875 BANK STABILIZATION
172 GLEASON #656 STORM SEWER
173 KENNY DR.- BOUNDARY RD. STORM SEWER
174 LOUISIANA AND HOLLY HILLS STORM SEWER
175 RAFORD CT. STORM SEWER SEPARATION
176 SAPPINGTON RD. AND SAPPHIRE RIDGE CT. STORM SEWER
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Wastewater Engineering 68 $59,323,000 Wastewater Construction 52 $255,740,000
Stormwater Engineering 3 $700,000 Stormwater Construction 21 $11,156,000
TOTAL:144 $326,919,000
Wastewater Continued 3 $20,000,000
Stormwater Continued 6 $3,214,000
TOTAL:9 $23,214,000
GRAND TOTAL:153 $350,133,000
Page 1 of 1
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY20
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 7
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 7
analysis of the system, and implement required collection system and wastewater treatment plant
repairs and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table-top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultants to perform preliminary studies during periods of heavy workload, or for large,
complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel
projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 7
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, easement plats are drafted, and easements are obtained.
In FY 2020, 38 engineering budget items have been procured using the Watershed
Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order
to increase efficiency, expedite the program and meet Consent Decree requirements and
schedule. Following is a listing of the Watershed Consultant related engineering projects and
associated professional service firms:
Project Number Project Name Page Number Budget
Watershed Program Consultant - 11151 - Construction Management Services - Tank/Treatment/Pump Station Facilities. Consultant: KAI 360 Construction Services, LLC (formerly Kennedy Associates / Architects, Inc.)
11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 11 10,400,000
Watershed Program Consultant - 11152 - Construction Management Services - Lower and Middle RDP Tunnel Facilities. Consultant: Shannon & Wilson, Inc.
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 9 1,800,000
Watershed Program Consultant - 11826 - Construction Management Services -
Lower Meramec and Deer Creek Tunnels. Consultant: Black & Veatch Corporation
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 10 4,400,000
Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO Controls System Improvements. Consultant: Jacobs Engineering Group, Inc.
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 38 55,000
11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 39 65,000
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 41 270,000
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) 43 310,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 45 320,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 46 375,000
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 51 600,000
11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 131 65,000
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 134 440,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 7
Watershed Program Design Consultant - 11110 - Deer Creek Sanitary System Improvements. Consultant: Parsons Water & Infrastructure, Inc.
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 14 1,500,000
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION 15 1,000,000
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION 128 1,000,000
Watershed Program Design Consultant - 11144 - Bissell - Coldwater - Missouri - Meramec Sanitary System Improvements. Consultant: Wood Environment & Infrastructure Solutions, Inc. (formerly AMEC)
12508 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021) CONTRACT A 2 51,000
12509
BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B 3 47,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 4 591,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 5 750,000
12166 FENTON CREEK PUMP STATION (P-425) IMPROVEMENTS 16 432,000
12173 FISHPOT TRUNK WEST AND ED LOU LANE I/I REDUCTION (SMITH DR AND VLASIS DR) 17 145,000
12272 GRAND GLAIZE TRUNK SANITARY RELIEF (BALLWIN GOLF CLUB TO CLAYMONT COVE CT) 36 253,000
13164 LOWER MERAMEC TUNNEL I/I SOURCE REDUCTION 48 24,000
12364 OAKWOOD FARMS PUMP STATION (P-470) ELIMINATION 54 124,000
12200 SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR TO S GREENTRAILS DR) 60 646,000
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST BROOK LN TO SUNNY WOOD CT) 61 235,000
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES ST TO N LAFAYETTE ST) 63 50,000
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD) 67 40,000
Watershed Program Design Consultant - 11145 - Lemay Sanitary System Improvements. Consultant: Burns & McDonnell Engineering Co., Inc.
12059 LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A 42 65,000
12368 PRICE TO PIONEER SANITARY RELIEF 55 630,000
12212 ST. GEORGE CREEK SANITARY RELIEF (DAISY LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE) 62 600,000
12302 WW-2 AND WW-3 WARSON WOODS SANITARY RELIEF 68 1,300,000
Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek) Controls System Improvements. Consultant: HDR Engineering, Inc.
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III AND PHASE IV 13 550,000
11746
LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL 47 600,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 58 600,000
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 59 1,800,000
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL 66 1,200,000
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III AND PHASE IV 126 500,000
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 7
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may utilize its eminent domain
powers to condemn for easements in order to ensure that a project is constructed. Any required
condemnation proceedings are performed in full compliance with state and federal law. Some
projects may additionally require specific permitting from other government agencies, such as
the Missouri Department of Natural Resources or US Army Corps of Engineers, prior to bidding.
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon final approval, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
assistance. Because of the uncertainty of the viability and/or schedule of sub-district projects,
they are not always listed in the Budget Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 7
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets (adding the value of work
completed to the overall value of all physical assets owned by the District). Wastewater projects
may also be funded by various Operation, Maintenance, Construction and Improvement (OMCI)
funds, Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via the Districtwide Stormwater Fund, the
Stormwater Regulatory Fund, the Improvement Fund, or from various Operation, Maintenance,
Construction, and Improvement (OMCI) funds. These OMCI funds are established in certain
areas of the District, are supported by property tax collection, and must be spent only within their
specific areas of tax collection.
The sections included in this Budget Supplement document are:
• Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of often
used terms.
• Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
• Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
• Wastewater Continued Projects – summary of wastewater projects continued from previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Wastewater Contingency Projects – summary and details on wastewater projects currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 7
• Wastewater Program – annual alphabetical listing of wastewater projects by fund, including the type of service (task) budgeted.
• Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
• Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
• Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
• Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
• Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include locations and
quantities of work to be performed. These maps and quantities are approximate only, and final
location and extent of work may vary depending on final design and/or field conditions during
construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD The Federal Consent Decree, entered on April 27, 2012 and all appendices and all modifications or amendments thereto, between
MSD, United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows from the Combined and Separate Sewer Systems in order to improve
water quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe by lining it with a new pipe. This work does not require excavating the
pipe and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater treatment facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer system at a point prior to the headworks of a wastewater treatment facility.
FORCE MAIN A pressurized sewer pipe that can carry wastewater. Sewer force mains
are necessary when topography, or other system characteristics, do not
allow wastewater to move through the line by the influence of gravity alone. Force mains are the pipes that convey wastewater under pressure
through the work of pumps located in pump stations or lift stations.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using
infiltration, such as bioretention and bioswales.
GRADE CONTROL STRUCTURE A structure constructed in a creek or stream to control erosion. The structure allows water to pass to a lower elevation while directing the
energy and velocity of the water in a manner that minimizes erosion
that would otherwise change the shape of the stream.
GLOSSARY
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system; infiltration refers to groundwater sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can include defective building laterals, sewer pipes, pipe joints,
connections, or manhole walls.
INFILTRATION Infiltration refers to groundwater sources of flows into sewer pipes. Infiltration sources can include defective building laterals, sewer pipes,
pipe joints, connections, or manhole walls.
INFLOW Inflow refers to direct connections of rainwater sources to the sanitary
sewer system. Inflow sources can include roof downspouts, yard and area drains, foundation drains, manhole covers, cross connections from
storm sewers, or inlets.
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LIFT STATION Lift stations are used for pumping wastewater or stormwater from a point of lower elevation to a point of higher elevation. Lift stations utilize pumps to lift the wastewater from the lower elevation to the
higher elevation. Wastewater then flows by gravity to the next location in the system.
LMRDP Lower and Middle River Des Peres, generally the river from University City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving stream water quality and the community's financial capability.
MAIN A smaller public sewer collecting flows from buildings via lateral connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote of the people, with responsibility for wastewater and stormwater services in St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects or maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or CSO.
PRIVATE I/I REDUCTION Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to the sanitary sewer system (inflow) or deteriorated service laterals or
broken connections (infiltration).
PUBLIC I/I REDUCTION Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
GLOSSARY
PUMP STATION Pump stations are facilities which include pumps and ancillary
equipment, for pumping fluids from one place to another. A pump is a mechanical device that converts mechanical energy to pressure, in order
to convey wastewater or stormwater. Pumping results in pressurized
sewer pipes that are called force mains.
RAIN GARDEN A landscaped shallow swale or depression that temporarily holds water
and reduces stormwater runoff as the water infiltrates into the soil. The water is absorbed by plants and is filtered as it percolates through the
soil.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as possible to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER SYSTEM The portion of the sewer system designed to convey only sewage, and not stormwater, from residences, commercial buildings, industrial
plants and institutions for treatment at a wastewater treatment facility
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system needs in the early 2000s.
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or United States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the United States or the State.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement plan which describes the results of system evaluations and the specific
measures that will result in the Elimination of all Constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows under current and projected future conditions as defined in Paragraphs 21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow
to a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is centrally located within a watershed to which subtrunks and other
sewers are tributary.
USGS United States Geological Survey.
GLOSSARY
WASTEWATER Wastewater, also written as waste water, is any water that has been
adversely affected in quality by human influence. Wastewater can originate from a combination of domestic, industrial, commercial or
agricultural activities, and from sewer inflow or infiltration.
WATERSHED An area of land which drains to a specific creek, river, or other body of
water.
WATERSHED CONSULTANT A consulting firm retained for a multi-year design effort on a related suite of projects in a specific watershed.
WWTF Wastewater Treatment Facility, any facility, method or process which removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces or renders less obnoxious pollutants or water contaminants from wastewater before releasing it to the environment.
8 April 2019
Page 1 of 5
WASTEWATER ENGINEERING PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$6,000,000 1
12508 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
$51,000 2
12509 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
$47,000 3
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$591,000 4
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$750,000 5
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
$800,000 6
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
$800,000 7
12000 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
$2,500,000 8
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$1,800,000 9
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$4,400,000 10
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$10,400,000 11
12907 CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
$1,700,000 12
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$550,000 13
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$1,500,000 14
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$1,000,000 15
12166 FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
$432,000 16
12173 FISHPOT TRUNK WEST AND ED LOU LANE I/I
REDUCTION (SMITH DR AND VLASIS DR)
$145,000 17
8 April 2019
Page 2 of 5
WASTEWATER ENGINEERING PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12759 FLOW METERING AND MONITORING (2017)$2,500,000 18
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
$1,900,000 19
12397 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2020) CONTRACT A
$550,000 20
13059 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2020) CONTRACT B
$200,000 21
12391 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
$85,000 22
12392 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
$85,000 23
12393 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
$85,000 24
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
$250,000 25
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
$60,000 26
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
$60,000 27
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
$60,000 28
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
$60,000 29
12398 GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2019)
$200,000 30
12413 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
$50,000 31
12416 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
$50,000 32
12417 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
$50,000 33
12418 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
$50,000 34
8 April 2019
Page 3 of 5
WASTEWATER ENGINEERING PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12419 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
$50,000 35
12272 GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT COVE
CT)
$253,000 36
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
$400,000 37
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$55,000 38
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
$65,000 39
13336 LANGLEY AND PHILO SANITARY STORAGE $350,000 40
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$270,000 41
12059 LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
$65,000 42
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
$310,000 43
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
$500,000 44
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$320,000 45
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$375,000 46
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$600,000 47
13164 LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
$24,000 48
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$400,000 49
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$4,000,000 50
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$600,000 51
8 April 2019
Page 4 of 5
WASTEWATER ENGINEERING PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
$1,500,000 52
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
$1,200,000 53
12364 OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
$124,000 54
12368 PRICE TO PIONEER SANITARY RELIEF $630,000 55
12697 PUMP STATION REPAIR AND IMPROVEMENT
DESIGN (CONTRACT A)
$50,000 56
12006 RADAR RAINFALL DATA (2020)$130,000 57
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 58
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL $1,800,000 59
12200 SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
$646,000 60
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
$235,000 61
12212 ST. GEORGE CREEK SANITARY RELIEF (DAISY
LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE)
$600,000 62
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES
ST TO N LAFAYETTE ST)
$50,000 63
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$520,000 64
12004 STREAM FLOW WATER QUALITY SAMPLING
(2020)
$300,000 65
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
$1,200,000 66
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON
RD AND KEHRS MILL RD)
$40,000 67
12302 WW-2 AND WW-3 WARSON WOODS SANITARY
RELIEF
$1,300,000 68
8 April 2019
Page 5 of 5
WASTEWATER ENGINEERING PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
TOTAL:$59,323,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Design Services
6660 - SanitaryReplacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENTFACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL ANDLEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDEREDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS HANDLINGSYSTEM IMPROVEMENTS.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
11
$6,000,000
Various
Various
Various
Capital
1Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2021) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 65,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12121, 12146, 12173,12184, AND 12311.
§¨¦44
§¨¦55
§¨¦270
§¨¦255
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12508
Wastewater
11
$51,000
Various
Various
Various
Capital
2Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2021) CONTRACT B
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 61,472 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12171, 12213, AND12376.
§¨¦64
§¨¦70
§¨¦270 §¨¦170
§¨¦70§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12509
Wastewater
11
$47,000
Various
Various
Various
Capital
3Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64 §¨¦270
§¨¦170
§¨¦44
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$591,000
Various
Various
Various
Asset Management
4Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64 §¨¦270
§¨¦170
§¨¦44
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$750,000
Various
Various
Various
Asset Management
5Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF TRICKLING FILTER MEDIAREPLACEMENT
Design Services
6660 - SanitaryReplacement Fund
AGING TRICKLING FILTER MEDIA NEARING END OF USEFUL LIFE.
REPLACE TRICKLING FILTER MEDIA ON SIX FILTERS AT THE BISSELLPLANT.
H
A
L
L
GRANDN
O
RFOLKSOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12566
Wastewater
11
$800,000
St. Louis City
Bissell
Bissell
Capital
6Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN (RIVER VALLEY RDTO L-52)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN IS UNDERSIZED AND OVER THIRTY YEARS OLD.
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF36-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$30,000,000.RIVER VALLEYCENTRAL MIDLANDHOG HOLLOWW ATER W O R K SJOHNPELLET
PRIV
A
T
E RIDGECRES T
R IDGETRA ILLAKERIVERBEND
SUNBRIDGEWATER W
O
RKS RIDGEMEA DOW
RID GECRESTHENNINGCO LISEUM
PRIVATE
OLIVE
B
LVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11790
Wastewater
11
$800,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
7Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2020)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMSAND QUANTIFY REQUIRED REPAIRS/IMPROVEMENTS AND CLEANING.
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OFSELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12000
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
8Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES),AND THE JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TOMARTIGNEY PS).
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦64
§¨¦270
§¨¦44
§¨¦255
§¨¦70
§¨¦170
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$1,800,000
Various
Lemay/RDP
Various
Asset Management
9Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE DEER CREEK TUNNEL & TRUNK SEWER, MALINE CREEKSTORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL, UPPER RDP CSOSTORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEMBAUMGARTNER TO FENTON WWTF TUNNEL.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$4,400,000
Various
Various
Various
Asset Management
10Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CONSTRUCTION OF STORAGE TANKS AND PUMP STATIONS, ANDTREATMENT FACILITY IMPROVEMENTS.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUTTHE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$10,400,000
Various
Various
Various
Asset Management
11Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT ANDASSET INVESTIGATION (2020)
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS FIELD RECONNAISSANCE ANDINSPECTION, MAP UPDATES, WORK ORDER MANAGEMENT, GISSUPPORT, SSO MONITORING EQUIPMENT MAINTENANCE, AND CCTVVIDEO REVIEW. SERVICES MAY BE RENEWED THROUGH FY2022 BASEDON PERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12907
Wastewater
16
$1,700,000
Various
Various
Various
Asset Management
12Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHILLS
DE N NY
GODWI NCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P I C A RDY
WINDI N G R I D GE
INDIAN
ELLSWORTHLOG CABINPARK
OVERBROOKHIGHDOWNANZEIGER
PRIVATE
TWINSPRINGS ROLLINGROCKMAYFAIRWARRIDGE
WILDROSE
WATE R BURYLYLEWOOD
RAUSC
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R CREEKPRIVATE
PRIVATE
P RIV A T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
11
$550,000
Ladue
Lemay/RDP
Deer Creek
Capital
13Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $153,000,000.PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦44
§¨¦64
§¨¦170
DALE
ME
T
R
O
LIN
K
CLAYTON
UNIONPACIFICPINE
ELMLAYFOLKMCKNIGHT
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEPERNOD
KIRKHAMETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHALINDENEULALIE
LINDENWOODGLENGOR
E
FYLERCLAYTONIA
LEE
ARUNDEL
EUCLID SW AN
PAR KLITHIA
PACIFIC HANLEYFORESTLOUISDELNORTEPLATEAU
WILL IA MS
ALAMO
MARDEL
MADGE
HANCOCKMCCUTCHEONWISE
C A M BRIDGEARSENALFLORASALEMB
U
C
KHICKS
ST CLAIRMARYG R EENWOODBRUNO
FAIRVIEW M A NHATTANPRATHERBARTOLDRUSSELL
YEATMANROCK HILLEAGER
ROSE
FLORENCE MARTINIOXFORD
GODWI N
C O M M ONWEALTHMOORLANDSY ORKBACON
MORITZ
LYLEDESPERESPRIVATEARLINGTON
ANNA
WAYMIRE
ELLSWORTH
WELLINGTON
JAMES
MAPLECIRCLECOLLINS
GREELEY ECOFFBLENDONCORONAEAST PORTEREXETERHORNER
BERRY RICHERTHATTONSANBONITA
UNIONPACIFIC FORESTMARYWHITE
IVANHOEELMMANCHESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
14Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
H
E
R
N
S
A
NT
A
F
E
CARR LA
N
E BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
HE
R
N
S
A
N
T
A F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
11
$1,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
15Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FENTON CREEK PUMP STATION (P-425)IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-425 AND CONSTRUCT1,585 FEET OF ASSOCIATED FORCEMAIN.PREMIO
NOCHE
PIEDRAS
GANSOFELIZ
PEQUENO
TREE TRAILS
BIRCH
MEADOW VADERAD URANGOKINGS TRAIL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12166
Wastewater
11
$432,000
Unincorporated
Meramec
Fenton Creek
Capital
16Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FISHPOT TRUNK WEST AND ED LOU LANE I/IREDUCTION (SMITH DR AND VLASIS DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS, ANDEXCESSIVE I/I FLOWS AT THE VANCE ROAD PUMP STATION AND GRANDGLAIZE WWTF.
REPLACE 343 FEET OF 8-INCH SANITARY SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 14 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12508. THIS PROJECTINCLUDES THE SCOPE OF WORK FROM PROJECT 12158.
§¨¦44
§¨¦55
§¨¦270
§¨¦55
§¨¦44
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12173
Wastewater
11
$145,000
Ballwin
Meramec
Fishpot Creek
Capital
17Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING AND MONITORING (2017)
Vendor Services
1101 - General Fund
COMPUTER MODELING OF THE SEWER SYSTEM REQUIRES FLOW DATAIN ORDER TO BE ACCURATELY CALIBRATED TO FIELD CONDITIONS.
CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATERSYSTEM TO COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEMRESPONSE DURING WET WEATHER EVENTS. THIS INFORMATION WILLBE USED TO CALIBRATE HYDRAULIC MODELS TO DETERMINE IFPROJECTS ARE REQUIRED.
SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12759
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
18Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2019)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDEDSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12386
Wastewater
14
$1,900,000
Various
Various
Various
Asset Management
19Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2020) CONTRACT A
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12397
Wastewater
11
$550,000
Various
Various
Various
Asset Management
20Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2020) CONTRACT B
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13059
Wastewater
11
$200,000
Various
Various
Various
Asset Management
21Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2020) CONTRACT A
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12391
Wastewater
11
$85,000
Various
Various
Various
Asset Management
22Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2020) CONTRACT B
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12392
Wastewater
11
$85,000
Various
Various
Various
Asset Management
23Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2020) CONTRACT C
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12393
Wastewater
11
$85,000
Various
Various
Various
Asset Management
24Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - LANDSCAPEDESIGN (2019)
GSA - (Design)Operating Funds
1101 - General Fund
LANDSCAPE ARCHITECTURAL DESIGN SERVICES ARE NEEDED TOSUPPORT PROJECTS THROUGHOUT THE DISTRICT.
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS NEEDED DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13044
Unallocated
11
$250,000
Various
Various
Various
Asset Management
25Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12382
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
26Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12383
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
27Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12384
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
28Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2018) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12385
Unallocated
12
$60,000
Various
Various
Various
Non-recurring
29Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWER ANDCHANNEL DESIGN (2019)
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER AND CHANNEL DESIGN.SERVICES MAY BE RENEWED THROUGH FY2020 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12398
Wastewater
11
$200,000
Various
Various
Various
Asset Management
30Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT A
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12413
Wastewater
11
$50,000
Various
Various
Various
Asset Management
31Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT B
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12416
Wastewater
11
$50,000
Various
Various
Various
Asset Management
32Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT C
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12417
Wastewater
11
$50,000
Various
Various
Various
Asset Management
33Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT D
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12418
Wastewater
11
$50,000
Various
Various
Various
Asset Management
34Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT E
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12419
Wastewater
11
$50,000
Various
Various
Various
Asset Management
35Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE TRUNK SANITARY RELIEF(BALLWIN GOLF CLUB TO CLAYMONT COVE CT)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS IN THE GRAND GLAIZE TRUNKSEWER.
CONSTRUCT 1,600 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
CLAYMONT
GEREMMABELLERIVESUNNYSLOPE
DENB
I
G
H
PINE TREECAPRICE GARDENSWELLSHIRECLAYMONTCOVE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12272
Wastewater
11
$253,000
Ballwin
Meramec
Grand Glaize Creek
Capital
36Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF FLOODWALL PROTECTION
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
MAJOR FLOODING EVENTS CAN IMPACT AND DAMAGE THE GRANDGLAIZE TREATMENT FACILITY.
CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENTPLANT AND MAINTENANCE BUILDINGS FROM FLOODING.
PRIVATE
TWIN LAKES
WESTERMANBURLINGTONNORTHERNSANTAFEUNION PACIFICGRANDGLAIZE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13072
Wastewater
11
$400,000
Valley Park
Meramec
Glaize Creek
Capital
37Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$67,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFOR
D
E
R CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHER ID A NPOT
T
L
E
ORIE
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHOR
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
SHROCK
JACI
N
T
O
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
11
$55,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
38Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THEMARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT.
CONSTRUCT 5,700 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, ANDREHABILITATE 2,800 FEET OF 30-INCH TO 36-INCH SANITARY SEWER, TOCONVEY FLOW TO THE NEW JEFFERSON BARRACKS TUNNEL.
§¨¦55
§¨¦255
UNIONPACIFICKOCHRIVERKINSWOOD
RIPAUNION
GREGGMILDFOR
D
E
R
POT
T
LE CCCREAVIS
B
A
R
RACKS
GRANTLIND
YAEGER TELFO R D
ARLEE
SHERMANGENTRYFAIN PRIVATERINGER JOPLINWIL
L
MAGOFFINCLIFFSHERIDANVIC
T
O
R
Y
GARKLARK
CLAGEROUTE R
BLUFFBUR
N
COATE
ETTA
CLYDEPERRINBOUNDARYCAMINOJEFFERSONIAN
HAL S EYPEACEHAVEN FIRSTPECAN
A
SHROCK
SOUTHSHIREBUCKLEY
PE ALARRAS
J
E
FFERSON
ELLENBLUE RIDGEBANISTERALLE
N
LI
S
I
E
U
X KASKEBUNKERBIRCHBUCKLEYP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11957
Wastewater
11
$65,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
39Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANGLEY AND PHILO SANITARY STORAGE
Design Services
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS EXCEED THE CAPACITY OF THE SANITARYSEWER.
CONSTRUCT 80,000 GALLONS OF SANITARY STORAGE, INCLUDING 350FEET OF 48-INCH TO 84-INCH SANITARY STORAGE PIPE, 510 FEET OF8-INCH TO 18-INCH SANITARY SEWER, AND 230 FEET OF 12-INCH TO42-INCH STORM SEWER
LANGLEY
PILOTLODE
WALDO
PHILOACORNMATHILDAHARMONYKATHLEENVINE
LACEYLA
K
E
W
O
O
D
ROSEMARYVIRGILHIL
D
A
LODE
PILOTVINE
GRAVOIS RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13336
Wastewater
11
$350,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
40Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMPSTATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY21/2. TOTAL CONSTRUCTION BUDGET IS$44,575,000. PHASE II FUNDING IS FOR SUBSTATION.
PR
I
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
UNION PACIFICUNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
VATE
UNION PACIFICUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
11
$270,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
41Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 100,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12335, 12278, 12175,AND 12228.
§¨¦64
§¨¦270
§¨¦44
§¨¦55
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12059
Wastewater
11
$65,000
Various
Lemay/RDP
Various
Capital
42Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Miscellaneous Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDMA N CHE S T E R R D
W A T S O NRDCHIPPEWABLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
11
$310,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
43Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOUISA AND ARSENAL PUMP STATIONS (P-112 ANDP-113) UPGRADES
Design Services
6660 - SanitaryReplacement Fund
MECHANICAL SYSTEMS ARE AGING AND IN NEED OF REPLACEMENT.
CONSTRUCT UPGRADE OF MECHANICAL VALVE AND PIPING SYSTEMS.UNION PACIFICAR
S
E
N
A
L
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12489
Wastewater
11
$500,000
St. Louis City
Bissell
Mississippi River Tributary Areas
Capital
44Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$320,000
Various
Lemay/RDP
Various
Asset Management
45Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$375,000
Various
Lemay/RDP
Various
Asset Management
46Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Design Services
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
THIS PROJECT ALSO ELIMINATES MERAMEC BOTTOMS PUMP STATION489 AND FORCEMAIN, PER THE CAPACITY ASSURANCE EVALUATIONREPORT.
§¨¦55
§¨¦270
§¨¦55 KERTHMA
T
T
I
S
G R A V O ISWELLSKELLERMERAMECBOTTO M AMBSKENNERLY
T
H
EI
SSEA
S
T
CONCORD
ALL
E
N ALSWELLSC H U E S SLERMENTZHILL
RI N G ERBA UERBUTL E R HILL
GREENTONS
USONHILLS
POI N T E
CARIBEEHAWKINSGE
R
A
L
D
KE
M
P
F
H
AGEMANNOLSENGREGORY
DIERSPRIVATE
MAIN
RIVERCURVE VALMEYERTESCORDMAN GOWA
T
S
O
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYREFERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYLE
TOWNE SO UTHPRIVATEPRIVATE
AMBS
BAUER
PRIVATEPR
I
V
A
T
E
T ES S ONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$600,000
Various
Meramec
Meramec Tributary Areas
Capital
47Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC TUNNEL I/I SOURCEREDUCTION
Design Services
6660 - SanitaryReplacement Fund
DURING FLOOD INUNDATION AND HIGH GROUNDWATER, INFLOW ANDINFILTRATION OCCURS INTO THE LOWER MERAMEC TUNNEL.
REHABILITATE 2,150 FEET OF 60-INCH DIAMETER SANITARY SEWER,AND REHABILITATE 5,250 FEET OF 8-INCH TO 48-INCH SANITARY SEWERAND 120 STRUCTURES.
INCLUDES SCOPE OF WORK FROM PROJECT 13165.
YAEGER
BAUMGARTNERHEINTZOLD B A U M GARTNERMILBURNMILDBURLINGTONNORTHERN S ANTAFEW
HIT
E
PI
NEFIRELEAFBLACKFOREST
SAGE
PRIVATEFOXFIRE
GATLING
PATTERSON
CHAU
V
E
AUFALCONVIEW
G WENMILLWILDBROOKSUMMERLYN
TREERIDGEHOLLOW OAKLAKEVIEW HEIGHTSBURGUNDYWAYBRISTLECONE INNS
B
R
U
C
KPARISHEINTZ
P RIVATE PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13164
Wastewater
11
$24,000
Unincorporated
Meramec
Mattese Creek
Capital
48Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
ConstructionManagement ServicesDuring Design
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.FINE
PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
14
$400,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
49Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Design Services
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.FINE
PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
11
$4,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
50Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLGUSTAVLOWELLJORDANCHAIN OF ROCKS
FONTAINE
MELVIN
LOGAN
RAFORD
G
A
S
T
NASSAU
JACKSON
JENNINGSSTATION
FREMONT
DONNELL
CHURCH
R IVERRUN
RIVER TRAIL
P O R T L A N D
MA K A L U
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
11
$600,000
St. Louis City
Bissell
Maline Creek
Capital
51Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MC-02 WATSON TO EDGAR RD SANITARY RELIEF(SKME-580A)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,700 FEET OF 27-INCH TO 36-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-557.
PROJECT BUDGET HAS PARTIAL CONSTRUCTION FUNDING IN FY 22AND SUPPLEMENTAL CONSTRUCTION APPROPRIATION FY 23. TOTALCONSTRUCTION BUDGET IS $10,000,000.EDGARLACLEDE STATIONIMSEFLORENCE
RAVENSRIDGE
FIELDSTON
PRIVATE
BUSCH
PEMBROKELACLEDE G R O V E S
CULVERHILLHURSTGREEN
OL DWESTB URY
KIRKYCANON
VILLAWOOD
RADNOR VICAROAK KNOLL MANOR
LORD SHILLCHAT W ELLCHESTN UTHILLSST JAMES CRATHESO A K KNOLLMANOR WATSON RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10024
Wastewater
11
$1,500,000
Various
Lemay/RDP
Mackenzie Creek
Capital
52Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION
Design Services
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES AREOVER 50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, ANDSTRUCTURES.
§¨¦70
§¨¦64
§¨¦44
§¨¦55 §¨¦70RIVERVIEWDRMANCHESTER RD
NATURALBRIDGERDNATU
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12483
Wastewater
11
$1,200,000
St. Louis City
Various
Various
Capital
53Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OAKWOOD FARMS PUMP STATION (P-470)ELIMINATION
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION P-470 NEEDS TO BE REPLACED OR ELIMINATED.
CONSTRUCT 920 FEET OF 8-INCH SANITARY SEWER. DECOMMISSIONAND ABANDON EXISTING PUMP STATION P-470 AND ASSOCIATEDFORCEMAIN.JACOBGATEFORDOAKMONTFA
R
M
OA
KBORO
U
G
HW ESTRUNOAKBRIAR FARM
R ID G E OAK BROOKMONT FARMCASTL
E
M
A
N
O
R
GATEFORD RIDGE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12364
Wastewater
11
$124,000
Ballwin
Meramec
Kiefer Creek
Capital
54Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PRICE TO PIONEER SANITARY RELIEF
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,665 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.DIELMANMEEKS
M
E
S
A
UNION PACIFIC
PAGE
LA JOLLA
CROCKETTINDIANM E A DOWS
HURON
PIONEERG RANDVIEWC O DYWALTERSRIDDLE
WISHARTDIELMANROCKISLANDINDUSTRIAL
MOHAVEELMRIDGEWIBRACHTOTTAWAYUCCA
NORFOLKSOUTHERNKINARKPRICE
CHICAGO HEIGHTSWERREMEYER ZIMMERMANDIELMANINDUSTRIALLOTSIENATALIE
MEEKS §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12368
Wastewater
11
$630,000
Olivette
Lemay/RDP
University City Branch
Capital
55Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPAIR AND IMPROVEMENTDESIGN (CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
AGING PUMP STATION FACILITIES ARE IN NEED OF REPAIR,IMPROVEMENT, REPLACEMENT, OR ELIMINATION.
DESIGN PUMP STATION FACILITY IMPROVEMENTS TO INCLUDENEEDED REPAIR, RENOVATION, RECONSTRUCTION, OR ELIMINATION.
CONSTRUCTION WILL BE IMPLEMENTED IN PHASES UNDER VARIOUSPROJECT NUMBERS, INCLUDING BUT NOT LIMITED TO 12583, 12207 AND12188.
§¨¦64
§¨¦70
§¨¦270
§¨¦70
§¨¦64
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12697
Wastewater
16
$50,000
Various
Various
Various
Asset Management
56Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (2020)
Vendor Services
1101 - General Fund
PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTSARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2022 BASEDON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12006
Wastewater
16
$130,000
Various
Various
Various
Asset Management
57Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$600,000
Various
Various
Various
Asset Management
58Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
Design Services
6660 - SanitaryReplacement Fund
COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, ANDCLAYTONIA WATERSHEDS REQUIRE MAJOR SYSTEM CONTROLS TOOBTAIN CONSENT DECREE COMPLIANCE.
CONSTRUCT 16,300 FEET OF 17-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 28 MILLION GALLONS.
§¨¦44
§¨¦64§¨¦170
§¨¦64
§¨¦44
§¨¦170
DALE
CLAYTON
ME
T
R
OLIN
KELMUNIONPACIFICPINE
PERNOD
FYLER
FOLK
WATSONOLEATHA TAMMNEWPORT
MARSHALL YALECLARK McCAUSLANDARSENAL
W ELLS
LACLEDESTATIONBELLEVUESOUT HWEST
ODELLBRENTWOODHANLEY
LINDENWOOD
SCANLAN
ETHEL
BRADLEY
KIRKHAMWHITE
BELLBREDELLBOLANDSUTTONLAWN
WEST PARK
EULALIE
GLEN
SWAN
PAR K
SMILEYPACIFICFORESTLOUIS
MARQUETTEDELNORTE
WINONA
WIL L IA MS
ALAMO
HIGHSCHOOLMARDEL
C A M BRIDGEGARNER
FLORA
ARTHUR
BERTHOLD
SALEMB
U
C
K
HICKSWRENWOOD
ST CLAIRMARYG R E E NWOODBRUNO GLADES
POTOMAC
MARMADUKE
WISE
FAIRVIEW M A NHATTANSUMMITPRATHERHANCOCK
RUSSEL
L
YEATMANEA G ER
ROSE
SPRINGFLORENCE MARTINIOXFORD PRIVATEBREMERTONC O M M O NWEALTHMOORLANDSTHOLOZANLYLEYORK
ARLINGT
O
N
VILLA
WAYMIRE SOUTHSARAH
JAMES
MAPLEANNALEE CUTTERGREELEY JAMIESONECOFFSOUTHWOOD
VINE
ARBOR
NORTHWOOD
PORTERMITCHELL
PLATEAU
RICHERTHATTONARLINGTON
PARK TAMMTAMMMARYFLORA
GLENYALEELM
EAGER
THOLOZANYALEARTHUR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12441
Wastewater
11
$1,800,000
Various
Lemay/RDP
Deer Creek
Capital
59Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAYLESVILLE SANITARY RELIEF (SAYLESVILLEDR TO S GREENTRAILS DR)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,920 FEET OF 18-INCH SANITARY SEWER.
PROJECT 11416, BOXFORD COURT BANK STABILIZATION, TO BECONSTRUCTED WITH THIS PROJECT, AS BOTH ARE IN THE SAME AREA.
LADUE
C
R
OSSTRAIL
S
TRAILT O PGREENTRAILS SEABROOKSAYLESVILLEPAR
LIA
MENT
WEST M ANORPRIVA T EDI
N
S
MOOR
A G USTA
PENSHURSTRAINYLAKEKI NDERHOOK
C A M B E RRA
REELFO OTLAKENEWBEDF
ORD
LIGHTH O R S E
V
E
R
N
O
N
H
O
U
S
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12200
Wastewater
11
$646,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
60Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCHUETZ ROAD SANITARY RELIEF (FORESTBROOK LN TO SUNNY WOOD CT)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,010 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.GUELBRETHFOREST BROOKCORBEIL
TUXF
O
R
D
M
E
A
D
O
W
L
A
R
K
WIL
L
OW
B
R
O
O
K
GLENRIDGE O
XFORD HILL
BILSTON
GOSPORT
GREEN BRIAR
SUNNY WOOD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10161
Wastewater
11
$235,000
Creve Coeur
Missouri
Fee Fee Creek
Capital
61Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. GEORGE CREEK SANITARY RELIEF (DAISY LNTO GRAVOIS RD TO NEW HAMPSHIRE AVE)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-404 REQUIRES REMOVAL.
CONSTRUCT 2,640 FEET OF 18-INCH TO 24-INCH SANITARY SEWER.ELIMINATE CONSTRUCTED SSO OUTFALL BP-404.
WEBER
IV
Y MACKENZIERADIOALTHEA
VITA
NI
L
E
SVASEL
BRENDARAMBLERLUCIANEIERASTERCORAL
STERLING
DARLOW
BRINKERLAVERN
DAISY
D
AR
L
E
N
E
PAVIA ELGINALPINE
BIXBY
CHARLTONFAYETTEPALMETTOCOLVER
ARV INBURL
I
NGTONNORTHERNSANTAFEDEXTER
RAYWOOD
LENARD
JUDSON TOBEYMAXWELL
IRENE
LEONA
FAIRHURST DEMINGSTERLING ELGINALPINEBRENDA L
U
C
I
A
MAXWELL
GRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12212
Wastewater
11
$600,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
62Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. JACQUES SANITARY RELIEF (ST. JACQUES STTO N LAFAYETTE ST)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLBP-110 REQUIRES REMOVAL.
CONSTRUCT 195 FEET OF 8-INCH SANITARY SEWER, REPLACE 154 FEETOF 12-INCH SEWER WITH 15-INCH SEWER, AND ELIMINATECONSTRUCTED SSO OUTFALL BP-110.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12509.LAFAYETTEJEFFERSONST JACQUESST M
A
R
I
E
CLARKELMDALEST
A
L
B
E
R
T
ST BAPTISTA
ST AUGUSTA
ST CHRISTINAS
T
EDITH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12213
Wastewater
11
$50,000
Florissant
Coldwater
Coldwater Creek
Capital
63Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFFRESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER QUANTITYAND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM INCONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING ANDDESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS REQUIREDPURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$520,000
St. Louis City and County
Various
Various
Asset Management
64Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (2020)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF THE CSO LTCP, SSOELIMINATIONS, & STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGHFY2022 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12004
Unallocated
16
$300,000
Various
Various
Various
Asset Management
65Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER RDP (UNIVERSITY CITY) CSO STORAGETUNNEL
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE UPPER RIVER DES PERES ANDTHE UNIVERSITY CITY WATERSHED IS REQUIRED BY THE CONSENTDECREE.
CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 30 MILLION GALLONS.
DELMAR
KINGSBURY
PERSHINGHANLEY ETZEL
VERNON
KINGSLANDJULIANPURDUE
TULANE FERGUSONPENNSYLVANIAYALECORBITT
COR N E L L
SHAFTESBURY
PAGE
STA N F O RD
TRINITYDARTMOUTH
TEASDALE
BARTMER
BEMISTONCENTRALGANNON
AHERN PLYMOUTH
WILSONPARTRIDGEWASHINGTONWATTSDREXEL
JACKSONDORSET
LINDENPRIVATE LELANDMEYERWELLINGTON
COLGATE
ROBERTS
WATERMAN BELRUELOOP
AMHERSTWALDRON CHAMBERLAINWILSHIREU
R
S
U
L
ABACKER
HARVARDROTHMIDVALECARLETON
HEMANDOVE RCREST
VANDERBILTWARRENMELROSE
HAZELWOOD
MELVILLECOLBYOVERHILLUNIVERSITY BUCKNERPRINCETON
SCHOFIELD
ARCADIA
COLUMBIA
ROSSIREMLEYARDEE
LIONSGATEAMHERST
PRIVATE
CORNELL
DARTMOUTH
WASHINGTON
AHERN
PRINCETON
CHAMBERLAIN
PRIVATE
STAN FORDCRESTPRIVATE
CO R NELL
WATERMANPURDUEHANLEYCARLETON
DREXEL PRI
V
A
T
E
STANFORD
MELROSE
OLIVEBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12440
Wastewater
11
$1,200,000
University City
Lemay/RDP
University City Branch
Capital
66Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALLEY PUBLIC I/I REDUCTION (CLARKSON RDAND KEHRS MILL RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC I/I CAUSING BUILDING BACKUPS ANDOVERCHARGED SANITARY SEWERS.
REHABILITATE 43,700 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12257.
CLAYTON
V
A
L
L
E
Y
COUNTR YRIDGEFIELD
VIRGINIA
P ARASOLWILSON
DEL EB R OKETTINGTON
SUNSETSUNMEADOWTREVI PROVI
DENCEHERWORT H
PRIVATE
WOLFFFORES T C LUB
CAMARGO
CRES T L A N D
K E HRS RIDGE
CHERRY H
ILL
LONECAB I N
CHIPPE NHAMWILSON CREEK
FAIRVIEW
SKYLINEPEPPERMILLWESTPARWHITINGCLAYHEATHW E S T W O O DBEDFORDSYCAMOREWETHERBURN
AUTUMN RUNCLARKS O N W O O D S
GOLFVIEWHILLHOUSEJ O Y C E R ID G ESHEP
KEIGHLYFIELD CLARKSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12507
Wastewater
11
$40,000
Clarkson Valley
Missouri
Caulks Creek
Capital
67Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WW-2 AND WW-3 WARSON WOODS SANITARYRELIEF
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLSBP-156, BP-158, AND BP-501 REQUIRE REMOVAL.
CONSTRUCT 10,900 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.ELIMINATE CONSTRUCTED SSO OUTFALLS BP-156, BP-158, AND BP-501.BERRYWOODLAWNKIRKHAM
OLD WARSON
ODAYWOODLEEBENNETT
DICKSONBISMARK
HUDSON
ANDREWGILBERTM ED IN A
FOOTE
QUAN
NORTH
MARK
RENDERERMCKINLEYKORTWRIGHTBACON
FL AN D E R S
GAS CONY
WILDDEER
EDLINSLOCUMBE A UCAIRECOPP E R H I LL
JOANNA
R ID GELINECHELSEA
P
R
IVATE HIGHHAMP T O N
ROLFE
MANIT
O
U
JULIAN
B
LO
S
S
OM
T
A
V
A
LO
N
VICTORIA
WARWICK
WAT E R B URYBARRONOAKGLENMOOR
MO NACOALEXANDRA FREDERICKMONIERFA
I
RD
A
L
E
IOLAWINGFIELDGLENBROOK
MUECK
G R E E N VIEWSOUTHRIDGEMINMARBEAUFORD
W A RSONNANCY CAROL MARTHAJ A M AICA
NORMAN
HAMMELKENMOREALFRED HOLLIST ON OAK LEAFNOLAN
KINSELLA
ALDEN
LEWISTON
DENVERLEONARDASCOTCHELSEA
FLANDERS
VICTORIA
M A N C H E S T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12302
Wastewater
11
$1,300,000
Various
Lemay/RDP
Deer Creek
Capital
68Page
2020
8 April 2019
Page 1 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
$5,100,000 69
13219 BADEN AND MILL CREEK ORS PUMP
STATIONS - PUMP REHABILITATION
$4,500,000 70
13232 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE)
$6,000,000 71
12092 BELLEFONTAINE #2 SANITARY RELIEF
(CHAMBERS RD TO COBURG LANDS DR)
$1,990,000 72
12033 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
$5,700,000 73
12030 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
$2,100,000 74
12027 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
$5,900,000 75
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
$6,000,000 76
12100 BRENTWOOD FOREST, FAIR OAKS,
MIDDLESEX I/I REDUCTION (I-64 AND LAY RD)
$1,000,000 77
12104 BROOKSHIRE SANITARY RELIEF (BROOKSHIRE
DR TO COUGAR DR)
$3,500,000 78
12111 CAPILIA SANITARY RELIEF (GRANT RD TO
CAPILIA DR)
$1,650,000 79
12112 CARSON VILLA, ROSARY LANE AND
THURSTON I/I REDUCTION
$3,000,000 80
11789 CAULKS CREEK FORCEMAIN REHABILITATION $5,600,000 81
11917 CELLA - ROLLING ROCK - GLEN CREEK
SANITARY SEWER IMPROVEMENTS
$200,000 82
12131 CONWAY VILLAGE SANITARY RELIEF
(CONWAY RD TO I-64)
$3,275,000 83
12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH
$3,450,000 84
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 85
8 April 2019
Page 2 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$5,000,000 86
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$13,000,000 87
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$38,000,000 88
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$15,000,000 89
11136 DEGIVERVILLE COMBINED SEWER
IMPROVEMENTS
$2,200,000 90
12516 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2020)
$4,000,000 91
12160 EDNA-THURSBY, ESSEX, TREASURER COVE,
WAYFARER EAST AND YARNELL CREEK WEST
I/I REDUCTION
$250,000 92
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS $500,000 93
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
$2,750,000 94
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
$10,000,000 95
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
$7,100,000 96
12897 INFRASTRUCTURE REPAIRS (FACILITIES)
(2020)
$3,000,000 97
12020 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2020) CONTRACT A
$2,500,000 98
12021 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2020) CONTRACT B
$2,500,000 99
12010 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2020)
$7,000,000 100
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$2,000,000 101
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
$5,180,000 102
8 April 2019
Page 3 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12841 KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
$8,000,000 103
13336 LANGLEY AND PHILO SANITARY STORAGE $800,000 104
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$14,000,000 105
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$2,315,000 106
12057 LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
$3,800,000 107
13082 LOWER MERAMEC WWTF FITTING
REPLACEMENT
$2,000,000 108
12336 MACKENZIE I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK
SEMINARY, AND NERINX HALL)
$1,170,000 109
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$8,200,000 110
12342 MARK TWAIN I/I REDUCTION (MANCHESTER
RD AND BOMPART AVE)
$500,000 111
12484 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION PHASE II
$7,000,000 112
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$4,500,000 113
10716 NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
$3,500,000 114
13302 RAINRIDGE CT. PROPERTY BUYOUT $600,000 115
12205 SOUTH COUNTY SANITARY RELIEF (P-419 TO
CRIPPLE CREEK DR)
$4,000,000 116
12230 TILLES PARK, LITZSINGER AND PARKRIDGE I/I
REDUCTION (LITZSINGER RD AND S
MCKNIGHT RD)
$850,000 117
13344 UNIVERSITY CITY I/I REDUCTION - EAST (UR-
08 AND UR-09) PHASE II
$2,000,000 118
12247 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION C PUBLIC I/I REDUCTION
$4,400,000 119
8 April 2019
Page 4 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12490 VANCE RD PUMP STATION (P-472) UPGRADES $4,160,000 120
TOTAL:$255,740,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
82ND STREET TO I-170 SANITARY RELIEF (UR-08,UR-09)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
UNDERSIZED SEWER. ELIMINATION OF CONSTRUCTED SSO BP-421REQUIRED. PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS.
CONSTRUCT 5,928 FEET OF 15-INCH TO 30-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-421. FACILITATES FUTUREELIMINATION OF MULTIPLE UPSTREAM CONSTRUCTED SSO OUTFALLS(BP-416, BP-417, BP-433, AND BP-476), AND PUMP STATION P-790.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS $9,100,000.INCLUDES PROJECT 12127.
§¨¦170
§¨¦170 82NDMCKNIGHTELMORE GRANTRICHARD
ORCHARD
OLD BONHOMMEHILLTOP S
H
E
R
I
D
A
N
WOODSONGROBY
SPOON COOLIDGEBRADDOCK
ARCHER
PRIVATECOLLINGWOODAPPLET O NLAVALVARN E YCOCHISE
CHISHOLM
MAYFLOWER
BONPRI
CEBRIG
HTLINGBRISCOETULANEC
O
O
L
I
D
G
E
PRIVATE
RICHARD
ORCHARD
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11993
Wastewater
15
$5,100,000
Various
Lemay/RDP
University City Branch
Capital
69Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BADEN AND MILL CREEK ORS PUMP STATIONS -PUMP REHABILITATION
Construction
6660 - SanitaryReplacement Fund
AGING PUMPS ON THE MISSISSIPPI FLOODWALL FLOOD PROTECTIONSYSTEM NEED REHABILIATION.
REHABILITATE 6 MAJOR PUMPS.
§¨¦70
§¨¦64
§¨¦44
§¨¦55 §¨¦55RIVERVIEWDRMANCHESTER RD
NATURALBRIDGERDNATU
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13219
Wastewater
15
$4,500,000
St. Louis City
Bissell
Various
Capital
70Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BADEN CITYSHED MITIGATION BASINS (CALVARY,FREDERICK, PARTRIDGE AND TILLIE)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS, STRUCTURE AND STREET FLOODING.
CONSTRUCT 4 STORMWATER DETENTION BASINS, AND 3 RAINGARDENS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS $9,520,000.
SWI
T
Z
E
R
BAD
E
N CHURCHNORFOLKSOUTHERN
BITTNERNEWBYGARTH
FRE
D
E
RIC
K
TILLIEROBINORIOLEPEGG
Y
GILMOREPARTRIDGEETO
N
LYNHAVEN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13232
Wastewater
15
$6,000,000
St. Louis City
Bissell
Baden
Capital
71Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BELLEFONTAINE #2 SANITARY RELIEF(CHAMBERS RD TO COBURG LANDS DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-287 REQUIRES REMOVAL.
CONSTRUCT 3,340 FEET OF 12-INCH SANITARY SEWER, AND ELIMINATECONSTRUCTED SSO OUTFALL BP-287.
C
A
B
O
T
KILGORE
AVANT
ADDISON
ASHFORD TAPPANLAIRE
A S HBROOKCRETEBO SWORTH
ATTICA
JEPSONAKRON
GABRIEL
NEWBOLDCOMET
GRE NSHAWHEDGE BLISS
OD E S SA
BALLARD
BAKEWELL
SURFGOLDEN
CORINTH
U
N
I
C
O
R
N
DELHI FONDANORWICHFARRINGTONSEATONBLACKHURST EWELLLOCHIEL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12092
Wastewater
15
$1,990,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
72Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2020) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 54,900 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12273, 12269, AND12158.
§¨¦44
§¨¦55
§¨¦270
§¨¦55
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12033
Wastewater
15
$5,700,000
Various
Various
Various
Capital
73Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2020) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 26,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12095, 12112, AND12229.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
RIVERVIEWDRST C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12030
Wastewater
15
$2,100,000
Various
Various
Various
Capital
74Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2020) CONTRACT C
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 85,240 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12073 AND 12223.
§¨¦270
§¨¦270
GEYERADAMS
BALLASCLAYESSEX
UNI O N P A C IF IC TAYLORCOUCHCRAIGANNDOUGHE RTYFERRYDES PERESROSE HILL
NIRK
WOODBINE
BOAZ
LARK EVANSEDNAWAY
PEEKESIMMONSWILSON
LEEVAN BURENCRESTJEFFERSONIRIS
MONROE
FRIEDAALTUSNELDABAC
HSARAH
RAYNE R
LINWOOD
JEWEL
G A BRIELLINDGATE
ROSE
GRAND
KIRKSHIRE
GOETHEWESTVIEW TWIN PINELILLIAN
LINDEMANSUNNY
PO N CA CAROLINEMADISON
KNIERIMNANA
BRIARGATE
SHA RIWINSLOW
PRIVATE SWAN
GRANT
CULLODENHEEGE PEARLBROOKCREEK
MOZARTBARBYGRASSY RIDGE
AMHERST
ROGER
HARVEYMCKINLEY
BALLASM O N R O E
TAYLORJEWEL
SUNNY
S KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12027
Wastewater
15
$5,900,000
Various
Various
Various
Capital
75Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF MAIN SUBSTATIONSWITCHGEAR AND MCC REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
EXISTING SWITCHGEAR IS OBSOLETE AND REPLACEMENT ISREQUIRED TO MINIMIZE POWER SERVICE INTERRUPTIONS.
CONSTRUCT REPLACEMENT OF MAIN SUBSTATION SWITCHGEAR ANDPRELIMINARY AND PRIMARY TREATMENT MOTOR CONTROL CENTERUNITS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$10,500,000.
H
A
L
L
GRANDN
O
R
FOLKSOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12494
Wastewater
15
$6,000,000
St. Louis City
Bissell
Bissell
Capital
76Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/IREDUCTION (I-64 AND LAY RD)
Construction
6660 - SanitaryReplacement Fund
REDUCTION OF I/I ACROSS THE TRIBUTARY AREA REQUIRED.
CONSTRUCT 665 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 46 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12042. INCLUDES SCOPEOF WORK FROM PROJECTS 12138 AND 12244.
§¨¦64
§¨¦170
§¨¦64
§¨¦170
PINE
CLAYTON
LAYBRENTWOODMCKNIGHTWHITE LINDENME
TROLI
N
K
LAWNSWANMCCUTCHEON B
U
C
K
LITZSINGER
WRENWOOD
ST CLAIRURBAN
ROSE
GODWIN
Y O R KPARKRIDGEHIGH SCHOOLMORITZ
E A G E R
ELLSWORTH
BRYAN
SONORA
EVERETTFRANCISWATKINS
P R IVATESUSSEXEVANS
WILD ROSE
STRASSNER
DAYTONA
LINDWORTHGALLERIA
HALIFAX
PARKSID
E
MONM OUTHEXMOORN O RTHC OTE
BE R K SHIREWHITEHALL
AGNES
HATTONDEER CREEK WOODS
B R ID G E P O R TRIDGETOPORIOLEWHITBURNROBINSEMINOLEREDBIRDBRIDGEPORT
EAGER
WHITE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12100
Wastewater
15
$1,000,000
Brentwood
Lemay/RDP
Deer Creek
Capital
77Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BROOKSHIRE SANITARY RELIEF (BROOKSHIREDR TO COUGAR DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 6,000 FEET OF 8-INCH TO 18-INCH SANITARY SEWER.
N
EW
H
A
L
L
S
F
E
R
R
Y
AVON
BALTIC
W E D G W O OD
WELLINGT
O
N
A
BERDEEN
WINTERGREEN
COUGAR
C
HURCHILL
B
R
U
N
S
WIC
K
HEATHERTONDR E SDEN
D
O
VERRAN
C
H
O
GREENWAY CHASE
MORRISRETFORD
INDIANCUP
W
ESTMINSTER
CANTERBUR Y
SHOREHAM
SOME R SETSUNCRESTGREENHEATH
WINDSOR
HUNTINGTO NBROOKSHIREBRAD WELL
M
O
ULEES PACEJOST ESTATESWOODSAG ECH ESHIR
E
COTTONTAIL
CHELSEA
SPRINGTIME
CAMBRIDGE
CRICKETLAVIN
B
UCKINGHA MDOMENIQUE
ED
I
N
B
U
R
G
FARNHAMLINDBERGHLINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12104
Wastewater
15
$3,500,000
Unincorporated
Coldwater
Coldwater Creek
Capital
78Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAPILIA SANITARY RELIEF (GRANT RD TOCAPILIA DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-370 AND BP-581 REQUIRE REMOVAL.
CONSTRUCT 2,770 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, ANDABANDON 2,600 FEET OF 8-INCH TO 10-INCH SEWER. ELIMINATECONSTRUCTED SSO OUTFALLS BP-370 AND BP-581.
GRANT WHITEHAVENFERNALDBUL
L
R
U
N GRANT PARKGRANTWOODP R I VA TE RALEIGHCA
P
I
L
I
A
FORT DONELSONROCKFORESTAPPOMATTOXGR
A
N
T
H
A
V
E
N
GRA N BURYFORTHENR
Y
PRIVAT E
CA
P
I
L
I
A
CAPI
L
I
A
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12111
Wastewater
15
$1,650,000
Various
Lemay/RDP
Gravois Creek
Capital
79Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CARSON VILLA, ROSARY LANE AND THURSTON I/IREDUCTION
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,200 FEET OF 12-INCH TO 15-INCH STORM SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT 104 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12030.HANLEYCLER WESTGL
E
N
E
C
H
O
OLD HANLEYLYNDHURSTAUDRAIN ANDOVERMAYBELLEKENDALE
TR
U
M
B
E
L
LST HENRYHATHERLYMONITEAU
MARCELLA
MERIDIAN
ELAIN
E
AR
D
S
L
E
Y
HORATIO
ALGER NORDICWERDER
RACQUET
WALES
THELMA
CHADWICKCLEARVIEW
ALV
A
SPUR
DELAVANROANOKEELSWORTHW
E
LSBERG
K
N
O
LLWOOD
BELLERIVE ACRES
MEDORA
DARWIN
KATHERINE
PRIVATE
HAMMONDSNO
WHILL
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12112
Wastewater
15
$3,000,000
Bel-Ridge
Bissell
Maline Creek
Capital
80Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN REHABILITATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
FORCEMAIN CONVERSION TO REDUNDANT FORCEMAIN REQUIRESREHABILITATION DUE TO AGE AND CONDITION.
REHABILITATE 30,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROMPUMP STATION A TO THE 36-INCH FORCEMAIN AT THE MISSOURIAMERICAN WATER PLANT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$14,600,000.
§¨¦64THF
CENTRAL M ID L A N D LADUEEDISONW
E
S
T
APPALACHIANWILDHORSECREEK HOGHOLLOWPRIVATEW
IL
SON GREENTRAILSSWINGLEYRIDGECHESTERFIELD
WATER W O RK SW
HITE PETZOLDRA INYLAKENOONI
N
G
TREE
LYDIAHILL CONWA Y
W E S T E R NM I L L
PR IV A T E
PRIVA T E
P
R
I
V
A
T
E
PR IVATEOLIVEBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11789
Wastewater
15
$5,600,000
Various
Missouri
Missouri River Tributary Areas
Capital
81Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CELLA - ROLLING ROCK - GLEN CREEK SANITARYSEWER IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS AND BUILDING BACKUPS.
PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES.
§¨¦64
§¨¦170
LADUE
LAYMCKNIGHTPRICECLAYTONWARSON BARNESCELLAKENTMCCUTCHEONROANOVERHILLS
G LEN E A G L E SDANIELSW A NEAGER
YO RKCONWAYLITZSINGER LINDWOR T H
DROM
A
RADIELMANSPRINGWOOD
P IC A RDY
MIDPARKINDIANLOG CABINCLE R MO N T
LAWN
WIN D ING RID G E
TWINSPRINGS BERKLEYWARRIDGEPRIVATE
RAUSC
H
E
RTIRRILL FARMSAPPLE TREEFORDYCES A R A NACEXMOORLORENZOD E E R CREEK
DEER CREEK WOODS CANARYPAXTON
PRIVATE
YORK
PRIVATE
LITZSINGER
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11917
Wastewater
15
$200,000
Ladue
Lemay/RDP
Deer Creek
Capital
82Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONWAY VILLAGE SANITARY RELIEF (CONWAYRD TO I-64)
Construction
6660 - SanitaryReplacement Fund
EXISTING SEWER IS DETERIORATED AND LACKS CAPACITY, CAUSINGBUILDING BACKUPS.
CONSTRUCT 3,600 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦64SOUTHOUTERFORTY
NORTHOUTERFORTY TECUMSEHCONWAY
V
I
LLAGEPRIVATEMERTZM A R Y VILLECENTREPINETREELAKE
BROOMSTICKPINE CREEKFAIRFIELDLAKE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12131
Wastewater
15
$3,275,000
Town and Country
Missouri
Creve Coeur Creek
Capital
83Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CREVE COEUR CREEK PUBLIC I/I REDUCTIONSOUTH
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 76,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12135.
§¨¦64
§¨¦270
§¨¦64
§¨¦270
LADUE
C LA Y TO NMASONWOODSMILLNORTHFORTY MOSLEYEMERSONW
EI
D
MANROSSSOUTHOUTERFORTY TEMP
O
S
C
H
U
L
T
E
OAKAMBOIS
RUHLCARBERRY
FOR E S T CREST
G LEN COVE
STUDT
TAMMANYPRIVAT
E CRAIGCRAIG V I E W
DRYRIDGEBRIDLENIMES
CHASSELLEMAGNACA
R
T
A
HIRAM
CR
O
SSTRAILS
BOPP
KR
O
P
P
LAKESHORE
KINGS GLEN
DUBON ACTIVEBOX
F
O
R
D
CLIONYVESHARFLOLADUEFARM
TUREENFAIRWAYS
TUCKERKRAMHEWLETTDARIEN
MASONPRIV ATE
PRIVATE
OLIVEBLVD
SMO141HWY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12432
Wastewater
15
$3,450,000
Various
Missouri
Creve Coeur Creek
Capital
84Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AREREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Various
Non-recurring
85Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AREREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦70
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$5,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
86Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHILLS
DE N NY
GODWI NCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P I C A RDY
WINDI N G R I D G E
INDIAN
ELLSWORTHLOG CABINPARK
OVERBROOKHIGHDOWNANZEIGER
PRIVATE
TWINSPRINGS ROLLINGROCKMAYFAIRWARRIDGE
WILDROSE
WATE R BURYLYLEWOOD
RAUSC
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R CREEKPRIVATE
PRIVATE
P RIV A T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
15
$13,000,000
Ladue
Lemay/RDP
Deer Creek
Capital
87Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $153,000,000.PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦44
§¨¦64
§¨¦170
DALE
ME
T
R
O
LIN
K
CLAYTON
UNIONPACIFICPINE
ELMLAYFOLKMCKNIGHT
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEPERNOD
KIRKHAMETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHALINDENEULALIE
LINDENWOODGLENGOR
E
FYLERCLAYTONIA
LEE
ARUNDEL
EUCLID SW AN
PAR KLITHIA
PACIFIC HANLEYFORESTLOUISDELNORTEPLATEAU
WILL IA MS
ALAMO
MARDEL
MADGE
HANCOCKMCCUTCHEONWISE
C A M BRIDGEARSENALFLORASALEMB
U
C
KHICKS
ST CLAIRMARYG R EENWOODBRUNO
FAIRVIEW M A NHATTANPRATHERBARTOLDRUSSELL
YEATMANROCK HILLEAGER
ROSE
FLORENCE MARTINIOXFORD
GODWI N
C O M M ONWEALTHMOORLANDSY ORKBACON
MORITZ
LYLEDESPERESPRIVATEARLINGTON
ANNA
WAYMIRE
ELLSWORTH
WELLINGTON
JAMES
MAPLECIRCLECOLLINS
GREELEY ECOFFBLENDONCORONAEAST PORTEREXETERHORNER
BERRY RICHERTHATTONSANBONITA
UNIONPACIFIC FORESTMARYWHITE
IVANHOEELMMANCHESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$38,000,000
Various
Lemay/RDP
Deer Creek
Capital
88Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
H
E
R
N
S
A
NT
A
F
E
CARR LA
N
E BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
HE
R
N
S
A
N
T
A F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
15
$15,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
89Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEGIVERVILLE COMBINED SEWERIMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
EXISTING COMBINED SEWER HAS CHRONIC ROOT INTRUSION ANDINFLOW CAUSING BUILDING BACKUPS.
PERFORM POINT REPAIRS AND REHABILITATION OF LATERALCONNECTIONS, AND IMPROVE ACCESS TO MANHOLES WITHIN METRORIGHT-OF-WAY FOR MAINTENANCE.
DELMAR
METROLINKLAURELMETROLINK
ENRIGHT
FOREST PARK
DE
G
I
V
E
R
V
I
L
L
E
PERSHING DEBALIVIEREWATERMAN
NI
N
A
KINGSBURY
WESTMINSTER
MCPHERSONHAMILTONGOODFELLOW
DES PERESNI
N
A
ME
T
R
O
L
I
N
K
WATERMAN
PERSHING
KINGSBURY
METROLINK
WESTMINSTER
MCPHERSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11136
Wastewater
15
$2,200,000
St. Louis City
Lemay/RDP
Blackstone- Clarendon
Capital
90Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR WASTEWATERPROJECTS (2020)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTYRIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12516
Wastewater
13
$4,000,000
Various
Various
Various
Asset Management
91Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EDNA-THURSBY, ESSEX, TREASURER COVE,WAYFARER EAST AND YARNELL CREEK WEST I/IREDUCTION
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARYSEWERS.
PERFORM PRIVATE I/I REDUCTION AT 82 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12029.
§¨¦270
§¨¦270
BALLASU N I O N P A C IF IC
BOAZ
ANN
EDNALARK
CRAIG
HIGHLAND
NELDABACH
M A RSHALLB U R L IN G T O N N O R T H E R N S A N T A F E
WESTVIEW
THURSBYGLEN
WOO
D
P ONCA OL D B IG B E N D
WOODBINE
BRIARGATE
VIRGINIA
S H A RIJOESIGNALHILLSCULLODEN F R IAR
SO MMETWI
LDWOOD BARBYSWEETBRIAR GR ANDVIEW
WINDY HILL
CHARMWOOD GLENFORDTIMBER B R O O K
HORSES
H
O
E
D U BO ISMEYERGREENGLEN
HOFFMAN
EMMERSONST GIL E S
HUNTINGLAKE
REPETTOBRIAR GREENBALLASU N IO N P A C IF I C BACH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12160
Wastewater
15
$250,000
Various
Meramec
Grand Glaize Creek
Capital
92Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GASLIGHT SQUARE SEWER IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED COMBINED SEWERS CAUSING WET WEATHERBUILDING BACKUPS.
INVESTIGATE AND CONSTRUCT A LIMITED PILOT PROGRAM TOMITIGATE THE OVERCHARGING OF THE COMBINED SEWER.
OLIVE
BOYLESARAHWHITTIERMCPH
E
R
S
O
N
WEST
M
I
N
S
T
E
R
WASH
I
N
G
T
O
N
LINDELL
DELM
A
R
MARYLAND
MCPH
E
R
S
O
N
WEST
M
I
N
S
T
E
R
MARYLAND
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11137
Wastewater
15
$500,000
St. Louis City
Bissell
Western Mill Creek
Capital
93Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF FLOODWALL PROTECTION
Construction
4102 - ImprovementFund
MAJOR FLOODING EVENTS CAN IMPACT AND DAMAGE THE GRANDGLAIZE TREATMENT FACILITY.
CONSTRUCT A FLOODWALL SYSTEM TO PROTECT THE TREATMENTPLANT AND MAINTENANCE BUILDINGS FROM FLOODING.
PRIVATE
TWIN LAKES
WESTERMANBURLINGTONNORTHERNSANTAFEUNION PACIFICGRANDGLAIZE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13072
Wastewater
15
$2,750,000
Valley Park
Meramec
Glaize Creek
Capital
94Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYREHABILITATION (FANNIE AVE TO PARDEE LANE)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REHABILITATE 39,560 FEET OF 36-INCH TO 72-INCH SANITARY TRUNKSEWER AND REHABILITATE 103 MANHOLES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$25,000,000.
§¨¦55
§¨¦270 UNIONMACKENZIEROCKHILL
PARDEEMUSICKELMGREGGGR
A
N
T
REAVISBARRAC
KS
WIL
L
GERMANIA
RIVERVALCOURMORGANFORDWACHTELBAY
L
E
S
S
ZEISSH
ALE
SEIBERT
CCCGREENPARK PARDELLAIO NELACLEDE STATIONCH
ESHIRE
RIVER
DESPERES
BAPTIST CHURCHTELFORDMA
T
T
I
S ELTONCORDESBLO
W
ARLEE
TULIP
LIT TIE
GENTRYMATHILDAFAIN
IVY
SHERMAN JOPLINREAVIS
RADIOSHARPP R IV A TE
ALICETON
MOHEGAN
ELIS
E NEW HAMPSHIREKAYEDGAR
RIPASELMA
MUELLERHEI
D
E
L
B
E
R
G
KITWEBER
GRANDCLIFFRUSTYDIERSVAUK
LUCIABUXTONLARKFORMAN
OUTE RWELLSSUN
R
A
Y ACORNTESCORDGATESBURY
SUN
S
H
I
N
E
SEDANALTHEAVASELFLORIJEFFLEIGHCAMINOMAYOLANZINZER
HALS EYVIRGOBUF
F
T
O
N
LINCORDAFFTON
JAMIEJAN
PECANASHBURY
PICKWICKREGINABUCKLEYLAK
E
S
I
D
E
LARKINSIGS
B
E
E
HEE
G
E
VIC
T
O
R
Y PHILOHEA
L
Y
FATIM
A
CECI
L
JOELOLEDELKOERBER
SONATAEIFF
E
L
ALL
E
N WANDARAYPINOAKJUBIL PEARHEEGE
GRANT
WEBER
GRANTLEMAYFERRYRDTESSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10496
Wastewater
15
$10,000,000
Various
Lemay/RDP
Gravois Creek
Capital
95Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS. ELIMINATION OF CONSTRUCTEDSSO OUTFALLS REQUIRED.
CONSTRUCT A 7.8 MILLION GALLON SANITARY STORAGE FACILITY TOSTORE WET WEATHER SANITARY FLOW. ELIMINATE CONSTRUCTEDSSOS BP-588 AND BP-599.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$25,100,000.
PAR
D
E
E
BR
O
O
K
V
I
E
W
ARBAN
PRIVATEGRA
N
T
LODGE POLEW H IT E C L IFFPARKSILVERCRESTLURLINEPRIVATEPRIVATE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
15
$7,100,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
96Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (FACILITIES) (2020)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
FACILITIES HAVE NEEDS FOR REPAIRS OR IMPROVEMENTS THAT POSEMAJOR OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO WAIT FORCAPITAL PROJECT DELIVERY.
CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TOADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS ANDPUMP STATIONS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12897
Wastewater
17
$3,000,000
Various
Various
Various
Asset Management
97Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2020) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12020
Wastewater
15
$2,500,000
St. Louis City and County
Various
Various
Capital
98Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2020) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12021
Wastewater
15
$2,500,000
St. Louis City and County
Various
Various
Capital
99Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2020)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATERINFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12010
Wastewater
17
$7,000,000
Various
Various
Various
Asset Management
100Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 20. TOTAL CONSTRUCTION BUDGET IS$67,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHKINSWOOD GREGGREAVIS
B
A
R
R
ACK
SFOR
D
E
R CCCGRANTLIND TELFO R D
HOFFM
EIS
TE
R
ARLEE
SHERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHER ID A NPOT
T
L
E
ORIE
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHOR
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
SHROCK
JACI
N
T
O
SOUTHSHIRE
ARRAS
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHPR
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$2,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
101Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS
Construction
6660 - SanitaryReplacement Fund
INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THEMARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT.
CONSTRUCT 5,700 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, ANDREHABILITATE 2,800 FEET OF 30-INCH TO 36-INCH SANITARY SEWER, TOCONVEY FLOW TO THE NEW JEFFERSON BARRACKS TUNNEL.
§¨¦55
§¨¦255
UNIONPACIFICKOCHRIVERKINSWOOD
RIPAUNION
GREGGMILDFOR
D
E
R
POT
T
LE CCCREAVIS
B
A
R
RACKS
GRANTLIND
YAEGER TELFO R D
ARLEE
SHERMANGENTRYFAIN PRIVATERINGER JOPLINWIL
L
MAGOFFINCLIFFSHERIDANVIC
T
O
R
Y
GARKLARK
CLAGEROUTE R
BLUFFBUR
N
COATE
ETTA
CLYDEPERRINBOUNDARYCAMINOJEFFERSONIAN
HAL S EYPEACEHAVEN FIRSTPECAN
A
SHROCK
SOUTHSHIREBUCKLEY
PE ALARRAS
J
E
FFERSON
ELLENBLUE RIDGEBANISTERALLE
N
LI
S
I
E
U
X KASKEBUNKERBIRCHBUCKLEYP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11957
Wastewater
15
$5,180,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
102Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KINGSLAND SANITARY STORAGE FACILITY(ENGELHOLM)
Construction,Design-Build
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT A 1 MILLION GALLON SANITARY STORAGE FACILITY.70THMETRO L
INK
FERGUSONLEROYKI
NGSLANDENGELHOLMENG
E
L
C
R
E
S
TFERGUSON METRO LINKENGELHOLMST C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12841
Wastewater
15
$8,000,000
Pagedale
Lemay/RDP
University City Branch
Capital
103Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANGLEY AND PHILO SANITARY STORAGE
Land Purchase
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS EXCEED THE CAPACITY OF THE SANITARYSEWER.
CONSTRUCT 80,000 GALLONS OF SANITARY STORAGE, INCLUDING 350FEET OF 48-INCH TO 84-INCH SANITARY STORAGE PIPE, 510 FEET OF8-INCH TO 18-INCH SANITARY SEWER, AND 230 FEET OF 12-INCH TO42-INCH STORM SEWER
LANGLEY
PILOTLODE
WALDO
PHILOACORNMATHILDAHARMONYKATHLEENVINE
LACEYLA
K
E
W
O
O
D
ROSEMARYVIRGILHIL
D
A
LODE
PILOTVINE
GRAVOIS RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13336
Wastewater
13
$800,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
104Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Construction
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMPSTATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY21/2. TOTAL CONSTRUCTION BUDGET IS$44,575,000. PHASE II FUNDING IS FOR SUBSTATION.
PR
I
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
UNION PACIFICUNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
VATE
UNION PACIFICUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
15
$14,000,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
105Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Construction, Phase II
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMPSTATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY21/2. TOTAL CONSTRUCTION BUDGET IS$44,575,000. PHASE II FUNDING IS FOR SUBSTATION.
PR
I
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
UNION PACIFICUNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
VATE
UNION PACIFICUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
15
$2,315,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
106Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 34,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12201 AND 12348.
§¨¦270
§¨¦44
§¨¦55
WATSON RD
M A N C H E S T E R R D
GRAVOIS R
D
TESSONFERRYRDN KIRKWOOD RDSLINDBERGHBLVDS
LIN
DBERGHBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12057
Wastewater
15
$3,800,000
Various
Lemay/RDP
Various
Capital
107Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF FITTINGREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
FITTINGS AND VALVES ARE DETERIORATING AND LEAKING DUE TOSETTLING.
REPLACE 60-INCH AND 48-INCH FITTINGS AND ISOLATION VALVES ONPRIMARY INFLUENT AND EFFLUENT LINES.
PROCUREMENT OF SOME LONG LEAD TIME FITTINGS AND KNIFEGATES TO BE MADE IN ADVANCE VIA THE IR FUNDING MECHANISM.
§¨¦44
§¨¦55
§¨¦270
§¨¦255
§¨¦70§¨¦170
§¨¦44
§¨¦55
§¨¦55§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13082
Wastewater
15
$2,000,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
108Page
2020O
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MACKENZIE I/I REDUCTION (RESURRECTIONCEMETERY, WEHNER PARK, KENRICK SEMINARY,AND NERINX HALL)
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
CONSTRUCT 293 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 113 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12511.
§¨¦44
§¨¦44ELM
HEEGE
WEIL
EDGARLACLEDE STATIONCHESHIRELANSDOWNELOCKWOOD
MAPLEMURDOCH
LILACRIV
E
R
D
E
S
PERESFLETAJACKSON
STAELY
MCC
A
U
SLANDSELMAGRAMOND
OAK TREEPLANTGLENDALE JOYBURLINGTONNORTHERNSANTAFEWINONA
SYLVESTERGENESTABANCROFT
WELLSGLEN
ROSE
S UTHERLAND
CIRCLEVIEW
ROCKHILL VALCOURRIDGE
BELTONPARK
GARDEN
PLAINVIEW
COLLEENSUMMITALBANYSOUTHSIDE
P RIVATE
FOREST
LANVALEINNISFAIL
SAVIO
BRUNSWICK
RHODESCHAPELFORDCEDARLENOX
SOUTHERN
YALE
JOELBOMPARTHARLANKAINMATHILDAGENERAL S H ERIDAN
SWONHAZEL
CHESTNUT
LARKHILL
BUSCH
CHIVVISHURSTGREEN
KENRIDGE
LA BELLECARM
E
L
PONTIACCATALPA
NORMALAMBERGATE
KIRKY
PI
L
G
R
IM
FRISCO
KENORA
CHESHIRESELMAPRIVATEPLANTMAPLEWA TSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12336
Wastewater
15
$1,170,000
Various
Lemay/RDP
Mackenzie Creek
Capital
109Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR A PROJECTED FIVE YEARCONSTRUCTION PROJECT. TOTAL CONSTRUCTION BUDGET IS$86,200,000.HALLGUSTAVLOWELLJORDANCHAIN OF ROCKS
FONTAINE
MELVIN
LOGAN
RAFORD
G
A
S
T
NASSAU
JACKSON
JENNINGSSTATION
FREMONT
DONNELL
CHURCH
R IVERRUN
RIVER TRAIL
P O R T L A N D
MA K A L U
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
15
$8,200,000
St. Louis City
Bissell
Maline Creek
Capital
110Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARK TWAIN I/I REDUCTION (MANCHESTER RDAND BOMPART AVE)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 250 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 31 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12042.HANLEYME
T
R
O
L
I
N
K
BRENTWOODMARSHALL
WHITE
UNION
P
A
C
I
F
I
C
ROSALIE
EULALIE
FOLK
GLENDOROTHYPACIFIC
FOREST LOUISLACLEDESTATIONSALEMMARYBARTOLDCECELIAALICIA
FLORENCE
SUMMITMADGE
WEAVER
COLEMANEUNICE
ATALANTA
PENDLETONANNALEE
PRIVATE
HARRISON
MELVINOXFORDRUTHJ
AGUARHILLJOSEPH
LITZSINGER
KENTLANDRUSSELLCOLLIER
SUNNENHELEN
MASON
BRIDGEPORT
HENRIETTA
MAGDALEN
J E R OME
HERMELINPATTONWESTPOINTBARTO
L
OJAMESONMARI KAYGENEVIEVE
GLENM
E
T
R
O
LI
NKWHITE
MARYBARTOLDLITZ SINGER
U N IO N P A CIFIC
LITZSINGER
H
ELENMANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12342
Wastewater
15
$500,000
Brentwood
Lemay/RDP
Deer Creek
Capital
111Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION PHASE II
Construction,Design-Build
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES AREOVER 50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, ANDSTRUCTURES.
§¨¦44
§¨¦70
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12484
Wastewater
15
$7,000,000
St. Louis City
Various
Various
Capital
112Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION(P-323) IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE.
CONSTRUCT 2,000 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 1,600FEET OF 6-INCH FORCEMAIN, AND REPLACE SANITARY PUMP STATIONP-323.BUSSENCLIFF CAVECHATPORT BLUFFDOBER
HUNTSPORTGLENRICH
HEMPLINE
W IN C A NTON
PIERPORTSTEELE RIDGEASHTON CIRCLEHALYARD
ROCK HARBORHEMPLINE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10715
Wastewater
15
$4,500,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
113Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN QUARRY PUMP STATION(P-307) (SKME-544) IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE, AND IS RECEIVINGADDITIONAL FLOW DUE TO ELIMINATION OF A PUMP STATION.
CONSTRUCT 2,500 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, 1,200FEET OF 10-INCH SANITARY FORCEMAIN, AND REPLACE SANITARYPUMP STATION P-307.KOCHBLUFFPRIVATEMA
G
O
F
FIN
ROB E R T KOCHHOSPITALPRIVATE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10716
Wastewater
15
$3,500,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
114Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RAINRIDGE CT. PROPERTY BUYOUT
Property RightsAcquisition
6660 - SanitaryReplacement Fund
STRUCTURAL EROSION THREATENING SANITARY SEWER AND 3RESIDENTIAL PROPERTIES.
VOLUNTARY BUYOUT OF 3 RESIDENTIAL PROPERTIES, DEMOLITION,AND BANK STABILIZATION OF GRAVOIS CREEK.
PARTIAL FUNDING FOR THIS PROJECT ALSO TO BE PROVIDED FROMTHE GRAVOIS CREEK OMCI EASEMENT FUND, WHICH HAS BEENPREVIOUSLY APPROPRIATED.
§¨¦55
§¨¦44
§¨¦270 §¨¦255
§¨¦44
§¨¦255
GRAVOIS RD
LEMAY FERRY RDW ATSONRDTELEGRAPHRDTESSONFERRYRDSLINDBERGH
BLVD
CHIPPEWABLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13302
Wastewater
13
$600,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
115Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SOUTH COUNTY SANITARY RELIEF (P-419 TOCRIPPLE CREEK DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 8,900 FEET OF 12-INCH TO 21-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL BUDGET IS $6,140,000.BECKERUNION PACIFICCHRISTOPHER
MERAMA R
LIDO
BEETREEQUEEN BEETALLOA
KPOINT
PINEYPOINTE BIRDIEB LUFF RIDGE
OLDEWICK
NETTIE
SPRINGWATER
BALTUS R O L
P R I V ATECHINALAKEARMONA
BLUFFWOOD
WOODBR I D G E ESTATES
COR A M
BRUSH CREEK
RIVER WINDS
HILLYHAVEN
E L K PEAKBUMBLE BEEZAHARIAS BLOWT E L E GRAPHRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12205
Wastewater
15
$4,000,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
116Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TILLES PARK, LITZSINGER AND PARKRIDGE I/IREDUCTION (LITZSINGER RD AND S MCKNIGHTRD)
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,200 FEET OF 12-INCH STORM SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 37 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12042.
§¨¦64§¨¦64
LITZSINGER MCKNIGHTPINE
OLD WARSON
WHITEDANIELLAYTRENT ST CLAIRGODWIN
SW A N
R
OCKF
O
R
DPARKRIDGEBREMERTONY O R KSOUTH FORTY LADUECRES T
PRIVATE
ELLSWORTH
SONORA MCCUTCHEONEAGER
GILBERTSUSSEXROLLINGROCK
WILD ROSE
WAT E R B URYRAUSC
H
E
R
DES PERESLAWN
OAK BENDMERRITTLINDWORTHPOCAHONTASROCK HILLGREENRIDGEOVERHILLSSARANAC
MONM OUTHN O R THC OTE
WHITEHALL
LOGCABIN
W A RSONS U T T O N
TILLES
DEER CREEK WOODSDANFIELD CANARYPRIVATE
LOGC ABIN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12230
Wastewater
15
$850,000
Ladue
Lemay/RDP
Deer Creek
Capital
117Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY I/I REDUCTION - EAST (UR-08AND UR-09) PHASE II
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION.
CONSTRUCT 3,050 FEET OF 12-INCH TO 36-INCH STORM SEWER,PERFORM PRIVATE I/I REDUCTION AT 22 PROPERTIES, AND CONSTRUCT380 FEET OF BERM.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12437. PHASE ICONSTRUCTED UNDER PROJECT 11984.
§¨¦170
PAGE
DELMAR HANLEYCANTON
TERMINAL
82NDWOODSONRIDGE
GROBY NORTH N SOUTHCORNELL
MIRIAM
MCKNIGHTU N I O N P A CIFIC
O L D B O N H O M M E 81STLYNNWALTON
SHAFTESBURY
LE PEREPRICEWAYNE
TEASDALE
MONROE
HILLTOPLAFON
GANNON
AHERN LAMB78THWILSON
B
RADDOCK
A
L
E
R
T
ELMORE GRANTBERICKRICHARDBELT WAY
BURNSS
H
E
RID
A
N
GAYMILAN
AMHERSTGULF BLOO
M
BARBYENFIELDPICKERINGBON AIREPRIVATELINK
BALSONSPENCERFAIRVIEWWELLINGTON
HARNEY
BELL
CARLETON
TULANEBRASSIE
GARFIELD
BON HILLS RABEFULLERTONPENNELL
ALBEYGEOFFRYHOW
BUCHANAN
WASHINGTON
MELROSEELBRING
DUKEDELCRESTRYECRIXDALE
VILLA
IROQUOIS CRYSTALREAR
STANFORDELKINGTONWATSONIA
LOCUST BLANCHA
PARAMOUNT
ANNAERITH
PRIVATEPRICEPRIV
A
T
E
VILLA
PRICEPAGE
HARNEYWAYNE
BALSON
P
R
I
V
A
T
E
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13344
Wastewater
15
$2,000,000
Various
Lemay/RDP
University City Branch
Capital
118Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION C PUBLIC I/I REDUCTION
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REHABILITATE 20,000 FEET OF 8-INCH TO 42-INCH SEWER.HARVEYBERMUDAPAUL
SUBURBA
N
CARSON
WIEGELDADEGEORGIA LEE
WESLEY
TIFFIN BARATRUGGLES
DUPREENORF
O
L
K
S
O
U
T
H
E
R
N
BROTHERTON
W O O D S T O C K
HAWKESBURYCLARK CLAYELKAN HARTNETTELI
Z
A
B
E
T
H
GRAF HERNBEHLEBRAND
STLOUIS
LOUISA FERGU
S
O
N
PATRICIA
ROBERTA
FERMOJEANHARRISON
EMERALDMARGUERITEROWLES
HILLSRED
M
O
N
D
FAIRVIEW
DERINDA
GRO
V
E ARLINEMAPLEWYLINLEWIS
THOMASMA
R
V
I
N
OLIVER
ADA MSANABEL
HASTING
HALPINRO
CKIN
GHAM BLANDINGSHIRLEY
GO
DFREYEL
S
I
E
PARKE
R
ESTELLE
MINTERTINDUSTRIALSPRINGE
A
ST
WALLI
NGFORD WILLMANNMILLER
COMPTON
TESMOREDADEHERNWESLEYCLARK
TIFFIN
ADAMS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12247
Wastewater
15
$4,400,000
Berkeley
Bissell
Maline Creek
Capital
119Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VANCE RD PUMP STATION (P-472) UPGRADES
Construction
6660 - SanitaryReplacement Fund
PUMP STATION AND SYSTEMS ARE AGING AND IN NEED OFREPLACEMENT AND REHABILITATION.
CONSTRUCT UPGRADE OF ELECTRICAL, MECHANICAL, AND CONTROLSYSTEMS, REHABILITATE STRUCTURE AND WET WELL, AND ELEVATEELECTRICAL ROOM FLOOR TO REDUCE RISK FROM FLOODING.
VANCE MAINRUTHERGLEN PRIVATEEVAINEZPRIVATE
MAIN
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12490
Wastewater
15
$4,160,000
Valley Park
Meramec
Kiefer Creek
Capital
120Page
2020
8 April 2019
Page 1 of 1
WASTEWATER CONTINUED PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11790 CAULKS CREEK
FORCEMAIN (RIVER
VALLEY RD TO L-52)
PROJECT CONTINUED DUE TO COORDINATION WITH
PREVIOUS PHASE. ANTICIPATE BOARD INTRODUCTION IN
OCTOBER 2019.
$15,000,000
11992 UNIVERSITY CITY
SANITARY STORAGE
FACILITY
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF UNIVERSITY CITY. ANTICIPATE BOARD
INTRODUCTION IN MAY 2020.
$3,700,000
11678 WEBSTER GROVES TRUNK
E SANITARY
REHABILITATION AND I/I
REDUCTION PHASE IV (PART 3)
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN DECEMBER 2019.
$1,300,000
TOTAL: $20,000,000
8 April 2019
Page 1 of 2
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
$4,500,000 121
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$6,000,000 122
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
$15,000,000 123
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 124
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$22,000,000 125
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$500,000 126
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$15,000,000 127
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$1,000,000 128
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$15,000,000 129
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
$600,000 130
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
$65,000 131
13336 LANGLEY AND PHILO SANITARY STORAGE $1,000,000 132
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$24,000,000 133
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$440,000 134
12329 LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
$4,000,000 135
12163 PARK DRIVE SANITARY RELIEF (ENGELHOLM
AVENUE)
$4,870,000 136
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
$1,300,000 137
8 April 2019
Page 2 of 2
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12188 RIVERPORT 6 PUMP STATION (P-781)
REHABILITATION
$1,000,000 138
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
$3,337,000 139
12205 SOUTH COUNTY SANITARY RELIEF (P-419 TO
CRIPPLE CREEK DR)
$2,140,000 140
12207 SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736)
REPLACEMENT
$1,100,000 141
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
$6,000,000 142
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
$4,000,000 143
12583 WHITE BIRCH PUMP STATION (P-725)
ELIMINATION
$1,200,000 144
12296 WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
$1,375,000 145
TOTAL:$140,427,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF MAIN SUBSTATIONSWITCHGEAR AND MCC REPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING SWITCHGEAR IS OBSOLETE AND REPLACEMENT ISREQUIRED TO MINIMIZE POWER SERVICE INTERRUPTIONS.
CONSTRUCT REPLACEMENT OF MAIN SUBSTATION SWITCHGEAR ANDPRELIMINARY AND PRIMARY TREATMENT MOTOR CONTROL CENTERUNITS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$10,500,000.
H
A
L
L
GRANDN
O
R
FOLKSOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12494
Wastewater
15
$4,500,000
St. Louis City
Bissell
Bissell
Capital
121Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRESIMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL BUDGET IS $10,000,000.
EDISON
CENTRAL MIDLAND
CRYSTALSPR IN G S
B R IG H THURST
LANSBROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
15
$6,000,000
Chesterfield
Missouri
Caulks Creek
Capital
122Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN (RIVER VALLEY RDTO L-52)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN IS UNDERSIZED AND OVER THIRTY YEARS OLD.
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF36-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$30,000,000.RIVER VALLEYCENTRAL MIDLANDHOG HOLLOWW ATER W O R K SJOHNPELLET
PRIV
A
T
E RIDGECRES T
R IDGETRA ILLAKERIVERBEND
SUNBRIDGEWATER W
O
RKS RIDGEMEA DOW
RID GECRESTHENNINGCO LISEUM
PRIVATE
OLIVEBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11790
Wastewater
15
$15,000,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
123Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AREREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Various
Non-recurring
124Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHILLS
DE N NY
GODWI NCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P I C A RDY
WINDI N G R I D G E
INDIAN
ELLSWORTHLOG CABINPARK
OVERBROOKHIGHDOWNANZEIGER
PRIVATE
TWINSPRINGS ROLLINGROCKMAYFAIRWARRIDGE
WILDROSE
WATE R BURYLYLEWOOD
RAUSC
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R CREEKPRIVATE
PRIVATE
P RIV A T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
15
$22,000,000
Ladue
Lemay/RDP
Deer Creek
Capital
125Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHILLS
DE N NY
GODWI NCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P I C A RDY
WINDI N G R I D G E
INDIAN
ELLSWORTHLOG CABINPARK
OVERBROOKHIGHDOWNANZEIGER
PRIVATE
TWINSPRINGS ROLLINGROCKMAYFAIRWARRIDGE
WILDROSE
WATE R BURYLYLEWOOD
RAUSC
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R CREEKPRIVATE
PRIVATE
P RIV A T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
11
$500,000
Ladue
Lemay/RDP
Deer Creek
Capital
126Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $153,000,000.PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦44
§¨¦64
§¨¦170
DALE
ME
T
R
O
LIN
K
CLAYTON
UNIONPACIFICPINE
ELMLAYFOLKMCKNIGHT
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEPERNOD
KIRKHAMETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHALINDENEULALIE
LINDENWOODGLENGOR
E
FYLERCLAYTONIA
LEE
ARUNDEL
EUCLID SW AN
PAR KLITHIA
PACIFIC HANLEYFORESTLOUISDELNORTEPLATEAU
WILL IA MS
ALAMO
MARDEL
MADGE
HANCOCKMCCUTCHEONWISE
C A M BRIDGEARSENALFLORASALEMB
U
C
KHICKS
ST CLAIRMARYG R EENWOODBRUNO
FAIRVIEW M A NHATTANPRATHERBARTOLDRUSSELL
YEATMANROCK HILLEAGER
ROSE
FLORENCE MARTINIOXFORD
GODWI N
C O M M ONWEALTHMOORLANDSY ORKBACON
MORITZ
LYLEDESPERESPRIVATEARLINGTON
ANNA
WAYMIRE
ELLSWORTH
WELLINGTON
JAMES
MAPLECIRCLECOLLINS
GREELEY ECOFFBLENDONCORONAEAST PORTEREXETERHORNER
BERRY RICHERTHATTONSANBONITA
UNIONPACIFIC FORESTMARYWHITE
IVANHOEELMMANCHESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$15,000,000
Various
Lemay/RDP
Deer Creek
Capital
127Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
H
E
R
N
S
A
NT
A
F
E
CARR LA
N
E BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
HE
R
N
S
A
N
T
A F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
11
$1,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
128Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
H
E
R
N
S
A
NT
A
F
E
CARR LA
N
E BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
HE
R
N
S
A
N
T
A F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
15
$15,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
129Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(GOODFELLOW TO HAMILTON)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 7,200 FEET OF 12-INCH TO 48-INCH SEWER, AND 3,000 FEETOF SEWER LINING.
THIS APPROPRIATION FUNDS A UTILITY RELOCATION ALLOWANCE FORTHE PROJECT, WHICH THE CORPS CANNOT FUND UNDER ITS PROJECTCONSTRUCTION AGREEMENT.
TERR
Y
ST LO
U
I
S
MAFFITT
ROOS
E
V
E
L
T
GOODFELLOWKENN
E
R
L
Y
LABA
D
I
E
GREE
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11769
Wastewater
15
$600,000
St. Louis City
Bissell
Harlem
Capital
130Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THEMARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT.
CONSTRUCT 5,700 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, ANDREHABILITATE 2,800 FEET OF 30-INCH TO 36-INCH SANITARY SEWER, TOCONVEY FLOW TO THE NEW JEFFERSON BARRACKS TUNNEL.
§¨¦55
§¨¦255
UNIONPACIFICKOCHRIVERKINSWOOD
RIPAUNION
GREGGMILDFOR
D
E
R
POT
T
LE CCCREAVIS
B
A
R
RACKS
GRANTLIND
YAEGER TELFO R D
ARLEE
SHERMANGENTRYFAIN PRIVATERINGER JOPLINWIL
L
MAGOFFINCLIFFSHERIDANVIC
T
O
R
Y
GARKLARK
CLAGEROUTE R
BLUFFBUR
N
COATE
ETTA
CLYDEPERRINBOUNDARYCAMINOJEFFERSONIAN
HAL S EYPEACEHAVEN FIRSTPECAN
A
SHROCK
SOUTHSHIREBUCKLEY
PE ALARRAS
J
E
FFERSON
ELLENBLUE RIDGEBANISTERALLE
N
LI
S
I
E
U
X KASKEBUNKERBIRCHBUCKLEYP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11957
Wastewater
11
$65,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
131Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANGLEY AND PHILO SANITARY STORAGE
Construction
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS EXCEED THE CAPACITY OF THE SANITARYSEWER.
CONSTRUCT 80,000 GALLONS OF SANITARY STORAGE, INCLUDING 350FEET OF 48-INCH TO 84-INCH SANITARY STORAGE PIPE, 510 FEET OF8-INCH TO 18-INCH SANITARY SEWER, AND 230 FEET OF 12-INCH TO42-INCH STORM SEWER
LANGLEY
PILOTLODE
WALDO
PHILOACORNMATHILDAHARMONYKATHLEENVINE
LACEYLA
K
E
W
O
O
D
ROSEMARYVIRGILHIL
D
A
LODE
PILOTVINE
GRAVOIS RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13336
Wastewater
15
$1,000,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
132Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMPSTATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY21/2. TOTAL CONSTRUCTION BUDGET IS$44,575,000. PHASE II FUNDING IS FOR SUBSTATION.
PR
I
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
UNION PACIFICUNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
VATE
UNION PACIFICUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
15
$24,000,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
133Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMPSTATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY21/2. TOTAL CONSTRUCTION BUDGET IS$44,575,000. PHASE II FUNDING IS FOR SUBSTATION.
PR
I
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
UNION PACIFICUNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
VATE
UNION PACIFICUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
11
$440,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
134Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDLEY DRIVE SANITARY RELIEF (I-170 TOASHMONT DR) (UR-07)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, AND BP-476REQUIRE REMOVAL.
CONSTRUCT 6,310 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, ANDBP-476. ELIMINATE WET WEATHER PUMP STATION P-790.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL BUDGET IS $5,600,000.
§¨¦170
§¨¦170
PRICEDIELMANOLD BONHOM
M
E
ENGEL
LE PEREHILLTOPENFIELDBON AIREHIGHGATEALICE
ARBORBELL
SPOONELBRINGGE
O
F
F
RYRYEDIELMANINDU
ST
R
IALLAG U NAVILLA
LADUE HILLSWHITE ROSEPRICEWOO DSPRIVATEHARVESTMAGNETCOLLINGWOODDOLORESELKINGTONH IGH ACRES
WATSONIA
GLENMARYCORDELLLOCUST
ALDANBONHOMME W O O D S
BEAUWOODL LE WELLYNPUTTERPLANTERSBON P RICEINDIAN TRAILSFRIESELONGACRESENGELTONBIRNAW OODSWAYFIELDF A IR W INDSBERRY HILLWOODMOORBRISCOEJACKLYNNCIMARRON
BERKLEY PLACEHILLTOP MANOR
MARBROOKE
HARVEST
VILLA
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12329
Wastewater
15
$4,000,000
Olivette
Lemay/RDP
University City Branch
Capital
135Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PARK DRIVE SANITARY RELIEF (ENGELHOLMAVENUE)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS SSO BP-451 AND SSO BP-621 REQUIREREMOVAL.
CONSTRUCT 4,210 FEET OF 15-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-451 AND BP-621.METRO L
INK
LULUMARK
E
T
PENNSYLVANIA70THSALERNOLEROYPAR
K
FERGUSONLEADALE
MAINPRI
VAT
E
GRA
N
D ENGELHOLMDONCASTER
CURTIS
EA
S
T
H
I
L
LFERGUSONSALERNOMETRO L
INKSALERNOENGELHOLMSTCHARLESROCKRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12163
Wastewater
15
$4,870,000
Pagedale
Lemay/RDP
University City Branch
Capital
136Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPLACEMENT PROJECTS (PHASEI) (P-708)
Construction, Phase II
6660 - SanitaryReplacement Fund
DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICTREQUIRE REPLACEMENT/REHABILITATION.
REPLACE PUMP STATION P-708 (EXPRESSWAY).
R
A
M
S
LAKEFRONT EARTH C
ITYAMERICAN
EAGLE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11701
Wastewater
15
$1,300,000
Various
Missouri
Missouri River Tributary Areas
Capital
137Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERPORT 6 PUMP STATION (P-781)REHABILITATION
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-781 NEEDS REHABILITATION TO MEET CURRENTSERVICE LEVEL DEMANDS.
REHABILITATE PUMP STATION P-781.MAGELLANRIVERPORT
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12188
Wastewater
15
$1,000,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
138Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERSIDE AND YARNELL SANITARY RELIEFREPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
PIPE WITH LEAKING JOINTS AND GROUND SURFACE SUBSIDENCE.
REPLACE APPROXIMATELY 5,700 FEET OF 36-INCH TO 42-INCHSANITARY SEWER, AND MAKE POINT REPAIRS AT 4 LOCATIONS ON36-INCH PIPE AND 1 POINT REPAIR ON 48-INCH PIPE.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS $6,637,000.GRAVOISLARKIN WILLIAMS
WATSONMAI
N
GREEN ACRES
PRIVATE
NEWSMIZERMILL
DART
WAT
E
R
OLDSMIZERMILL
FABICK
FURY
ROCK ALVAPEFFER
SO U T H
OP
P
SYARNELLMONTEVALEVALIANTFORESTKNOLLRIVERSIDEFERRYSENNAWOODSWEANEYRIVERHILLS
CHRYSLER
OLDGRAVOIS
H A Y S H ILLRAINTREEFR
I
N
G
E
WEST
FR
E
D
E
GRAVES U M ME RT
O
PWOODWAYFE
N
T
O
N
V
I
E
W
S
K
I
N
K
E
R
FENTONPARK WA
T
S
O
N
PRIVATE PRIVATEE MO30 HWY W MO30 HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12840
Wastewater
15
$3,337,000
Fenton
Meramec
Fenton Creek
Capital
139Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SOUTH COUNTY SANITARY RELIEF (P-419 TOCRIPPLE CREEK DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 8,900 FEET OF 12-INCH TO 21-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL BUDGET IS $6,140,000.BECKERUNION PACIFICCHRISTOPHER
MERAMA R
LIDO
BEETREEQUEEN BEETALLOA
KPOINT
PINEYPOINTE BIRDIEB LUFF RIDGE
OLDEWICK
NETTIE
SPRINGWATER
BALTUS R O L
P R I V ATECHINALAKEARMONA
BLUFFWOOD
WOODBR I D G E ESTATES
COR A M
BRUSH CREEK
RIVER WINDS
HILLYHAVEN
E L K PEAKBUMBLE BEEZAHARIAS BLOWT E L E GRAPHRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12205
Wastewater
15
$2,140,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
140Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
DETERIORATED PUMP STATION REQUIRES REPLACEMENT.
CONSTRUCT REPLACEMENT OF DETERIORATED PUMP STATION.
EDISON
GODDARDUNION
PAC
IF
IC
SPUR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12207
Wastewater
15
$1,100,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
141Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)FORCEMAIN REPLACEMENT (COAL BANK RD TOSPRING GARDEN DR)
Construction
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN HAS EXTENSIVE DAMAGE CAUSED BYHYDROGEN SULFIDE AND AIR POCKETS.
CONSTRUCT 10,100 FEET OF 20-INCH FORCEMAIN.
REPLACES SYSTEM CAPACITY PROJECT 12254. FUNDING INCLUDESSUPPLEMENTAL APPROPRIATION IN FY 22. TOTAL CONSTRUCTIONBUDGET IS $9,400,000.
§¨¦270
§¨¦270DUNN
COALBANK
PRIVATEUPHILLMILDREDDUNDEE
LOOKAWAYRODERICK GLEN GARRYSPRINGGARDENMONTEI
T
H
M CALPINE
BRIGADOON
PRIV ATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12922
Wastewater
15
$6,000,000
St. Louis City
Bissell
Watkins Creek
Capital
142Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS, SECONDARYCONTAINMENT IS NEEDED FOR ON-SITE CHEMICALS, AND CURRENTLOCATION IS SUBJECT TO FREQUENT FLOODING.
CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATELOCATION OUTSIDE OF THE FLOODPLAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $6,100,000.REPLACES CAPACITY PROJECT 12254.
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
15
$4,000,000
Unincorporated
Bissell
Watkins Creek
Capital
143Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITE BIRCH PUMP STATION (P-725)ELIMINATION
Construction
6660 - SanitaryReplacement Fund
DETERIORATED PUMP STATION REQUIRES REPLACEMENT ORELIMINATION.
CONSTRUCT 2,800 FEET OF 8-INCH SANITARY SEWER. DECOMMISSIONAND ABANDON EXISTING PUMP STATION P-725 AND ASSOCIATEDFORCEMAIN.
TES
O
N
PRIVATE
WO
O
D
C
R
E
S
T FREELANDPRIVATEPRI
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12583
Wastewater
15
$1,200,000
Hazelwood
Coldwater
Coldwater Creek
Capital
144Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WOODS MILL SANITARY RELIEF (I-64 TO BROOKMILL LN)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS.
CONSTRUCT 2,790 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦64 §¨¦64
SAVVISS O U T H OUTERF O R T Y
WOODSMILLOLDWOODSMILLBROO KM IL L
P R IVA TELAKEMILLK E L L W O ODMARYVILLECENTRES MO141 HWYN MO141 HWY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12296
Wastewater
15
$1,375,000
Town and Country
Missouri
Creve Coeur Creek
Capital
145Page
2021
8 April 2019
Page 1 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $591,000
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $5,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017) Various $2,500,000
13044 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
Various $250,000
12382 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT A
Various $60,000
12383 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT B
Various $60,000
12384 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT C
Various $60,000
12385 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2018) CONTRACT D
Various $60,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $375,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$520,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $300,000
FUND TOTAL: $19,706,000
4102 - IMPROVEMENT FUND
13072 Construction GRAND GLAIZE WWTF FLOODWALL
PROTECTION
Valley Park $2,750,000
8 April 2019
Page 2 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $2,750,000
6660 - SANITARY REPLACEMENT FUND
11993 Construction
(Supplemental
Appropriation)
82ND STREET TO I-170 SANITARY RELIEF
(UR-08, UR-09)
Various $5,100,000
13219 Construction BADEN AND MILL CREEK ORS PUMP
STATIONS - PUMP REHABILITATION
St. Louis City $4,500,000
13232 Construction BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE)
St. Louis City $6,000,000
12092 Construction BELLEFONTAINE #2 SANITARY RELIEF
(CHAMBERS RD TO COBURG LANDS DR)
Bellefontaine
Neighbors
$1,990,000
12565 Design Services BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $6,000,000
12033 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $5,700,000
12030 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT B
Various $2,100,000
12027 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2020)
CONTRACT C
Various $5,900,000
12508 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $51,000
12509 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
Various $47,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $750,000
12494 Construction BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
St. Louis City $6,000,000
12566 Design Services BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $800,000
12100 Construction BRENTWOOD FOREST, FAIR OAKS,
MIDDLESEX I/I REDUCTION (I-64 AND LAY
RD)
Brentwood $1,000,000
12104 Construction BROOKSHIRE SANITARY RELIEF
(BROOKSHIRE DR TO COUGAR DR)
Unincorporated $3,500,000
12111 Construction CAPILIA SANITARY RELIEF (GRANT RD TO
CAPILIA DR)
Various $1,650,000
12112 Construction CARSON VILLA, ROSARY LANE AND
THURSTON I/I REDUCTION
Bel-Ridge $3,000,000
8 April 2019
Page 3 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11790 Construction CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $15,000,000
11790 Engineering
During
Construction
Services
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $800,000
11789 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN
REHABILITATION
Various $5,600,000
11917 Construction CELLA - ROLLING ROCK - GLEN CREEK
SANITARY SEWER IMPROVEMENTS
Ladue $200,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $1,800,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $4,400,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $10,400,000
12131 Construction CONWAY VILLAGE SANITARY RELIEF
(CONWAY RD TO I-64)
Town And Country $3,275,000
12432 Construction CREVE COEUR CREEK PUBLIC I/I
REDUCTION SOUTH
Various $3,450,000
12472 Construction DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $13,000,000
12472 Engineering
During
Construction
Services
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $550,000
11731 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $1,500,000
11731 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $38,000,000
12615 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $1,000,000
12615 Construction DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $15,000,000
11136 Construction DEGIVERVILLE COMBINED SEWER
IMPROVEMENTS
St. Louis City $2,200,000
12516 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2020)
Various $4,000,000
8 April 2019
Page 4 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12160 Construction EDNA-THURSBY, ESSEX, TREASURER COVE,
WAYFARER EAST AND YARNELL CREEK
WEST I/I REDUCTION
Various $250,000
12166 Design Services FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
Unincorporated $432,000
12173 Design Services FISHPOT TRUNK WEST AND ED LOU LANE
I/I REDUCTION (SMITH DR AND VLASIS DR)
Ballwin $145,000
11137 Construction GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $500,000
12386 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
Various $1,900,000
12397 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT A
Various $550,000
13059 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT B
Various $200,000
12391 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
Various $85,000
12392 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
Various $85,000
12393 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
Various $85,000
12398 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2019)
Various $200,000
12413 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
Various $50,000
12416 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
Various $50,000
12417 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
Various $50,000
12418 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
Various $50,000
12419 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
Various $50,000
12272 Design Services GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT
COVE CT)
Ballwin $253,000
13072 Engineering
During
Construction
Services
GRAND GLAIZE WWTF FLOODWALL
PROTECTION
Valley Park $400,000
8 April 2019
Page 5 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10496 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE
TO PARDEE LANE)
Various $10,000,000
12569 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $7,100,000
12897 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2020)
Various $3,000,000
12020 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2020) CONTRACT A
St. Louis City And
County
$2,500,000
12021 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2020) CONTRACT B
St. Louis City And
County
$2,500,000
12010 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2020)
Various $7,000,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $2,000,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $55,000
11957 Construction JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $5,180,000
11957 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $65,000
12841 Construction,
Design-Build
KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
Pagedale $8,000,000
13336 Design Services LANGLEY AND PHILO SANITARY STORAGE Unincorporated $350,000
13336 Land Purchase LANGLEY AND PHILO SANITARY STORAGE Unincorporated $800,000
11817 Construction LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $14,000,000
11817 Construction,
Phase II
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $2,315,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $270,000
12057 Construction LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
Various $3,800,000
12059 Design Services LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $65,000
11820 Miscellaneous
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $310,000
8 April 2019
Page 6 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12489 Design Services LOUISA AND ARSENAL PUMP STATIONS (P-
112 AND P-113) UPGRADES
St. Louis City $500,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $320,000
11746 Design Services LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $600,000
13164 Design Services LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
Unincorporated $24,000
12255 Construction
Management
Services During
Design
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $400,000
12255 Design Services LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $4,000,000
13082 Construction LOWER MERAMEC WWTF FITTING
REPLACEMENT
Unincorporated $2,000,000
12336 Construction MACKENZIE I/I REDUCTION
(RESURRECTION CEMETERY, WEHNER
PARK, KENRICK SEMINARY, AND NERINX
HALL)
Various $1,170,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $600,000
11656 Construction
(Supplemental
Appropriation)
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $8,200,000
12342 Construction MARK TWAIN I/I REDUCTION
(MANCHESTER RD AND BOMPART AVE)
Brentwood $500,000
10024 Design Services MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $1,500,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,200,000
12484 Construction,
Design-Build
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE II
St. Louis City $7,000,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $4,500,000
10716 Construction NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $3,500,000
12364 Design Services OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
Ballwin $124,000
12368 Design Services PRICE TO PIONEER SANITARY RELIEF Olivette $630,000
12697 Professional
Services
PUMP STATION REPAIR AND
IMPROVEMENT DESIGN (CONTRACT A)
Various $50,000
8 April 2019
Page 7 of 7
WASTEWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13302 Property Rights
Acquisition
RAINRIDGE CT. PROPERTY BUYOUT Unincorporated $600,000
12441 Design Services RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $1,800,000
12200 Design Services SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $646,000
10161 Design Services SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
Creve Coeur $235,000
12205 Construction SOUTH COUNTY SANITARY RELIEF (P-419
TO CRIPPLE CREEK DR)
Unincorporated $4,000,000
12212 Design Services ST. GEORGE CREEK SANITARY RELIEF
(DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
Unincorporated $600,000
12213 Design Services ST. JACQUES SANITARY RELIEF (ST.
JACQUES ST TO N LAFAYETTE ST)
Florissant $50,000
12230 Construction TILLES PARK, LITZSINGER AND PARKRIDGE
I/I REDUCTION (LITZSINGER RD AND S
MCKNIGHT RD)
Ladue $850,000
13344 Construction UNIVERSITY CITY I/I REDUCTION - EAST
(UR-08 AND UR-09) PHASE II
Various $2,000,000
11992 Land Purchase UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $3,700,000
12247 Construction UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION C PUBLIC I/I REDUCTION
Berkeley $4,400,000
12440 Design Services UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $1,200,000
12507 Design Services VALLEY PUBLIC I/I REDUCTION
(CLARKSON RD AND KEHRS MILL RD)
Clarkson Valley $40,000
12490 Construction VANCE RD PUMP STATION (P-472)
UPGRADES
Valley Park $4,160,000
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $1,300,000
12302 Design Services WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $1,300,000
FUND TOTAL: $312,607,000
GRAND TOTAL:$335,063,000
8 April 2019
Page 1 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017) Various $2,500,000
13044 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $385,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $800,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$600,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $300,000
FUND TOTAL: $18,735,000
5120 - DISTRICTWIDE STORMWATER FUND
8 April 2019
Page 2 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12239 Construction TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $875,000
FUND TOTAL: $875,000
6660 - SANITARY REPLACEMENT FUND
12077 Design Services AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $1,145,000
13232 Construction
(Supplemental
Appropriation)
BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE)
St. Louis City $3,520,000
12085 Design Services BANFF SANITARY RELIEF (CAITHNESS RD
TO LANARK RD)
Unincorporated $38,000
12086 Design Services BARRETT STATION I/I REDUCTION
(DOUGHERTY FERRY RD AND BARRETT
STATION RD)
Des Peres $185,000
12088 Design Services BAXTER I/I REDUCTION (BAXTER RD NEAR
COUNTY CREEK CT)
Ballwin $20,000
12093 Design Services BELLERIVE SANITARY RELIEF (LADUE RD
TO CONWAY RD)
Town And Country $240,000
12565 Design Services BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $3,000,000
12508 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $4,732,000
12509 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
Various $2,320,000
12584 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
Various $107,000
13031 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
Various $150,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $441,000
12548 Design Services BISSELL POINT WWTF CONCRETE AND
GATE IMPROVEMENTS
St. Louis City $600,000
12494 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
St. Louis City $4,500,000
12566 Construction BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $14,000,000
8 April 2019
Page 3 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12566 Engineering
During
Construction
Services
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $400,000
12110 Construction CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
Northwoods $1,800,000
12248 Construction CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $6,000,000
11790 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $15,000,000
13220 Construction COLDWATER CREEK WWTF FINE SCREEN
REBUILDS
Unincorporated $500,000
12552 Design Services COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
Unincorporated $900,000
11724 Construction COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $2,500,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $4,000,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $7,700,000
12141 Design Services CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $340,000
12142 Construction DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
Unincorporated $767,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $22,000,000
12472 Engineering
During
Construction
Services
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $500,000
11731 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $15,000,000
12615 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $1,000,000
12615 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $15,000,000
8 April 2019
Page 4 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12740 Construction DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
St. Louis City $1,900,000
12152 Construction E. WATSON SANITARY RELIEF (RUDSON LN
TO RICHVIEW DR)
Crestwood $3,257,000
12818 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2021)
Various $2,000,000
12159 Design Services EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
Woodson Terrace $371,000
12170 Design Services FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $2,324,000
11737 Design Services FERGUSON SEWER RELIEF SANITARY
STORAGE FACILITY (ELTORA AVE AND
PENNSYLVANIA AVE)
Pagedale $800,000
10012 Construction FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
Unincorporated $4,000,000
12178 Design Services FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $511,000
12185 Design Services FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
Bellefontaine
Neighbors
$220,000
11137 Pre-Design
Services
GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $750,000
12157 Design Services GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF PHASE II
Unincorporated $383,000
12386 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
Various $4,250,000
12397 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT A
Various $550,000
13059 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT B
Various $200,000
12391 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
Various $85,000
12392 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
Various $85,000
12393 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
Various $85,000
12400 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
Various $200,000
12413 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
Various $50,000
12416 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
Various $50,000
8 April 2019
Page 5 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12417 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
Various $50,000
12418 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
Various $50,000
12419 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
Various $50,000
12175 Construction GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD
TO WINDSOR SPRINGS DR)
Various $2,500,000
12264 Design Services GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
Sunset Hills $374,000
12246 Design Services GRAND GLAIZE WET WEATHER PUMP
STATION
Valley Park $671,000
12815 Design Services GRAVOIS CREEK SANITARY TRUNK
RELOCATION (AFFTON ATHLETIC
COMPLEX)
Unincorporated $363,000
12814 Design Services GRAVOIS CREEK SANITARY TRUNK
STREAM STABILIZATION (GREEN PK IND
DR)
Unincorporated $86,000
11769 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (GOODFELLOW TO HAMILTON)
St. Louis City $600,000
11796 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $6,000,000
12695 Professional
Services
HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
St. Louis City $500,000
13231 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $9,000,000
13337 Design Services HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $250,000
12308 Design Services HORTON PUMP STATION (P-814)
ELIMINATION
Town And Country $135,000
12312 Design Services HUNTLEIGH TRAILS LN SANITARY RELIEF
(TWO MILE CREEK TRUNK SEWER TO N
GEYER RD)
Huntleigh $240,000
12995 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2021)
Various $3,000,000
13014 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT A
Various $2,500,000
13015 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT B
Various $2,500,000
13342 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT C
Various $500,000
12987 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2021)
Various $7,000,000
8 April 2019
Page 6 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11957 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $65,000
13336 Construction LANGLEY AND PHILO SANITARY STORAGE Unincorporated $1,000,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $24,000,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $440,000
12059 Construction LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $7,938,000
13303 Construction LEMAY WWTF AERATION BASIN GATES Unincorporated $1,000,000
13153 Design Services LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $571,000
12328 Design Services LINDBERGH PARK COMBINED SEWER
RELIEF (BREDELL AVE TO PRINCETON PL)
Maplewood $650,000
12329 Construction LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
Olivette $4,000,000
12330 Design Services LINDSAY I/I REDUCTION (CHARBONIER RD
AND N. LINDBERGH BLVD)
Florissant $52,000
12331 Design Services LINDY I/I REDUCTION (CABALLERO DR AND
CHAMBERLAIN DR)
Ballwin $20,000
12333 Design Services LOHMEYER COMBINED SEWER RELIEF
(BENTLEY DR TO BREDELL AVE)
Maplewood $170,000
12489 Construction LOUISA AND ARSENAL PUMP STATIONS (P-
112 AND P-113) UPGRADES
St. Louis City $3,300,000
12741 Construction LOUISVILLE AVENUE AND OAKLAND
AVENUE COMBINED SEWER RELIEF
St. Louis City $2,450,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $25,000,000
13164 Construction LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
Unincorporated $2,635,000
12255 Design Services LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $2,500,000
12762 Construction MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (RAIN GARDEN)
St. Louis City $200,000
8 April 2019
Page 7 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12338 Design Services MANCHESTER I/I REDUCTION
(MANCHESTER RD AND HWY 141)
Manchester $51,000
12339 Design Services MANCHESTER RD AND S BIG BEND BLVD
COMBINED SEWER RELIEF (HAMPTON
CREEK TO LYNDOVER PL)
Maplewood $930,000
12345 Design Services MASON VALLEY I/I REDUCTION
(MANCHESTER RD AND BARRETT PKWY)
Town And Country $190,000
12350 Design Services MERAMEC BOTTOMS I/I REDUCTION
(LMSA7 AND LMSA7 WEST)
Unincorporated $20,000
12352 Construction MIDLAND SANITARY RELIEF (MIDLAND
BLVD TO SIMS AVE)
Overland $1,640,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
13223 Construction MISSOURI RIVER WWTF TUNNEL SERVICE
WATER PIPING REPLACEMENT
Maryland Heights $400,000
12357 Design Services NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
Unincorporated $132,000
12433 Design Services NORTH FEE FEE CREEK PUBLIC I/I
REDUCTION
Various $142,000
12365 Design Services OLIVETTA STREET SEWER SEPARATION University City $560,000
12163 Construction PARK DRIVE SANITARY RELIEF
(ENGELHOLM AVENUE)
Pagedale $4,870,000
12903 Work Order
Repair Costs
(Capital)
PRIVATE INFLOW AND INFILTRATION
REDUCTION PROGRAM (2021)
Various $500,000
12699 Professional
Services
PUMP STATION REPAIR AND
IMPROVEMENT DESIGN (CONTRACT C)
Various $515,000
11701 Construction,
Phase II
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $1,300,000
12187 Design Services REINKE I/I REDUCTION (MANCHESTER RD
AND NEW BALLWIN RD)
Ellisville $110,000
12188 Construction RIVERPORT 6 PUMP STATION (P-781)
REHABILITATION
Maryland Heights $1,000,000
12840 Construction
(Supplemental
Appropriation)
RIVERSIDE AND YARNELL SANITARY
RELIEF REPLACEMENT
Fenton $3,337,000
12189 Design Services ROBYN HILLS NUMBER 1 PUMP STATION (P-
417) REPLACEMENT
Sunset Hills $110,000
12195 Design Services S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $144,000
12203 Design Services SMOKETREE DR TO WHITE BIRCH CT
SANITARY RELIEF
Unincorporated $230,000
10756 Construction SOUTH BROADWAY AT MERAMEC
COMBINED SEWER REPLACEMENT
St. Louis City $1,385,000
12205 Construction
(Supplemental
Appropriation)
SOUTH COUNTY SANITARY RELIEF (P-419
TO CRIPPLE CREEK DR)
Unincorporated $2,140,000
8 April 2019
Page 8 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12628 Design Services SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
809 TO P-750)
Chesterfield $1,517,000
12207 Construction SPIRIT OF ST. LOUIS 2 PUMP STATION (P-
736) REPLACEMENT
Chesterfield $1,100,000
12208 Construction SPRING AVE SANITARY RELIEF (YEATMAN
AVE TO DALE AVE)
Webster Groves $1,100,000
12210 Design Services ST. ALBERT I/I REDUCTION (WASHINGTON
ST AND ST. FERDINAND ST)
Florissant $930,000
12211 Design Services ST. ANTHONY SANITARY RELIEF (S NEW
FLORISSANT RD TO ST. BERNADETTE LN)
Florissant $152,000
12221 Construction SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
Unincorporated $3,369,000
11669 Construction SUB-TRUNK #3 SANITARY RELIEF (MURIEL
DR TO JENNER LN)
Unincorporated $2,195,000
12231 Design Services TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Ladue $1,530,000
12236 Design Services TOWNE SOUTH SANITARY RELIEF (BROAD
OAK DR TO TESSON FERRY RD)
St. Louis County $245,000
12239 Construction TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $4,000,000
11992 Construction UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12241 Design Services UPPER BADEN SANITARY RELIEF
(JENNINGS STATION RD TO OAKRIDGE
BLVD)
Northwoods $380,000
12249 Design Services UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
St. Louis County $1,435,000
12258 Design Services VALLEY PARK I/I REDUCTION (HWY 141 TO
SIMPSON PARK)
Valley Park $286,000
12507 Construction VALLEY PUBLIC I/I REDUCTION
(CLARKSON RD AND KEHRS MILL RD)
Clarkson Valley $2,880,000
12268 Design Services WATERFORD SANITARY RELIEF (N
WATERFORD DR TO DURWOOD DR)
Florissant $372,000
12922 Construction WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK
RD TO SPRING GARDEN DR)
St. Louis City $6,000,000
12491 Construction WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
Unincorporated $4,000,000
10794 Design Services WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $1,700,000
11679 Construction WEST LOCKWOOD SANITARY RELIEF Webster Groves $2,389,000
11212 Construction WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
Brentwood $3,500,000
12583 Construction WHITE BIRCH PUMP STATION (P-725)
ELIMINATION
Hazelwood $1,200,000
12280 Design Services WHITE PLAINS SANITARY RELIEF
(SALTBOX DR TO CEDAR CREEK RD)
Chesterfield $191,000
8 April 2019
Page 9 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12305 Design Services WINDMOOR PUMP STATION (P-710)
ELIMINATION
Town And Country $100,000
12296 Construction WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
Town And Country $1,375,000
12307 Design Services YARNELL CREEK EAST I/I REDUCTION
(LARKIN-WILLIAMS RD AND RUDDER RD)
Fenton $20,000
FUND TOTAL: $377,278,000
GRAND TOTAL:$396,888,000
8 April 2019
Page 1 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2022)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $395,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $800,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $300,000
FUND TOTAL: $18,750,000
6660 - SANITARY REPLACEMENT FUND
8 April 2019
Page 2 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12079 Design Services ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $95,000
12847 Construction BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
St. Louis City $7,300,000
12565 Design Services BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $2,050,000
12584 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
Various $3,550,000
13031 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
Various $5,200,000
12585 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT A
Various $176,000
13032 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT B
Various $150,000
13033 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $130,000
12586 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $160,000
12587 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $80,000
13124 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $110,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $786,000
12548 Construction BISSELL POINT WWTF CONCRETE AND
GATE IMPROVEMENTS
St. Louis City $2,400,000
12566 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $8,500,000
11847 Construction BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $6,000,000
12107 Design Services BUCKLEY SANITARY RELIEF (DACE LN TO
POPLAR DR)
Unincorporated $143,000
12108 Design Services BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $62,000
12248 Construction
(Supplemental
Appropriation)
CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $4,000,000
8 April 2019
Page 3 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12114 Design Services CAULKS CREEK PUMP STATION B (P-751)
STORAGE
Chesterfield $83,000
12122 Design Services CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $117,000
12552 Construction COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
Unincorporated $3,480,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $0
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $4,800,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $1,000,000
12130 Design Services CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $352,000
12132 Design Services CONWOOD LN SANITARY RELIEF (CONWAY
RD TO WESTWOOD CT)
Westwood $30,000
12134 Design Services COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $115,000
12143 Design Services DANIEL BOONE I/I REDUCTION
(SHACKELFORD RD AND MULLANPHY LN)
Florissant $100,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $12,000,000
12145 Design Services DC-04 DEER CREEK SANITARY RELIEF
PHASE III (LAKESHORE DR TO NEW BALLAS
RD)
Creve Coeur $182,000
12615 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $11,800,000
11833 Design Services DELCREST SANITARY RELIEF Various $432,000
12819 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2022)
Various $2,000,000
11888 Construction FABICK PUMP STATION (P-444)
IMPROVEMENTS (SKME-404E)
Fenton $750,000
12167 Design Services FENTON CREEK EAST I/I REDUCTION (OLD
TOWN FENTON)
Fenton $26,000
12166 Construction FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
Unincorporated $1,100,000
10012 Construction
(Supplemental
Appropriation)
FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
Unincorporated $1,691,000
13046 Design Services FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $1,000,000
8 April 2019
Page 4 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12173 Construction FISHPOT TRUNK WEST AND ED LOU LANE
I/I REDUCTION (SMITH DR AND VLASIS DR)
Ballwin $305,000
12182 Design Services FOX BRIDGE PUMP STATION (P-484)
STORAGE
Sunset Hills $30,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $3,500,000
13098 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $450,000
13099 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $450,000
13102 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
13104 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
12400 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
Various $200,000
13108 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $50,000
13109 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $50,000
13110 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $50,000
13111 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $50,000
13112 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
Various $50,000
12272 Construction GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT
COVE CT)
Ballwin $1,140,000
11797 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $4,000,000
11796 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $3,300,000
13231 Construction
(Supplemental
Appropriation)
HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $5,400,000
12299 Design Services HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $87,000
8 April 2019
Page 5 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12996 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2022)
Various $3,000,000
13016 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT A
Various $2,500,000
13017 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT B
Various $2,500,000
12988 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2022)
Various $7,000,000
13227 Design Services L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $900,000
12325 Construction LANG ROYCE SANITARY RELIEF (FARGO
DR TO FLORIDALE CT)
Dellwood $1,000,000
12371 Design Services LAUMEIER PARK (P-469) STORAGE Various $20,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $4,260,000
13304 Construction LEMAY WWTF GRIT TANK 1-4 RENEWAL Unincorporated $1,344,000
11943 Design Services LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $241,000
12329 Construction
(Supplemental
Appropriation)
LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
Olivette $1,600,000
12332 Design Services LITTLETON CT. SANITARY RELIEF (OLD
SMIZER MILL RD AND 141 TO LA PALMA
DR)
Fenton $192,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $70,000,000
12499 Construction,
Phase II
LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
Unincorporated $1,500,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,500,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,800,000
8 April 2019
Page 6 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12255 Construction LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
12337 Design Services MAIN SANITARY RELIEF (VANCE RD TO
INEZ AVE)
Valley Park $208,000
12344 Design Services MARTIGNEY SANITARY RELIEF (KOCH RD
TO WOOD HILL DR)
Unincorporated $1,550,000
10024 Construction MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $6,000,000
12346 Design Services MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
Richmond Heights $49,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12485 Construction,
Design-Build
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE III
St. Louis City $5,000,000
12354 Design Services MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE IV
Bridgeton $143,000
13222 Construction MISSOURI RIVER WWTF DIGESTER GAS
STORAGE COVER REPLACEMENT
Maryland Heights $1,100,000
12355 Design Services MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
Crestwood $326,000
12360 Design Services NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $735,000
12433 Construction NORTH FEE FEE CREEK PUBLIC I/I
REDUCTION
Various $4,750,000
12364 Construction OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
Ballwin $356,000
12200 Construction SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $3,500,000
10161 Construction SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
Creve Coeur $1,020,000
12201 Construction SHREWSBURY SANITARY RELIEF SEWER
AND I/I REDUCTION (WEIL AVE AND I-44)
Various $1,312,000
12202 Design Services SMITH CREEK LADUE ROAD SANITARY
RELIEF (ROYAL MANOR DR TO HEWLETT
CT)
Creve Coeur $360,000
12213 Construction ST. JACQUES SANITARY RELIEF (ST.
JACQUES ST TO N LAFAYETTE ST)
Florissant $208,000
12214 Design Services ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $295,000
12216 Design Services ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO MARMARY DR)
St. Ann $261,000
12217 Design Services ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $211,000
12224 Design Services SUNSET COUNTRY CLUB PUMP STATION (P-
408) STORAGE
Sunset Hills $40,000
12233 Design Services TM-04 TWO MILE SANITARY RELIEF PHASE
II (LOCKETT RD TO MEIER RD)
Des Peres $51,000
8 April 2019
Page 7 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12239 Construction
(Supplemental
Appropriation)
TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $1,894,000
11992 Construction
(Supplemental
Appropriation)
UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12242 Design Services UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $303,000
12245 Design Services UPPER LAWNVIEW CREEK SANITARY
RELIEF (RHAPSODY LN TO MILLVALLEY
DR)
Unincorporated $418,000
12922 Construction
(Supplemental
Appropriation)
WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK
RD TO SPRING GARDEN DR)
St. Louis City $3,400,000
12491 Construction
(Supplemental
Appropriation)
WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
Unincorporated $2,100,000
12271 Design Services WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $290,000
12277 Design Services WEIDMAN I/I REDUCTION (HWY 141 AND
DUTCH MILL DR)
Unincorporated $59,000
12279 Design Services WESTON PLACE PUMP STATION (P-771)
IMPROVEMENTS
Town And Country $69,000
12284 Design Services WILSON AVE SANITARY RELIEF (HARRISON
AVE TO CLEVELAND AVE)
Kirkwood $68,000
12287 Design Services WILSON SANITARY RELIEF (WILD HORSE
CREEK RD TO CLARKSON RD)
Chesterfield $751,000
12288 Design Services WILTON PUMP STATION (P-412) STORAGE Kirkwood $20,000
12300 Design Services WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $420,000
FUND TOTAL: $320,211,000
GRAND TOTAL:$338,961,000
8 April 2019
Page 1 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2022)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $410,000
12816 Vendor
Services
RADAR RAINFALL DATA (2023)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $19,115,000
6660 - SANITARY REPLACEMENT FUND
8 April 2019
Page 2 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12077 Construction AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $4,000,000
12085 Construction BANFF SANITARY RELIEF (CAITHNESS RD
TO LANARK RD)
Unincorporated $135,000
12086 Construction BARRETT STATION I/I REDUCTION
(DOUGHERTY FERRY RD AND BARRETT
STATION RD)
Des Peres $160,000
12088 Construction BAXTER I/I REDUCTION (BAXTER RD NEAR
COUNTY CREEK CT)
Ballwin $30,000
12093 Construction BELLERIVE SANITARY RELIEF (LADUE RD
TO CONWAY RD)
Town And Country $1,440,000
12565 Construction,
Proposer
Stipend
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $1,000,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $10,000,000
12565 Construction,
Design-Build
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $100,000,000
12585 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT A
Various $5,872,000
13032 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT B
Various $5,000,000
13033 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $4,300,000
12586 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $5,220,000
12587 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $2,600,000
13124 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $3,500,000
11847 Construction
(Supplemental
Appropriation)
BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $3,200,000
12105 Design Services BRUNSTON SANITARY RELIEF (BRUNSTON
DR TO MATTESE VILLA DR)
St. Louis City And
County
$112,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $0
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $3,600,000
8 April 2019
Page 3 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $1,000,000
12139 Construction CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $10,000,000
12140 Construction CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION
Brentwood $18,000,000
12141 Construction CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $2,358,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $9,240,000
12820 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2023)
Various $2,000,000
12159 Construction EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
Woodson Terrace $1,972,000
11737 Construction FERGUSON SEWER RELIEF SANITARY
STORAGE FACILITY (ELTORA AVE AND
PENNSYLVANIA AVE)
Pagedale $6,000,000
12178 Construction FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $2,045,000
12185 Construction FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
Bellefontaine
Neighbors
$800,000
11137 Design Services GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $1,500,000
12157 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF PHASE II
Unincorporated $1,535,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $4,000,000
13098 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $450,000
13099 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $450,000
13102 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
13104 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
8 April 2019
Page 4 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2023) CONTRACT A
Various $200,000
13108 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $50,000
13109 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $50,000
13110 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $50,000
13111 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $50,000
13112 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
Various $50,000
12174 Design Services GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $515,000
12264 Construction GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
Sunset Hills $2,000,000
12246 Construction GRAND GLAIZE WET WEATHER PUMP
STATION
Valley Park $2,235,000
13221 Design Services GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2024)
Valley Park $100,000
12281 Design Services GRAND NATIONAL SANITARY RELIEF
(GRAND NATIONAL DR TO KNEELAND RD)
Unincorporated $136,000
12815 Construction GRAVOIS CREEK SANITARY TRUNK
RELOCATION (AFFTON ATHLETIC
COMPLEX)
Unincorporated $1,700,000
12814 Construction GRAVOIS CREEK SANITARY TRUNK
STREAM STABILIZATION (GREEN PK IND
DR)
Unincorporated $130,000
12291 Construction GREENBRIAR #2 PUMP STATION (P-448)
ELIMINATION
Des Peres $450,000
12334 Construction HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $16,000,000
11797 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $1,760,000
11798 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $5,000,000
12942 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX) - SEPARATION
SEWERS
Various $7,900,000
13337 Construction HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $2,000,000
12308 Construction HORTON PUMP STATION (P-814)
ELIMINATION
Town And Country $700,000
12997 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2023)
Various $3,000,000
8 April 2019
Page 5 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13018 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT A
Various $2,500,000
13019 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT B
Various $2,500,000
12989 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2023)
Various $7,000,000
13153 Construction LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $2,284,000
12328 Construction LINDBERGH PARK COMBINED SEWER
RELIEF (BREDELL AVE TO PRINCETON PL)
Maplewood $2,600,000
12330 Construction LINDSAY I/I REDUCTION (CHARBONIER RD
AND N. LINDBERGH BLVD)
Florissant $33,000
12331 Construction LINDY I/I REDUCTION (CABALLERO DR AND
CHAMBERLAIN DR)
Ballwin $30,000
12333 Construction LOHMEYER COMBINED SEWER RELIEF
(BENTLEY DR TO BREDELL AVE)
Maplewood $660,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $60,000,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,800,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $750,000
12338 Construction MANCHESTER I/I REDUCTION
(MANCHESTER RD AND HWY 141)
Manchester $205,000
12339 Construction MANCHESTER RD AND S BIG BEND BLVD
COMBINED SEWER RELIEF (HAMPTON
CREEK TO LYNDOVER PL)
Maplewood $3,700,000
12345 Construction MASON VALLEY I/I REDUCTION
(MANCHESTER RD AND BARRETT PKWY)
Town And Country $320,000
10024 Construction
(Supplemental
Appropriation)
MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $4,000,000
8 April 2019
Page 6 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12350 Construction MERAMEC BOTTOMS I/I REDUCTION
(LMSA7 AND LMSA7 WEST)
Unincorporated $45,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12357 Construction NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
Unincorporated $487,000
12365 Construction OLIVETTA STREET SEWER SEPARATION University City $2,383,000
12368 Construction PRICE TO PIONEER SANITARY RELIEF Olivette $3,881,000
12187 Construction REINKE I/I REDUCTION (MANCHESTER RD
AND NEW BALLWIN RD)
Ellisville $415,000
12189 Construction ROBYN HILLS NUMBER 1 PUMP STATION (P-
417) REPLACEMENT
Sunset Hills $515,000
12195 Construction S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $573,000
12196 Design Services S GORE AVE SANITARY RELIEF (GRAY AVE
TO OAK TERR)
Webster Groves $140,000
13185 Professional
Services
SLUDGE TRANSFER FORCEMAIN DESIGN
(CONTRACT A)
Various $7,200,000
12203 Construction SMOKETREE DR TO WHITE BIRCH CT
SANITARY RELIEF
Unincorporated $1,085,000
12628 Construction SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
809 TO P-750)
Chesterfield $7,000,000
12210 Construction ST. ALBERT I/I REDUCTION (WASHINGTON
ST AND ST. FERDINAND ST)
Florissant $453,000
12211 Construction ST. ANTHONY SANITARY RELIEF (S NEW
FLORISSANT RD TO ST. BERNADETTE LN)
Florissant $609,000
12212 Construction ST. GEORGE CREEK SANITARY RELIEF
(DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
Unincorporated $2,260,000
12218 Construction STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
Frontenac $300,000
12236 Construction TOWNE SOUTH SANITARY RELIEF (BROAD
OAK DR TO TESSON FERRY RD)
St. Louis County $948,000
12258 Construction VALLEY PARK I/I REDUCTION (HWY 141 TO
SIMPSON PARK)
Valley Park $269,000
12262 Construction VALLEY VIEW PUMP STATION (P-734)
REPLACEMENT
Wildwood $380,000
12268 Construction WATERFORD SANITARY RELIEF (N
WATERFORD DR TO DURWOOD DR)
Florissant $1,486,000
10794 Construction WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $4,000,000
12280 Construction WHITE PLAINS SANITARY RELIEF
(SALTBOX DR TO CEDAR CREEK RD)
Chesterfield $762,000
12305 Construction WINDMOOR PUMP STATION (P-710)
ELIMINATION
Town And Country $390,000
12302 Construction WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $5,000,000
8 April 2019
Page 7 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12307 Construction YARNELL CREEK EAST I/I REDUCTION
(LARKIN-WILLIAMS RD AND RUDDER RD)
Fenton $81,000
FUND TOTAL: $417,164,000
GRAND TOTAL:$436,279,000
8 April 2019
Page 1 of 6
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2022)
Various $200,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $420,000
12816 Vendor
Services
RADAR RAINFALL DATA (2023)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,475,000
6660 - SANITARY REPLACEMENT FUND
12077 Construction
(Supplemental
Appropriation)
AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $2,620,000
8 April 2019
Page 2 of 6
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12079 Construction ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $380,000
12090 Design Services BC-01 PHASE III AND BC-02 PHASE II
SANITARY RELIEF (I-170 TO
HEATHERWOOD DR)
Ladue $1,175,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,000,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $150,000,000
12106 Design Services BUCKHURST DR TO OAK HILL DR
SANITARY RELIEF
Ellisville $181,000
12107 Construction BUCKLEY SANITARY RELIEF (DACE LN TO
POPLAR DR)
Unincorporated $572,000
12108 Construction BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $247,000
12114 Construction CAULKS CREEK PUMP STATION B (P-751)
STORAGE
Chesterfield $332,000
12122 Construction CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $469,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $50,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $3,250,000
13224 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
SLUDGE TRANSFER FORCEMAINS
Various $350,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $500,000
12129 Design Services CONWAY MEADOWS SANITARY RELIEF
(CONWAY RD TO I-64)
Chesterfield $111,000
12130 Construction CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $1,410,000
12132 Construction CONWOOD LN SANITARY RELIEF (CONWAY
RD TO WESTWOOD CT)
Westwood $120,000
12133 Design Services COUNTRY HOME DR SANITARY RELIEF
(SUMMITT TREE CT TO AUTUMN PEAK DR)
Unincorporated $343,000
12134 Construction COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $426,000
12139 Construction
(Supplemental
Appropriation)
CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $6,000,000
8 April 2019
Page 3 of 6
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12140 Construction
(Supplemental
Appropriation)
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION
Brentwood $12,000,000
12143 Construction DANIEL BOONE I/I REDUCTION
(SHACKELFORD RD AND MULLANPHY LN)
Florissant $72,000
12145 Construction DC-04 DEER CREEK SANITARY RELIEF
PHASE III (LAKESHORE DR TO NEW BALLAS
RD)
Creve Coeur $730,000
11833 Construction DELCREST SANITARY RELIEF Various $2,065,000
12147 Design Services DIETRICH GLEN PUMP STATION (P-525)
IMPROVEMENTS
Unincorporated $20,000
12151 Design Services DUBRAY SANITARY RELIEF (S. BALLAS RD
TO DUBOIS CT)
Kirkwood $312,000
12821 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2024)
Various $2,000,000
12167 Construction FENTON CREEK EAST I/I REDUCTION (OLD
TOWN FENTON)
Fenton $35,000
12170 Construction FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $7,138,000
11737 Construction
(Supplemental
Appropriation)
FERGUSON SEWER RELIEF SANITARY
STORAGE FACILITY (ELTORA AVE AND
PENNSYLVANIA AVE)
Pagedale $4,000,000
13046 Construction FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $4,000,000
12182 Construction FOX BRIDGE PUMP STATION (P-484)
STORAGE
Sunset Hills $120,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $3,500,000
13100 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
13101 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $450,000
13105 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $75,000
13106 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $75,000
13107 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $75,000
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2023) CONTRACT A
Various $200,000
8 April 2019
Page 4 of 6
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13113 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
13221 Construction GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2024)
Valley Park $400,000
12334 Construction
(Supplemental
Appropriation)
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $10,500,000
11798 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $2,500,000
12299 Construction HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $350,000
12312 Construction HUNTLEIGH TRAILS LN SANITARY RELIEF
(TWO MILE CREEK TRUNK SEWER TO N
GEYER RD)
Huntleigh $960,000
12998 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2024)
Various $3,000,000
13020 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT A
Various $5,000,000
13021 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT B
Various $5,000,000
12990 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2024)
Various $7,000,000
12313 Design Services JEFFERSON BARRACKS CREEK SANITARY
RELIEF (N. KINSWOOD LN TO S. FRANRU
LN)
Unincorporated $575,000
13227 Construction L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $3,600,000
12371 Construction LAUMEIER PARK (P-469) STORAGE Various $51,000
11943 Construction LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $960,000
12332 Construction LITTLETON CT. SANITARY RELIEF (OLD
SMIZER MILL RD AND 141 TO LA PALMA
DR)
Fenton $770,000
11820 Design Services LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $2,000,000
8 April 2019
Page 5 of 6
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $57,000,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,200,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $20,000,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $750,000
12337 Construction MAIN SANITARY RELIEF (VANCE RD TO
INEZ AVE)
Valley Park $832,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12486 Construction,
Design-Build
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE IV
St. Louis City $5,000,000
12354 Construction MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE IV
Bridgeton $476,000
12359 Design Services NOONING TREE PARK SANITARY RELIEF
(WHITREE LN TO BRIGHTFIELD MANOR DR)
Chesterfield $300,000
12360 Construction NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $2,935,000
12204 Design Services SOUTH COUNTY RELIEF PUMP STATION (P-
419) IMPROVEMENTS
Unincorporated $500,000
12628 Construction
(Supplemental
Appropriation)
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
809 TO P-750)
Chesterfield $4,783,000
12206 Construction SPIRIT OF ST. LOUIS 1 PUMP STATION (P-
735) REPLACEMENT
Chesterfield $650,000
12214 Construction ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $1,181,000
12216 Construction ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO MARMARY DR)
St. Ann $1,046,000
12217 Construction ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $842,000
12219 Design Services STRASSNER AVE SANITARY RELIEF (BLACK
CREEK TRUNK TO SWALLOW DR)
Brentwood $667,000
8 April 2019
Page 6 of 6
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12220 Design Services SUB-TRUNK #11 SANITARY RELIEF
(BELGROVE DR TO LOTHIAN CIR)
Unincorporated $78,000
12224 Construction SUNSET COUNTRY CLUB PUMP STATION (P-
408) STORAGE
Sunset Hills $155,000
12231 Construction TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Ladue $6,000,000
12233 Construction TM-04 TWO MILE SANITARY RELIEF PHASE
II (LOCKETT RD TO MEIER RD)
Des Peres $204,000
12241 Construction UPPER BADEN SANITARY RELIEF
(JENNINGS STATION RD TO OAKRIDGE
BLVD)
Northwoods $1,519,000
12242 Construction UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $1,213,000
12245 Construction UPPER LAWNVIEW CREEK SANITARY
RELIEF (RHAPSODY LN TO MILLVALLEY
DR)
Unincorporated $1,672,000
12249 Construction UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
St. Louis County $6,000,000
12263 Design Services VILLE PATRICIA SANITARY RELIEF (VILLE
ROSA LN TO CAMPUS PARKWAY DR)
Hazelwood $305,000
12270 Design Services WATKINS CREEK SANITARY RELIEF
(KENRAN INDUSTRIAL BLVD TO FARM
POND CT)
Unincorporated $2,080,000
10794 Construction
(Supplemental
Appropriation)
WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $3,085,000
12277 Construction WEIDMAN I/I REDUCTION (HWY 141 AND
DUTCH MILL DR)
Unincorporated $237,000
12279 Construction WESTON PLACE PUMP STATION (P-771)
IMPROVEMENTS
Town And Country $276,000
12284 Construction WILSON AVE SANITARY RELIEF (HARRISON
AVE TO CLEVELAND AVE)
Kirkwood $271,000
12287 Construction WILSON SANITARY RELIEF (WILD HORSE
CREEK RD TO CLARKSON RD)
Chesterfield $3,010,000
12288 Construction WILTON PUMP STATION (P-412) STORAGE Kirkwood $30,000
12300 Construction WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $1,680,000
12302 Construction
(Supplemental
Appropriation)
WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $4,062,000
FUND TOTAL: $396,078,000
GRAND TOTAL:$414,553,000
PROJECT NUMBER PROJECT NAME COST
ESTIMATE
PAGE
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
$100,000 146
10067 HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-
230)
$100,000 147
12686 STORMWATER STREAMBANK STABILIZATION
DESIGN (CONTRACT A)
$500,000 148
TOTAL:$700,000
Page 1 of 1
STORMWATER ENGINEERING PROJECTS - FY20
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - WATERQUALITY SUPPORT SERVICES (2020)
GSA - (Planning)Operating Funds
5110 - StormwaterRegulatory Fund
WATER QUALITY EXPERTISE IS NEEDED TO SUPPORT THE DISTRICT'SREGULATORY AND LEGAL EFFORTS.
RETAIN ENGINEERING FIRM FOR AS NEEDED WATER QUALITY SUPPORTSERVICES. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12842
Stormwater
11
$100,000
Various
Various
Various
Asset Management
146Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALLSTEAD STORM CHANNEL PHASE IV(MCBJ-230)
Design Services
5120 - DistrictwideStormwater Fund
DAMAGE TO PROPERTY DUE TO EROSION.
CONSTRUCT 1,220 FEET OF 45-FOOT WIDE BY 12-FOOT HIGH VERTICALWALL CHANNEL, FROM VORHOFF DRIVE SOUTH TO HUDSON DRIVE.
HUDSON HALLWOODVORHOF
C
A
N
F
I
E
L
D
ED
G
E
F
I
E
L
D
IBIS
KIPP
FOSSMURAT C
H
I
C
K
E
R
I
N
G
GREEN SLOPE
R
O
T
H
W
E
L
LLANDSEEROLDMANOR
HUDSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10067
Stormwater
11
$100,000
Unincorporated
Bissell
Blackjack Creek
Non-recurring
147Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER STREAMBANK STABILIZATIONDESIGN (CONTRACT A)
Professional Services
5120 - DistrictwideStormwater Fund
EROSION AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICTTHREATENING STRUCTURES AND ROADWAYS, AND DEGRADINGWATER QUALITY.
DESIGN STREAMBANK STABILIZATION ENGINEERING SOLUTIONS INTHE BISSELL, COLDWATER, AND LEMAY WATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12686
Stormwater
16
$500,000
Various
Various
Various
Asset Management
148Page
2020
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11501 BELDON DRIVE STORM SEWER $400,000 149
10209 CHERRY TREE LANE STORM IMPROVEMENT $670,000 150
11587 CRAIG ROAD #1485 STORM SEWER
IMPROVEMENTS
$340,000 151
12683 EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (2020)
$500,000 152
11639 FAIRCHILD #6816 STORM SEWER $350,000 153
11030 GUENEVERE DR - BARHAM DOWN STORM
IMPROVEMENTS
$400,000 154
11589 HICKORY TREE LN. STORM SEWER $350,000 155
11608 HUNTER'S GLEN CT. #305 STORM SEWER $140,000 156
11545 KAYSER AVE. - WALLER AVE. STORM SEWER $180,000 157
11476 KENWOOD - JUNE CREEK BANK STABILIZATION $1,643,000 158
11419 LALITE #6145 - 6151 STORM IMPROVEMENTS $300,000 159
11544 LARKIN LN. #8 STORM IMPROVEMENTS (ME-260)$300,000 160
11520 MIDRIDGE DRIVE STORM SEWER $150,000 161
11389 NOTTINGHAM - MAYFAIR STORM SEWER $230,000 162
11424 SCOTT AVE #1213 STORM SEWER $125,000 163
10262 SHIVA COURT CHANNEL IMPROVEMENTS (CAU3-A)$650,000 164
STORMWATER CONSTRUCTION PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12675 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2020)
$3,000,000 165
13352 STORMWATER QUALITY GREEN INFRASTRUCTURE
- SMALL GRANT RAINSCAPING PROGRAM
$200,000 166
10366 UNION ROAD 100 BLOCK STORM IMPROVEMENTS $550,000 167
11618 WHITNEY POINTE DR. #2210 CHANNEL
IMPROVEMENTS
$478,000 168
11046 WOODLAKE VILLAGE 1009 BANK STABILIZATION $200,000 169
TOTAL:$11,156,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BELDON DRIVE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING DUE TO INADEQUATE STORM SEWER/COMBINEDSEWER SYSTEM.
CONSTRUCT 1,100 FEET OF 12-INCH STORM SEWER.COLLEGEMANETTEBELDONCALVI
N
P
A
I
SLEYAPRICOTLAMONTRAMSEYETONHIGGINSROSL
Y
N
JENW
O
O
D MAYFAIRGLENBOROHARN
E
Y
SEYM
O
U
R STRATHMOREEUNIC
E
GAYLORDOCTAVIA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11501
Stormwater
15
$400,000
Flordell Hills
Bissell
Baden
Capital
149Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CHERRY TREE LANE STORM IMPROVEMENT
Construction
5584 - University CityOMCI Fund
INADEQUATE STORM SEWER SYSTEM.
CONSTRUCT 1,150 FEET OF 12-INCH TO 36-INCH STORM SEWER, AND 165FEET OF 4 FOOT WIDE BY 1.5 FOOT HIGH CONCRETE BOX CULVERT.
ENGEL
RADFORDASHMONTHARVESTCORDELLCRABAPPLE
ENGELTONBONHOMMEWOO D S
MANSFIELD
HARVEST
CRABAPPLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10209
Stormwater
15
$670,000
Olivette
Lemay/RDP
University City Branch
Capital
150Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRAIG ROAD #1485 STORM SEWERIMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
GARAGE AND YARD FLOODING, AND EROSION.
CONSTRUCT 776 FEET OF 12-INCH TO 18-INCH STORM SEWER.
C
R
A
I
G
LAND O LAKES
MEREVIE
WMIRROR LAK
E
LAKECOMO
SWAN LAKE
LAKE PLACI
D
LAKE C O NSTANCEO
R
C
H
A
R
D
V
I
EWBRIDALSHIREWHI
T
E
O
R
C
H
A
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11587
Stormwater
15
$340,000
Unincorporated
Missouri
Creve Coeur Creek
Capital
151Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR STORMWATERPROJECTS (2020)
Property RightsAcquisition
5120 - DistrictwideStormwater Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM REQUIRES PROPERTY RIGHTS ACQUISITIONFOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM STORMWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12683
Stormwater
13
$500,000
Various
Various
Various
Asset Management
152Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FAIRCHILD #6816 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 700 FEET OF 12-INCH TO 18-INCH STORM SEWER.LAWLERMELBAAVONDALENELSONMANOLAFAIR
C
H
I
L
D OAKRIDGEBELAIRENEONAASCENSION
MAYWOODSALOMESACR
A
M
E
N
T
O
FAIRCHIL
D FAIRCHI
L
D
N
ATURAL
BRIDGE
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11639
Stormwater
15
$350,000
Northwoods
Bissell
Harlem
Capital
153Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GUENEVERE DR - BARHAM DOWN STORMIMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
BASEMENT AND YARD FLOODING, AND EROSION.
CONSTRUCT 1,049 FEET OF 12-INCH TO 24-INCH STORM SEWER.
H
E
N
R
Y
GUENEVEREHO
L
L
Y
R
I
D
G
E
ROTHERHAMBARHAM DOWN
B
A
YW
I
L
L
O
W DUTC
H
MILL
HELMSDALESPRIN G M EA DO W SR
U
T
H
WO
O
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11030
Stormwater
15
$400,000
Ballwin
Meramec
Grand Glaize Creek
Capital
154Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HICKORY TREE LN. STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
BASEMENT AND YARD FLOODING, AND YARD EROSION.
CONSTRUCT 600 FEET OF 12-INCH TO 36-INCH STORM SEWER, 390 FEETOF CONCRETE SWALE, AND ABANDON 85 FEET OF CMP.TIMKASPRING OAKSLOCKCAYBETHOAK PASS
HICKORY TREESPR INGLEI
G
H
CEDAR TREE
LORCHRIS§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11589
Stormwater
15
$350,000
Ballwin
Meramec
Grand Glaize Creek
Capital
155Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HUNTER'S GLEN CT. #305 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND STRUCTURE FLOODING.
CONSTRUCT 136 FEET OF 18-INCH STORM SEWER.
VIRGINIAWOLFFCLARKSON PINES
BONNIEHUNTERS GLENOZARKTRAILRENDINAKENSINGTONWAYCLARKSON PINES
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11608
Stormwater
15
$140,000
Ellisville
Meramec
Fishpot Creek
Capital
156Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KAYSER AVE. - WALLER AVE. STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND STREET FLOODING.
CONSTRUCT 414 FEET OF 12-INCH TO 18-INCH STORM SEWER.MILITARYFAN
N
I
E
KAY
S
E
R
HOR
NWACHTEL WAL
L
E
R
BAY
L
E
S
S
KAY
S
E
R
WAL
L
E
R
KAY
S
E
R
HOR
N
BAY
L
E
S
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11545
Stormwater
15
$180,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
157Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KENWOOD - JUNE CREEK BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
MODERATE RISK STRUCTURAL EROSION ALONG A TRIBUTARY TOBADEN CREEK.
CONSTRUCT 35 FEET OF 36-INCH DIAMETER STORM SEWER, AND 1,315FEET OF MODULAR BLOCK WALL AND BANK STABILIZATION.
§¨¦70
§¨¦70
JUNE
KENWOOD
STIVERS
ROHN
EDGEWOODLI
LLIANBEGG
KENEWAHRAVENWOODSEATTLEJORDANMOT
T
E
KAHN
S MELWOODBARR
S
TRA
T
FOR
D
OAKWOODROHN
ROHN
BEGG§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11476
Stormwater
15
$1,643,000
Northwoods
Bissell
Baden
Capital
158Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LALITE #6145 - 6151 STORM IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
OVERLAND YARD AND STRUCTURE FLOODING.
CONSTRUCT 500 FEET OF 12-INCH TO 18-INCH STORM SEWER.MIMIKALALIT
EGOODFELLOW GARE
S
C
H
E
SHER
R
Y
LAUR
A
LUCIL
L
E
THEO
D
O
R
EWILBORNSHER
R
Y
GARE
S
C
H
E
LALIT
E
GARE
S
C
H
E
SHER
R
Y
LAUR
A
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11419
Stormwater
15
$300,000
St. Louis City
Bissell
Baden
Capital
159Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LARKIN LN. #8 STORM IMPROVEMENTS (ME-260)
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 565 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND 1RAINGARDEN.LARKINVON TALGELEONARDSUNNYVIEWBERRYWICKWICKERFIELD
ASHWI
C
K
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11544
Stormwater
15
$300,000
Unincorporated
Meramec
Mattese Creek
Capital
160Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MIDRIDGE DRIVE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
EROSION AND YARD FLOODING DUE TO SURFACE FLOWS.
CONSTRUCT 500 FEET OF 12-INCH STORM SEWER.
VA
LLE
Y
SCENIC
FORK
MIDRIDGE
DI
AMONDCROWNJE
F
F
R
E
Y
JE
F
FRE
Y
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11520
Stormwater
15
$150,000
Riverview
Bissell
Bissell
Capital
161Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NOTTINGHAM - MAYFAIR STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 472 FEET OF 12-INCH TO 15-INCH STORM SEWER.
MA
Y
F
A
I
R
DEL EBRO
NOTTINGHAMMORENALENNOXCLAYTONBROOKKETTINGTONBED FO RDCHARTRA
N
D
BEDFORD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11389
Stormwater
15
$230,000
Ballwin
Missouri
Caulks Creek
Capital
162Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCOTT AVE #1213 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
PONDING IN YARDS.
CONSTRUCT 240 FEET OF 15-INCH STORM SEWER.
JUNEBOWERS
SCOTT
PRIGGECRITERIONWALKER
BARON
CONGRESS
REALE
RHEABURLINGTON NORTHERN SANTA FE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11424
Stormwater
15
$125,000
Unincorporated
Bissell
Spanish Lake
Capital
163Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SHIVA COURT CHANNEL IMPROVEMENTS(CAU3-A)
Construction
5120 - DistrictwideStormwater Fund
CHANNEL BANK EROSION THREATENING SEVEN PROPERTIES.
CONSTRUCT 345 FEET OF 8 TO 11 FOOT HIGH ROCK BLOCK WALL.SHIVA
FORESTLEAFF O REST PINE
BALAJIPEACEFULBAJAFUL L E R T O N MEADOWS
ELMFORESTNEWPOINTOAKFO R E S T
HOLLISTERC R O S S IN G
WINTER LEAF
SHIVA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10262
Stormwater
15
$650,000
Wildwood
Missouri
Caulks Creek
Non-recurring
164Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - DISTRICTWIDE (2020)
Work Order Repair Costs(Capital)
5120 - DistrictwideStormwater Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF STORMWATERINFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12675
Stormwater
17
$3,000,000
Various
Various
Various
Asset Management
165Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER QUALITY GREENINFRASTRUCTURE - SMALL GRANT RAINSCAPINGPROGRAM
Vendor Services
5110 - StormwaterRegulatory Fund
RAINSCAPING NEEDED TO ADDRESS WATER QUALITY OF STORMWATERRUNOFF THROUGH PUBLIC PARTICIPATION.
SMALL GRANT PROGRAM TO FUND CONSTRUCTION AND ENCOURAGETHE USE OF RAINSCAPING TECHNIQUES BY INDIVIDUALLANDOWNERS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13352
Stormwater
16
$200,000
Various
Various
Various
Non-recurring
166Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNION ROAD 100 BLOCK STORM IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING AND ROAD PONDING.
CONSTRUCT 1,500 FEET OF 12-INCH TO 18-INCH STORM SEWER.UNIONWEB
E
R
HEA
L
Y
D
E
B
R
AMORGAN FORDCLEARPOINTG
R
A
S
S
O KETMOREAVE
N
U
E
F HERNANWEIMARHEIDELBERG
HANNOVER
KET
T
L
E
R
TIFFANYAVENUEF
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10366
Stormwater
15
$550,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Non-recurring
167Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITNEY POINTE DR. #2210 CHANNELIMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
HIGH RISK STRUCTURAL EROSION DUE TO CHANNEL INCISION.
CONSTRUCT 140 FEET OF STREAMBANK BIOSTABILIZATION ANDGRADE CONTROL STRUCTURES.
WILSON CREEK
K E H R S G R O V EDUNHILLWAY WILSONRIDGEWHITNEYPOINTEDEVONSB
R
O
O
KSTILLWATER POINT§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11618
Stormwater
15
$478,000
Clarkson Valley
Missouri
Caulks Creek
Non-recurring
168Page
2020
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WOODLAKE VILLAGE 1009 BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
CREEK BANK EROSION.
CONSTRUCT 75 FEET OF BANK STABILIZATION.PRIVATEBEAULAC
P A VILLIONLA
B
A
R
G
E
THE PI NESFOR ESTMANOR
L
A
C
F OR
E
STLAC
COALPORTWOOD CHAPEL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11046
Stormwater
15
$200,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
169Page
2020
8 April 2019
Page 1 of 1
STORMWATER CONTINUED PROJECTS - FY20
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11600 BROOKVALE TERRACE -
PARKFIELD TERRACE
STORM IMPROVEMENTS
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF MANCHESTER. ANTICIPATE BOARD
INTRODUCTION IN JULY 2019.
$700,000
10289 LINDEN #1064 STORM
SEWER
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNER AND DESIGN REVISIONS. ANTICIPATE
BOARD INTRODUCTION IN SEPTEMBER 2019.
$1,300,000
10282 MAINTENANCE YARD
VEHICLE STORAGE
BUILDING (MINTERT)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
FERGUSON SCHOOL DISTRICT AND EASEMENT
ACQUISITION. ANTICIPATE BOARD INTRODUCTION IN
DECEMBER 2019.
$250,000
11239 STEEPLECHASE STORM
SEWER IMPROVEMENTS
(FRONTENAC 3-3)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF FRONTENAC. ANTICIPATE BOARD
INTRODUCTION IN OCTOBER 2019.
$215,000
11224 TIMBER TRAIL - BRIAR
RIDGE CHANNEL
IMPROVEMENTS
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF FRONTENAC. ANTICIPATE BOARD
INTRODUCTION IN MARCH 2020.
$249,000
12938 WILLOW HILL STORM
SEWER (LADUE 1614A)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF LADUE. ANTICIPATE BOARD INTRODUCTION IN
MAY 2020.
$500,000
TOTAL: $3,214,000
12 April 2019
Page 1 of 1
STORMWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11494 BARTOLET TO PAULE AVE. STORM SEWER
REPLACEMENT
$110,000 170
11623 BRUNSTON DR. #4875 BANK STABILIZATION $205,000 171
11474 GLEASON #656 STORM SEWER $105,000 172
11438 KENNY DR.- BOUNDARY RD. STORM SEWER $170,000 173
11522 LOUISIANA AND HOLLY HILLS STORM SEWER $175,000 174
11506 RAFORD CT. STORM SEWER SEPARATION $197,000 175
11573 SAPPINGTON RD. AND SAPPHIRE RIDGE CT.
STORM SEWER
$600,000 176
TOTAL:$1,562,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BARTOLET TO PAULE AVE. STORM SEWERREPLACEMENT
Construction
5120 - DistrictwideStormwater Fund
UNDERSIZED PIPES ARE CAUSING BASEMENT AND GARAGE FLOODING,AND STREET FLOODING ALONG PAULE.
CONSTRUCT 600 FEET OF 30-INCH TO 36-INCH STORM SEWER,REPLACING 24-INCH TO 27-INCH SEWERS.WACHTELPAU
L
E
DAMMERTORIE
N
T
RAU
H
U
T
NAE
R
T
DEG
E
N
H
A
R
D
TERSKINEJEFF
O
R
D
S REGINAPLA
C
I
D
BAR
T
O
L
E
T
BOB
R
I
N
G
LEN
H
A
R
D
T KIRCHNERCLEVES
PAU
L
E
REGINALEMAY FERRY RDTELEGRAPH RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11494
Stormwater
15
$110,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
170Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRUNSTON DR. #4875 BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 90 FEET OF 12 FOOT MODULAR BLOCK RETAINING WALL.
BRUNSTONAMBS MUSICTO
W
N
E
C
E
N
T
R
E VALMEYERFUCHSAM
B
S
D
A
L
E
FOUL
K
SHARLANE
STON
E
H
I
L
L
CROWNOVER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11623
Stormwater
15
$205,000
Unincorporated
Meramec
Mattese Creek
Capital
171Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLEASON #656 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 260 FEET OF 12-INCH TO 15-INCH STORM SEWER.
C
A
L
U
M
E
T
KELVIN
SCENICGLOUCESTERBAGNELLGLEASONKARESS
FARLOHAYWARD
BURLINGTON NORTHERN SANTA FE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11474
Stormwater
15
$105,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
172Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KENNY DR.- BOUNDARY RD. STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING AND EROSION.
CONSTRUCT 390 FEET OF 12-INCH TO 15-INCH STORM SEWER.BOUNDARYSHERMANTUCKAHOEO HARA
KENNYBRILLIANTCORLISSBETTYJEANGRE
E
N
L
A
N
D
JEF
F
E
R
S
O
N
B
A
R
R
A
C
K
S
HALSEY
BUR
M
A
WIL
L
E
T
T
E
ELK HILLALBEMARLETELEGRAPH RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11438
Stormwater
15
$170,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
173Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOUISIANA AND HOLLY HILLS STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 260 FEET OF 12-INCH TO 15-INCH STORM SEWER.
§¨¦55
§¨¦55
IRON
ALASKAUNION PACIFICHOLLYHILLS COLORADOLOUISIANAIDAHOFI
E
L
D
H
O
U
S
E TENNESSEEALABAMATENNESSEE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11522
Stormwater
15
$175,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
174Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RAFORD CT. STORM SEWER SEPARATION
Construction
5120 - DistrictwideStormwater Fund
STORMWATER OVERCHARGES THE 12-INCH VCP COMBINED SEWERAND CAUSES BUILDING BACKUPS IN SEVERAL DUPLEX BUILDINGS.
CONSTRUCT 370 FEET OF 18-INCH STORM SEWER, TO SEPARATE THESTORM AND SANITARY SYSTEMS.
FONTAINE
RAFORD
CHAIN OF ROCKS
RIVER RUN
RIVER TRAIL
JENNINGSSTATION
MAKALU
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11506
Stormwater
15
$197,000
Bellefontaine Neighbors
Bissell
Baden
Capital
175Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAPPINGTON RD. AND SAPPHIRE RIDGE CT.STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
STRUCTURAL FLOODING FROM OVERLAND FLOW.
CONSTRUCT 812 FT OF 12-INCH TO 30-INCH STORM SEWER.SAPPINGTONDOVERHILL
HANFORD
OLEANDER
REBECCASTEPHENSONTRAILRIDGE
SAPPHIRE RIDGE
DOERUN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11573
Stormwater
15
$600,000
Unincorporated
Meramec
Mattese Creek
Capital
176Page
2021
12 April 2019
Page 1 of 2
STORMWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
Various $100,000
13352 Vendor
Services
STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
11501 Construction BELDON DRIVE STORM SEWER Flordell Hills $400,000
11600 Construction BROOKVALE TERRACE - PARKFIELD
TERRACE STORM IMPROVEMENTS
Manchester $700,000
11587 Construction CRAIG ROAD #1485 STORM SEWER
IMPROVEMENTS
Unincorporated $340,000
12683 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
STORMWATER PROJECTS (2020)
Various $500,000
11639 Construction FAIRCHILD #6816 STORM SEWER Northwoods $350,000
11030 Construction GUENEVERE DR - BARHAM DOWN STORM
IMPROVEMENTS
Ballwin $400,000
10067 Design Services HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
Unincorporated $100,000
11589 Construction HICKORY TREE LN. STORM SEWER Ballwin $350,000
11608 Construction HUNTER'S GLEN CT. #305 STORM SEWER Ellisville $140,000
11545 Construction KAYSER AVE. - WALLER AVE. STORM
SEWER
Unincorporated $180,000
11476 Construction KENWOOD - JUNE CREEK BANK
STABILIZATION
Northwoods $1,643,000
11419 Construction LALITE #6145 - 6151 STORM IMPROVEMENTS St. Louis City $300,000
11544 Construction LARKIN LN. #8 STORM IMPROVEMENTS
(ME-260)
Unincorporated $300,000
10282 Design Services MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
St. Louis County $250,000
11520 Construction MIDRIDGE DRIVE STORM SEWER Riverview $150,000
11389 Construction NOTTINGHAM - MAYFAIR STORM SEWER Ballwin $230,000
11424 Construction SCOTT AVE #1213 STORM SEWER Unincorporated $125,000
12 April 2019
Page 2 of 2
STORMWATER PROJECTS - FY20
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10262 Construction SHIVA COURT CHANNEL IMPROVEMENTS
(CAU3-A)
Wildwood $650,000
12675 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2020)
Various $3,000,000
12686 Professional
Services
STORMWATER STREAMBANK
STABILIZATION DESIGN (CONTRACT A)
Various $500,000
10366 Construction UNION ROAD 100 BLOCK STORM
IMPROVEMENTS
Unincorporated $550,000
11618 Construction WHITNEY POINTE DR. #2210 CHANNEL
IMPROVEMENTS
Clarkson Valley $478,000
11046 Construction WOODLAKE VILLAGE 1009 BANK
STABILIZATION
Chesterfield $200,000
FUND TOTAL: $11,836,000
5566 - DEER CREEK OMCI FUND
10289 Construction LINDEN #1064 STORM SEWER Richmond Heights $1,300,000
11239 Construction STEEPLECHASE STORM SEWER
IMPROVEMENTS (FRONTENAC 3-3)
Frontenac $215,000
11224 Construction TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
Frontenac $249,000
12938 Construction WILLOW HILL STORM SEWER (LADUE
1614A)
Ladue $500,000
FUND TOTAL: $2,264,000
5584 - UNIVERSITY CITY OMCI FUND
10209 Construction CHERRY TREE LANE STORM
IMPROVEMENT
Olivette $670,000
FUND TOTAL: $670,000
GRAND TOTAL:$15,070,000
12 April 2019
Page 1 of 2
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
Various $100,000
13352 Vendor
Services
STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
11494 Construction BARTOLET TO PAULE AVE. STORM SEWER
REPLACEMENT
Unincorporated $110,000
11623 Construction BRUNSTON DR. #4875 BANK STABILIZATION Unincorporated $205,000
10391 Construction CARL AVE., AVIS ST., AND MAIN ST. STORM
SEWER
Jennings $500,000
11418 Construction DRURY - SWITZER STORM SEWER St. Louis City $300,000
11474 Construction GLEASON #656 STORM SEWER Bellefontaine
Neighbors
$105,000
11438 Construction KENNY DR.- BOUNDARY RD. STORM SEWER Unincorporated $170,000
11432 Construction LARKWOOD - JAYWOOD - SPARROWWOOD
BANK STABILIZATION (CRE-07)
Unincorporated $808,000
11522 Construction LOUISIANA AND HOLLY HILLS STORM
SEWER
St. Louis City $175,000
10282 Construction,
Design-Build
MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
St. Louis County $1,000,000
11481 Construction MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
Unincorporated $1,195,000
11506 Construction RAFORD CT. STORM SEWER SEPARATION Bellefontaine
Neighbors
$197,000
11016 Construction ROLAND BLVD STORM IMPROVEMENTS Northwoods $360,000
11573 Construction SAPPINGTON RD. AND SAPPHIRE RIDGE CT.
STORM SEWER
Unincorporated $600,000
11442 Construction STANWOOD DR. AND BELWOOD DR. STORM
SEWER AND BANK STABILIZATION
Normandy $2,580,000
13004 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2021)
Various $3,000,000
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $495,000
12 April 2019
Page 2 of 2
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11396 Construction WEATHERBY DRIVE STORM SEWER Unincorporated $280,000
11430 Construction WILBORN DRIVE #5361 STORM SEWER Jennings $300,000
FUND TOTAL: $12,380,000
5563 - CLAYTON CENTRAL OMCI FUND
12986 Design Services CLAYTON CENTRAL OMCI STORMWATER
IMPROVEMENTS
Clayton $400,000
FUND TOTAL: $400,000
5571 - GRAVOIS CREEK OMCI FUND
10266 Construction ST. SIMON CT. #10023 STORM CHANNEL
(GCMB-250)
Unincorporated $122,000
FUND TOTAL: $122,000
5587 - WATKINS CREEK OMCI FUND
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $405,000
FUND TOTAL: $405,000
GRAND TOTAL:$13,607,000
12 April 2019
Page 1 of 1
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
Various $100,000
13352 Vendor
Services
STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
11416 Construction BOXFORD COURT BANK STABILIZATION Chesterfield $267,000
11408 Construction BROADHEAD #921 STORM SEWER Unincorporated $180,000
11535 Construction DEKAMAY DRIVE STORM SEWER (MGJB-
130)
Unincorporated $560,000
11558 Construction GENTLE COURT CHANNEL IMPROVEMENT
(WILL-06)
Unincorporated $100,000
10070 Construction HALL STREET STORM SEWERS St. Louis City $5,000,000
11530 Construction LARIMORE STORM SEWER Unincorporated $2,870,000
11507 Construction MINNIE AVE. TO GREEN HAVEN STORM
SEWER
Jennings $306,000
11536 Construction NOTTINGHAM ESTATES DR. #5217 STORM
SEWER
Unincorporated $150,000
11598 Construction ORCHARD AND WINDSOR LANE STORM
SEWER
Kirkwood $509,000
13005 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2022)
Various $3,000,000
FUND TOTAL: $12,942,000
GRAND TOTAL:$13,242,000
12 April 2019
Page 1 of 1
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2023)
Various $100,000
13352 Vendor
Services
STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
10070 Construction
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $3,100,000
10356 Construction HEMPLINE COURT STORM SEWER Unincorporated $120,000
11630 Construction REYNOSA - MELITTA STREAMBANK
STABILIZATION
Unincorporated $1,200,000
13006 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2023)
Various $3,000,000
FUND TOTAL: $7,420,000
5563 - CLAYTON CENTRAL OMCI FUND
12986 Construction CLAYTON CENTRAL OMCI STORMWATER
IMPROVEMENTS
Clayton $1,500,000
FUND TOTAL: $1,500,000
GRAND TOTAL:$9,220,000
12 April 2019
Page 1 of 1
STORMWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating
Funds
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2023)
Various $100,000
13352 Vendor
Services
STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
13007 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2024)
Various $5,000,000
13129 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024)
Various $4,000,000
FUND TOTAL: $9,000,000
GRAND TOTAL:$9,300,000
12 April 2019
Page 1 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11030 GUENEVERE DR - BARHAM DOWN STORM
IMPROVEMENTS
STORMWATER BALLWIN 154
11389 NOTTINGHAM - MAYFAIR STORM SEWER STORMWATER BALLWIN 162
11589 HICKORY TREE LN. STORM SEWER STORMWATER BALLWIN 155
12173 FISHPOT TRUNK WEST AND ED LOU LANE I/I
REDUCTION (SMITH DR AND VLASIS DR)
WASTEWATER BALLWIN 17
12272 GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT COVE
CT)
WASTEWATER BALLWIN 36
12364 OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
WASTEWATER BALLWIN 54
12112 CARSON VILLA, ROSARY LANE AND
THURSTON I/I REDUCTION
WASTEWATER BEL-RIDGE 80
12092 BELLEFONTAINE #2 SANITARY RELIEF
(CHAMBERS RD TO COBURG LANDS DR)
WASTEWATER BELLEFONTAINE
NEIGHBORS
72
12247 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION C PUBLIC I/I REDUCTION
WASTEWATER BERKELEY 119
12100 BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX
I/I REDUCTION (I-64 AND LAY RD)
WASTEWATER BRENTWOOD 77
12342 MARK TWAIN I/I REDUCTION (MANCHESTER
RD AND BOMPART AVE)
WASTEWATER BRENTWOOD 111
11046 WOODLAKE VILLAGE 1009 BANK
STABILIZATION
STORMWATER CHESTERFIELD 169
12200 SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
WASTEWATER CHESTERFIELD 60
12 April 2019
Page 2 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11618 WHITNEY POINTE DR. #2210 CHANNEL
IMPROVEMENTS
STORMWATER CLARKSON
VALLEY
168
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD
AND KEHRS MILL RD)
WASTEWATER CLARKSON
VALLEY
67
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 96
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
WASTEWATER CREVE COEUR 61
11608 HUNTER'S GLEN CT. #305 STORM SEWER STORMWATER ELLISVILLE 156
11501 BELDON DRIVE STORM SEWER STORMWATER FLORDELL HILLS 149
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES
ST TO N LAFAYETTE ST)
WASTEWATER FLORISSANT 63
11917 CELLA - ROLLING ROCK - GLEN CREEK
SANITARY SEWER IMPROVEMENTS
WASTEWATER LADUE 82
12230 TILLES PARK, LITZSINGER AND PARKRIDGE I/I
REDUCTION (LITZSINGER RD AND S MCKNIGHT
RD)
WASTEWATER LADUE 117
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE
IV
WASTEWATER LADUE 13
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE
IV
WASTEWATER LADUE 87
11476 KENWOOD - JUNE CREEK BANK
STABILIZATION
STORMWATER NORTHWOODS 158
11639 FAIRCHILD #6816 STORM SEWER STORMWATER NORTHWOODS 153
12 April 2019
Page 3 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10209 CHERRY TREE LANE STORM IMPROVEMENT STORMWATER OLIVETTE 150
12368 PRICE TO PIONEER SANITARY RELIEF WASTEWATER OLIVETTE 55
12841 KINGSLAND SANITARY STORAGE FACILITY
(ENGELHOLM)
WASTEWATER PAGEDALE 103
11520 MIDRIDGE DRIVE STORM SEWER STORMWATER RIVERVIEW 161
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - PUMP STATION
WASTEWATER SHREWSBURY 15
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - PUMP STATION
WASTEWATER SHREWSBURY 89
11136 DEGIVERVILLE COMBINED SEWER
IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 90
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS WASTEWATER ST. LOUIS CITY 93
11419 LALITE #6145 - 6151 STORM IMPROVEMENTS STORMWATER ST. LOUIS CITY 159
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 51
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 110
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
WASTEWATER ST. LOUIS CITY 43
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
WASTEWATER ST. LOUIS CITY 53
12484 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION PHASE II
WASTEWATER ST. LOUIS CITY 112
12 April 2019
Page 4 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
WASTEWATER ST. LOUIS CITY 44
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
WASTEWATER ST. LOUIS CITY 76
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
WASTEWATER ST. LOUIS CITY 6
13219 BADEN AND MILL CREEK ORS PUMP STATIONS
- PUMP REHABILITATION
WASTEWATER ST. LOUIS CITY 70
13232 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE)
WASTEWATER ST. LOUIS CITY 71
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
64
12020 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2020) CONTRACT A
WASTEWATER ST. LOUIS CITY
AND COUNTY
98
12021 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2020) CONTRACT B
WASTEWATER ST. LOUIS CITY
AND COUNTY
99
12131 CONWAY VILLAGE SANITARY RELIEF
(CONWAY RD TO I-64)
WASTEWATER TOWN AND
COUNTRY
83
10067 HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
STORMWATER UNINCORPORAT
ED
147
10366 UNION ROAD 100 BLOCK STORM
IMPROVEMENTS
STORMWATER UNINCORPORAT
ED
167
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
113
12 April 2019
Page 5 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10716 NEW ENGLAND TOWN QUARRY PUMP STATION
(P-307) (SKME-544) IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
114
11424 SCOTT AVE #1213 STORM SEWER STORMWATER UNINCORPORAT
ED
163
11544 LARKIN LN. #8 STORM IMPROVEMENTS (ME-
260)
STORMWATER UNINCORPORAT
ED
160
11545 KAYSER AVE. - WALLER AVE. STORM SEWER STORMWATER UNINCORPORAT
ED
157
11587 CRAIG ROAD #1485 STORM SEWER
IMPROVEMENTS
STORMWATER UNINCORPORAT
ED
151
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
38
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
101
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
41
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
105
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
106
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
WASTEWATER UNINCORPORAT
ED
39
12 April 2019
Page 6 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
WASTEWATER UNINCORPORAT
ED
102
12104 BROOKSHIRE SANITARY RELIEF (BROOKSHIRE
DR TO COUGAR DR)
WASTEWATER UNINCORPORAT
ED
78
12166 FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
16
12205 SOUTH COUNTY SANITARY RELIEF (P-419 TO
CRIPPLE CREEK DR)
WASTEWATER UNINCORPORAT
ED
116
12212 ST. GEORGE CREEK SANITARY RELIEF (DAISY
LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE)
WASTEWATER UNINCORPORAT
ED
62
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
50
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
49
13082 LOWER MERAMEC WWTF FITTING
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
108
13164 LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
WASTEWATER UNINCORPORAT
ED
48
13302 RAINRIDGE CT. PROPERTY BUYOUT WASTEWATER UNINCORPORAT
ED
115
13336 LANGLEY AND PHILO SANITARY STORAGE WASTEWATER UNINCORPORAT
ED
40
12 April 2019
Page 7 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13336 LANGLEY AND PHILO SANITARY STORAGE WASTEWATER UNINCORPORAT
ED
104
12440 UPPER RDP (UNIVERSITY CITY) CSO STORAGE
TUNNEL
WASTEWATER UNIVERSITY
CITY
66
12490 VANCE RD PUMP STATION (P-472) UPGRADES WASTEWATER VALLEY PARK 120
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
WASTEWATER VALLEY PARK 37
13072 GRAND GLAIZE WWTF FLOODWALL
PROTECTION
WASTEWATER VALLEY PARK 94
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
WASTEWATER VARIOUS 52
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
WASTEWATER VARIOUS 95
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 45
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 46
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 4
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 5
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 85
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 11
12 April 2019
Page 8 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 9
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 58
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 14
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 88
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 47
11789 CAULKS CREEK FORCEMAIN REHABILITATION WASTEWATER VARIOUS 81
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 10
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
WASTEWATER VARIOUS 69
12000 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2020)
WASTEWATER VARIOUS 8
12004 STREAM FLOW WATER QUALITY SAMPLING
(2020)
UNALLOCATED VARIOUS 65
12006 RADAR RAINFALL DATA (2020)WASTEWATER VARIOUS 57
12010 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2020)
WASTEWATER VARIOUS 100
12027 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT C
WASTEWATER VARIOUS 75
12030 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT B
WASTEWATER VARIOUS 74
12 April 2019
Page 9 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2020) CONTRACT A
WASTEWATER VARIOUS 73
12057 LEMAY PUBLIC I/I REDUCTION (2020)
CONTRACT A
WASTEWATER VARIOUS 107
12059 LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
WASTEWATER VARIOUS 42
12111 CAPILIA SANITARY RELIEF (GRANT RD TO
CAPILIA DR)
WASTEWATER VARIOUS 79
12160 EDNA-THURSBY, ESSEX, TREASURER COVE,
WAYFARER EAST AND YARNELL CREEK WEST
I/I REDUCTION
WASTEWATER VARIOUS 92
12302 WW-2 AND WW-3 WARSON WOODS SANITARY
RELIEF
WASTEWATER VARIOUS 68
12336 MACKENZIE I/I REDUCTION (RESURRECTION
CEMETERY, WEHNER PARK, KENRICK
SEMINARY, AND NERINX HALL)
WASTEWATER VARIOUS 109
12382 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT A
UNALLOCATED VARIOUS 26
12383 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT B
UNALLOCATED VARIOUS 27
12384 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT C
UNALLOCATED VARIOUS 28
12385 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2018) CONTRACT D
UNALLOCATED VARIOUS 29
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
WASTEWATER VARIOUS 19
12391 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
WASTEWATER VARIOUS 22
12392 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
WASTEWATER VARIOUS 23
12 April 2019
Page 10 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12393 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
WASTEWATER VARIOUS 24
12397 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT A
WASTEWATER VARIOUS 20
12398 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2019)
WASTEWATER VARIOUS 30
12413 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
WASTEWATER VARIOUS 31
12416 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
WASTEWATER VARIOUS 32
12417 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
WASTEWATER VARIOUS 33
12418 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
WASTEWATER VARIOUS 34
12419 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
WASTEWATER VARIOUS 35
12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH
WASTEWATER VARIOUS 84
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 59
12508 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT A
WASTEWATER VARIOUS 2
12509 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT B
WASTEWATER VARIOUS 3
12516 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2020)
WASTEWATER VARIOUS 91
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 1
12 April 2019
Page 11 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY20
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12675 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - DISTRICTWIDE (2020)
STORMWATER VARIOUS 165
12683 EASEMENT ACQUISITION FOR STORMWATER
PROJECTS (2020)
STORMWATER VARIOUS 152
12686 STORMWATER STREAMBANK STABILIZATION
DESIGN (CONTRACT A)
STORMWATER VARIOUS 148
12697 PUMP STATION REPAIR AND IMPROVEMENT
DESIGN (CONTRACT A)
WASTEWATER VARIOUS 56
12759 FLOW METERING AND MONITORING (2017) WASTEWATER VARIOUS 18
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2020)
STORMWATER VARIOUS 146
12897 INFRASTRUCTURE REPAIRS (FACILITIES) (2020) WASTEWATER VARIOUS 97
12907 CRITICAL INFRASTRUCTURE ASSESSMENT AND
ASSET INVESTIGATION (2020)
WASTEWATER VARIOUS 12
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
UNALLOCATED VARIOUS 25
13059 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT B
WASTEWATER VARIOUS 21
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
WASTEWATER VARIOUS 86
13344 UNIVERSITY CITY I/I REDUCTION - EAST (UR-08
AND UR-09) PHASE II
WASTEWATER VARIOUS 118
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
STORMWATER VARIOUS 166
10262 SHIVA COURT CHANNEL IMPROVEMENTS
(CAU3-A)
STORMWATER WILDWOOD 164
MSD Project Clear
is the initiative to
improve water
quality and
alleviate many
wastewater
concerns in the
St. Louis region.
It will invest
billions of dollars
over a generation
in planning,
designing, and
building
community
rainscaping,
system
improvements,
and an ambitious
program of
maintenance
and repair.