COMMUNITY BENEFITS AGREEMENT (CBA)
DRAFT MEETING MINUTES
Tuesday, June 19, 2018, 1:00 p.m. - 3:00 p.m.
2350 MARKET STREET, ST LOUIS MO
1ST FLOOR
CONFERENCE ROOM #100A
1. Roll Call — In attendance were (Quorum): (Attendance sheet is attached)
MSD — Brian Hoelscher
NAACP City Branch —Adolphus Pruitt
NSBE — Jan Walker
MOKAN — Diana Hanks
UAPO — Zaki Baruti
CBTU — Lew Moye
MCU — Susan Sneed
CORE — Jesse Lofton
MCU — Jim Sahaida
2. There were no public comments.
3. Meeting Minutes from March 30, 2018 were unanimously approved.
4. General discussion on Cost per Individual for OJT for Tunnel Workers.
MSD: Shonnah Paredes explained that the MSD sponsored Tunnel OJT
Program is for diverse workers (exclusively minorities and women) who do not
have any experience in tunneling. MSD sponsors the OJT trainees for a period
of six months. This program is charged to the Capital Program since it was
issued by MSD outside of the CBA Agreement. The estimated expenditure
breakdown was detailed for trainees who completed the program versus those
trainees that did not complete the program. Data for unemployed OJT
participation will be presented with the next Diversity Annual Report. MSD is
currently waiting for this information from the Prime contractors. In the event that
a trainee does not complete the program, the Prime Contractor immediately
replaces the training using a recruitment list they can refer to, to fee trainees into
the Tunnel OJT Program.
MCU: Susan Sneed stated that SAK Construction saw the benefits of the MSD
sponsored Tunnel OJT Program so much that they decided to voluntarily run the
same program on another one of their MSD contracts not mandated by MSD
(Jefferson Barracks Tunnel)
NAACP: Adolphus Pruitt asked if the members of the CBA could attend a site
visit to one of the tunneling projects. Brian Hoelscher responded that MSD is
currently setting up two tunnel site visits for individuals who would like to attend.
One of the visits will include the boring machine and the other will include the
Metropolitan
Si. Louis
Sewer District
blast chamber. Attendees can chose which they would like to visit. While
possible dates for the tunnel site visits are not currently available, MSD will
forward the dates for attendance once they are determined.
5. Unbundling: The CBA Group requested that the editable version of MSD's
Unbundling Policy be sent via e-mail. The CBA Group will review and make any
suggested changes directly to the document (via "track changes" option) before
the next CBA meeting.
6. General Discussion Regarding MSD's Insurance Requirements
The CBA Group requested information regarding the summary of insurance
requirements for MSD contractors. MSD provided the MSD Insurance Summary
of 2017. These MSD mandated insurance requirements are only for the Prime
contractor.
7. At the next meeting, MSD will provide information regarding disputed payments
to M/WBEs in the MSD Diversity Reporting System.
8. General Discussion Regarding Opportunities for Workforce Training Programs
MSD: Brian Hoelscer stated that MSD's contract with the BUD Training Program
(SLATE) has expired, and MSD is considering alternatives for those dollars for
other training program activities. MSDs is looking to offer performance grants for
construction workforce training opportunities to expand MSDs reach to various
programs throughout MSD's service area.
NAACP: Adolphus Pruitt stated that a combination of programs providing
training and follow-up tracking to fill the pipeline for pre -apprentice and
apprentice training is needed. He spoke with the President of the Contractor
Loan fund who agreed that this is a conceptually good idea.
9. Outstanding Cures Issues
Page 1 of 14 — 1st Blue Item (Breach of Article V (FSH) of the CBA): Per the CBA
Group, leave this item open (blue).
Page 1 of 14 — 2nd Blue Item (Unbundling): Per the CBA Group, leave this item
open (blue).
Page 2 of 14 — Only Blue Item (Page 5, Cure iii — Mentor/Protege):
Per the CBA Group, leave this item open (blue) for now, but add in the
comments to separate this item from the tunneling program. The CBA Group
Metropolitan
SI. Louis
Sewer District
is interested in see what the mentor/protege program could be for non -
tunneling projects.
MSD: Per Shonnah Paredes, Mentor/Protege was added to the Diversity
policy last year and will be added to the master list.
Page 6 of 14 — 1st Blue Item (Local Direct Purchase Program): Per Adolphus
Pruitt, MSD legally cannot do this due to the MSD Charter which is derived from
the U.S. Constitution; therefore, close this item (white) and move to the "no
longer in default" list.
Page 6 of 14 — 2nd Blue Item (Insurance/Bonding): Per CBA Group, leave this
item open (blue) for further.
Page 7 of 14 — Only Blue Item (Page 15, Cure j —Diversity Flow Chart): Per
CBA Group, leave this item open (blue).
Page 8 of 14 — Both Blue Items (Flow Chart): Per CBA Group, leave these items
open (blue).
Page 9 of 14 — Only Yellow Item: Per CBA Group, close this item (white) and
move to the "no longer in default" list.
Page 10 of 14 — 1st Blue Item (Workforce Non -Compliance Penalties): Per CBA
Group, close this item (white) and move to the "no longer in default" list.
Page 10 of 14 — 2"d Blue Item (Flowchart): Per CBA Group, leave this item open
(blue).
Page 13 of 14 — Only Blue Item (Page 21, Cure 7): Per CBA Group, close this
item (white) and move to the "no longer in default" list.
9. Meeting adjournment was approximately 3:05 p.m.
Metmpolitan
Si. Louis
Sewer District
COMMUNITY BENEFITS AGREEMENT (CBA)
REGULAR MEETING
Sign In
June 19, 2018, 1:00 3:00 p.m.
2350 MARKET STREET, ST LOUIS, MO 63103
CONFERENCE ROOM #100A
Company
Name
Phone
1. MSI\
2. C\f\c
3.
4.
5.
6.
12.
13.
14.
15.
16.
Jcd
Let
.af\ \AL-jeAF2-1\Nt..( 1L0(ei LI) 2-4
.S\f\ofM\ aL 2e4es .314 - 1LDC- 619
YNAOL:2_,N
-7.
-(1 7 if
)-
( -