HomeMy Public PortalAboutPlan Review ChecklistMET NOT REQ'D MET NOT REQ'D
PLAN REVIEW CHECKLIST
Project Number:____________ Review Engineer:__________________ Peer Review:____________________
GENERAL ITEMS
ITEM
Information File Merged
Location Map
North Arrow and Scale
MSD P# and Base Map No. (all
sheets)
Nearby P-Jobs
Addendum, Revision, Supersede
Surcharge, Recoupment,
Subdistrict Area
Maintenance Comments
MSD Benchmark
Onsite and Offsite Topography
Existing Utilities (Plan View)
Gas
Water/Tap Size
Electric
Cable
Address and Zip Code
Municipal Requirements
Field Visit
ITEM
Engineer's Seal and Date
Existing easements, Book and Page
MSD Structure Numbers
New Easements for proposed and
possble future extensions
Subdivision Plat
Special Structure/Sealed Calcs. And
Details
Construction Notes
Standard Construction
Public Sewer Maintenance
Compacted Fill
C-900 Pipe
Septic Tank Abandonment
Manager to Check for Completeness:________________
Swimming Pool Backwash
Contr. Insurance (Offsite)
MET NOT REQ'D
PLAN REVIEW CHECKLIST
Project Number:____________ Review Engineer:__________________ Peer Review:____________________
SANITARY REVIEW
ITEM
Downstream Sewer Evaluation
Planning Maps
Downstream sewer size realtive to existing/proposed flows
Customer Complaints
Hydraulic Analysis
Onsite Sewer Pipe Evaluation
Sized for Future Upstream Potential Flow
Min. Pipe Slope Requirements
Alignment (Proximity to Buildings, Acute Angles, etc.
Building Footprint
Minimum Basement Elevation on Plan and Profile
Strapped Plumbing Required in Combined Areas (or variance request)
2% Slope for Laterals
Lateral Stationing on Profile
Pipe Curve Data
Pipe Material/Class/Load Calculation (Sealed)
Manager Check for Completeness:______________________
Public/Private Designation of Sewers on Profile
Industrial Use Survey
Oil/Grease Separator
Sampling Tee
PLAN REVIEW CHECKLIST
Project Number:____________ Review Engineer:__________________ Peer Review:____________________
STORM REVIEW
MET NOT REQ'D ITEM
Downstream Sewer Evaluation
Planning Maps
Stormwater Study Reports
Customer Complaints
Drainage Area Map
No Proposed breaking of watershed
Boundaries Drawn Correctly (on and off site)
Correct onsite PI Factors
Offsite PI Factors reflect potential future development
Overland flow paths
Hydraulic Analysis
Pipe Hydraulic Calculations/Sealed (starting 2 reaches down, minimum)
Hydraulic Grade Line on Profile
Inlet Capacity/Bypass Flow Analysis
Inlet Capacity/Analysis of FES
Outlet Capacity Analysis of FES
Ponding Areas/Easement
Rock Blanket Analysis, Rock Gradation and Length
Pipe Curve Data
Pipe Material/Class/Load Calculations (Sealed)
Public/Private Designation on Profile
Utility Crossings on Profile
Manager Check for Completeness:___________________________________