Loading...
HomeMy Public PortalAbout382484TOP OF BANK. 4\ STANDARD INLET OR INLET MANHOLE. APPROVED CORRUGATED METAL OR PLASTIC PIPE TO BE REPLACED WITH CONCRETE PIPE WHEN CHANNEL IS PAVED. STANDARD INLET OR INLET MANHOLE. STORMWATER / TOP OF BANK. SEWER. \ f TRIM PIPE TO MATCH SLOPE. TOE OF SLOPE. STONE REVETMENT & FILTER FABRIC. (TYPE 1) SEE NOTE 2. CONCRETE COLLAR. TOE OF SLOPE. TYPICAL PLAN & SECTION AT SEWER LINE DISCHARGING INTO CHANNEL 12" 12" MIN. MIN. CONCRETE PIPE. 6" MIN. APPROVED CORRUGATED METAL PIPE. MIN. DETAIL OF CONCRETE COLLAR NOTES: 1) MECHANICALLY COMPACT BACKFILL IN TRENCHES OR CLOSURES OF ABANDONED CHANNELS TO DENSITY NOT LESS THAN THAT IN ADJACENT BANK. PROTECT WITH A BLANKET OF CRUSHED LIMESTONE OR PAVING WHERE NECESSARY. 2) 45 DEGREES AT UNPAVED CHANNELS AND FOR LARGE FLOWS ENTERING SMALL CHANNELS. 30 DEGREES AT PAVED CHANNELS AND FOR SMALL FLOWS ENTERING LARGE CHANNELS. 3) CHANNEL PAVING OR BANK PAVING OR BOTH MAY BE REQUIRED TO PREVENT EROSION AT CURVES IN ALIGNMENT OR AT LOCATIONS OF POSSIBLE EROSION DUE TO DISCHARGE OF LARGE FLOWS. STORMWATER CHANNELS METROPOLITAN ST. LOUIS SEWER DISTRICT Standard Details of Sewer Construction Dr. RGW/SAM Ch. J.C.K. 2009 SHEET 62