Loading...
HomeMy Public PortalAbout382576EXISTING PLASTIC SEWER. PLASTIC SADDLE TEE OR WYE FITTING. (SOLVENT WELD) ADJUSTABLE STAINLESS STEEL STRAPS AND SCREWS. WHEN A CONNECTION TO A PLASTIC PIPE IS ALLOWED AND A CONNECTION IS LARGER THAN 6" IN DIAMETER, A SOLVENT WELD WYE OR TEE FITTING OF A SIMILAR MATERIAL MUST BE USED. (EXAMPLE: 10" X 8") THIS IS ACCOMPLISHED BY CAREFULLY CUTTING A HOLE WITH A SAW IN THE MAIN AT THE REQUIRED LOCATION. AFTER CUTTING AND SHAPING THE HOLE TO THE SIZE OF THE FITTING, THE FOLLOWING STEPS SHOULD BE TAKEN: NOTES: 1) CLEAN AND DRY BOTH INSIDE SADDLE WYE SURFACE AND PIPE SURFACE TO BE SOLVENT CEMENTED. 2) IMPORTANT: APPLY A LIBERAL, HEAVY COAT OF ONE-STEP SOLVENT CEMENT TO THE INSIDE SURFACE OF THE SADDLE WYE AND TO THE EXTERIOR WELDING SURFACE TO THE PIPE. 3) WITHOUT DELAY, MATE THE SURFACES AND STRAP DOWN TIGHTLY. A BEAD OF SOLVENT SHOULD APPEAR AFTER THE SADDLE HAS BEEN STRAPPED DOWN TIGHTLY. 4) USING A RAG OR PAPER TOWEL, WIPE BEAD AND ANY EXCESS SOLVENT CEMENT OFF PIPE AND SADDLE. 5) ALLOW 30-60 MINUTES FOR SET-UP TIME BEFORE BACKFILLING. CURE TIME DEPENDS ON SIZE AND FIT OF MATERIALS BEING INSTALLED AND VARIOUS COLD DAMP CONDITIONS. 6) DISCARD OLD SOLVENT IF IT BECOMES JELLED OR LUMPY. 7) A CLEAN, DRY BEDDING MATERIAL IS REQUIRED AROUND THE COMPLETED CONNECTION BEFORE BACKFILLING. THE BEDDING MATERIAL SHOULD BE ONE OF THE FOLLOWING: A) M.S.D. NO. 1 BEDDING. B) 1 TO 3 CEMENT TO SAND MORTAR MIX. C) "PRE -MIX" CONCRETE. 8" (& LARGER) CONNECTION TO PLASTIC MAIN METROPOLITAN ST. LOUIS SEWER DISTRICT Standard Details of Sewer Construction Dr. DAB/SAM Ch. J.C.K. 2009 SHEET 66