HomeMy Public PortalAbout430750PART 4 – PIPE SEWER CONSTRUCTION Section B, Pipe Field Tests, Paragraph 2, Reach Integrity Testing – delete the first sentence and the following replacement applies: All sanitary and combined sewers shall sustain a maximum leakage limit of 100 gallons/inch of pipe diameter/mile of line/day, as required by the Missouri Department of Natural Resources Specifications. Section B, Pipe Field Tests, Paragraph 2, Reach Integrity Testing, Subparagraph c, Infiltration/Exfiltration Testing – delete the sixth sentence, concerning leakage limits, and the following replacement applies: The measurement of leakage shall not exceed 100 gallons/inch of pipe diameter/mile of line/day, as required by the Missouri Department of Natural Resources Specifications. Section B, Pipe Field Tests, Paragraph 4, Manhole Testing, Subparagraph a, Vacuum Testing – after the first sentence, the following addition applies: The vacuum test must be performed prior to backfilling around the manhole unless the contractor provides documentation from the precast manhole manufacturer stating that the manhole may be vacuum tested after backfilling has taken place. The contractor must submit this documentation prior to backfilling around any manhole. Section B, Pipe Field Tests, Paragraph 4, Manhole Testing, Subparagraph b, Exfiltration Testing – delete the second sentence, concerning leakage limits, and the following addition applies: For exfiltration testing, the allowable leakage limit is 100 gallons/inch of pipe diameter/mile of line/day when the average head on the test section is three feet (3’) or less.