HomeMy Public PortalAbout702658111 E -1 11 Metropolitan St. Louis Sewer District 2013-2014 Budget Supplement 2 Type of Project Number Cost • Wastewater Construction 49 $ 143,084,000 • Wastewater Engineering 83 48,020,000 • Stormwater Construction 8 2,746,000 • Stormwater Engineering 13 2,550,000 Proposed Projects Subtotal: 153 $196,400,000 • Continued Wastewater 11 $ 25,988,000 • Continued Stormwater 1 150,000 Continued Projects Subtotal: 12 $26,138,000 Project Totals: 165 $222,538,000 FY 2014 CIRP Program Summary 3 Stormwater $5.3 M 21 Projects Wastewater $191.1 M 132 Projects TOTAL NUMBER OF NEW PROJECTS = 153 TOTAL COST= $196.4 M FY 2014 CIRP New Wastewater & Stormwater Projects 97% 3% 4 TOTAL NUMBER OF PROJECTS = 132 TOTAL COST= $191.1 M Treatment Plant 4 Projects $6.1 M County 78 Projects $103.6 M City 9 Projects $20.8 M City & County 41 Projects $60.6 M 54% 11% 32% FY 2014 CIRP New Sanitary Revenue Allocations 3% 5 FY 2014 CIRP Continued Projects Wastewater • Projects in Design/ Scope Changes 4 • Coordination With Others 5 • Easement Acquisition/ Condemnation 2 Stormwater • Projects in Design/ Scope Changes 0 • Coordination With Others 0 • Easement Acquisition/ Condemnation 1 Total 12 6 7% 3% TOTAL NUMBER OF PROJECTS = 165 TOTAL COST= $222.5 M OMCI & Special Construction Funds 23 Projects @ $5.7 M Sanitary Replacement Fund 121 Projects @ $200.5 M 90% FY 2014 CIRP Funding Sources General Fund 21 Projects @ $16.3 M 7 Engineering $50.6 M 96 Projects Construction $145.8 M 57 Projects TOTAL NUMBER OF PROJECTS = 153 TOTAL COST= $196.4 M FY 2014 CIRP Engineering & Construction - New Projects 26% 74% 8 Type of Project Number Cost • Wastewater Construction 11 53,150,000 • Stormwater Construction 7 534,000 • Phased Funding 10 34,215,000 Project Totals: 28 $87,899,000 FY 2014 CIRP Contingency Projects 9 1 0 1 1 Ayres Sanitary Relief and I/I Reduction 1 2 CC-17 Four Seasons Branch Sanitary Relief Phase II 1 3 Mackenzie Place Pump Station Secondary Power Supply 1 4 OMCI MAP 23 TAXING SUBDISTRICTS 1 5 STORM MAP 1 6 Conway Rd 11700 Storm Sewer 1 7 Firethorn Drive #1901 Storm Improvements 1 8 Sunswept Drive #8 Bank Stabilization 1 9 Type of Project Number Cost • Asset Management 11 $23,300,000 • Cityshed 3 $9,600,000 • CSO 13 $44,500,000 • SSO 76 $100,109,000 • Treatment Plant 4 $6,150,000 • Districtwide 25 $7,445,000 • Stormwater 21 $5,296,000 TOTALS: 153 $196,400,000 FY 2014 New CIRP Allocations 2 0 FY 2014 New CIRP Allocations Stormwater 21 projects $5.3M CSO 13 projects $44.5M Treatment Plant 4 projects $6.1M Asset Mgt. 11 projects $23.3M SSO 76 projects $100.1M 12% 51% 23% TOTAL NUMBER OF PROJECTS = 153 TOTAL COST = $196.4 M Cityshed 3 projects $9.6M Districtwide 25 projects $7.4M 3-5% each 2 1 • Reduce frequency of CSO’s and SSO’s • Building Backups Addressed • Characterization and Assessment - CCTV 150,000 feet • Sewer Upgrades & Renewal- 350,000 to 450,000 ft • Repair/Replacement Projects- 200 small projects ($20,000 average project cost) • Pump station SCADA improvements • Begin critical infrastructure assessment Anticipated Results- Asset Management Projects 2 2 • Reduce Stormwater Load on Combined System • Eliminate overland structure flooding by completing buyouts and site clearing in areas prone to flooding (51 homes) • Building Backups Addressed • Begin construction of Maplewood Blendon • Begin design of improvements (strapped plumbing and private pump station) to reduce backups in Gaslight Square Anticipated Results- Cityshed Projects 2 3 Anticipated Results-CSO Projects • CSO flow reduction – Green Infrastructure • Infrastructure Rehabilitation • Building Backups & System Surcharging Addressed • Continue Design of Lower & Middle RDP CSO Controls System Improvements • Continue Design of Maline CSO Controls 2 4 Anticipated Results-SSO Projects • Constructed SSO’s Removed – 10 (7 at end of construction, 3 after monitoring verification) • Begin design work on 23 constructed SSO removals for future construction • Building Backups & System Surcharging Addressed • Characterization and Assessment - CCTV 850,000 feet • Watershed Design in Deer, Lemay, Bissell, Coldwater, Missouri, & Meramec watersheds 2 5 • Begin design on Bissell and Lemay Incinerator Scrubber Replacement – regulatory changes require incinerator improvements to meet new standards •Miscellaneous WWTP improvements and repairs at Coldwater and Lower Meramec plants Anticipated Results - WWTP Projects 2 6 • General Service Agreements for survey, geotechnical, construction management, sewer design, planning & property appraisal to support efforts throughout the District • Data acquisition: stream flow gauging, water quality sampling, radar rainfall data • Private I/I public engagement program • Begin implementation of Supplemental Environmental Projects (SEP) Program required by Consent Decree Anticipated Results- Districtwide Projects 2 7 • Reduce flooding of - Homes or structures - 6 properties - Yards - 23 properties - Streets - 3 locations • Address erosion problems - 6 properties • Anticipate 90 work order repair projects averaging $9,000 per project Anticipated Results - STORMWATER Projects 2 8 Program Variations from Rate Commission Schedule 2 9 The Metropolitan St. Louis Sewer District