Loading...
HomeMy Public PortalAboutFY2020 Consultant Services PresentationFY 2020 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2020 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January 22, 2019 Today’s Agenda Introductions Proposed Program – Procurements Completed Proposed Program – Procurements Needed Consultant Selection Process RFQ/RFP Schedule & Project Details Executive Director’s Update Questions and Closing Proposed FY 2020 Program Engineering Projects – Procurements Completed Project Consultant Budget WATERSHED CONSULTANT - LOWER & MIDDLE RDP CSO CONTROLS (11109) Jacobs Engineering Group, Inc. $ 1.99 M WATERSHED CONSULTANT - DEER CREEK SANITARY PROGRAM (11110) Parsons Water & Infrastructure, Inc. $ 2.50 M WATERSHED CONSULTANT – BISSELL COLDWATER MISSOURI MERAMEC PROGRAM (11144) AMEC Foster Wheeler Environment & Infrastructure Inc. $ 4.70 M WATERSHED CONSULTANT – LEMAY SANITARY PROGRAM (11145) Burns & McDonnell Engineering Co., Inc. $ 3.71 M WATERSHED CONSULTANT - RDP TRIBUTARIES (DEER CREEK) CONTROLS SYSTEM IMPROVEMENTS (11153) HDR Engineering, Inc. $ 5.83 M WATERSHED CONSULTANT – CONSTRUCTION MANAGEMENT – TANKS/TREATMENTS/PUMP STATION FACILITIES (11151) Kennedy Associates/ Architects, Inc. $10.40 M WATERSHED CONSULTANT – CONSTRUCTION MANAGEMENT – RDP TUNNELS (11152) Shannon & Wilson Inc. $ 1.80 M WATERSHED CONSULTANT – CONSTRUCTION MANAGEMENT – LOWER MERAMEC AND DEER CREEK TUNNELS (11826) Black & Veatch Corporation $ 4.40 M WATERSHED CONSULTANTS 8 $ 35.33 M Proposed FY 2020 Program Engineering Projects – Procurements Completed Project Consultant Budget BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS Black & Veatch Corporation $ 6.00 M CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52) CDM Smith, Inc. $ 0.80 M GRAND GLAIZE WWTF FLOODWALL PROTECTION Reitz & Jens Inc. $ 0.20 M LINDEN #1064 STORM SEWER Heideman & Associates, Inc. $ 0.03 M LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL IMPROVEMENTS Crawford Murphy & Tilly Inc. $ 0.17 M LOWER MERAMEC WWTF EXPANSION PHASE II HDR Engineering, Inc. $ 4.00 M Totals 6 $ 11.20 M Proposed FY 2020 Program Engineering Projects – Procurements Completed Project Consultant Budget MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION Black & Veatch Corporation $ 1.20 M PUMP STATION REPAIR AND IMPROVEMENT DESIGN (CONTRACT A) Horner & Shifrin, Inc. $ 0.05 M STORMWATER STREAMBANK STABILIZATION DESIGN (CONTRACT A) Access Engineering, LLC $ 0.50 M Totals 3 $ 1.75 M Proposed FY 2020 Program General Services – Procurements Completed Project Consultant Budget GENERAL SERVICES AGREEMENT – SEWER AND CHANNEL DESIGN (2019) EFK Moen, LLC $ 0.20 M GENERAL SERVICES AGREEMENT – LANDSCAPE DESIGN (2019) DTLS Inc. $ 0.25 M GENERAL SERVICES AGREEMENT – CONSTRUCTION MANAGEMENT (2019) Kennedy Associates/Architects, Inc. $ 1.90 M Totals 3 $ 2.35 M Proposed FY 2020 Program Other Projects – Procurements Completed Project Vendors Budget FLOW METERING AND MONITORING (2017) ADS Environmental Services $ 2.50 M STREAM FLOW GAUGE OPERATION U.S. Geological Survey $ 0.62 M Totals 2 $ 3.12 M Proposed FY 2020 Program Other Projects – Procurements Needed Project Vendors Budget CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020) TBD $ 2.50 M CRITICAL INFRASTRUCTURE ASSESSMENT (2020) TBD $ 1.70 M RADAR RAINFALL DATA (2020) TBD $ 0.15 M STREAM FLOW WATER QUALITY SAMPLING (2020) TBD $ 0.30 M Totals 4 $ 4.65 M Proposed FY 2020 Program Engineering Projects – Procurements Needed Project Name Budget BISSELL POINT WWTF TRICKLING FILTER MEDIA REPLACEMENT 800,000 LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-113) UPGRADES 500,000 LOWER MERAMEC WWTF EXPANSION PHASE II (Construction Management) 400,000 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020) CONTRACT A 550,000 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020) CONTRACT B 200,000 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT A 85,000 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT B 85,000 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT C 85,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT A 50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT B 50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT C 50,000 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT D 50,000 Proposed FY 2020 Program Engineering Projects – Procurements Needed, Cont. Project Name Budget GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT E 50,000 GENERAL SERVICES AGREEMENT - WATER QUALITY SUPPORT SERVICES (2020) 100,000 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT) 250,000 The following projects are dependent on Stormwater Capital Rate approval: HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230) 2,507,000 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT D) 214,000 STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (CONTRACT E) 265,000 STORMWATER STREAMBANK STABILIZATION DESIGN (CONTRACT D) 989,000 GENERAL SERVICES AGREEMENT - STORMWATER PLANNING (2020) 300,000 20 $ 7,580,000 Consultant Selection Process Pre-Qualification RFQ/RFP Process RFP Only Process RFQ Shortlist Selection Criteria RFP Selection Criteria Selection Process Documents – www.stlmsd.com/msd-work/consultant-selection (under Links on bottom right) Consultant Selection Process Pre-Qualification Pre-Qual Packets were due on January 7, 2019. We are requiring pre-quals be submitted as a PDF to msdengpq@stlmsd.com. Questions – Sharon Holt at 314.768.6285 The 2019 Questionnaire’s process and Attachment A for the Conflict of Interest Policy have been revised. Previous year’s performance evaluation will be included with the pre-qualification notification letter. Consultant Selection Process RFQ/RFP Process Projects $500,000 or greater, or special circumstances – RFQ/RFP All consultants notified of RFQ and eligible Shortlisting to 3 or more firms by RFQ Shortlist Committee after Qualifications evaluation Selection by separate RFP Selection Committee after Proposal evaluation Interviews may be required Consultant Selection Process RFP Only Process Projects less than $500,000 – RFP Project Pairings Statement of Interest & Pre-Qualifications to aid in shortlisting Shortlisting to 3 or more firms by RFQ Shortlist Committee Selection by separate RFP Selection Committee after Proposal evaluation Consultant Selection Process RFQ Shortlist Selection Criteria Project Team and Key Members Personnel Availability/Workload Past Performance/Project Experience Backlog Diversity Multiplier Consultant Selection Process RFP Selection Criteria Understanding of Project and Technical Approach Project Manager and Project Team Personnel Availability Project Design Schedule Related Project Experience/Past Performance Backlog Diversity Multiplier Consultant Selection Process Workforce Diversity Per current policy there are no subcontracting MWBE goals Primes are required to subcontract a minimum of 25% of the project Workforce Diversity goals on contracts over $500,000 (for the Prime firm only) Goal 18% Minority and 32% Women Qualifications and Proposals receive additional credit through the use of Diversity Multipliers for MWBE Primes and meeting Workforce Diversity goals Consultant Selection Process Backlog Calculation Backlog calculation for every firm will be computed based on a combination of: Watershed Consultant Contracts – Open balance on contracts counted towards prime and subs based on their participation in the watershed consultant contract. Other Consultant Contracts – open balance on contracts counted towards prime only. Consultant Selection Process Backlog Scoring Backlog for proposals on projects $500,000 and over will be computed by summing backlog for all the firms of the team proposing Backlog for proposals on projects less than $500,000 will be computed by summing backlog for the prime only (not the team) Proposed FY 2020 Program RFQ/RFP Schedule RFQ1/RFP1 – 5 projects totaling $2.45 M RFQ Issued: February 28 RFQ Due: March 26 RFP Issued: May 9 RFP Due: June 4 Selection: July 5 Proposed FY 2020 Program RFQ/RFP Grouping RFQ1/RFP1 – Project Details Bissell Point WWTF Trickling Filter Media Replacement, budgeted at $800,000. Louisa and Arsenal Pump Station Upgrades, budgeted at $500,000. Lower Meramec WWTF Expansion Phase II (Construction Management), budgeted at $400,000. Proposed FY 2020 Program RFQ/RFP Grouping RFQ1/RFP1 – Project Details General Services Agreement – Facility and Sewer Design Contract A, budgeted at $550,000. General Services Agreement – Facility and Sewer Design Contract B, budgeted at $200,000. Proposed FY 2020 Program RFQ/RFP Schedule RFP2 – 9 projects totaling $605,000 Interest Statement Issued: February 28 Interest Statement Due: March 26 RFP Issued: May 28 RFP Due: June 20 Selection: July 26 Proposed FY 2020 Program RFQ/RFP Grouping RFP2 – Project Details General Services Agreement – Geotechnical, budgeted at $255,000. 3 firms to be selected. General Services Agreement – Survey, budgeted at $250,000. 5 firms to be selected. General Services Agreement – Water Quality Support, budgeted at $100,000. Proposed FY 2020 Program RFQ/RFP Schedule RFQ3/RFP3 – 6 projects totaling $4,525,000 RFQ Issued: June 4 RFQ Due: June 26 RFP Issued: August 13 RFP Due: September 5 Selection: October 4 Proposed FY 2020 Program RFQ/RFP Grouping RFQ3/RFP3 – Project Details Maintenance Yard Vehicle Storage Building (Mintert); budgeted at $250,000 for the first year. Owner’s Representative services for this anticipated design-build project to construct a vehicle storage building at the Mintert maintenance yard. Proposed FY 2020 Program RFQ/RFP Grouping – please note: the following projects are dependent on passage of the Stormwater Capital Rate in April RFQ3/RFP3 – Project Details General Services Agreement – Stormwater Planning; budgeted at $300,000 for the first year. Stormwater planning assistance to support District planning efforts. Hallstead Storm Channel Phase IV; budgeted at $2,507,000. Bank stabilization and channel improvements. Proposed FY 2020 Program RFQ/RFP Grouping – please note: the following projects are dependent on passage of the Stormwater Capital Rate in April RFQ3/RFP3 – Project Details Stormwater Streambank Stabilization Design (Contract D); budgeted at $989,000 for the first year. Design channel improvement projects over two years. Stormwater Infrastructure Improvements Design (Contract D); budgeted at $214,000 for the first year. Design storm sewer improvement projects over two years. Proposed FY 2020 Program RFQ/RFP Grouping – please note: the following projects are dependent on passage of the Stormwater Capital Rate in April RFQ3/RFP3 – Project Details Stormwater Infrastructure Improvements Design (Contract E); budgeted at $265,000 for the first year. Design storm sewer improvement projects over two years. Executive Director’s Update Stormwater Rate Proposal Wastewater Rate Proposal Diversity and New Disparity Study Questions and Closing Questions and Answers www.stlmsd.com Thanks to MSPE, ACEC, and the Engineers’ Club of St. Louis Enjoy the Networking