Loading...
HomeMy Public PortalAboutHDSU - Vortsentry HS Maintenance GuideVortSentry® HS Maintenance Guide ENGINEERED SOLUTIONS VortSentry® HS Maintenance The VortSentry HS system should be inspected at regular intervals and maintained when necessary to ensure optimum performance. The rate at which the system collects pollutants will depend more heavily on site activities than the size of the unit, i.e., unstable soils or heavy winter sanding will cause the treatment chamber to fill more quickly, but regular sweeping will slow accumulation. Inspection Inspection is the key to effective maintenance and is easily performed. Pollutant deposition and transport may vary from year to year and regular inspections will help ensure that the system is cleaned out at the appropriate time. At a minimum, inspections should be performed twice per year (i.e. spring and fall) however more frequent inspections may be necessary in equipment washdown areas and in climates where winter sanding operations may lead to rapid accumulations of a large volume of sediment. It is useful and often required as part of a permit to keep a record of each inspection. A simple inspection and maintenance log form for doing so is available for download at www.contechstormwater.com. The VortSentry HS should be cleaned when the sediment has accumulated to a depth of two feet in the treatment chamber. This determination can be made by taking two measurements with a stadia rod or similar measuring device; one measurement from the manhole opening to the top of the sediment pile and the other from the manhole opening to the water surface. If the difference between these measurements is less than the distance given in Table 1, the VortSentry HS should be maintained to ensure effective treatment. Cleaning Cleaning of the VortSentry HS should be done during dry weather conditions when no flow is entering the system. Cleanout of the VortSentry HS with a vacuum truck is generally the most effective and convenient method of excavating pollutants from the system. Simply remove the manhole cover and insert the vacuum hose into the sump. All pollutants can be removed from this one access point from the surface with no requirements for Confined Space Entry. In installations where the risk of petroleum spills is small, liquid contaminants may not accumulate as quickly as sediment. However, an oil or gasoline spill should be cleaned out immediately. Motor oil and other hydrocarbons that accumulate on a more routine basis should be removed when an appreciable layer has been captured. To remove these pollutants, it may be preferable to use adsorbent pads, which solidify the oils. These are usually much easier to remove from the unit individually, and less expensive to dispose than the oil/water emulsion that may be created by vacuuming the oily layer. Floating trash can be netted out if you wish to separate it from the other pollutants. Manhole covers should be securely seated following cleaning activities to prevent leakage of runoff into the system from above and also to ensure proper safety precautions. If anyone physically enters the unit, Confined Space Entry procedures need to be followed. Disposal of all material removed from the VortSentry HS should be done is accordance with local regulations. In many locations, disposal of evacuated sediments may be handled in the same manner as disposal of sediments removed from catch basins or deep sump manholes. Check your local regulations for specific requirements on disposal. VortSentry HS Model Diameter Distance Between Water Surface and Top of Storage Sump Sediment Storage Oil Spill Storage in m ft m yd3 m3 gal liter HS36 36 0.9 3.6 1.1 0.5 0.4 83 314 HS48 48 1.2 4.7 1.4 0.9 0.7 158 598 HS60 60 1.5 6 1.8 1.5 1.1 258 978 HS72 72 1.8 7.1 2.2 2.1 1.6 372 1409 HS84 84 2.1 8.4 2.6 2.9 2.2 649 2458 HS96 96 2.4 9.5 2.9 3.7 2.8 845 3199 Table 1: VortSentry HS Maintenance Indicators and Sediment Storage Capacities. 1. The water depth to sediment is determined by taking two measurements with a stadia rod: one measurement from the manhole opening to the top of the sediment pile and the other from the manhole opening to the water surface. If the difference between these measurements is less than the distance given in Table 1, the system should be cleaned out. Note: To avoid underestimating the volume of sediment in the chamber, the measuring device must be carefully lowered to the top of the sediment pile. 2. For optimum performance, the system should be cleaned out when the floating hydrocarbon layer accumulates to an appreciable thickness. In the event of an oil spill, the system should be cleaned immediately. VortSentry HS Inspection & Maintenance Log VortSentry HS Model: Location: Date Water depth to shipment1 Floatable layer thickness2 Describe maintenance performed Maintenance Personnel Comments