HomeMy Public PortalAbout09-25-2012 BFO report Town of Watertown Town Council Committee of the Budget and Fiscal Oversight Meeting: September 19, 2012 Report: September 25, 2012 The Committee convened on September 19, 2012 at 8 pm. Present at the meeting were: Vincent Piccirilli, Chair; Angie Kounelis,Vice-Chair; Cecilia Lenk, Secretary; Town Manager Michael Driscoll; Director of Community Development and Planning Steven Magoon; Purchasing Agent Raeleen Parsons; School Committee Member David Leon; Watertown Public Schools Director of Business Services Jack Loughran; and Beth Greenblatt of Beacon Integrated Services,the Town's ESCO consultant. Also attending were the following members of the Environment and Energy Efficiency Committee: Ken Mirvis, Matthew Reigert, Stephane Acel-Green, and Charles Bering. Treasurer/Collector Phyllis Marshall joined the meeting at 9:15 pm. The purpose of the meeting was to discuss the results of the due diligence on the ESCO proposal submitted by Johnson Controls, following their energy audit of Town and School buildings. This action was recommended by the Committee during its February 22, 2012 meeting, and the Committee's recommendation #6 in its March 13, 2012 report,where it was determined that the Town needed additional review of the proposal before presentation to the full Council. Ms. Greenblatt conducted the due diligence, in collaboration with Ms. Marshall, Ms. Parsons, Mr. Piccirilli, Mr. Loughran, and department heads from the Town and School. Mr. Driscoll opened the meeting by noting that the Town's FY13 budget policy guidelines look to working with the Town's selected Energy Services Company (ESCO) to develop and implement a plan towards reducing municipal baseline energy usage by 20% in five years. Ms. Greenblatt went through the attached presentation of the due diligence process on the proposal from Johnson Controls. The original proposal was winnowed down, based on the cost effectiveness of the individual projects,to a "budget neutral" $6.8M scenario. With further input from the department heads, some additional items that were previously identified in the facility maintenance study were added back in to develop an "optimized" $7.35M scenario which still shows a positive cash flow over the 20 year life of the program. Attached are two spreadsheets that outline the energy efficiency projects that would be undertaken in each of 14 Town and School buildings under two proposed scenarios. Mr. Driscoll stated that he believes the "optimized" scenario represents the best long-term value for the Town, and he confirmed that the department heads are satisfied with the scope of work proposed in this scenario. Mr. Loughran stated that the School Department was satisfied with the scope of work proposed,but expressed concern over the scheduling of the work in the school buildings. Ms. Greenblatt explained that much of the work will be performed in non-student areas, but work in classrooms will be done over the summer or on second shift, and the schedule Pagel of 2 will be embedded in the final contract. It was noted that about 80% of the work (and about 80% of the energy savings) are in the school buildings. The financing was discussed,where the entire capital project would be paid for through the energy savings,based on a budgeted 3% energy cost annual increase over the life of the contract, at an interest rate of 3.5% or less. The Measurement&Verification provision of the contract will serve to confirm savings on an annual basis, and if all the savings do not materialize, Johnson Controls will be required to write a check to the Town to make up the difference. All were satisfied with this approach, although Councilor Kounelis asked that energy usage updates be provided quarterly. Councilor Lenk asked how rebate money would be applied to the debt service, and Mr. Driscoll suggested that a stabilization fund be set up to capture the rebates as well as the annual savings from each department's gas and electric line items that will be reserved for paying down the debt. This will accommodate fluctuations in the annual savings that will be recognized over the 20 year life of the program. The timeline was discussed, and if the Council votes to proceed,the contract would be executed by January,with a loan order brought forward in February, and a bond issue in March. This would allow Johnson Controls to submit the final design drawings for approval to order equipment in May, to allow construction in the school classrooms to occur over the summer 2013. After further discussion of the proposed options and financial and budget impacts of each, the Committee unanimously voted the following: 1. Recommend to that the Town Council moves forward on the optimized $7.35M ESCO project. 2. Recommend that the Town Council direct the Town Manager to negotiate a contract with Johnson Controls for the ESCO project; including the addition of quarterly reports of energy usage in all buildings under agreement. 3. Recommend that the Town Council review the establishment of an energy stabilization fund in which to place rebates, grants, and funds from departmental energy savings. The energy stabilization fund will be used to pay the debt service on the energy efficiency projects incurred under the ESCO agreement. The Manager noted that additional funds will be needed for Beacon Integrated Services to act as the Town's agent if the Council approves moving forward with the program. The meeting adjourned 9:50 PM Submitted by Cecilia Lenk Page 2 of 2 Town of Watertown Energy Saving Performance Contracting Program Review and Update BEACON -GRMI'E-L) IT IONS September 19, 2012 �d Performance Contracting Overview General Approach Design-build energy efficiency project that leverages existing operating and energy budgets to implement turnkey energy efficiency and renewable energy solutions: � Upgrade building infrastructure and increase building efficiency ❑ Reduce operating and maintenance costs Enhance operating staff productivity Implement renewable energy strategies Improve indoor air quality Enhance core curriculum by integrating innovative technologies with educational objectives I3 F A Go,N Town of Watertown Slide 2 t'j'•i� Performance Contracting Overview Illustrative Example - 2596 Operating Cost Savings 100 - Savings used to Paj- debt obligation 75 - m 2- 50 - 0 a 25 - ---------- ----- o 1 1 Before Program During Program After Program ■Annual Operating Budget ❑Annual Carrying Cost of Program 13 E AC�a N Town of Watertown Slide 3 .I.I G 1111)M1.11'1[Otiff Program Winnowing Process to Achieve Best Value JCI identified total technical JCI Conducted Detailed Energy Audit potential for energy infrastructure upgrades in specified buildings Town and School stakeholders Stakeholder Reviews and Winnowing reviewed and eliminated projects based on priorities and economics Town and School stakeholders and JCI Stakeholder Final Optimization optimized project comprehensiveness to meet Town financial requirements �h I3 E A�a N Town of Watertown Slide 4 .I.I G�I.11)ti[ll.l]'1[Otiff Program Winn o wing Process Results Total Technical Potential - Original Proposal 16 Town and School Buildings ❑ 145 Energy Infrastructure Upgrade Projects ❑ $10.6 Million in Energy Infrastructure Investments ❑ Cashflow: -$1 .22 million during first 11 years; -$61,000 over 20 years. Winnowing - Scope Refinement #1 15 Town and School Buildings (removed Old Police Station) ❑ 118 Energy Infrastructure Upgrade Projects ❑ $8 Million in Energy Infrastructure Investments ❑ Cashflow: -$278,000 during first 6 years; $1 .9 million over 20 years. I3FAGaN Slide t'j'•i� Program Budget Neutral Project — Project #1 Final Project with No Budget Impact 14 Town and School Buildings 91 Energy Infrastructure Upgrade Projects $6.8 Million in Energy Infrastructure Investments Cashflow: -$51,626 over the first three years; $2.45 million over 20 years. Utility rebates of approximately $250,000 used to offset cashflow impact in early years. I3FAGaN Slide t'j'•i� JC1 Pro osed ProgramP Budget Neutral Project Simple Annual Payback in Facility Project Cost Savings Rebates Years Watertown High School $1,959,803 $131,333 $48,992 14.5 Watertown Middle School $689,791 $58,925 $52,090 10.8 Hosmer Elementary School $870,227 $74,727 $33,976 11.2 Lowell Elementary School $1,024,666 $55,721 $38,171 17.7 Cunniff Elementary School $807,959 $27,324 $18,002 28.9 Phillips Elementary School $440,149 $26,602 $2,397 16.5 Watertown Town Hall $415,289 $10,822 $14,350 37.0 Watertown Library $107,030 $16,372 $11,324 5.8 Main Fire Station $70,328 $5,126 $3,166 13.1 North Fire Station $20,842 $1,974 $25 10.5 East Fire Station $10,191 $982 $22 10.4 Department of Public Works $211,303 $27,949 $7,257 7.3 Ice Rink $133,318 $23,504 $17,783 4.9 Senior Center $17,208 $1,095 $1,940 13.9 Investment Grade Audit Cost $37,565 - - - Total I $6,815,670I $462,4561 $249,4951 14.2I I3 F A G o,N Town of Watertown Slide 7 1"'1i'•i� JC1 Pro osed ProgramP Cashflo w Analysis at 3. 1991o' Net Interest Costs TOTAL ANNUAL COST ANNUAL SAVINGS ANNUAL YEAR Debt Service* M&V Total Total CASHFLOW 1 $474,819 $19,800 $494,619 $462,456 $32,163 2 $473,319 $20,394 $493,713 $476,330 $17,383 3 $471,694 $21,006 $492,700 $490,620 $2,080 4 $469,944 $21,636 $491,580 $505,338 $13,758 5 $473,069 $22,285 $495,354 $520,498 $25,144 6 $470,944 $22,954 $493,897 $536,1 13 $42,216 7 $473,694 $23,642 $497,336 $552,197 $54,861 8 $471,194 $24,352 $495,545 $568,763 $73,217 9 $472,806 $25,082 $497,888 $585,825 $87,937 10 $473,750 $25,835 $499,585 $603,400 $103,816 11 $472,375 $26,610 $498,985 $621,502 $122,518 12 $470,650 $27,408 $498,058 $640,147 $142,089 13 $473,575 $28,230 $501,805 $659,352 $157,547 14 $470,975 $29,077 $500,052 $679,132 $179,080 15 $473,025 $29,949 $502,974 $699,506 $196,532 16 $474,550 $30,848 $505,398 $720,491 $215,094 17 $470,550 $31,773 $502,323 $742,106 $239,783 18 $471,200 $32,726 $503,926 $764,369 $260,443 19 $471,325 $33,708 $505,033 $787,300 $282,267 20 $470,925 $34,719 $505,644 $810,919 $305,275 $9,444,381 $532,033 $9,976,415 $12,426,366 $2,449,951 Debt service is based on assumption of level payments with a net interest cost of 3.19%. Total principal borrowed of $6,815,000 includes the cost of the Investment Grade Energy Audit. Debt service is before rebates of $249,495 which will be used to offset early year cashflow impacts. I3 F A Go,N Town of Watertown Slide 8 t'j'•i� JC1 Pro osed ProgramP CashflowAnalysls at 3.5916 Net Interest Costs TOTAL ANNUAL COST ANNUAL SAVINGS ANNUAL YEAR Debt Service* M&V Total Total CASHFLOW 1 $478,525 $19,800 $498,325 $462,456 $35,869 2 $480,125 $20,394 $500,519 $476,330 $24,189 3 $481,375 $21,006 $502,381 $490,620 $1 1 ,761 4 $477,275 $21,636 $498,91 1 $505,338 $6,427 5 $478,000 $22,285 $500,285 $520,498 $20,213 6 $478,375 $22,954 $501,329 $536,1 13 $34,785 7 $478,400 $23,642 $502,042 $552,197 $50,154 8 $478,075 $24,352 $502,427 $568,763 $66,336 9 $477,400 $25,082 $502,482 $585,825 $83,343 10 $481,375 $25,835 $507,210 $603,400 $96,191 11 $479,825 $26,610 $506,435 $621,502 $1 15,068 12 $477,925 $27,408 $505,333 $640,147 $134,814 13 $480,675 $28,230 $508,905 $659,352 $150,447 14 $477,900 $29,077 $506,977 $679,132 $172,155 15 $479,775 $29,949 $509,724 $699,506 $189,782 16 $481,125 $30,848 $51 1,973 $720,491 $208,519 17 $481,950 $31,773 $513,723 $742,106 $228,383 18 $482,250 $32,726 $514,976 $764,369 $249,393 19 $482,025 $33,708 $515,733 $787,300 $271,567 20 $481,275 $34,719 $515,994 $810,919 $294,925 $9,593,650 $532,033 $10,125,683 $12,426,366 $2,300,682 Debt service is based on assumption of level payments with a net interest cost of 3.5%. Total principal borrowed of $6,815,000 includes the cost of the Investment Grade Energy Audit. Debt service is before rebates of $249,495 which will be used to offset early year cashflow impacts. I3 F A Go,N Town of Watertown Slide 9 t'j'•i� Program Optimized Project - Project #2 Winnowing - Scope Refinement #2 14 Town and School Buildings 97 Energy Infrastructure Upgrade Projects $7.35 Million in Energy Infrastructure Investments Cashflow: -$144,281 over the first four years; $1 .97 million over 20 years. Utility rebates of approximately $274,000 used to offset cashflow impact in early years. I3FAGaN Slidel0 t'j'•i� JC1 Pro osed ProgramP Optimized Project Simple Payback Facility Project Cost Annual Savings Rebates in Years Watertown High School $1,959,803 $131,333 $48,992 14.5 Watertown Middle School $689,791 $58,925 $52,090 10.8 Hosmer Elementary School $870,227 $74,727 $33,976 11.2 Lowell Elementary School $1,024,666 $55,721 $38,171 17.7 Cunniff Elementary School $807,959 $27,324 $18,002 28.9 Phillips Elementary School $440,149 $26,602 $2,397 16.5 Watertown Town Hall $415,289 $10,822 $14,350 37.0 Watertown Library $107,030 $16,372 $11,324 5.8 Main Fire Station $260,089 $6,952 $10,166 35.9 North Fire Station $20,842 $1,974 $25 10.5 East Fire Station $121,367 $1,662 $3,522 70.9 Department of Public Works $211,303 $27,949 $7,257 7.3 Ice Rink $307,539 $31,225 $31,833 8.8 Senior Center $91,624 $1,627 $1,961 55.1 Investment Grade Audit Cost $37,565 - - - Total 1 $7,365,2451 $473,2151 $274,066 15.0 I3 F A G o,N Town of Watertown Slide 11 1"'1i'•i� JC1 Pro osed ProgramP Cashflo w Analysis at 3. 1991o' Net Interest Cost TOTAL ANNUAL COST ANNUAL SAVINGS ANNUAL YEAR Debt Service* M&V Total Total CASHFLOW 1 $512,175 $19,800 $531,975 $473,215 $58,760 2 $510,175 $20,394 $530,569 $487,41 1 $43,158 3 $508,050 $21 ,006 $529,056 $502,034 $27,022 4 $510,800 $21 ,636 $532,436 $517,095 $15,341 5 $508,300 $22,285 $530,585 $532,608 $2,023 6 $510,675 $22,954 $533,629 $548,586 $14,957 7 $512,800 $23,642 $536,442 $565,043 $28,601 8 $509,675 $24,352 $534,027 $581,995 $47,968 9 $510,600 $25,082 $535,682 $599,455 $63,773 10 $510,825 $25,835 $536,660 $617,438 $80,779 11 $508,575 $26,610 $535,185 $635,961 $100,777 12 $510,975 $27,408 $538,383 $655,040 $1 16,657 13 $512,850 $28,230 $541,080 $674,691 $133,61 1 14 $509,200 $29,077 $538,277 $694,932 $156,655 15 $510,200 $29,949 $540,149 $715,780 $175,631 16 $510,675 $30,848 $541,523 $737,254 $195,731 17 $510,625 $31,773 $542,398 $759,371 $216,973 18 $510,050 $32,726 $542,776 $782,152 $239,376 19 $508,950 $33,708 $542,658 $805,617 $262,959 20 $512,325 $34,719 $547,044 $829,785 $282,741 $10,208,500 $532,033 $10,740,533 $12,715,464 $1,974,931 * Debt service is based on assumption of level payments with a net interest cost of 3.1 9%. Total principal borrowed of $7,365,000 includes the cost of the Investment Grade Energy Audit. Debt service is before rebates of $274,066 which will be used to offset early year cashflow impacts. I3 F A Go,N Town of Watertown Slide 12 t'j'•i� JC1 Pro osed ProgramP CashflowAnalysls at 3.5916 Net Interest Cost TOTAL ANNUAL COST ANNUAL SAVINGS ANNUAL YEAR Debt Service* M&V Total Total CASHFLOW 1 $517,775 $19,800 $537,575 $473,215 $64,360 2 $518,675 $20,394 $539,069 $487,41 1 $51 ,658 3 $519,225 $21,006 $540,231 $502,034 $38,197 4 $519,425 $21,636 $541,061 $517,095 $23,966 5 $519,275 $22,285 $541,560 $532,608 $8,952 6 $518,775 $22,954 $541,729 $548,586 $6,857 7 $517,925 $23,642 $541,567 $565,043 $23,476 8 $516,725 $24,352 $541,077 $581,995 $40,918 9 $520,175 $25,082 $545,257 $599,455 $54,198 10 $518,100 $25,835 $543,935 $617,438 $73,504 11 $515,675 $26,610 $542,285 $635,961 $93,677 12 $517,900 $27,408 $545,308 $655,040 $109,732 13 $519,600 $28,230 $547,830 $674,691 $126,861 14 $515,775 $29,077 $544,852 $694,932 $150,080 15 $516,600 $29,949 $546,549 $715,780 $169,231 16 $516,900 $30,848 $547,748 $737,254 $189,506 17 $516,675 $31,773 $548,448 $759,371 $210,923 18 $520,925 $32,726 $553,651 $782,152 $228,501 19 $519,475 $33,708 $553,183 $805,617 $252,434 20 $517,500 $34,719 $552,219 $829,785 $277,566 $10,363,100 $532,033 $10,895,133 $12,715,464 $1 ,820,331 Debt service is based on assumption of level payments with a net interest cost of 3.5%. Total principal borrowed of $7,365,000 includes the cost of the Investment Grade Energy Audit. r. Debt service is before rebates of $274,066 which will be used to offset early year cashflow impacts. A Ga,N Town of WatertownSlide 13 � Program Impact on Investments Energy Conservation Measures Excluded from Budget Neutral Project: Boiler Replacements Main Fire Station East Fire Station Ice Rink Senior Center Temperature Setback Senior Center Convert Electric Baseboard Heat Ice Rink Financial Impact: Investment Cost: $550,000 • Annual Savings: $10,750 gE pNC�C)T-N Town of Watertown Slide 14 J 1�1f'[:!!.1'1F1Y ti[Y[.1I 11� Next Steps Thank You Beacon Integrated Solutions P.O. Box 320325 Boston, MA 02132 bgreenblatt@beacon-llc.com www.beacon-llc.com 13 F A Ga,N Town of Watertown Slide 15 t'j'•i� I Financial Summary Project Construction Cost $6,778,105 Deatailed Energy Audit Cost $37,565 Total Cost $6,815,670 lEnter 1 in ECM Matrix below to Include scope by ECM and Building First Year Energy/Water Savings $462,456 lEnter 0 in ECM Matrix below to Exclude scope by ECM and Building First Year Measurement and Verification Cost $19,800 Estimated Utility Rebates $249,495 Payback 15.40 c c °o r c — c v a °o 3 0 3 L — « « 3 m 3 y u c c = c v c 0 0 c Y c « L « �n £ c p d o p c c o °. c o Y 2 Y L p 0 ii o W ° Y p a C O c v ECM# Description of Measure t v o £ L 3 E L c E L E L 3 a o@ c « ' E 3 E V O U V L U 16 00 R 2 01 J W U d O. y 10 O 10 J VI Vf O v1 Vf M 3 x c W W W W ~ O 2 Z W y 1 V C y C 1 Lighting-Fixture Retrofit r/ r/ ® r/ 1 X X I f X 0 f ,/ 2 Lighting-Fixture Controls r/ X 0 3 Building Envelope-Weatherization r/ r/ ® r/ X 0 4 Building Envelope-Roof/Attic Insulation ti/ ® X 0 5 Building Envelope-Window Replacement 6,7,8 Building Controls-Temperature Setback r/ 4f �./ 4f �./ %r -e ® r/ 1 X X I f 9 Air Handling Unit/RTU Replacement I X 10 Condition A-HVAC Mechanical Rehab r/ L—Xi �.r X X X 11 Air Handling Unit-VFD on Fans r/ r/ %r 12 Heating System-Boiler Replacement 13 Heating System-Steam Trap Replacement f �/ 14 Heating System-Pipe/Valve/Duct Insulation f f r/ r/ 1 X X 7 r/ X 15 Pumping System-VFD on Hot Water Pumps f r/ r/ 16 Repair or Replace Heat Recovery Heat Wheel �2 17 Electric Baseboard to Hot Water Baseboard 18 Kitchen Hood-VFD on Exhaust Fan 19 Water Conservation X X .r T 20 Vending Machine Controllers ® X X X X Z 21 Walk-in Coolers/Walk-in Freezers f r/ r/ 22 Energy Efficient Transformers r/ r/ %r 4f 23 Chiller and Dehumidification Control v 24 Building Envelope-Window Film X 25 Chiller Replacement 26 Install new AC Units X 27 Install Low-e Ceiling T 28 Roof Replacement Z 29 Reduced Scope High School-Controls 30 Replacement Unit Ventilators r/ 31 Replace 2nd Boiler at Phillips School X Totals ILeeend; ./ Measure(s)Selected X Measure(s)not included in this package I Financial Summary Project Construction Cost $7,327,680 Deatailed Energy Audit Cost $37,565 Total Cost $7,365,245 lEnter 1 in ECM Matrix below to Include scope by ECM and Building First Year Energy/Water Savings $473,215 lEnter 0 in ECM Matrix below to Exclude scope by ECM and Building First Year Measurement and Verification Cost $19,800 Estimated Utility Rebates $274,066 Payback 16.24 c c °o r c — c v a °o 3 0 3 L — « « 3 m 3 y u c c = c v c 0 0 c Y c « L « �n £ c p d o p c c o °. c o Y 2 Y L p 0 ii o W ° Y p a C O c v ECM# Description of Measure t v o £ L 3 E L c E L E L 3 t o o m c M « ' E 3 E V O U V L U 16 00 R 2 01 J W U d O. y 10 O 10 J VI Vf O v1 Vf M d _ O 3 x c W W W W ~ O 2 Z W y 1.1 V C y C 1 Lighting-Fixture Retrofit r/ f %r 4f %r %r r/ r/ ® r/ 1 X X I f X 0 f ,/ 2 Lighting-Fixture Controls r/ ® r/ X 0 3 Building Envelope-Weatherization r/ r/ ® r/ X 0 4 Building Envelope-Roof/Attic Insulation ti/ ® X 0 5 Building Envelope-Window Replacement 6,7,8 Building Controls-Temperature Setback r/ 4f �./ 4f �./ %r r/ ® r/ 1 X X I f 9 Air Handling Unit/RTU Replacement I X 10 Condition A-HVAC Mechanical Rehab r/ L—Xi �.r X X X 11 Air Handling Unit-VFD on Fans r/ r/ %r 12 Heating System-Boiler Replacement 13 Heating System-Steam Trap Replacement f r/ 14 Heating System-Pipe/Valve/Duct Insulation f r/ r/ r/ 4f llv� F X X 7 f 9 T 15 Pumping System-VFD on Hot Water Pumps r/ r/ r/ 16 Repair or Replace Heat Recovery Heat Wheel Z 17 Electric Baseboard to Hot Water Baseboard 18 Kitchen Hood-VFD on Exhaust Fan f r/ f r/ 19 Water Conservation ./ ./ 4f X X .r T 20 Vending Machine Controllers ® X X X X Z 21 Walk-in Coolers/Walk-in Freezers f r/ r/ 22 Energy Efficient Transformers r/ r/ %r 4f 23 Chiller and Dehumidification Control v 24 Building Envelope-Window Film X 25 Chiller Replacement 26 Install new AC Units X 27 Install Low-e Ceiling T 28 Roof Replacement Z 29 Reduced Scope High School-Controls 30 Replacement Unit Ventilators r/ 31 Replace 2nd Boiler at Phillips School X Totals ILeeend; ./ Measure(s)Selected X Measure(s)not included in this package