HomeMy Public PortalAboutRate Proposal Summary March 4, 2015Metropolitan St. Louis
Sewer District
Rate Proposal Summary
March 4, 2015
1
Exhibit MSD 80
Rate Change Proposal
•Four year rate plan, FY17-FY20
•Wastewater rate change
•Wastewater: current
•Wastewater: proposed
•Stormwater revenue change
•Stormwater: current
•Stormwater: proposed
2
Two Utilities
Wastewater Service
•Collecting and treating the
"used" water from sinks,
toilets and floor drains
•Travels through miles of
pipes to one of seven
treatment plants
•Treated to high standards
before being returned to
our region’s waterways.
•Wastewater service is
currently funded by rates
based upon water usage
and account type
Stormwater Service
•Collecting the rain and
other water drainage that
is not naturally absorbed in
the soil on your property
•Addressing regulatory
requirements regarding
impacts of stormwater
runoff on receiving stream
water quality
•Stormwater service is
currently funded by a flat
fee and small property
taxes, based upon
geographic location
3
CURRENT
WASTEWATER RATES
Current Rates, Progress under FY13-16 rate cycle
4
Current Wastewater Rate
Structure
•Residential Accounts
•Single-Family Homes
•Multi-Family Homes
•Metered and Unmetered
•Commercial Accounts
•Metered
•Tiered compliance charges according to
inspections and testing
•Extra-strength surcharges (where
applicable)
5
WASTEWATER: current
Regulatory Requirements
•MSD Project Clear
•Sanitary Sewer Overflow (SSO) elimination
•Combined Sewer Overflow (CSO) abatement
•Building backup prevention
•Asset re-investment
•System renewal, repairs, and rehabilitation
•Increased Wastewater Treatment Plant
capacity
6
WASTEWATER: current
FY13-16 Rate Proposal Status
•Capital Improvement & Replacement Program:
•Provides a schedule and cost of needed repairs and
improvements to the wastewater system to maintain
the system and ensure compliance with all State and
Federal Regulatory requirements
•$971,015,0001 identified in FY13-16 Rate Proposal
•Accomplishments:
•Plan to appropriate $889,632,0001 (95%) of amount
identified in FY13-16 Rate Proposal
•80% of projects appropriated within 2 months of
planned date through FY15
7
WASTEWATER: current
1 Appendix 7.7.1
" O p e r a t i o n s &