HomeMy Public PortalAbout00006REPEALED BY ORDINANCE NO. 110 O R D I N A N C E NO. 6
AN ORDINANCE authorizing and directing the Executive
Director to approve, revise or reject plans, designs and
specifications of all sanitary works proposed to be constructed,
altered or reconstructed by any other person or corporation,
private or public, in the District, providing the terms upon which
approval may be granted, providing for the adoption of standards
by the Executive Director, authorizing the Executive Director to
make field inspections and to require that the construction be
done in accordance with the plans and specifications approved, and
further authorizing the Executive Director to delegate the power
to approve, revise or reject plans, designs and specifications,
and to make field inspections to the Health Department of St.
Louis County and to the Plan and Design Section of the Board of
Public Service of the City of St. Louis, with an emergency clause.
BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE
METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director is authorized and
directed to approve, revise or reject plans, designs and
specifications of all sanitary works proposed to be constructed,
altered or reconstructed by any other person or corporation,
private or public, in the District.
Section Two. The Executive Director is authorized to
grant the approval provided in Section One hereof as to any such
works in that part of the District lying in St. Louis County upon
certification by the Health Department of St. Louis County that
such plans, designs and specifications meet the minimum standards
fixed by the Division of Health of the Department of Welfare of
the State of Missouri. The Executive Director is further
authorized to grant such approval as to any such works lying in
the City of St. Louis upon certification by the Plan and Design
Section of the Board of Public Service of the City of St. Louis
that such plans, designs and specifications meet the minimum
requirements of the City of St. Louis.
Section Three. The Executive Director shall, before
any acceptance of any such sanitary works, require that a field
inspection thereof be made and that such field inspection shall
show that such works have been installed and constructed in
accordance with the plans, designs and specifications approved as
hereinbefore provided. The Executive Director may accept the
certification of inspection of the Health Department of St. Louis
County as to any construction in St. Louis County or the
certification of inspection of the Plan and Design Section of the
Board of Public Service of the City of St. Louis as to any
construction in the City of St. Louis that such installation and
construction complies with the approved plans, designs and
specifications.
Section Four. The immediate construction of sanitary
works being necessary in order to protect the public health of the
District constitutes an emergency within the meaning of the Plan
of the District and this ordinance shall take effect immediately
upon its adoption.
The foregoing Ordinance was adopted June 14, 1954.