Loading...
HomeMy Public PortalAbout00833 O R D I N A N C E NO. 833 AN ORDINANCE, authorizing the Executive Director and the Secretary-Treasurer of The Metropolitan St. Louis Sewer District to purchase from the owner thereof, as the site to construct a sewage treatment plant to serve the Coldwater Creek Trunk Subdistrict of The Metropolitan St. Louis Sewer District, a tract of land in St. Louis County, Missouri described as follows: A tract of land in U. S. Survey 210, Township 47 North, Range 7 East, and described as: Beginning at an iron pipe set in the West line of said Survey 210, distant South 4 degrees 39 minutes East 1528.19 feet from its intersection with the South line of Missouri Highway 140; thence South 88 degrees 31 minutes East, 668.66 feet to an iron pipe; thence South 8 degrees 03 minutes East, 1014.00 feet to a point in the center line of Cold Water Creek Drainage Ditch, 100 feet wide; thence along the center line of said Ditch, North 88 degrees 31 minutes West 581.65 feet to a point; thence along the center line of the Old Cold Water Creek the following courses and distances, North 22 degrees 34 minutes East 167.70 feet, North 66 degrees 30 minutes West 163.28 feet and North 35 degrees 24 1/2 minutes West 155.21 feet to a point in the West line of said Survey 210; thence along the West line of said Survey 210, North 4 degrees 39 minutes West 661.97 feet to the point of beginning, containing 15.048 acres, according to a survey executed by Pitzman's Company of Surveyors and Engineers on the 16th day of May, 1962, together with certain easements necessary for the construction of the Coldwater Creek Treatment Plant and Interceptor Sewer. for a total sum of Fifty-Two Thousand Six Hundred Sixty-eight Dollars ($52,668.00), the purchase price to be paid as follows: Either the total of Fifty- Two Thousand Six Hundred Sixty-eight Dollars ($52,668.00) at the time of closing or in installments agreeable to the seller but not to exceed three years and with the further provision that any installment payments shall be made without interest except from dates of maturity, in which case interest is to be eight per cent (8%) per annum. In either case, 2 the total price paid by the Sewer District for this property shall not exceed Fifty-Two Thousand Six Hundred Sixty-eight Dollars ($52,668.00), and authorizing the Executive Director and the Secretary-Treasurer to execute any note, deed of trust or any other agreement or instrument necessary or proper to carry out the terms of this purchase of property, and containing an emergency clause. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and the Secretary-- Treasurer of The Metropolitan St. Louis Sewer District shall be and are hereby authorized and directed to purchase from the owner thereof, as the site to construct a sewage treatment plant to serve the Coldwater Creek Trunk Subdistrict of The Metropolitan St. Louis Sewer District, a tract of land in St. Louis County, Missouri described as follows: to wit: A tract of land in U. S. Survey 210, Township 47 North, Range 7 East, and described as: Beginning at an iron pipe set in the West line of said Survey 210, distant South 4 degrees 39 minutes East 1528.19 feet from its intersection with the South line of Missouri Highway 140; thence South 88 degrees 31 minutes East, 668.66 feet to an iron pipe; thence South 8 degrees 03 minutes East, 1014.00 feet to a point in the center line of Cold Water Creek Drainage Ditch, 100 feet wide; thence along the center line of said Ditch, North 88 degrees 31 minutes West 581.65 feet to a point; thence along the center line of the Old Cold Water Creek the following courses and distances, North 22 degrees 34 minutes East 167.70 feet, North 66 degrees 30 minutes West 163.28 feet and North 35 degrees 24 1/2 minutes West 155.21 feet to a point in the West line of said Survey 210; thence along the West line of said Survey 210, North 4 degrees 39 minutes West 661.97 feet to the 3 point of beginning, containing 15.048 acres, according to a survey executed by Pitzman's Company of Surveyors and Engineers on the 16th day of May, 1962, together with certain easements necessary for the construction of the Coldwater Creek Treatment Plant and Interceptor Sewer. Section Two. Upon the execution and delivery to them by the said owner of a warranty deed in proper form, being free from liens and encumbrances, conveying fee simple title to the said land to The Metropolitan St. Louis Sewer District, the Executive Director and the Secretary-Treasurer shall be and are hereby authorized and directed to pay to the said owner, for the said land, the total sum of Fifty-Two Thousand Six Hundred Sixty-eight Dollars ($52,668.00) as follows: Either the total of Fifty-Two Thousand Six Hundred Sixty- eight Dollars ($52,668.00) at the time of closing or in installments agreeable to the seller but not to exceed three years and with the further provision that any installment payments shall be made without interest except from dates of maturity, in which case interest is to be eight per cent (8%) per annum. In either case, the total price paid by the Sewer District for this property shall not exceed Fifty-Two Thousand Six Hundred Sixty-eight Dollars ($52,668.00). The Executive Director and the Secretary-Treasurer are further authorized to execute any note, deed of trust, or any other agreement or instrument necessary or proper in the premises. 4 Section Three. The purchase of this property being a necessity to properly carry out the functions of this District and the necessity for acquiring this property immediately for its program of water pollution abatement and in particular to construct the Coldwater Creek Treatment Plant constitutes an emergency within the meaning of the Plan and this Ordinance shall therefore take effect immediately upon its enactment. The foregoing Ordinance was adopted September 20, 1962.