Loading...
HomeMy Public PortalAbout01975 O R D I N A N C E NO. 1975 AN ORDINANCE confirming a contract with Millstone Construction, Inc., and Millstone Associates, Inc., a Joint Venture, for the construction of the River des Peres Interceptor Sewer to be constructed for the Mississippi River Subdistrict as part of the Lemay System, in and near the River des Peres Channel from the Lemay Pump Station No. 1 at 8500 Virginia Avenue, northwestwardly to Mardel Avenue, in the City of St. Louis, Missouri, with an emergency clause. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The contract heretofore let by the Executive Director to Millstone Construction, Inc., and Millstone Associates, Inc., a Joint Venture, as the lowest responsible bidder, for the construction of the River des Peres Interceptor Sewer to be constructed for the Mississippi River Subdistrict as part of the Lemay System, of The Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 17th day of November, 1969 and formally executed on the 4th day of December, 1969, by said contractors and by the Executive Director and the Secretary-Treasurer on behalf of the District, in the following form: is hereby confirmed. Section Two. This ordinance being for the confirmation of a contract for sewer construction and the sewers to be constructed being necessary for the protection of the public health, an emergency exists within the meaning of the Plan, and this ordinance shall be and become effective immediately upon its adoption. The foregoing Ordinance was adopted December 11, 1969