Loading...
HomeMy Public PortalAbout02744 O R D I N A N C E NO. 2744 AN ORDINANCE, authorizing the Executive Director and the Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract, No. E-266, with the firm of Warren & Van Praag, Inc. for engineering services relating to the East-West Gateway Coordinating Council Phase I, Water Pollution Control Study, St. Louis County - areas tributary to the Meramec River - Mattese Watershed. WHEREAS, by Resolution Numbers 1411 and 1412 adopted on November 27, 1974, the Executive Director was authorized to file applications on behalf of The Metropolitan St. Louis Sewer District with the Environmental Protection Agency and the Missouri Clean Water Commission for grants to aid in the cost of the preparation of preliminary engineering in accordance with the East-West Gateway Coordinating Council Phase I, Water Pollution Control Study, St. Louis County - areas tributary to the Meramec River, and WHEREAS, the District has requested and advertised for and received proposals from engineering firms stating their qualifications to perform said work. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. That the Executive Director and the Secretary-Treasurer be and they are hereby authorized to enter into a contract, No. E-266, with the firm of Warren & Van Praag, Inc. for engineering services relating to the East-West Gateway Coordinating Council Phase I, Water Pollution Control Study, St. Louis County - areas tributary to the Meramec River - Mattese Watershed. Section Two. The contract authorized in Section One of this Ordinance shall provide for a total fee in the amount of Thirty-two Thousand Dollars ($32,000.00) and such other terms and conditions as are approved by the General Counsel of the District. 3 The foregoing Ordinance was adopted January 29, 1975.