Loading...
HomeMy Public PortalAbout09-0249 Kefamily ir Jl CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 05 -22 -2009 PERMIT #: 090249 WORK DESCRIPTION NEW RESIDENTIAL BLDG - SF WORK LOCATION 1232 SOLOMON AVE OWNER NAME KEFAMILY ENTERPRISES,LLC ADDRESS PO BOX 2841 CITY, ST, ZIP TYBEE ISLAND GA 31328 -2841 PHONE NUMBER CONTRACTOR NAME FIDELITY CONSTRUCTION INC ADDRESS PO BOX 15844 CITY STATE ZIP SAVANNAH GA 31416 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE 728 OCCUPANCY TYPE P TOTAL FEES CHARGED $4,280.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $66,000.00 TOTAL BALANCE DUE: $4,280.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. .. Signature of Building Inspector or Authorized Agent: ,/02& P. 0. Box 2749 - 403 Butler Avenue, Ty bee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityofty bee.org vi- 02 4 9 S� As-built survey required a after Framing inspection, before Insulation and Finals. (23 scop (2) Construction Stage - For all new construction and substantial improvements, the permit holder shall provide to the Building and Zoning Department Tybee Island, Georgia an as -built certification of the regulatory floor elevation or flood - proofing level immediately after the lowest floor or flood proofing is completed. Where a structure is subject to the provisions applicable to Coastal High Hazards Areas, after placement of the lowest horizontal structural members. Any regulatory floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood proofing is utilized for non - residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The Building and Zoning Department Tybee island, Georgia shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop -work order for the project. • j ;f. 1' FLOOD INSURANCE RATE MAPS and FLOOD DAMAGE PREVENTION ORDINANCE The Federal Emergency Management Association (FEMA) mandated adoption of new Flood Insurance Rate Maps (FIRMs) and a new Flood Damage Prevention Ordinance (FDPO) by September 26, 2008. It was required that the FDPO that the City of Tybee Island adopted meet or exceed the minimum standards outlined by FEMA. There are significant changes in the new ordinance. Some of the more significant changes are outlined below, however, please be aware that this outline does not address all of the changes. The ordinance in its entirety and the new FIRMs are available at the City's website, www.citvoftvbee.org or in the Zoning Department at City Hall. AE ZONES • SURVEY REQUIREMENT — All new construction/substantial improvement projects are required to submit an as -built certification immediately after the lowest floor or flood - proofing is completed. • FINISHED FLOOR ELEVATION — All new construction/substantial improvement projects are required to be elevated at least one foot above the base flood elevation. The following are included in the requirement and must be elevated: o All heating and air conditioning equipment and components, including ductwork; o All electrical; o All plumbing fixtures; o All other service facilities. • NON - RESIDENTIAL — New construction/substantial improvement for non - residential projects may elect to floodproof the project in lieu of elevation. VE ZONES • SURVEY REQUIREMENT — All new construction/substantial improvement projects are required to submit an as -built certification after placement of the lowest horizontal structural members. • FINISHED FLOOR ELEVATION — All new construction/substantial improvement of existing structures shall be elevated so that the bottom of the lowest supporting horizontal structural member (excluding pilings or columns) is located no lower than one foot above the base flood elevation level. Substantial Improvement means any combination of repair, reconstruction, alteration, or improvement to a structure taking place during a 5-year period, in which the cumulative cost equals or exceeds 50% of the market value before the start of construction of the improvement. Please do not hesitate to contact (912) 786 -4573, extension 107, if you require more information. October 2008 P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (912) '786-4573 — FAX (912) 786 -9539 www.cityoftybee.org v l - 02 4 9 SF As-built survey required a after Framing inspection, before Insulation and Finals. C) t4fo (2) Construction Stage - For all new construction and substantial improvements, the permit holder shall provide to the Building and Zoning Department Tybee Island, Georgia an as -built certification of the regulatory floor elevation or flood- proofing level immediately after the lowest floor or flood proofing is completed. Where a structure is subject to the provisions applicable to Coastal High Hazards Areas, after placement of the lowest horizontal structural members. Any regulatory floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same, When flood proofing is utilized for non - residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk_ The Building and Zoning Department Tybee Island, Georgia shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop -work order for the project. o 1 10 / CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 05 -22 -2009 PERMIT #: 090249 WORK DESCRIPTION NEW RESIDENTIAL BLDG - SF WORK LOCATION 1232 SOLOMON AVE OWNER NAME KEFAMILY ENTERPRISES,LLC ADDRESS PO BOX 2841 CITY, ST, ZIP TYBEE ISLAND GA 31328 -2841 PHONE NUMBER CONTRACTOR NAME FIDELITY CONSTRUCTION INC ADDRESS PO BOX 15844 CITY STATE ZIP SAVANNAH GA 31416 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE 728 OCCUPANCY TYPE P TOTAL FEES CHARGED $4,280.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $66,000.00 TOTAL BALANCE DUE: $4,280.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. AO - Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEO' A APPLICATION FOR BUILDING PERMIT rq Z* — ! o � 32 S' larn o , v-e, ti Location: -t- PIN # L-4 _ _ c� l NAME _ ADDRESS TELEPHONE Owner `-- I I �} {� �cz,.�� � Imo _ Ro.17t�` 2-s L-41 '7(32-YS — 2 °U1oo Architect e� f� � J P 0 Pic ' zto ti 3%32.5 1 '`ice or Engineer bu k � , �Il p ;� � 4 0 C4 Building / q �r� Contractor - , c \�\ ; cy Cp - 151. Po , ► 50x 14 ' ` . ‘ 1Z ) 7 + .� (Check all that apply) ❑ Repair n Residential I I Footprint Changes n Renovation Single Family n Discovery n Minor Addition Ij Duplex n Demolition TI Substantial Addition n Multi - Family El Other n Commercial Details of Project: -? 2 , .5,, 4- t Estimated Cost of Construction: $ & Q 00 Construction Type (C) (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer _ 1 Proposed use: \ i t Remarks: C� �c..t In ��. �X ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area c( AC Living space (total sq. ft.) - 7 z. # Off - street parking spaces Z Trees located & listed on site plan Access: p Driveway 2 S (ft.) With culvert? With swale? Setbacks: Front 2 c Rear 1 0 Sides (L) I (R) v if # Stories I Height 27 g Vertical distance measured from the average adjacent g rade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: _ On -site restroom facilities will be provided through S.. -kJ h R _ „ / ON % On -site waste and debris containers will be provided by A-4-\ Construction debris will be disposed by A-Acc� -kk by means of A- r , rt ; f I understand that I must comply with zoning, flood damage control, building, fire. shore Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore draina impaired by this permitted construction. (17 Date: 3 /2c ) 2009 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? - Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site - - - Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: �' • r- Date FEES -,Q Zoning Administrator �` t r I - 2 . Permit G Code Enforcement Officer � �� J L ' Inspections /(p'{ Water /Sewer Water Tap - 3 - 0 Storm/Drainage � 'f �'y%'�, �� �'1%� � � Sewer Stub s- 7 5C� Inspections Aid to Const. 2 City Manager — cg mot» iz2 �X 75 TOTAL 7 2& DEFT OF E�. flATUPAL PliSOURCES GEORGIA Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Proiects Involving Demolition. Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules, In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the projec f iy),) i)ti )05 Undersigned Date \-\'' t. e Printed Name Office Use Only: Project Address: Permit Number: REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Peimits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the a.plicant's plans will result in meeting requirements. The final product must actuall eet e I Ordinance requirements. Applicant name: - Project I.D.: Attachments approved by: Date: