Loading...
HomeMy Public PortalAbout03912 O R D I N A N C E NO. 3912 AN ORDINANCE, making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund of the District, of which Seven Thousand Dollars ($7,000.00) is to pay the District's ten percent (10%) share, Fifty-two Thousand Five Hundred Dollars ($52,500.00) will be received from the Environmental Protection Agency, and Ten Thousand Five Hundred Dollars ($10,500.00) will be received from the Clean Water Commission for additional costs of a Step I engineering study for performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District North- west) in Caulks Creek Watershed (Addendum #2 to Engineering Con- tract E-287) (Federal Project C-291148-01). WHEREAS, the District will receive a seventy-five per- cent (75%) grant from the Environmental Protection Agency of the United States government to pay seventy-five percent (75%) of the cost of said study, and WHEREAS, the District will receive a fifteen percent (15%) grant from the Clean Water Commission of the State of Missouri to pay fifteen percent (15%) of the cost of said study, and WHEREAS, Ordinance No. 3520, adopted May 24, 1978, and Ordinance No. 3752, adopted April 11, 1979, provided for the initial funding of said project. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: 2 Section One. The sum of Seven Thousand Dollars ($7,000.00) is hereby appropriated from the General Fund of the District to pay ten percent (10%) of the additional costs of a Step 1 engineering study for the performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Caulks Creek Watershed (Addendum #2 to Engineering Contract E-287) (Federal Project C- 291148-01). Section Two. The grant from the Environmental Protection Agency of the United States government will amount to Fifty-two Thousand Five Hundred Dollars ($52,500.00) which, when received, will be deposited in the General Fund of the District, and is to pay seventy-five percent (75%) of the additional costs of a Step 1 engineering study for the performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Caulks Creek Watershed (Addendum #2 to Engineering Contract E-287) (Federal Project C-291148-01), and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said study. Section Three. The grant from the Clean Water Commission of the State of Missouri will amount to Ten Thousand Five Hundred Dollars ($10,500.00) which, when received, will be deposited in the General Fund of the District, and is to pay 3 fifteen percent (15%) of the additional costs of a Step I engineering study for the performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Caulks Creek Watershed (Addendum #2 to Engineering Contract E-287) (Federal Project C-291148-01), and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said study. Section Four. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. 4 The foregoing Ordinance was adopted November 28, 1979.