HomeMy Public PortalAbout03912 O R D I N A N C E NO. 3912
AN ORDINANCE, making a supplemental appropriation of
Seventy Thousand Dollars ($70,000.00) from the General Fund of the
District, of which Seven Thousand Dollars ($7,000.00) is to pay
the District's ten percent (10%) share, Fifty-two Thousand Five
Hundred Dollars ($52,500.00) will be received from the
Environmental Protection Agency, and Ten Thousand Five Hundred
Dollars ($10,500.00) will be received from the Clean Water
Commission for additional costs of a Step I engineering study for
performance of a sewer system evaluation survey for the Lower
Missouri River Basin (Metropolitan St. Louis Sewer District North-
west) in Caulks Creek Watershed (Addendum #2 to Engineering Con-
tract E-287) (Federal Project C-291148-01).
WHEREAS, the District will receive a seventy-five per-
cent (75%) grant from the Environmental Protection Agency of the
United States government to pay seventy-five percent (75%) of the
cost of said study, and
WHEREAS, the District will receive a fifteen percent
(15%) grant from the Clean Water Commission of the State of
Missouri to pay fifteen percent (15%) of the cost of said study,
and
WHEREAS, Ordinance No. 3520, adopted May 24, 1978, and
Ordinance No. 3752, adopted April 11, 1979, provided for the
initial funding of said project.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
2
Section One. The sum of Seven Thousand Dollars
($7,000.00) is hereby appropriated from the General Fund of the
District to pay ten percent (10%) of the additional costs of a
Step 1 engineering study for the performance of a sewer system
evaluation survey for the Lower Missouri River Basin (Metropolitan
St. Louis Sewer District Northwest) in Caulks Creek Watershed
(Addendum #2 to Engineering Contract E-287) (Federal Project C-
291148-01).
Section Two. The grant from the Environmental
Protection Agency of the United States government will amount to
Fifty-two Thousand Five Hundred Dollars ($52,500.00) which, when
received, will be deposited in the General Fund of the District,
and is to pay seventy-five percent (75%) of the additional costs
of a Step 1 engineering study for the performance of a sewer
system evaluation survey for the Lower Missouri River Basin
(Metropolitan St. Louis Sewer District Northwest) in Caulks Creek
Watershed (Addendum #2 to Engineering Contract E-287) (Federal
Project C-291148-01), and said amount is hereby appropriated to be
used to make said payments when due and payable under the terms of
the contracts for said study.
Section Three. The grant from the Clean Water
Commission of the State of Missouri will amount to Ten Thousand
Five Hundred Dollars ($10,500.00) which, when received, will be
deposited in the General Fund of the District, and is to pay
3
fifteen percent (15%) of the additional costs of a Step I
engineering study for the performance of a sewer system evaluation
survey for the Lower Missouri River Basin (Metropolitan St. Louis
Sewer District Northwest) in Caulks Creek Watershed (Addendum #2
to Engineering Contract E-287) (Federal Project C-291148-01), and
said amount is hereby appropriated to be used to make said
payments when due and payable under the terms of the contracts for
said study.
Section Four. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
4
The foregoing Ordinance was adopted November 28, 1979.