Loading...
HomeMy Public PortalAbout04214 O R D I N A N C E NO. 4214 AN ORDINANCE, making a supplemental appropriation of Two Million Three Thousand Nine Hundred Dollars ($2,003,900.00) from the General Fund of the District of which Two Hundred Thousand Three Hundred Ninety Dollars ($200,390.00) is to pay the District's ten percent (10%) share, One Million Five Hundred Two Thousand Nine Hundred Twenty-five Dollars ($1,502,925.00) will be received from the Environmental Protection Agency, and Three Hundred Thousand Five Hundred Eighty-five Dollars ($300,585.00) will be received from the Clean Water Commission for additional costs of a Step I engineering study for performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Fee Fee and Creve Coeur Watersheds (Addendum #3 to Engineering Contract E-287) Federal Project C-291148-01). WHEREAS, the District will receive a seventy-five percent (75%) grant from the Environmental Protection Agency of the United States government to pay seventy-five percent (75%) of the cost of said study, and WHEREAS, the District will receive a fifteen percent (15%) grant from the Clean Water Commission of the State of Missouri to pay fifteen percent (15%) of the cost of said study, and WHEREAS, Ordinance No. 3520, adopted May 24, 1978, Ordinance No. 3752, adopted April Il, 1979, and Ordinance 3912, adopted November 28, 1979, provided for the initial funding of said project, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Thousand Three Hundred Ninety Dollars ($200,390.00) is hereby appropriated from the General Fund of the District to pay ten percent (10%) of the additional costs of a Step 1 engineering study for the performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Fee Fee and Creve Coeur Watersheds (Addendum #3 to Engineering Contract E-287) Federal Project C-291148-01. Section Two. The grant from the Environmental Protection Agency of the United States government will amount to One Million Five Hundred Two Thousand Nine Hundred Twenty-five Dollars ($1,502,925.00) which, when received, will be deposited in the General Fund of the District,, and is to pay seventy-five percent (75%) of the additional costs of a Step 1 engineering study for the performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Fee Fee and Creve Coeur Watersheds (Addendum #3 to Engineering Contract E-287) Federal Project C-291148-01), and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said study. Section Three. The grant from the Clean Water Commission of the State of Missouri will amount to Three Hundred Thousand Five Hundred Eighty-five Dollars ($300,585.00) which, when received, will be deposited in the General Fund of the District, and is to pay fifteen percent (15%) of the additional costs of a Step 1 engineering study for the performance of a sewer system evaluation survey for the Lower Missouri River Basin (Metropolitan St. Louis Sewer District Northwest) in Fee Fee and Creve Coeur Watersheds (Addendum #3 to Engineering Contract E-287) (Federal Project C-291148-01), and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said study. Section Four. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 22, 1980.