HomeMy Public PortalAboutTOL PR 2013-05-16 Sycolin Road Closure
Town
News
For Imme
Traf
Sycol
Leesburg
Bypass at
Bypass w
Sycolin R
destinati
to Battle
Drive/Ba
new traff
n of Le
Release
ediate Releas
ffic Sign
R
lin Road w
g, VA (May 1
t Sycolin Roa
will not have
Road, the Lee
ons in the so
field Parkwa
ttlefield Par
fic patterns:
eesburg
e
nal at Lee
emoved
will be close
August
16, 2013) – O
ad will be re
access to Sy
esburg Execu
outheast sec
ay. As a rem
kway) from
g
esburg B
d Perman
ed betwee
2014 for c
On Saturday
emoved perm
ycolin Road,
utive Airport
ctor of Town
minder, both
the Dulles G
Bypass a
nently o
en Gatewa
constructio
, June 8, 201
manently. O
either north
t, Loudoun C
n will be rout
Exit 1 (Leesb
Greenway ar
(more)
and Syco
on June 8
y Drive an
on of over
13, the traffi
Once the sign
h or south. A
County’s Phi
ted via the D
burg Bypass
re toll‐free. T
olin Road
8, 2013
nd Hope Pa
pass
ic signal on t
nal is remove
Access from
ilip Bolen Pa
Dulles Green
s) and Exit 2
The map bel
d Will Be
arkway un
the Route 7/
ed, traffic on
the Bypass
ark and othe
nway or Rou
(Miller
ow outlines
e
ntil
/15
n the
to
r
ute 7
the
TOL PR 2013‐05‐16 Sycolin Road closes June 8
Page 2
The intersection closure is necessary for the construction of the Sycolin Overpass. During
construction, Sycolin Road will be closed from Gateway Drive to Hope Parkway. Construction is
expected to last fourteen months. The overpass will open in August 2014, restoring traffic on
Sycolin Road between Gateway Drive and Hope Parkway. However, there will be no access to
Sycolin Road from the Bypass or to the Bypass from Sycolin Road once the overpass is
completed.
For more information, please visit the VDOT Project Website at
www.virginiadot.org/projects/northernvirginia/sycolin_road_overpass.asp or call the VDOT
Information Line at 1‐800‐367‐7623.
Contact:
Betsy Fields
Research & Communications Manager
bfields@leesburgva.gov
703‐771‐2734
# # #