Loading...
HomeMy Public PortalAboutTOL PR 2013-05-16 Sycolin Road Closure Town News For Imme   Traf   Sycol Leesburg Bypass at Bypass w Sycolin R destinati to Battle Drive/Ba new traff     n of Le Release ediate Releas ffic Sign R lin Road w g, VA (May 1 t Sycolin Roa will not have  Road, the Lee ons in the so field Parkwa ttlefield Par fic patterns: eesburg e   nal at Lee emoved will be close August  16, 2013) – O ad will be re access to Sy esburg Execu outheast sec ay.  As a rem kway) from    g esburg B d Perman ed betwee 2014 for c On Saturday emoved perm ycolin Road,  utive Airport ctor of Town minder, both  the Dulles G Bypass a nently o en Gatewa constructio   , June 8, 201 manently.  O either north t, Loudoun C n will be rout Exit 1 (Leesb Greenway ar (more)  and Syco on June 8 y Drive an on of over 13, the traffi Once the sign h or south.  A County’s Phi ted via the D burg Bypass re toll‐free. T olin Road 8, 2013  nd Hope Pa pass  ic signal on t nal is remove Access from ilip Bolen Pa Dulles Green s) and Exit 2  The map bel d Will Be arkway un the Route 7/ ed, traffic on  the Bypass ark and othe nway  or Rou (Miller  ow outlines   e  ntil  /15  n the  to  r  ute 7   the  TOL PR 2013‐05‐16 Sycolin Road closes June 8  Page 2    The intersection closure is necessary for the construction of the Sycolin Overpass.  During  construction, Sycolin Road will be closed from Gateway Drive to Hope Parkway.  Construction is  expected to last fourteen months.  The overpass will open in August 2014, restoring traffic on  Sycolin Road between Gateway Drive and Hope Parkway.  However, there will be no access to  Sycolin Road from the Bypass or to the Bypass from Sycolin Road once the overpass is  completed.    For more information, please visit the VDOT Project Website at  www.virginiadot.org/projects/northernvirginia/sycolin_road_overpass.asp or call the VDOT  Information Line at 1‐800‐367‐7623.     Contact:  Betsy Fields  Research & Communications Manager  bfields@leesburgva.gov  703‐771‐2734      #  # #