Loading...
HomeMy Public PortalAbout04501 O R D I N A N C E NO. 4501 AN ORDINANCE, making a supplemental appropriation of One Hundred Ninety-six Thousand One Hundred Ninety Dollars ($196,190.00) from the Mississippi River Construction Fund, of which Nineteen Thousand Six Hundred Twenty Dollars ($19,620.00) is to be used to pay the District's ten percent (10%) share; a grant One Hundred Forty-seven Thousand One Hundred Forty-two Dollars ($147,142.00) has been received from the Environmental Protection Agency, and Twenty-nine Thousand Four Hundred Twenty-eight Dollars ($29,428.00) has been reserved by the Missouri Department of Natural Resources for the preparation of As-Built Drawings, Engineering Contract E-229, of Lemay Wastewater Treatment Plant - Grit and Screenings Facilities, Contract PA-60; and Aeration Tanks and Service Building, Contract PA-62, in St. Louis County, Missouri, Federal Project C290640-02. WHEREAS, the District has received a seventy-five percent (75%) grant from the Environmental Protection Agency of the United States to pay seventy-five percent (75%) of the additional costs of said project, and WHEREAS, a fifteen percent (15%) grant has been reserved by the Missouri Department of Natural Resources to pay fifteen percent (15%) of the additional costs of said project, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OP THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Nineteen Thousand Six Hundred Twenty Dollars ($19,620.00) is hereby appropriated from the Mississippi River Construction Fund to pay ten percent (10%) for the preparation of As-Built Drawings, Engineering Contract E-229 of Lemay Wastewater Treatment Plant - Grit and Screenings Facilities, Contract PA-60; and Aeration Tanks and Service Building, Contract PA-62. Section Two. The grant from the Environmental Protection Agency of the United States amounts to One Hundred Forty-seven Thousand One Hundred Forty-two Dollars ($147,142.00) which will be deposited in the Mississippi River Construction Fund, and is to pay seventy-five percent (75%) for the preparation of As-Built Drawings, Engineering Contract E-229 of Lemay Wastewater Treatment Plant - Grit and Screenings Facilities, Contract PA-60; and Aeration Tanks and Service Building, Contract PA-62; said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contract for said project. Section Three. The reserved grant from the Missouri Department of Natural Resources amounts to Twenty-nine Thousand Four Hundred Twenty-eight Dollars ($29,428.00), which will be deposited in the Mississippi River Construction Fund, and is to pay fifteen percent (15%) for the preparation of As-Built Drawings, Engineering Contract E-229 of Lemay Wastewater Treatment Plant Grit and Screenings Facilities, Contract PA-60; and Aeration Tanks and Service Building, Contract PA-62; said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contract for said project. Section Four. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted September 9, 1981.