Loading...
HomeMy Public PortalAbout04543 O R D I N A N C E NO. 4543 AN ORDINANCE, making a supplemental appropriation of One Hundred Eighty-five Thousand Dollars ($185,000.00) from the Mississippi River Construction Fund, of which Eighteen Thousand Five Hundred Dollars ($18,500.00) is to be used to pay the District's ten percent (10%) share; a grant of One Hundred Thirty- eight Thousand Seven Hundred Fifty Dollars ($138,750.00) has been received from the Environmental Protection Agency, and Twenty- seven Thousand Seven Hundred Fifty Dollars ($27,750.00) has been reserved by the Clean Water Commission for the cost of continuing Step I engineering studies of the Mississippi River Sewer Overflow Regulation System and Master Plan in the Bissell Point and Lemay Watersheds (Engineering Contract E-284, Federal Project C-291077). WHEREAS, the District has received a seventy-five per- cent (75%) grant from the Environmental Protection Agency of the United States to pay seventy-five percent (75%) of the cost of continuing said studies, and WHEREAS, a fifteen percent (15%) grant has been reserved by the Clean Water Commission of the State of Missouri to pay fifteen percent (15%) of the cost of continuing said studies, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Eighteen Thousand Five Hundred Dollars ($18,500.00) is hereby appropriated from the Mississippi River Construction Fund to pay ten percent (10%) of the cost of continuing Step I engineering studies of the Mississippi River Sewer Overflow Regulation System and Master Plan in the Bissell Point and Lemay Watersheds (Engineering Contract E-284, Federal Project C-291077). Section Two. The grant from the Environmental Pro- tection Agency of the United States amounts to One Hundred Thirty- eight Thousand Seven Hundred Fifty Dollars ($138,750.00) which, when received, will be deposited in the Mississippi River Construction Fund, and is to pay seventy-five percent (75%) of the cost of continuing Step I engineering studies of the Mississippi River Sewer Overflow Regulation System and Master Plan in the Bissell Point and Lemay Watersheds (Engineering Contract E-284, Federal Project C-291077), and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said studies. Section Three. The reserved grant from the Clean Water Commission of the State of Missouri amounts to Twenty-seven Thousand Seven Hundred Fifty Dollars ($27,750.00) which, when received, will be deposited in the Mississippi River Construction Fund, and is to pay fifteen percent (15%) of the cost of con- tinuing Step I engineering studies of the Mississippi River Sewer Overflow Regulation System and Master Plan in the Bissell Point and Lemay Watersheds (Engineering Contract E-284, Federal Project C-291077), and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said studies. Section Four. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 28, 1981.