Loading...
HomeMy Public PortalAbout04650 O R D I N A N C E NO. 4650 AN ORDINANCE, appropriating One Hundred Ninety Thousand Dollars ($190,000.00) from the Subdistrict Planning Fund for the cost of continuing a Step 2 engineering design of trunk sewers and interim treatment facilities in the Lower Meramec River Basin - Grand Glaize Sub-watershed (Federal project No. C-290875-02). WHEREAS, it is necessary for the completion of the Step 2 engineering design of trunk sewers and interim treatment facil- ities in the Lower Meramec River Basin - Grand Glaize Sub-water- shed (Federal project No. C-290875-02) to provide additional engineering services, including value engineering for the entire Grand Glaize project, additional surveying for the treatment plant site and rights-of-way for the interceptor sewer, soil borings (geotechnical work), and other necessary engineering services, and WHEREAS, under the 1981 Amendments to the Clean Water Act funding for Step 1 and Step 2 grants must be advanced by the Grantee, and allowance will be made for the Federal share and State share of the advanced funds when the Grantee receives the Step 3 Construction Grant, and WHEREAS, when this allowance is made with the Step 3 Grant, said funds shall be repaid to the Subdistrict Planning Fund, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT. Section One. The sum of One Hundred Ninety Thousand Dollars ($190,000.00) is hereby appropriated from the Subdistrict Planning Fund for the cost of continuing a Step 2 engineering design of trunk sewers and interim treatment facilities in the Lower Meramec River Basin - Grand Glaize Sub-watershed (Federal Project No. C-290875-02). Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted March 3, 1982.