Loading...
HomeMy Public PortalAbout04677 O R D I N A N C E NO. 4677 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-338 with The Clayton Engineering Company for engineering services for the final design plans for the construction of storm sewers in the North Branch (Trenton Creek) of the University City Branch of River des Peres, in the City of Overland, Missouri. WHEREAS, the District requires consulting assistance for the engineering of said plans, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-338 with The Clayton Engineering Company for engineering services for the final design plans for the construction of storm sewers in the North Branch (Trenton Creek) of the University City Branch of River des Peres, in the City of Overland, Missouri. Section Two. The contract authorized in Section One of this Ordinance shall be comprised of such terms and conditions as are approved by the Director of Legal Services of the District. The foregoing Ordinance was adopted March 31, 1982.