HomeMy Public PortalAbout04692 O R D I N A N C E NO. 4692
AN ORDINANCE, authorizing and directing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St.
Louis Sewer District to enter into a contract with CH2M Hill for
engineering services for initiating Step 2 engineering design of
improvements to the Upper River des Peres Foulwater Interceptor,
connecting sewers and appurtenant structures between the discharge
of the River des Peres Underground Drainage Works and Deer Creek,
and between Deer Creek and Lemay Pump Station No. 1 (Part of
Federal Project No. C-291077).
WHEREAS, the District requires specialized consulting
assistance for said engineering services,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized and directed on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract
with CH2M Hill for engineering services for initiating Step 2
engineering design of improvements to the Upper River des Peres
Foulwater Interceptor, connecting sewers and appurtenant struc-
tures between the discharge of the River des Peres Underground
Drainage Works and Deer Creek, and between Deer Creek and Lemay
Pump Station No. 1 (Part of Federal Project No. C-291077).
Section Two. The contract authorized in Section One of
this Ordinance shall be comprised of such terms and conditions as
are approved by the Assistant Executive Director and General
Counsel of the District. The foregoing Ordinance was adopted April 14, 1982.