Loading...
HomeMy Public PortalAbout04692 O R D I N A N C E NO. 4692 AN ORDINANCE, authorizing and directing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with CH2M Hill for engineering services for initiating Step 2 engineering design of improvements to the Upper River des Peres Foulwater Interceptor, connecting sewers and appurtenant structures between the discharge of the River des Peres Underground Drainage Works and Deer Creek, and between Deer Creek and Lemay Pump Station No. 1 (Part of Federal Project No. C-291077). WHEREAS, the District requires specialized consulting assistance for said engineering services, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized and directed on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with CH2M Hill for engineering services for initiating Step 2 engineering design of improvements to the Upper River des Peres Foulwater Interceptor, connecting sewers and appurtenant struc- tures between the discharge of the River des Peres Underground Drainage Works and Deer Creek, and between Deer Creek and Lemay Pump Station No. 1 (Part of Federal Project No. C-291077). Section Two. The contract authorized in Section One of this Ordinance shall be comprised of such terms and conditions as are approved by the Assistant Executive Director and General Counsel of the District. The foregoing Ordinance was adopted April 14, 1982.