Loading...
HomeMy Public PortalAbout04810 O R D I N A N C E NO. 4810 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-344 with Volz Engineering & Surveying, Inc. for engineering services for the final design of River des Peres Relief Sewer Project GC-9 Victory - Brookview - Jonathan. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-344 with Volz Engineering & Surveying, Inc. for engineering services for the final design of River des Peres Relief Sewer Project GC-9 Victory -Brookview - Jonathan. The foregoing Ordinance was adopted September 8, 1982.