Loading...
HomeMy Public PortalAbout04838 O R D I N A N C E NO. 4838 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-353 with Fleming Corporation for engineering services for the final design of stormwater improvements in Flower Creek Phase II. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-353 with Fleming Corporation for engineering services for the final design of stormwater improvements in Flower Creek Phase II. The foregoing Ordinance was adopted September 15, 1982.