Loading...
HomeMy Public PortalAbout04869 O R D I N A N C E NO. 4869 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-360 with Sverdrup & Parcel and Associates, Inc., for engineering services for the Step 2 design of trunk sewers, pumping station, and force main in the Creve Coeur Creek watershed, in St. Louis County, Missouri (Part of Federal Project No. C-291148, Lower Missouri River Basin), with an emergency clause. WHEREAS, the District requires specialized consulting assistance for said engineering services, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-360 with Sverdrup & Parcel and Associates, Inc., for engineering services for the Step 2 design of trunk sewers, pumping station, and force main in the Creve Coeur Creek watershed, in St. Louis County, Missouri (Part of Federal Project No. C-291148, Lower Missouri River Basin). Section Two. The contract authorized in Section One of this Ordinance shall be comprised of such terms and conditions as are approved by the Assistant Executive Director and General Counsel of the District. Section Three. An immediate need for the extensive rehabilitation of sewer facilities exists in the Creve Coeur Creek watershed, thus necessitating that the design of trunk sewers, pumping station, and force main facilities as hereinabove authorized proceed without delay in order to preserve the public health. Accordingly, an emergency exists within the meaning of the Plan, and this Ordinance shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 20, 1982.