HomeMy Public PortalAbout04875 O R D I N A N C E NO. 4875
AN ORDINANCE, appropriating Five Hundred Thousand
Dollars ($500,000.00) from the Subdistrict Planning Fund for the
initial cost of professional services required for the Bissell
Point Watershed - Overflow Regulation System Design, Phase I, M.
S.D. Contract E-361 (Part of Federal Project No. C-291077,
Mississippi River Overflow Regulation System and Master Facilities
Plan).
WHEREAS, the District requires specialized consulting
assistance for said engineering services required for the Bissell
Point Watershed - Overflow Regulation System Design, Phase I
M.S.D. Contract E-361 (Part of Federal Project No. C-291077,
Mississippi River Overflow Regulation System and Master Facilities
Plan) to provide continued eligibility of the overall program for
Federal funding, and
WHEREAS, an allowance will be made for the Federal
share and State share of the advanced funds when the District
receives the Step 3 Construction Grant, and
WHEREAS, when this allowance is made with the Step 3
Grant, said funds shall be repaid to the Subdistrict Planning
Fund;
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Five Hundred Thousand Dollars
($500,000.00) is hereby appropriated from the Subdistrict Planning
Fund for the initial cost of professional services required for
the Bissell Point Watershed - Overflow Regulation System Design,
Phase I, (M.S.D. Contract E-361 (Part of Federal Project No.C-
291077, Mississippi River Overflow Regulation System and Master
Facilities Plan).
Section Two. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 27, 1982.