Loading...
HomeMy Public PortalAbout04880 O R D I N A N C E NO. 4880 AN ORDINANCE, appropriating Sixty Thousand Five Hundred Dollars ($60,500.00) from the Operation, Maintenance and Con- struction Improvement Fund of Gravois Creek to be used for the construction of sanitary sewers, together with repayment of the cost of Engineering, Survey and Inspection, and miscellaneous other costs incurred in connection with such construction project, in Windsor Spring Sanitary Pump By-Pass (S-1788, C-918), in St. Louis County, Missouri. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Sixty Thousand Five Hundred Dollars ($60,500.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Gravois Creek to be used for the construction of sanitary sewers, together with repayment of the cost of Engineering, Survey and Inspection, and miscellaneous other costs incurred in connection with such con- struction project, in Windsor Spring Sanitary Pump By-Pass (S- 1788, C-918), in St. Louis County, Missouri. Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted November 10, 1982.