HomeMy Public PortalAbout04902 O R D I N A N C E NO. 4902
AN ORDINANCE, authorizing and directing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St.
Louis Sewer District to enter into Contract E-365 with CH2M-Hill
Central, Inc. for professional services required for the Lemay -
River des Peres Watershed - Task Order No. 2, Preliminary Design
Services for the Upper and Lower River des Peres Foulwater
Interceptor (Part of Federal Project No. C-291077, Mississippi
River Overflow Regulation System and Master Facilities Plan).
WHEREAS, the District requires specialized consulting
assistance for said engineering services,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized and directed on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-365
with CH2M-Hill Central, Inc. for professional services required
for the Lemay - River des Peres Watershed - Task Order No. 2,
Preliminary Design Services for the Upper and Lower River des
Peres Foulwater Interceptor (Part of Federal Project No. C-291077,
Mississippi River Overflow Regulation System and Master Facilities
Plan).
Section Two. The contract authorized in Section One of
this Ordinance shall be comprised of such terms and conditions as
are approved by the Assistant Executive Director and General
Counsel of the District. The foregoing Ordinance was adopted November 24, 1982.