Loading...
HomeMy Public PortalAbout05148 O R D I N A N C E NO. 5148 AN ORDINANCE, appropriating Two Million Sixty-eight Thousand Dollars ($2,068,000.00) from the Fee Fee Sewer Extension and Improvement Fund for the cost of professional services required prior to and during the Phase I and II construction of the Grand Glaize interim treatment plant and interceptor sewers, Contract E-395, (Part of Federal Project No. C-290875, Lower Meramec River Basin). WHEREAS, the District requires specialized consulting assistance for said engineering services prior to and during the Phase I and II construction of the Grand Glaize interim treatment plant and interceptor sewers, Contract E-395, (Part of Federal Project No. C-290875, Lower Meramec River Basin), and WHEREAS, an eligibility allowance will be made for the Federal grant share and State grant share of the advanced funds when the District received the Step 3 Construction Grant, and WHEREAS, when this eligibility allowance is made with the Step 3 Grant, said funds shall be repaid to the Subdistrict Planning Fund; NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Million Sixty-eight Thou- sand Dollars ($2,068,000.00) is hereby appropriated from the Fee Fee Sewer Extension and Improvement Fund for the cost of pro- fessional services required prior to and during the Phase I and II construction of the Grand Glaize interim treatment plant and interceptor sewers, Contract E-395 (Part of Federal Project No. C- 290875, Lower Meramec River Basin). Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted June 22, 1983. -2-