Loading...
HomeMy Public PortalAbout05344 O R D I N A N C E NO. 5344 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-408 with Dabler Engineering Company, Inc. for engineering services for the final design of 7600 Block Suffolk Storm Sewer Project. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METRO- POLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract 408 with Dabler Engineering Company, Inc. for engineering services for the final design of 7600 Block Suffolk Storm Sewer Project. The foregoing Ordinance was adopted November 9, 1983.