Loading...
HomeMy Public PortalAbout05433 O R D I N A N C E NO. 5433 AN ORDINANCE, making a supplemental appropriation of Thirty Thousand Dollars ($30,000.00) from the Subdistrict Planning Fund for the cost of engineering services required for the Step 2 design of trunk sewers, pumping station, and force main in the Creve Coeur Creek watershed, in St. Louis County, Missouri, M.S.D. Contract E-360 (Part of Federal Project No. C-291148, Lower Missouri River Basin). WHEREAS, the District requires specialized consulting assistance for said engineering services, NOW, THEREFORE BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Thirty Thousand Dollars ($30,000.00) is hereby appropriated from the Subdistrict Planning Fund for the cost of engineering services required for the Step 2 design of trunk sewers, pumping station, and force main in the Creve Coeur Creek watershed, in St. Louis County, Missouri, M.S.D. Contract E-360 (Part of Federal Project No. C-291148, Lower Missouri River Basin). Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted December 28, 1983.