HomeMy Public PortalAbout05563 O R D I N A N C E NO. 5563
AN ORDINANCE, authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-456 with WVP Corporation for the
design of the Fenton Interim Wastewater Treatment Plant in the
Lower Meramec River Basin. (Part of Federal Project No. C-290875)
WHEREAS, the District requires specialized consulting
assistance for said engineering services,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary--
Treasurer are hereby authorized on behalf of The Metropolitan St.
Louis Sewer District to enter into Contract E-456 with WVP
Corporation for the design of the Fenton Interim Wastewater
Treatment Plant in the Lower Meramec River Basin. (Part of
Federal Project No. C-290875)
Section Two. The contract authorized in Section One of
this Ordinance shall be comprised of such terms and conditions as
are approved by the Assistant Executive Director and General
Counsel of the District.
The foregoing Ordinance was adopted March 28, 1984.